1. ISSUE
The City has received and is processing a Zoning Bylaw Text Amendment and
Rezoning applications for three properties at 1750, 1800 & 1816 Nichol Road to allow
for a development including a variety of residential formats and an area of mixed use
with residential units above commercial units.
2. RECOMMENDATION
THAT the Community Consultation Summary for the Zoning Bylaw Text
Amendment and Rezoning applications be received.
AND THAT the applicant be required to provide the following items prior to
Councils consideration of Bylaw Readings and scheduling of a Public Hearing:
Financial Impact Assessment
Traffic Study
Preliminary Infrastructure and Servicing Study
Environmental Report
Parks and Trails Plan
Waste Management Plan
Housing Agreements Strategy Affordable / Attainable Housing.
3. CAO COMMENTS
Reviewed. GDI.
4. BACKGROUND
4.1 The applicant is proposing to amend the Zoning Bylaw to add a Comprehensive
Development Zoning District (CD17) and rezone the properties at 1750, 1800 & 1816
Nichol Road (see Figure 1) to the new CD17 zone. The proposal was to develop the
subject properties with approximately 1580 residential units and limited commercial
Page 1 of 5
uses adjacent to Nichol Road. The applicant has revised their development plans to
reduce the number of proposed units from 1580 to 1200 units.
4.2 The subject properties have an Official Community Plan (OCP) designation of Future
Growth (see Figure 2) and are currently zoned Single Family Residential District (R1)
and Rural Residential 60 Hectare District (RR60)(see Figure 3).
4.3 The applicant has provided a project goals and objectives letter and a rezoning
planning document as part of their application outlining the proposed development
formats, densities, uses, parks and infrastructure (see Figure 4).
4.4 At their meeting of February 24, 2015, Council approved a Community Consultation
Plan for the subject application that included communication and consultation above
and beyond the required standard statutory consultation process. Due to the scale and
complexity of the subject application, additional communication and consultation was
undertaken to ensure the community was engaged and given an opportunity to provide
input.
4.5 The Community Consultation Plan included letters sent to all Revelstoke properties on
the south side of the bridge informing them of the subject development application,
ways to provide input and inviting them to a Public Open House. In addition to the
letter, communication notifications on the proposed development were posted on the
City website, posted on the City Facebook page and a press release was sent to local
media outlets.
4.6 The Public Open House was held on Thursday, April 30, 2015 at Arrow Heights
Elementary School from 6:00 8:00 pm. The format of the open house included an
introductory presentation from City Staff on the proposal followed by an opportunity for
the public to review a series of panel drawings, maps and designs for the proposed
development and ask questions of staff. Comment / Input forms were available for
attendees to provide their input. The number of people who attended the open house
was 154, of which two-thirds (105) were from the Arrow Heights neighbourhood. As of
May 29, 2015 comments have been received from 87 people. A summary of the
community consultation including copies of the open house sign in sheets and
comment / input form are attached as Figure 5.
4.7 The applicant has reviewed the public input received and has provided a letter in
response to the input (see Figure 6)
5. FINANCIAL IMPLICATIONS
5.1. The additional consultation and communication within the proposed Community
Consultation Plan resulted in additional Staff time, postage and facility rental not
normally required for Zoning Bylaw Text Amendment and Rezoning applications. These
costs are not anticipated to exceed $1500 and would not adversely impact the proposed
2015 Budget for Development Services.
Page 2 of 5
6. DISCUSSION
6.1. The subject application was originally proposed to include approximately 1580
residential units, the applicant has reduced the number of proposed units by 25% to
~1200 units through a reduction in the number of subzones including apartments. No
further density reduction has been recommended at this time. Following the review of
the additional information requested additional recommendation may be made on this
item.
6.2. The implementation of the Community Consultation Plan resulted in good community
engagement and a significant number of public input submissions. As a result of the
community consultation to date an expansion of the plan is not proposed at this time.
However, an expansion of the consultation plan may be considered as the application
progresses and if the assessments, reports and plans proposed result in additional
issues needing more detailed consultation than that offered through the Public Hearing
process.
