You are on page 1of 18

Plant Name

Fuel Type
Sampling Location

Stationary Source Information


Ladrillera El Rub, Tunja
Carbon
Chimenea Horno

Universidad de la Salle

Operator
Date
Project #
Base Run Number
# of Ports Available
# of Ports Used
Port Inside Diameter
Circular Stack?
Rectangular Stack?

15 de Octubre de 2009
R
4
4
0.1
1

Test Equipment Information


Meter Box Number
Meter Calibration Factor
Orifice Meter Coefficient
Pitot Identification
Pitot Tube Coefficient
Orsat Identification
Nozzle Number
Nozzle Diameter
Probe Number
Probe Length
Liner Material
Sample Case / Oven Number
Impinger Case Number
Acetone Lot Number

(Y)
(DH@)

Apex 572
0.994
48.960

(Cp)

0.850

(Dn)

30
6.200
1.83
Ac. Inox.

Testing Company Information


Company Name
Address
City State Zip Country
Phone Number
Fax Number

Universidad de la Salle
Calle 10 concarrera 2
Bogot
3 68 85 96 /97 /98
91-2 44 83 80

mm H2O

mm
m

METHOD 1 - SAMPLE AND VELOCITY TRAVERSES FOR STATIONARY SOURCES


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Date
Project #

15 de octubre de 2009

Operator
Stack Type
Stack Size

Universidad de la Salle

# of Ports Available
# of Ports Used
Port Inside Diameter

4
2
0.1

Circular
Large

Circular Stack or Duct Diameter


Distance to Far Wall of Stack
(Lfw)
Distance to Near Wall of Stack
(Lnw)
Diameter of Stack (=Lfw - Lnw)
(D)
Area of Stack (=3.14(D/2/Cunits)2)
(As)

2.87
0.39
2.48
4.831

Distance from Port to Disturbances


8.00
Distance Upstream
(A)
Diameters Upstream (=B/D)
(A/D)
14.00
Distance Downstream
(B)
Diameters Downstream (=A/D)
(B/D)

m
m
m
m2

m
diameters
m
diameters

Number of Traverse Points Required


Diameters to
Minimum Number of1
Flow Disturbance
Traverse Points
Up
Down
Particulate
Velocity
Stream
Stream
Points
Points

2.00-4.99
5.00-5.99
6.00-6.99
7.00-7.99
>= 8.00

0.50-1.24
1.25-1.49
1.50-1.74
1.75-1.99
>=2.00

24
20
16
12
8 or 122

16
16
12
12
8 or 122

Upstream Spec
Downstream Spec
Traverse Pts Required
1 Check the Minimum Number of Points for the Upstream

Number of Traverse Points Used

and Downstream conditions, then use the larger Number.


2 8 for Circular Stacks 12 to 24 inches

12 for Circular Stacks over 24 inches

Ports by

12

Across

24
0

Pts Used
Particulate

16
0

Required
Velocity

Traverse
Point
Number

1
2
3
4
5
6
7
8
9
10
11
12

Traverse Point Locations


Fraction
Distance
of
from
Stack
Inside
Diameter
Wall
m

Distance
Including
Nipple
Length
m

RCES
15 de octubre de 2009

METHOD 2 - DETERMINATION OF STACK GAS VELOCITY AND VOLUMETRIC FLOW RATE


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Date
Project #

15 de OCTUBRE de 2009

Operator
Stack Type
Pitot Leak Check

# of Ports Used
Pitot Identification
Pitot Coefficient (Cp)

Circular
PreTest

Diameter or Length of Stack


Width of Stack
Area of Stack

Stack Dimensions
(D)
(W)
(As)

PostTest

Velocity Traverse Data

2.48
4.831

m
m
m2

542.00
4.16
542.31

mm Hg
mm H2O
mm Hg

Estimate

0
%
%
%
%

Run Number
Run Time
Traverse
Point

Pressures
Barometric Pressure
Static Pressure
Absolute Stack Pressure

(Pb)
(Pstatic)
(Ps)

Stack Gas Composition


Composition Data:
Actual
1
Carbon Dioxide Concentration
(%CO2)
Oxygen Concentration
(%O2)
Carbon Monoxide Concentration
(%CO)
Nitrogen Concentration
(%N2)
Stack Moisture Content
(Bws)
Stack Dry Molecular Weight
(Md)
Stack Wet Molecular Weight
(Ms)

g/g-mole
g/g-mole

Results
Average Stack Gas Velocity
Dry Standard Volumetric Flow Rate
Dry Standard Volumetric Flow Rate

