SAP PP (PRODUCTION PLANNING) COURSE CONTENTS
SAP Overview
Introduction to SAP
SAP Services
Co-operative Business Scenarios
Navigation
System-wide Concepts
Enterprise Structure
Factory Calendar
Configuring SAP calendar
Define Public Holidays
Define Holiday Calendar
Creation of Factory Calendar
Basic Data
PP Organization Structures and Basic Data Overview
Material Master Records
Configuring Material Master Records
Bill of Material
BOM Management
BOM Reporting Functions
Define Modification Parameters
Define BOM Usages
Define Material Types For BOM Header
Define Item Categories used for Item Data
Define allowed Material Types for BOM Items
Define Order of priority for alternative BOM usages
Classification
Introduction
Basic Functionality
More Functionality
Object Dependencies
Work center
Define Work Center Category
Define Field Selection for Work Center
Define Task List Usage for Work centers
Define Parameters for Standard Value Key
Define Standard Value Key
Define Person Responsible for work Centers
Define Move time Matrix
Define Default Work Center
Default Control Keys
Define Capacity Categories
Define Capacity Planners
Define Shift Sequence
Define Work center Formulas
Define Work Center Formulas for Costing
Routing
Routing Part 1
Routing Part 2
Define Number Ranges for Routings
Define Field Selection
Define Material Type Assignments
Select Automatically (Routing Selection)
Define Task List Usage
Configure Planner Group
Configure Control Keys
Define Reduction Strategy
Define Relevancy to Costing
Define (Standard) Trigger Point Usage
Define Automatic Selection of Routings
Production Planning
Overview
MRP Run
Processing MRP Results
Master Production Scheduling
Long-term Planning
Technical Information on How the Planning Run Works
MRP Areas
Demand Management
Define number ranges for planned independent requirements
Configuring Requirement Types and Requirement Classes
Define Strategy
Define Strategy Group
Define version numbers
Maintain consumption mode and period of adjustment
Product Cost Planning
Introduction
Reference and Simulation Costing
Material Costing without Quantity Structure
Material Costing with Quantity Structure
CRP
Define layout keys
Define layout
Capacity Requirement Planning.
Define profile for capacity planning table
Define Overall profile
Material Requirement Planning
Plant Parameters
Carry Out Overall Maintenance of Plant Parameters
Scheduling Parameters for Purchasing
Number Range for Planned orders
Number Range for Purchase Requisitions
Define MRP Controllers
Define Missing Parts MRP Controller
Define Special Procurement Type
Maintain Planning Calendar
Define MRP Areas
Define Scope of Planning for Total Planning
Define Planning Horizon
Activate BOM Explosion characteristics
Define Planning Time Fence and Roll Forward Period
Define Floats (Scheduling Margin Key)
Define Parallel processing for MRP
Define Receipt days Supply
Parameters for Determining the Basic Dates
Define scheduling parameters for planned orders
Define availability stock in Transfer/Blocked stock/Restricted stock
Define External Procurement
Define BOM Explosion Control
Define BOM Explosion for Sales Orders
Define BOM and Routing Selection
Activate MRP and Set Up Planning File
Define Planning File Entries for Goods Movements
Convert Planning File Entries for MRP Areas
Manufacturing Planning and Execution for Discrete and Repetitive
Introduction
Master Data
Overview of Production Types
Planning
Material Staging
Back flushing
Evaluations
Planning and Execution with Final Assembly
Make-to-Stock Production
Make-to-Order Production
Repetitive Manufacturing
Special Topics
Variant Configuration
Introduction to Variant Configuration
Material Masters, Bill of Material and Routings
Integration
Shop Floor Control
Master Data
Define Order Types
Define order type-dependent parameters
Production Status Profile
Define number ranges for orders
Define number ranges for confirmations
Define number ranges for reservations
Define production scheduler
Define production scheduling profile
Define Confirmation Parameters
Define Time for Confirmation Processes
Define Reasons for Variances
Define single screen entry
Define Field Selection for Confirmation
Define Reduction Strategies
Define Print Control
Batch Status Management
Batch Search Strategy to Production
Activate Batch Management
Availability Check
Define Checking Group
Define Checking Rule
Define Scope of Check
Define Checking Control
Checking Rule for Back order Processing
Scheduling
Specify Scheduling Type
Define Scheduling Parameters for Planned Orders
Define Scheduling Parameters for Production Orders
ASAP
ASAP Overview
Implementation Roadmap
Integration with Other Module of PP.