6.3. The public consultation submissions included a mix of support and concerns with the
subject applications. The input received included a wide range of comments but
generally followed six main themes:
Support for variety and size of proposed residential units.
Concerns about the number of residential units proposed.
Support for the greenspace and trials proposed.
Concerns about infrastructure capacity (roads, water, sewer etc.).
Support for the concept of limited neighbourhood commercial uses being included.
Concerns about impacts of short term rental of units.
6.4. As a result of referrals to internal and external agencies and public input received
through the consultation process to date it is recommended that the applicant be
requested to provide seven additional items. It is further recommended that these items
be provided by the applicant, presented to Council, and made available to the
community in advance of the scheduling of a Public Hearing.
6.5. As the subject application would include the addition of a significant number of
residential units to the community the financial impact to the City should be reviewed.
This Financial Analysis is proposed to look at the site development in two formats, as a
standard single family subdivision and as the proposed mixed use / mixed format
development.
6.6. Traffic volume and flow resulting from the proposed development warrant the preparing
of a Traffic Study by a Civil Engineer. Items requiring review include the access points
to the proposed development site as well as the intersection of Nichol Road and Airport
Way and the Illecillewaet River crossing.
6.7. The infrastructure and servicing for the proposed development includes a number of
complex components requiring a Civil Engineer to review and plan. As the development
Page 3 of 5
Page 4 of 5
8. ATTACHMENTS
Page 5 of 5
1700
1633
1617
1646
Dogwood Dr
1574
Mountain View Dr
1569
1726
1740
1727
1742
1757
1756
1774
1790
1630
Arrow Dr
1811
1625
1741
1749
1678 1675
1736
1952
Pratico
Rd
1735
1767
1773
1738
1789 1788
1669
1815
1825
1837
1857
1875
1885
1679
Park Dr
1928
1940
1750
1836
1853
1906
1905
1910
1915 1914
1925 1920
1929
1931 1930
1950
1587
1570 1586
Nichol Rd
Nichol Rd
1816
1800
1886
1918
1911
1926
1921
1933
1935 1934
1936
Poplar Ln 1938
1953
1942
Aspen Cr
1946
1962 1958 1954
Nichol Rd
1785 1795
1775
McKinnon Rd
1720
1731
1743
1752
1840
1904
1890
1807
1833
1895
1664
McKinnon Rd
1739 1710
1635
1640
1812
McKinnon Rd
1663 1685
1593
1571
1656
Galt Cres
Context Map
1655
1665
1706
McKinnon Rd
McKinnon Rd
1645
Piotrowski Rd
1615
1717
1590
Camozzi Rd
1616
1718
Galt
Cres
Windsor Dr
1585
1595
1605
Grizzly Ln
1650
1610
1715
Bi
rc
1657
1580
1515
hD
r
Figure 1
1887
T3
Piotrowski Rd
Birch Dr
Hay Rd
Agricultural
Agricultural
Land Reserve Land Reserve
T4
Future Nichol Rd
Growth
SD - RMR
Future
Growth
Future
Growth
Future
Growth
SD - RMR
T3
Ln
lar
Pop T3
T3
Future
Growth
Nichol Rd
Camozzi Rd
Pratico
Rd
SD - RMR
SD - RN5
Future
Growth
T3
Future
Growth
T3
T4
Galt Cres
Hiob Rd
T3
SD - Civic
Institutional
Nichol Rd
T3
Future
Growth
T3
Park Dr
t Dr
Fores
T3
T3
T3
T3
T3
T4
T3
T3
Arrow Dr
Civic
Space
T3
T3
Aspen Cr
T3
T3
T3
Hay Rd
T3
T3
T4 Limited
T3
d
Hay R
T3
Park Dr
Mountain View Dr
McKinnon Rd
Tillen Rd
Park Dr
T3
T3
Grizzly Ln
McKinnon Rd
Emerald
Dr
Park Dr
T3
T4
k Rd
Meln
y
T3
Dogwood Dr
McKinnon Rd
T3
Official CommunityCres
Plan
Galt
T3
Land Use
Designation Map
T3
Hiob Rd
Park Dr
T3
Galt Cres
Future
Growth
Civic
Space
T3
Windsor Dr
Biatecki Rd Biatecki Rd
Park Dr
T3
Hiob
Rd
Figure 2
T3
SD - RMR
SD - RN3
SD - RN4
SD - RMR
SD - RN3
SD - RN4
T3
R1
Birch Dr
Hay Rd
R3
R1