(vs)
(Qsd)
(Qsd)

Stack Cross Section Schematic

0.85

m/sec
dscm/hr
dscm/min

1A
2A
3A
4A
5A
6A
7A
8A
9A
10A
11A
12A
1B
2B
3B
4B
5B
6B
7B
8B
9B
10B
11B
12B

R-1
Velocity
Head
(Dp)
mm H2O

Stack
Temp
(ts)
C

1.00
3.00
4.50
4.00
5.00
5.50
6.00
6.00
4.00
2.50
1.50
1.00
0.50
0.50
1.00
1.50
2.00
2.50
3.00
3.50
1.00
2.00
1.00
1.50

74
75
75
77
77
75
75
75
75
74
74
74
63
64
62
68
69
70
72
71
72
72
72
71

Average1
1 Please report the average of the square roots of

Dp, or, (Dp)1/2avg = 1/nS(Dp1/2)

As = DW/Ku for Rectangular Stacks


As = (p(D/2)2)/Ku for Circular Stacks
where Ku = 1 for metric units
where Ku = 144 (in2/ft2) for English units
Ps = Pbar + Pstatic/13.6
%N2 = 100 - %CO2 - %O2 - %CO
Md = .44(%CO2) + .32(%O2 ) + .28(%N2 + %CO)
Ms = Md(1 - Bws) + 18Bws
(Dp)1/2avg = 1/nS(Dp1/2)

Formulas Used
Ts(avg) = 1/nSts + Tu
where Tu = 273 oK for metric units
where Tu = 460 oR for English units
vs = KpCp(Dp)1/2avg (Ts(avg)/(PsMs))1/2

where Kp = 34.97 for metric units


where Kp = 85.49 for English units
Qsd = 3600(1 - Bws)vsAs(Tstd/Ts(avg))(Ps/Pstd)
where Tstd = 293 oK, Pstd = 760 mm Hg, for metric units
where Tstd = 528 oR, Pstd = 29.92 in Hg, for English units

Local
Velocity
(vs)l
m/sec

METHOD 3 - GAS ANALYSIS FOR THE DETERMINATION OF DRY MOLECULAR WEIGHT


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Operator
Fuel Type
Orsat Leak Check

Carbon

Run Number
Sample
Analysis
Time
hh:mm

Oxygen
Volume
(VO2)
ml

4.2
4.1
3.9

14.0
13.9
13.8

hh:mm

(Fo)avg
(%EA)avg

R-2
Carbon
Dioxide
Volume
(VCO2)
ml

Carbon
Monoxide
Volume
(VCO)
ml

Oxygen
Volume
(VO2)
ml

hh:mm

(Fo)avg
(%EA)avg

R-3
Carbon
Dioxide
Volume
(VCO2)
ml

Oxygen
Volume
(VO2)
ml

15:35
Carbon
Monoxide
Concentra.
(%CO)
percent

18:00

Run Stop Time


Nitrogen
Concentra.
(%N2)
percent

Dry
Molecular
Weight
(Md)
g/g-mole

Molecular
Weight
Deviation
(DMd)
g/g-mole

0.00
0.00
0.00

percent
Gas Analysis Data
Run Start Time
Carbon
Dioxide
Oxygen
Concentra.
Concentra.
(%CO2)
(%O2)
percent
percent

1
0

Molecular Wt Deviation < 0.3?


Fuel Factor in Handbook Range?

Run Stop Time


Carbon
Monoxide
Concentra.
(%CO)
percent

Nitrogen
Concentra.
(%N2)
percent

Dry
Molecular
Weight
(Md)
g/g-mole

Molecular
Weight
Deviation
(DMd)
g/g-mole

Carbon
Monoxide
Volume
(VCO)
ml

percent
Gas Analysis Data
Run Start Time
Carbon
Dioxide
Oxygen
Concentra.
Concentra.
(%CO2)
(%O2)
percent
percent

0
0

Molecular Wt Deviation < 0.3?


Fuel Factor in Handbook Range?

