GHAYATHI COMMUNITY HOSPITAL SEHA-G/TEN/44/2009

Abu Dhabi - UAE Section 15010


Burt Hill Project No. 10710.00 General Provisions
Technical Specifications Tender Documents
Book V Mechanical Works Date of Issue: 16
th
February 2011

BURT , HILL Page 6 of 11

testing organization equipped to perform such services, stating that the items have been
tested and conform to the requirements and testing methods of the specified agency.
1. Certification shall be submitted attesting to the fact that the specified performance
criteria are met by items of equipment.
2. Work shall be guaranteed to be free from leaks or defects. Any defective equipment,
materials, or workmanship, including damage to the work provided under other
divisions of this contract resulting from same, shall be replaced or repaired at no extra
cost to the Owner for the duration of the stipulated guarantee periods.
3. Unless specifically indicated otherwise, the duration of the guarantee period shall be
one (1) year following the date of final acceptance by the Owner. Owner acceptance
will begin with actual occupancy of the areas served by this equipment. Temporary
operation of the equipment for temporary conditioning, testing, etc., prior to
occupancy will not be considered part of the warranty period.
1.9 PRODUCT WARRANTIES
A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other
warranties required by the Contract Documents. Manufacturer's disclaimers and limitations
on product warranties do not relieve Contractor of obligations under requirements of the
Contract Documents.
1. Manufacturer's Warranty: Preprinted written warranty published by individual
manufacturer for a particular product and specifically endorsed by manufacturer to
Owner.
2. Special Warranty: Written warranty required by or incorporated into the Contract
Documents, either to extend time limit provided by manufacturer's warranty or to
provide more rights for Owner.
B. Special Warranties: Prepare a written document that contains appropriate terms and
identification, ready for execution. Submit a draft for approval before final execution.
1. Manufacturer's Standard Form: Modified to include Project specific information and
properly executed.
2. Specified Form: When specified forms are included with the Specifications, prepare
a written document using appropriate form properly executed.
C. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures."
1.10 FACTORY ACCEPTANCE TESTS
A. Factory acceptance test shall be witnessed by the Consultants Engineer, Client
Representative, Project Managers Representative and Contractors Representative. The
Contractor shall provide to and for Business Class air passage to the place of test, which
shall include 5 Stars accommodations for the testing period. Test Report shall be submitted
before the shipment of the products. The test shall be carried out by approved laboratories.
The independent lab details and method statement for testing shall be submitted for approval