Galt Cres
Grizzly Ln
R1
R2
Biatecki Rd Biatecki Rd
R1
Emerald Dr
Park Dr
McKinnon Rd
R1
R1
R1
R1
d
Hay R
Park Dr
R1
Tillen Rd
McKinnon Rd
R1
R1
Hiob Rd
R3
Piotrowski Rd
Park Dr
R1
Cres
Zoning DistrictGalt
Map
k Rd
R1
Dogwood Dr
Mountain View Dr
R1
Hiob Rd
Park Dr
R1
McKinnon Rd
R1
R1
Windsor Dr
Galt Cres
C10
P1
Meln
y
Park Dr
R1
Hiob
Rd
Figure 3
Arrow Dr
R1
R1
R5
Pratico
Rd
R1
Ln
lar
Pop R1
Nichol Rd
R1
R1
Nichol Rd
Nichol Rd
R1
Camozzi Rd
RR60
Aspen Cr
P3
R1
RR1
R1
Hay Rd
t Dr
Fores
Park Dr
R1
RR04
RR60
RN4
RN3
CD 08
RN5
R1
Figure 4
MacKenzie Landing
0929468 BC Ltd.
David Evans
3669 Catherwood Road
Revelstoke, BC V0E 2S3
1 (604) 932-9835
dnevanshk@gmail.com
Nichol Road
Revelstoke, BC
construction workers, electricians, plumbers, etc. and am focused on hiring as many local people as possible.
Sustainable Development Principles
Working with SPD, before beginning the design we undertook several preliminary steps to ensure that this development will be done right. First, we developed a list of Sustainable Design Principles (page 7). These principles were
developed by completing a thorough review of Revelstokes Official Community Plan (OCP), reviewing neighbourhood designs and layouts from other communities, and integrating standard sustainable design practices. We have
highlighted policies from the OCP that support this development and can be found as Appendix 1 of your submission package. We also mapped steep slopes and other environmentally sensitive lands with the aim of preserving
and protecting these areas throughout the construction phase (Map E - page 5). We also recognize that the development needs to be sensitive to its neighbours, so we have buffered existing single-family residential development
by locating higher density residential away from the edges (Map F - page 6), towards the interior of the lot, and
locating the mixed use commercial node along Nichol Road to take advantage of higher traffic volumes.
Staff Review and Support
We have reviewed the concepts and preliminary designs with the staff from the Department of Engineering, Building
& Planning and received support for this development. We have continued to work closely with City staff to ensure
that the development is consistent with Official Community Plan and the best interests of the City and residents. We
have agreed to work with the City to create a safe cycling and walking route through the neighbourhood by providing parks and greenway space to connect the recently constructed trail system running along Nichol Road to Arrow
Heights school up the steep embankment, through this property and along Nichol to other areas of Arrow Heights
and hopefully, eventually all the way to RMR.
Design Principles
There are several core design principles that make this development economically, environmentally, and socially
sustainable. These key concepts include:
Higher density & mixed use - Providing higher density means there are more units per hectare paying
for city services. This equates to lower costs for the City on infrastructure. Mixed use means that residents
of Arrow Heights and visitors going to or returning from Revelstoke Mountain Resort can stop to purchase
goods from small neighbourhood commercial stores rather than having to drive downtown. These commercial spaces arent designed to attract big box stores, but is at a size that encourages locally-owned businesses serving the immediate neighbourhood within a walkable distance. This helps the City meet its OCP
emissions targets of 8% GHG reduction by 2020 and 15% by 2030 based on 2007 levels, by reducing the
number of vehicular trips required.