Run Stop Time


Carbon
Monoxide
Concentra.
(%CO)
percent

Nitrogen
Concentra.
(%N2)
percent

Dry
Molecular
Weight
(Md)
g/g-mole

Molecular
Weight
Deviation
(DMd)
g/g-mole

Averages

Results
Average Calculated Fuel Factor
Average Excess Air

Fuel Type
Coal, Anthracite
Coal, Lignite
Coal, Bituminous
Oil, Distillate
Oil, Residual
Gas, Natural
Gas, Propane
Gas, Butane
Wood
Wood Bark

# of Ports Used
4
Maximum Fuel Factor
Orsat Identification

Averages

Results
Average Calculated Fuel Factor
Average Excess Air

Run Number
Sample
Analysis
Time

Carbon
Monoxide
Volume
(VCO)
ml

Gas Analysis Data


Run Start Time
Carbon
Dioxide
Oxygen
Concentra.
Concentra.
(%CO2)
(%O2)
percent
percent

15 de octubre de 2009

14.5
14.4
14.3
Averages

Results
Average Calculated Fuel Factor
Average Excess Air

Run Number
Sample
Analysis
Time

PreTest

Minimum Fuel Factor


0
PostTest

R-1
Carbon
Dioxide
Volume
(VCO2)
ml

Date
Project #

(Fo)avg
(%EA)avg

Fuel Factor Fo
Minimum

1.016
1.016
1.083
1.260
1.210
1.600
1.434
1.405
1.000
1.003

Maximum

1.130
1.130
1.230
1.413
1.370
1.836
1.586
1.553
1.120
1.130

percent

Molecular Wt Deviation < 0.3?


Fuel Factor in Handbook Range?
Formulas Used
%CO2 = VCO2
%O2 = VO2 - VCO2
%CO = VCO - VO2
%N2 = 100 - %CO2 - %O2 - %CO
Md = .44(%CO2)+ .32(%O2 )+ .28(%N2 + %CO)

Fo = (20.9 - %O2 - .5%CO)/(%CO2 + %CO)


%EA=100(%O2-.5%CO)/(.264%NO2-(%O2-.5%CO))

0
0

METHOD 4 - DETERMINATION OF MOISTURE CONTENT IN STACK GASES


Plant Name
Sampling Location
Operator
Stack Type
Train Leak Check

Run Number
Total Meter Volume
Avg Meter Temp
Avg Stack Temp

Chimenea Horno
Circular
PreTest

R-1
1.269
23
72

(Vm)
(tm)avg
(ts)avg

Impinger 1
ml
Contents
Final Value
Initial Value
Net Value

(Vf),(Wf)
(Vi),(Wi)
(Vn),(Wn)

Total Volume
Total Weight
Std Meter Volume
Calc Moisture Content

(Vt)
(Wt)
(Vm(std))
(Bws(calc))

Run Number
Total Meter Volume
Avg Meter Temp
Avg Stack Temp

113.00
100.00

(tm)avg
(ts)avg

Total Volume
Total Weight
Std Meter Volume
Calc Moisture Content

(Vt)
(Wt)
(Vm(std))
(Bws)

(Vm)
(tm)avg

Avg Stack Temp

(ts)avg

Contents
Final Value
Initial Value
Net Value

(Vf),(Wf)
(Vi),(Wi)
(Vn),(Wn)

Total Volume
Total Weight
Std Meter Volume
Calc Moisture Content

(Vt)
(Wt)
(Vm(std))
(Bws)

# of Ports Used
Meter Box Number
Meter Cal Factor (Y)

2
Apex 572
1.01

Moisture Content Data


Run Start Time
dcm
Barometric Pressure
oC
Stack Static Pressure
oC
Avg Orifice Pressure
Impinger 2
Impinger 3
Impinger 4
ml
ml
g

107.00
100.00

0.00
0.00

oC

Impinger 1
ml

Impinger 2
ml

0.00
0.00

ml
g
dscm
%

Stack Static Pressure


Avg Orifice Pressure
Impinger 3
Impinger 4
ml
g

Results
Water Vol Condensed
Water Vol Weighed
Sat. Moisture Content
Final Moisture Content

