Professional Documents
Culture Documents
MAN Diesel & Turbo is the worlds leading designer and manufacturer of large
exhaust gas turbochargers and thermal efficiency systems for low and medium
speed diesel and gas engines.
As an integral part of a leading developer and builder of two-and four-stroke, low
and medium speed engines, the MAN Diesel & Turbo Business Unit Turbocharger
has a deep understanding of all the core technologies of large engines and their
interaction with the turbocharger and thermal efficiency systems.
The result is world and market leading turbocharger technology.
More than ever before, the development focus at the MAN Diesel & Turbo Business
Unit Turbocharger is the environmental performance of low and medium speed diesel and gas engines. The contribution of high efficiency exhaust gas turbochargers
to this goal has been and will continue to be considerable.
MAN Diesel and Turbos absolute commitment to reducing emissions while in
creasing fuel efficiency and power density starts with our active partnership in the
emissions law making process and ends with the delivery of turbochargers and
thermal efficiency systems that achieve an ideal synthesis of product characteristics.
TCS-PTG Components
Generator
Coupling
Gear Box
Power Turbine
Control Flaps
+ Control cabinet
+ Software
turbochargers.
underway!
Technical data
TCS-PTG based on TCR
TCS-PTG18
1,000 kW
TCS-PTG20
1,400 kW
TCS-PTG22
2,500 kW
Turbochargers
Funnel (Boiler)
TCS-PTG55
3,700 kW
*The performace data vary to individual layout parameters. Available power based on typical 2-stroke-conditions with
MAN Diesel & Turbo high efficiency TCA turbochargers on the main engine (Turbine = 3.9; TEG = 490 C).
Generator
Coupling
Components
Exhaust gas turbine
Newly developed high efficiency turbine
New turbine nozzle ring with extended lifetime
Bearing arrangement with long lifetime
Axial: based on most modern TCA series
Main engine
Board grid
Gearbox
Exhaust
gas turbine
Maximum power output with MAN Diesel & Turbo TCA high efficient turbochargers
on the main engine and TCA/TCR based power turbine
Turbocharger
Efficiency B&W def
50.0
60.0
Engine Load in %
70.0
80.0
90.0
100.0
72.0
68.0
64.0
Conclusions
lated load.
application case.
100%
Reduction of emissions
Reduction of a ships Energy Efficiency Design
4
Assuming 6,000 OH and above TCS-PTG average
Engine power
TCS-PTG
Fuel oil
output /
power
0
10
20
30
40
50
60
70
80
90
100
output / %
20
30
40
50
60
70
85
100
per year
100
100
7,000
90
90
6,000
80
80
5,000
70
70
4,000
60
60
3,000
50
2,000
40
1,000
10%
80%
50
40
10%
30
30
20
20
10
10
Please note: Main engines fuel consumption might increase between 0.0-1.8%, depending on the application and turbocharger efficiency. Also exhaust gas temperature
will rise.
savings / tons
0 10
gram 3).
cost savings can be estimated.
Index (EEDI)
2 Estimation of an appropriate load profile is done
performance.
% of SMCR
ing advantages:
n
Payback
0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
time
60
70
80
90
100
7,000 OH
6,000 OH
5,000 OH
Case 1:
Power demand base load = 2,750 kW
~ 1,850 kW
Ship Power
Required
Genset-Output
At least 30%
of max. genset
output
TCS-PTG Max
Output
TCS-PTGStart
Power Management
System
20% Buffer
Genset
shut down
TCS-PTG-Output
100% Engine Load
~ 900 kW
2,750 kW
TCS-PTGoutput has to be
reduced to allow
genset run at
30% load
Electric
Consumption
900 kW ~ 30%
TCS-PTG22
1,850 kW ~ 78%
(Max: 2,370 kW at 85% MCR)
6L32/40 3,000 kW
Genset off
90% MCR
85% MCR
75% MCR
65% MCR
50% MCR
7L32/40 3,500 kW
Genset off
7L32/40 3,500 kW
Genset off
Engine Start
7L32/40 3,500 kW
The Power Management System maximizes the TCS-PTG output within the
Case 2:
Power demand with 1,000 reefer containers = 7,250 kW
frame conditions set by main engine output and ship power demand.
~ 2,370 kW
Yes
10
Genset at
minimal load
(30%) + TCS-PTG
can deliver
rest?
TCS-PTG22
2,370 kW ~ 85%
No
2,250 kW 75%
6L32/40 3,000 kW
Yes
TCS-PTG only
Genset = 30% of
genset max. load
TCS-PTG =
max. output
Genset off
TCS-PTG = rest
Power Management
System
No
~ 4,880 kW
7,250 kW
Ship Power
Required
TCS-PTG can
deliver at
least 120% of
the required
power
Electric
Consumption
90% MCR
85% MCR
75% MCR
65% MCR
50% MCR
2,630 kW 75%
7L32/40 3,500 kW
Genset off
7L32/40 3,500 kW
Genset off
7L32/40 3,500 kW
11
Exhaust gas
receiver
Scope of Supply
Funnel
Speed pick-up
Speed indicating instrument
Turbine cleaning device
EE
Gearbox
Coupling PTG-generator
Synchronous generator
BP
on base frame
n
Control valves
Emergency valves
TCS-PTG-control cabinet incl. TCS-PTG-software
Generator control cabinet
1
2
n
12
EE
Valve
Valve
BP
Bypass
Valve
Orifice
Thermodynamic layout
13
stations worldwide
gas engines
A fast delivery of spare parts is of utmost importance
A high availability of spare parts through an intel-
14
All data provided in this document is non-binding. This data serves informational
purposes only and is especially not guaranteed in any way. Depending on the
subsequent specific individual projects, the relevant data may be subject to
changes and will be assessed and determined individually for each project. This
will depend on the particular characteristics of each individual project, especially
specific site and operational conditions. CopyrightMAN Diesel & Turbo.
D2366459EN-N3 Printed in Germany GMC-AUG-08122