They reduce speeding, making streets safer for cyclists, pedestrians and children,
b. They reduce City lifecycle maintenance costs by having less paved surface to replace as needed,
c.
They improve water quality with a smaller surface for pollutants, and less surface to heat and degrade water, and
Page 2 of 3
d. They reduce snow removal costs, by reducing the amount of snow that needs to be cleared.
We will create a series of greenways for pedestrian, cycling and recreational use that will connect to surrounding pathways and parks and provide non-motorized access through the neighbourhood, while still allowing for Emergency Medical Services access (Map G - page 7). These greenways will be maintained by
the strata groups and will significantly reduce the amount of money the City spends on road maintenance
and snow removal.
Sustainable Design & Technologies - This development integrates several standard sustainable design
elements, with a specific focus on Revelstoke. The buildings will be located and placed to best take advantage of solar gain and the use of passive solar energy, reducing heating requirements in buildings. For heat
& power, this development will integrate district biomass heat & energy built on a phase by phase basis,
making this a potentially off-the-grid neighbourhood and a net contributor to the provincial power grid. This
development will also include several ecological elements such as using native species to reduce water use
and reflect a local sense of place, use storm water trenches rather than sewers to reduce infrastructure
costs and have cleaner storm water discharge, and maintain and protect slopes and existing large trees, to
better integrate the development into the landscape. Sustainability is also about building homes and public
spaces that will last a long time. This development will focus on high quality building and public spaces. See
the character palette for examples of potential building and public space design (pages 9-10).
David Evans
Page 3 of 3
Rezoning Application
MacKenzie Landing
0929468 BC Ltd.
David Evans
3669 Catherwood Road
Revelstoke, BC V0E 2S3
1 (604) 932-9835
dnevanshk@gmail.com
Nichol Road
Revelstoke, BC
Package Contents:
Part 1: Mapping & Design Principles
Maps A - G
Sustainable Development Principles
Neighbourhood Character Images
Flexible Building Types Diagram
Part 2: Official Community Plan Support
Highlighted Goals & Policies (Selected pages only)
Create a diverse housing stock with a variety of building types that provide different types of residential types,
including ownership, timeshare, suites, and rental units for a wider range of people (elderly, young families,
seasonal workers, young retirees, etc.)
Protect steep slopes by maintaining vegetation, minimizing soil compaction and creating minimal disturbances
(cut & fill) to slopes
Develop higher density housing to take advantage of municipal cost sharing for infrastructure (i.e. more people
paying for the same amount of pipe)
Transition surrounding neighbourhood single-family densities to higher densities towards the middle of the site
with adequate buffering
Reduce the number and width of roads throughout the neighbourhood to save on municipal maintenance
costs and create natural traffic calming
Re-establish the native forest ecology by planting native species and reducing lawn, water and pesticide use
Treat stormwater on-site through infiltration with storm trenches along roads and pathways and storm ponds
where appropriate
Make solar access a priority in building layout to take advantage of passive solar and maximize daylight in
winter
Consider shade and solar access in laying out trails and parks to encourage use during non-summer months
Use biomass to provide heat, hot water, and electricity for the entire neighbourhood
Infill new development within established neighbourhoods rather than new development on the outer edges of the City
Neighbourhood-Wide
Allow for small neighbourhood mixed use commercial development to service the Arrow Heights neighbourhood and reduce vehicle trips to downtown
Locate higher densities & mixed use commercial buildings along the Nichol Road transportation corridor
Create a diversity of parks using greenways, trails, open space and public space, and link to existing pathways
& parks in the Arrow Heights neighbourhood
Create buildings with High Environmental Performance standards (Passive House, LEED, etc.)
Create adaptable buildings that are designed to be flexible enough to house both residential and commercial
uses (to be located strategically)
Create sustainable buildings are designed to last for centuries, considering lifecycle, deconstruction, sustainable and non-toxic materials
Give every unit semi-private outdoor space (porches, patios, decks, etc.)