Moisture Content Data


Run Start Time
dcm
Barometric Pressure
oC
Stack Static Pressure
oC

Impinger 1
ml

Impinger 2
ml

0.00
0.00

ml
g
dscm
%

Run Stop Time


542.00
(Pb)
4.16
(Pstatic)
2.67
(DH)avg
Impinger 5
Impinger 6
ml
ml

mm Hg
mm H2O
mm H2O
Impinger 7
g

107.62
100.00

Results
Water Vol Condensed
Water Vol Weighed
Sat. Moisture Content
Final Moisture Content

oC

R-3

Run Number
Total Meter Volume
Avg Meter Temp

15 de octubre de 2009

Moisture Content Data


Run Start Time
dcm
Barometric Pressure

(Vm)

(Vf),(Wf)
(Vi),(Wi)
(Vn),(Wn)

PostTest

ml
g
dscm
%

R-2

Contents
Final Value
Initial Value
Net Value

Date
Project #

Avg Orifice Pressure


Impinger 3
Impinger 4
ml
g

Results
Water Vol Condensed
Water Vol Weighed
Sat. Moisture Content
Final Moisture Content

(Vwc(std))
(Vwsg(std))
(Bws(svp))
(Bws)

Run Stop Time


(Pb)
(Pstatic)
(DH)avg
Impinger 5
ml

(Vwc(std))
(Vwsg(std))
(Bws(svp))
(Bws)

Run Stop Time


(Pb)
(Pstatic)
(DH)avg
Impinger 5
ml

(Vwc(std))
(Vwsg(std))
(Bws(svp))
(Bws)

scm
scm
%
%

542.00
4.16
2.67
Impinger 6
ml

mm Hg
mm H2O
mm H2O
Impinger 7
ml

0.000
0.000

scm
scm
%
%

542.00
4.15

mm Hg
mm H2O

Impinger 6
ml

mm H2O
Impinger 7
ml

0.000
0.000

scm
scm
%
%

ISOKINETIC SAMPLING DATA


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Date
Project #

Operator
# of Points Across

12

Run #
# of Ports Used

Pitot Tube Coefficient


Avg Stack Temp
Avg Gas Meter Temp

Avg Pitot Tube Diff. Pressure


Stack Moisture Content
Stack Dry Molecular Weight
Estimated Orifice Flow Rate

Slide Rule Set-Up


(Cp)
(ts)
(tm)
(DH@)
(Dpavg)
(Bws)
(Mds)
(Qm)
(K)

0.850
72
24
49.78
9.62
5.0
28.94
21.20
3.30

Meter #
Meter Calibration Factor
Nozzle #
Actual Nozzle Diameter
Ideal Nozzle Diameter
Probe # / Length
Liner Material
Sample Case / Oven #
Impinger Case #

oC
oC

mm H2O
mm H2O
%
g/g-mole
acmm

Pre
Post

Pitot OK?

Pressures
Barometric Pressure
Stack Static Pressure
Absolute Stack Pressure
Absolute Meter Pressure

Traverse
Point #

1B
2B
3B
4B
5B
6B
7B
8B
9B
10B
11B
12B
1A
2A
3A
4A
5A
6A
7A
8A
9A

Sampling
Time
(Q)
min

0.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
25.0
27.5
30.0
32.5
35.0
37.5
40.0
42.5
45.0
47.5
50.0

Clock
Time
hr:min

15:35

16:10
17:25

(Pb)
(Pstatic)
(Ps)
(Pm)

542.00
4.15
542.31
545.66

mm Hg
mm H2O
mm Hg
mm Hg

Dry Gas
Meter
Reading
(Vm)
m3

Velocity
Head
(Dp)
mm H2O

Desired
Orifice

(DH)
mm H2O

Actual
Orifice

(DH)
mm H2O

Stack
Temp
(ts)

21.662
21.702
21.749
21.803
21.861
21.912
21.978
22.037
22.099
22.156
22.208
22.245
22.280
22.315
22.361
22.413
22.472
22.531
22.595
22.659
22.720

5.50
9.00
11.50
12.00
13.00
14.50
15.00
14.50
13.00
11.00
6.00
4.00
5.00
8.50
11.00
12.50
14.50
15.00
16.00
16.00
16.00

18.15
29.70
37.95
39.60
42.90
47.85
49.50
47.85
42.90
36.30
19.80
13.20
16.50
28.05
36.30
41.25
47.85
49.50
52.80
52.80
52.80

