Professional Documents
Culture Documents
2015 CIC Street Alley Condition Report
2015 CIC Street Alley Condition Report
Evaluate condition
Preventative maintenance
Resurface or reconstruct
Street Inventory
City Maintained
All Streets
3%
2%
5%
3%
City Maintained
Local
1272.2 miles
908.9 miles
17.5 %
County Highway
Collectors
32.4 miles
State Highway
40.6 miles
92%
Freeways
39.7 miles
77.6 miles
Minor Arterials
6%
223.2 miles
71.5 %
Major Arterials
62.5 miles
Pavement Quality Index (PQI) rates street segments to narrow the list
Visual inspection
Citizen complaints
Transportation Aids Distributions: Per State Statute, since 2001 each municipality
and county shall assess the physical condition of highways under its jurisdiction, using
a pavement rating system approved by the WISDOT. In 2015, $2,202 per mile in
mileage aid payment shall be available for each mile of road or street under the
jurisdiction of a municipality.
Data was delivered in Dec, 2014 will be analyzed to assist with ranking paving projects
Severity of cracking
Potholes
Joint failure
Rutting
Pavement Ratings
A PQI (Pavement Quality Index) is identified from the distresses on a
scale of 20 to 100 for the new Road Matrix system
100
70-90 is Good
45-70 is Fair
20-45 is Poor
18000
2014 16,804
2013 12,836
2012 8,017
2008 16,778
16000
14000
12000
10000
8000
6000
4000
2000
0
2008
2012
2013
2014
Crack Filling
Joint Repair
2015 32%
2016 82%
2017 84%
Good candidates
Construction Work:
16000000
14000000
12000000
10000000
LRIP
City
8000000
6000000
4000000
2000000
0
1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Mile
4.2
9.7
9.5
19.5
15.9
19.3
15.2
12.7
8 (estimated)
Provide design and construction funding for major and minor arterial streets
Design and construction funding for projects thru Milwaukee Urbanized Surface Transportation
Program (STP-M), Connecting Highway Program, Highway Safety Improvement Program (HSIP),
Safe Routes to School (SRTS), Transportation Enhancement (TE), American Recovery and
Reinvestment Act (ARRA), Municipal Streets Improvement Program (MSIP) or Congestion Mitigation
Air Quality (CMAQ) program.
Coordinate with adjacent outlying communities on arterial paving projects crossing municipal
boundaries funded by State and Federal Aid
Coordinate with the WisDOT on State Trunk Highway Projects within the City Limits
Represent City Interests on Milwaukee County Highway Paving and Bridge projects
$11,000,000
Connecting Highways
$ 5,075,000
$ 9,981,000
$18,913,435
80,000
$80,000,000
$70,000,000
$60,000,000
$50,000,000
$45,049,435
$40,000,000
$30,000,000
$20,000,000
$10,000,000
$0
$7,841,528
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
STP Funds
2004-2005
$12,042,850
2006-2007
$11,687,730
2008-2009
$10,965,750
2010-2012
$12,309,509
2013-2014
$11,796,858
2015-2018
$41,830,098
10.00
Miles
8.00
6.00
4.00
2.00
0.00
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Alleys:
New alley
Millions
2015
$2.025
2016
$2.125
2017
$2.125
2018
$2.125
2019
$2.125
2020
$2.125
6 Yr Total
$12.650
12%
Asphalt
Concrete
Brick/Block
86%
$500,000
$0
68
34
62
65
44
34
41
12
26
37
43
25
20
15
37
25
7
13
9
6
12
5
41
27
25
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014