Neighbourhood Character
Nichol Road
Private Property
5.0 m
2.7 m
4.3 m
2.7 m
3.0 m
Cycling Lane
Boulevard &
Parking
Driving Lane
Stormwater,
Boulevard &
Parking
Sidewalk
4.3 m
Road Width
9.7 m
Road & Parking Width
17.7 m
Road Right-of-Way
September 8, 2014
Neighbourhood Character
10
Flexible Building Types Allow for Higher Absorption Rates & Healthier Neighbourhoods
Mixed Use CD Zones (A & B)
A variety of building and unit sizes configurable at each phase as the market demands
Row houses with standard unit sizes to mimic single family housing and buffer higher density from surrounding single-family housing
11
Figure 5
File: 3360-20, ZON2014-16
Conclusion:
The consultation process to date has successfully engaged the community in providing input on
the subject development proposal. An expansion of the current consultation plan is not
recommended at this time. It is recommended that the formal Bylaw process proceed and that
the applicant provide additional studies related to the public input received. The additional
studies are to be completed in advance of the Public Hearing. It is further recommended by
Staff that notification for the Public Hearing be expanded from the standard 100m radius to
include all Revelstoke properties on the south side of the bridge.
City of Revelstoke
P.O. Box 170, Revelstoke, British Columbia VOE 2S0
revelstoke.ca
PLEASE SIGN IN
PIJBLIC OPEN
HOTJSE
Zonittg Byla\M Text
Amendment 8.Re-Zoning
Application
1750 8. 1816 Nichol Rd
DEVELOPMENT
PUBLIC WORKS
FINANCE
SERVICES
(2sol 837-3637
development@revelstoke.ca
FIRE RESCUE
SERVICES
PARKS,RECREATION
CORPORATE
&CULTURE
ADMINISTRATION ECONOMICDEVELOPMENT
837-2911
(250) 837-2001
(250) 837-2151
(2501 837-28A4
(250) 837-9351
(250)
works@revelstoke.ca
finance@revelgtoke.ca
file@levelstokqe
prc@revelstoke. ca
admin@evelatoke.ca
COMMUNITY
(2s0) 837-s34s
ced@revelstoke.ca
City of Revelstoke
P.O. Box 170, Revelstoke, British Columbia VOE 2S0
revelstoke.ca
PLEASE SIGN IN
PUBLIC OPE,N HOUSE
Zoning Bylaw Text Amendment & Re-Zoning Application 1750
NAME:
1
&
1816 Nichol Rd
CIVIC ADDRESS:
S*t)Dp
P^i/,rP
ll?oTeSr,e_
/ I z"ToR.asrD<
n)u,?:lrar
f)J l,^o,no
C" l,
h.P-lk)
^
"T'orn Cffiir+LLrl)f{
u'C*,n eu,^qnJ
2
J
/ qtv
4.
l74u
7t5
/.r+
!,
I 3f Con rnrfUtL'
lBL ,,[,L
/l
8.
n'.4 6ae
(
11
t1
$-t-rJct-.t
")
t"f
l4
('bi
oS-
!
16'Q^/ace-
r't'-+''V"
15
t''Q
I8
I9
uVELOPMENT
nl^^
^.A
,\-
FINANCE
SERVICES
(2sol 837-3637
development@revelstoke.ca
(250) 837-2001
wolks@revelstoke.ca
)t h^L-l P,-)
4n^/
f3
:il'+tn
\Q tTloretf ,bn'
PUBLIC WORKS
Ld
DI
,u/ih/1?ra
l+sb
Lb
S.f
) ry
,tt,,-?'-
+"*4
/S%o
)$
?., /r'rr
co
1{
i"l1
zl,
;Joo,eorn
N/c//L
/ 6 ? lt,4Y /1-
T2
1
(2s01 837-2161
finance@revels toke.ca
FIRE RESCUE
SERVICES
PARKS, RECREATION
& CULTURE
CORPORATE
COMMUNITY
ADMINISTRATION
ECONOMIC DEVELOPMENT
(2so) 837-2884
(2s0) 837-93s1
(2501
fire@levelstoke,ca
prc@revelstoke-ca
admin@levelstoke.ca
837-29t1
(2s0) 837-s34s
ced@revelstoke,ca
PLEASE SIGN IN
PUBLIC OPEN HOUSE
Zoning Bylaw Text Amendment & Re-Zoning Application 1750
&
1816
NAME:
CIVIC ADDRESS
ln u 1,^'l"r^ttthtL
21.