18.00
30.00
38.00
39.50
43.00
48.00
49.50
48.00
43.00
36.00
20.00
13.00
16.50
28.00
36.00
41.00
48.00
49.50
53.00
53.00
53.00

68
70
73
76
76
76
77
77
77
76
75
74
72
76
78
78
78
79
80
80
79

oC

10A
11A
12A
Ultimo
Final Values
Average Values

52.5
55.0
57.5
60.0

18:00

22.782
22.840
22.889
22.931

60.0

18:00

22.931

12.50
10.00
7.00

11.38

41.25
33.00
23.10

41.00
33.00
23.00

78
78
77

37.54

76

G DATA
19 de enero de 1998

R-1
of Ports Used

2
Sampling Equipment

Apex 572

Meter Calibration Factor

(Y)

1.010

(Dna)
(Dni)

6.200
6.335
1.83

30

Actual Nozzle Diameter


deal Nozzle Diameter
Probe # / Length
Liner Material
Sample Case / Oven #
mpinger Case #

0.00057

mm
mm
m

Ac. Inox.

m3/min
m3/min
m3/min

Leak Checks
@
@

mm Hg
mm Hg
Yes?

Orsat OK?
Meter
Inlet
Temp
(tmi)

Meter
Outlet
Temp
(tmo)

Filter
Temp

Impinger
Temp

oC

oC

oC

oC

24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
25
25
25
25

24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
24
25
25
25
25

150
150
150
150
152
151
152
152
152
150
151
151
151
151
152
152
151
151
152
152
151

12
12
12
12
12
13
13
12
12
13
13
13
13
12
12
12
12
11
11
12
12

Exit

mm Hg

Square
Root

(Dp1/2)
(mm H2O)1/2

Local
Stack
Velocity
(vs)l
m/sec

Cumulative
Meter
Volume
(Vm)std
scm

1.2
1.5
2.0
2.2
2.2
2.5
2.5
2.5
2.5
2.0
1.5
1.0
1.0
1.2
2.0
2.5
2.5
3.0
3.0
3.0
3.0

2.35
3.00
3.39
3.46
3.61
3.81
3.87
3.81
3.61
3.32
2.45
2.00
2.24
1.50
2.00
2.00
2.50
3.87
4.00
4.00
4.00

10.37
13.31
15.11
15.50
16.14
17.04
17.36
17.06
16.16
14.84
10.95
8.92
9.95
13.05
14.88
15.87
17.09
17.41
18.00
18.00
17.98

0.029
0.062
0.101
0.142
0.179
0.226
0.268
0.312
0.353
0.390
0.417
0.442
0.466
0.499
0.536
0.579
0.621
0.667
0.712
0.756
0.800

Pump
Vacuum

25
25
25

25
25
25

24

24

150
150
151

12
13
13

3.0

Maximum Vacuum

24

151

2.5
2.0
2.0

12

3.54
3.16
2.65

15.87
14.19
11.86

Final Values

3.09

14.87

0.841
0.876
0.906

0.906

Cumulative
Percent
IsoKinetic
(I)
%

104.1
99.6
99.0
100.2
97.4
99.3
98.5
98.8
98.7
98.6
98.2
98.7
98.5
98.5
98.4
98.8
98.6
98.8
98.9
98.6
98.5

98.6
98.5
98.5

98.5

METHOD 5 - SAMPLE RECOVERY AND INTEGRITY DATA SHEET


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Date
Project #

Operator

Acetone Lot Number


Run History Data

R-1
15:35
18:00
rjr
rjr
1/19/1998

Run Number
Run Start Time
Run Stop Time
Train Prepared By
Train Recovered By
Recovery Date
Relinquished By
Received By
Relinquished Date
Relinquished Time

R-2

R-3
(hh:mm)
(hh:mm)

(mm/dd/yy)

C.Q.
(mm/dd/yy)
(hh:mm)
Equipment Identification Numbers

117
10
10

Filter
Acetone Wash
Silica Gel
Impinger Case
Sample Box
Oven

Final Volume
Initial Volume
Net Volume
Comments

Final Weight
Initial Weight
Net Weight
Comments

12
1

1
Moisture Content Data
Impingers 1, 2, and 3 - Water Volume
216.0
(Vf)
200.0
(Vi)
16.0
(Vn)

Impinger 4 - Silica Gel Weight


206.7
(Wf)
200.0
(Wi)
6.7
(Wn)

ml
ml
ml

g
g
g

Total Water Collected


Total Volume

Vn = Vf - Vi

(Vlc)

Wn = Wf - Wi

22.7
Formulas Used
Vlc = Vn + Wn/rw where rw = .9982 g/ml

SHEET
19 de enero de 1998

METHOD 5 - DETERMINATION OF PARTICULATE EMISSIONS - RESULTS


Plant Name
Sampling Location

Ladrillera El Rub, Tunja


Chimenea Horno

Date
Project #

Operator

Universidad de La Salle

Stack Type
Historical Data

Run Number
Run Start Time
Run Stop Time
Meter Calibration Factor
Pitot Tube Coefficient
Actual Nozzle Diameter

(Y)
(Cp)
(Dna)

Initial Meter Volume


Final Meter Volume
Total Meter Volume
Total Sampling Time

(Vm)i
(Vm)f
(Vm)
(Q)

R-1

R-1

R-1

18:00
1.010
0.850
6.200

1.010
0.850
6.200

1.010
0.850
6.200

Average

Stack Test Data

Average Meter Temperature


Average Stack Temperature
Barometric Pressure
Stack Static Pressure
Absolute Stack Pressure
Average Orifice Pressure Drop
Absolute Meter Pressure
Avg Square Root Pitot Pressure
Impingers 1-3 Water Volume Gain
Impinger 4 Silica Gel Weight Gain
Total Water Volume Collected
Standard Water Vapor Volume
Standard Meter Volume
Calculated Stack Moisture
Saturated Stack Moisture
Reported Stack Moisture Content
Carbon Dioxide Percentage
Oxygen Percentage
Carbon Monoxide Percentage
Nitrogen Percentage
Dry Gas Molecular Weight
Wet Stack Gas Molecular Weight
Calculated Fuel Factor
Percent Excess Air
Average Stack Gas Velocity
Stack Cross-Sectional Area
Actual Stack Flow Rate

(tm)avg

21.662
22.931
1.269
60.0
24.3
76.2
542.00
4.15
542.31
37.54
544.76
3.09

(ts)avg
542.00
(Pb)
4.15
(Pstatic)
542.31
(Ps)
(DH)avg
(Pm)
(Dp1/2)avg
Moisture Content Data
16.0
(Vn)
6.7
(Wn)
22.7
(Vlc)
0.030
(Vw)std
0.906
(Vm)std
3.2
(Bws(calc))
55.8
(Bws(svp))
3.2
(Bws)
Gas Analysis Data
3.9
(%CO2)
9.9
(%O2)
0.4
(%CO)
85.8
(%N2)
29.02
(Md)
28.66
(Ms)
2.512
(Fo)
74.9
(%EA)
Volumetric Flow Rate Data
13.76
(vs)
0.66
0.66
(As)
549
(Qa)

542.00
4.15
542.31

1.269
60.0
24.3
76.2
542.00
4.15
542.31
37.54
544.76
3.09
16.0
6.7
22.7
0.030
0.906
3.2
55.8
3.2
3.9
9.9
0.4
85.8
29.02
28.66
2.512
74.9
13.76

0.66
549

Dry Standard Stack Flow Rate


Percent of Isokinetic Rate

(Qsd)
(I)

Mass of Particulate on Filter


Mass of Particulate in Acetone
Mass due to Acetone Blank
Total Mass of Particulates
Stack Particulate Concentration
Stack Particulate Concentration
Particulate Emission Rate

(mf)
(ma')
(Wa)
(mn)
(cs)
(cs)
(E)

318
104.5

318
104.5

Emission Rate Data

22.6
15.5
0.0
38.1
0.042
0.649
0.80

22.6
15.5
0.0
38.1
0.042
0.649
0.80

- RESULTS
15 de Octubre de 2004
Circular

hh:mm
hh:mm

mm
m3
m3
m3
min
oC
oC

mm Hg
mm H2O
mm Hg
mm H2O
mm Hg
(mm H2O)1/2
ml
g
ml
scm
dscm
%
%
%
%
%
%
%
g/g-mole
g/g-mole
%
m/sec
m2
acmm

dscmm
%
mg
mg
mg
mg
g/dscm
gr/dscm
kg/hr

You might also like