Z:u Scxn.t/,f
20
23 /(
lqut '?tc^.f}vz_,
R
trl
27.
rsKl
AWJ
28'
BLM br!.Nr
29 '
t'1/ tp /'t ffc L E?r)
,-)
'
30.
(-'wfu
lrftv.ru
36
3t.
38.
:o
40'
o''
l1't1-
wrNol\$t
iLrt
f.'-<A
ol r l1 q.,, s l)
:cil
43
t-lc'V'.4a-s-/\
u^,k
Arnn l{ nl
42a-' L
7e=-'( a,L
3itr
{-
f,{c ?o{i^s*
0^",1, rl;
\tut?cr\''r- R..'
,/
^A
(
/ffi6
drlU
Work
lcw Mu
,tri
Q,.**l^,
35
\(
tt
fuod tt,.zia.-y'
32.
{\h;
r-0 N/ P
tr
J1
34
rani L^,WI
\ o> CA uSo x)
26
JJ
2s
Nichol Rd
'
U.,t/\CD.L,c\
lo;3 nr.t,o l.
r*
NAME:
CIVIC ADDRESS:
t1i6 &-wLr
44.
46.
47
1n *,
49'
-
l+gl
2",-"- *-.-2
"'-, !-:
51.
lrLc-{-'.,\
o.-
.4n. L.,/)
48
50.
(,k11 Uvao.r
fi\*dr^-t
a78t
7s
-t.--
()
AI
,unur".m|p
zuze,r Lr.-
Z{
- gtt'- 5f
/a/o - //-/ oa
/r^lrl,f
-
.lg-A
54.
Ir
tt'i)erok
G*,
'
56.
s7
fc.rn fYlrP.
4,ilo.?
'X/,t,t",J
ckl,6
)l
>-',
58
59
Gal>uTa'(or
60
6r.
62
ftws
.,
rt
l kn\Ll ,
t
63
64
65
66
67
Pn
p" I R,e;w-.r
!7'tr-'1^4+ W
rq
tS
rt)
cu,t R.{
IL
t L
gol tu (P{
175 atuil' (r
r'
/6-2 h.Fl./ , Ll -t
atLP*-^;,
3r
F lfS
jZQ
f.
1+1,
City of Revelstoke
revelstoke.ca
PLEASE SIGN IN
PUBLIC OPEN HOUSE
Zoning Bylaw Text Amendment & Re-Zoning Application 1750
NAME:
1'
2.
\&1,(AT^suas ft6,.
6^/pS
, BL.r ru
a
J
11"'r
Ktra'<rs't
il -fc.t
lr=c-r
LtL wtr
8'
9
I1}S-l Ms"nt-L, Ta
4tq [1\"Vg,tdt6
I'1.t4 YAl
6qrl
8.
$-rnuU
lTq
10
mnt, a/hr"r2.
N tYz
"',rn/*
t2
13.
-/L+
l'-
1816 Nichol Rd
CWIC ADDRESS:
>A/tb
4'
&
+ H+t p
/b2t
tlTo
9,
lfJinntl
d-r
14.
E4
4^-
/'
15.
16'G
1
19
Dh v ELOPMENT
L(<-. rt
I
rq3l
,M/
PUBLIC WORKS
FINANCE
SERVICES
(2s0) 837-3637
developmnt@evelstoke-ca
(2s0) 837-2001
works@levelstoke-ca
(2so\ 837-2767
financ@lvelstoke-ce
tlo //*-
FIRE RESCUE
SERVICES
PARKS, RECREATION
& CULTURE
(2s0) 837-2884
fire@revelstoke.ca
(2s0) 837-93s1
(2s01 837-29a1
prc@revelstoke.ca
admin@revelstoke.ca
CORPORATE
COMMUNITY
ADMINISTRATION
ECONOMIC DEVELOPMENT
(2s0) 837-s34s
ced@fevelstoke.ca
PLEASE SIGN IN
PUBLIC OPEN HOUSE
ZoningBylaw Text Amendment &,Re-Zoning Application 1750 & 1816 Nichol Rd
NAME:
20
CIVIC ADDRESS:
t[-11 B, ".h
Lt
A lo^ eA t,r
22
e>e
.olur
21
z5
24
r.
/tly
,.r"L cr,n
rtttaceuJ z,rl=
L- t1;ob zu'
lc\ C$a!o -B'A
,u o 2- h rrru| kb.,
/ 7I Tut >LOtt W
He"iL t
25
26.
(,
Ltv/+;C'l
27.
28
29
30
31
(( aan S f
Sco?z D-v<
kor--Qrten<v-
(<tZ
P-f U".-
l,r.^*
32.
7ob
l1aT N,clol
t ttq
Rr.- Coruae**
'o C\in oP.^Jev.,.o si-;
35o*^,.o_
37
38.
39
40
R._-*r--\.=
43
?.
Ql')
lo + Corv\so,.. S'\rrr e L.
'lb E--'.^ 's L
r^Jesfi 2-< *(
Sr r akruy c"ro5 " /t kazz .4a*a
L'/
Zl
rl,<
,/r,42
n-
4onq
/9K
%>
t3Q
ae
-1
41
42
Dc'-^rni- S+
JJ.
36
rt
etto
It
-f
(,, t l,z ,a
PLEASE SIGN IN
PUBLIC OPEN HOUSE
ZoningBylaw Text Amendment & Re-Zoning Application 1750 & 1816 Nichol Rd
NAME:
aa'
CIVIC ADDRESS:
1*l-".^,(*4
?e^
45
46.
48'
50.
r,e c .*(\
{-(
...fr.^.
47
49
?>or\'
\B 2 (ol,hr<lc[e Rc/
t RAt-f gt l'^r<-tt--Rc[
Cz-
ktttw
L1
7)*wm
s
<,1s
L
,raw ,tl
53
r^r*
774
L,t4
,'*<L-
56
57.
58.
59.
iu<4yr?',:o/,^'
63
66
67
a@-
.e'I
'7
./' --Z
l'?zrs dzu-
li U
t[q,"
(t
/?x
1st
fcrl..
\
iri/'/
,(/,
Lr i,{,
Qt ?cor
a"
a-
sttrl*V
64
65
l,(
h,
27
illo \
I
,U
62.J
Vtrt 4h
,til-
60
6l
ah<,.1
o12-
"
to'(a,^a ,\b-kzr
55
s/r<#
zt4
lW( --far.sf
,t
l4U
52.
i7
t/
3t:r
Ar-.,- /).
51
u,n\-<v
Z-rc- E
. gtSr'a6* >l J
t**
3"{
r<\--:-, e}-*
'?l
o ?*nu"
NAME:
u'rflln\^J\u
69.
70
\.o*
\1o'r
C.k/e<
,oton-r" tA
..-
,uu
tgs)
t8 tt
/I
'1o tt"
75.
Zztz"/
Le@p
-'/
r-
6 t-zo n4
77
"''tJ*.
Ha.y
-*
P-rl
nT,
/r^o.-
e-d
IJ
B="Lu<
5o9 or^i
73'f/u.- .-r,11
74.
Nichol Rd
CIVIC ADDRE,SS:
argt4&
72'
1816
./J-
r--r-
,r7,-/_rz
^t
/.
D
r<,
tl.
75 E/,*,t
/ o > -f ftrzz/ [c-o-* '
-
79
\^
80.
8I
"s+;- v">'b
83
84'
85
86.
87
88
89
90
91
\,,/e
P Kt"i*4
/,-
f:S^\)--,to^a ,,
ro\
Yu
7{\.t
J
F..-{u4-
COMMENTS
April30th,2015
\
\;
---
u" \^ ,'>
\^)
Other Comments:
@\N-
COMMENTS
April30th,2015
&
Give us your thoughts on the Development Plan aspects for 1750, 1800
o ..\
llu
1L
"(-
f L
<9
-2
r
'1u -1
Transportation/Roads/Trail Network:
6t r-'l
t^
,.J c,
4
q
Other Comments:
T.
Uo
le t
I
o
lrL.
kc-
a.t L.
Q- 1.
1e
g-
tJo
{
+L of 1A-
Q-,
-f/^ / q
U-ztSJ
of
e_
(,
LJOtt
ch;
f-\
L
T
t l"e
uJ,p.^t!
,/
,v
-+
&r.
:,+1
COMMENTS
April30th,2015
Transnortation/Roads/Trail Network:
Other Comments:
-lhrS i3
tlni a
nQ--Qc
/l-
,{
\.tnuo+
?un P
l*,(P
S
)
ut
De o>n
(r 1+-
f\
Or\
t)
)
(B
fio tu)
_l
r-\-[
n--f-
ffi
May 12th,2015
Office of the Mayor
P.O. Box 170,
216 Mackenzie Avenue
Revelstoke, BC VOE 2S0
Sue Davies
Community Coordinator
Revelstoke Bear Aware
c.
c
!
a
(t)
Fl
Frl
!i
-1
9
c)
\o
oo
O
O
oo
t-l
d
\
o
o
.''!
C)
+-)
cd
(n
v)
(l)
v)
tr
o -
>t
E
o
.tr
+{
1<
cl
(l)
o
+
c)
)
o
C)
c.)
g
Ci
'l
cl
cgl
o<l
Id
rhl
l
' .=l
-C
Ft-
l{l
^l
sl
i
tl
;, 5l
2l
:EI
g
'l
OIol
.=
\\
-.:
s
-\
\5
..
rl
-\
\.R
(.
cl
un
ta
-)
U)
q)
q)
{.
cg
C)
c!
'
_t
l'
q)
zl
el
.-l
-l
rtl
Frl
\-l
6l
(lol
5l
l
l
ol
hl
,t
\
{
\
(
l.
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
ArA f-s
Dt
FCllrr\N
Dtn?(np
Transnortation/Roads/Trail Network:
sl(r
ttc
fc,t
cR rzn a
n^
PAO(
fV-
[-t4tlE
, 5w
^/
rt*tl-|r'
Other Comments:
'f /r
L,L
Cft
v
17
r)
pri
rL
o(
Nc,
t,
fVn,t n
.:
Cauc, ndtI
lI
<t
F -t/ ot/
<'
l1-
COMMENTS
April30th,2015
L / /lF
/rJt -e/
Ar,Z<
-,.//
Lt t{,e -/f/S
6o,rlO
,/
A,,*9
Other Comments:
J
lJl
eo rt-tna
^
^)
ftt*t
7t-a) ,.vv
,2
ze
7o 7
.C
c>7(4*l4oru)-
tJ
COMMENTS
April30th, 2015
c
(
,v
a_r/
I-
\\
,)0
l1r
6?n(?.'
---\
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
7"
( t, 5 7rt r ,: ,J T4 )<,fe
",
Transportation/Roads/Trail Network:
7
/L/^ t.'zAzt=
,Fo,<
S,L.,,-s Frro,
7.ll/r+L,a
u,,
Other Comments:
v-,/r l/arr,
,,//",., s
4'
COMMENTS
April30th,2015
( ,o,e
&r:-j
Transportation/Roads/Trail Network:
\]
Other
/^
{(
a'
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
&
Transoortation/Roads/Trail Network:
\)
Q-*co'
(
Other Comments:
COMMEI{TS
April30th,2015
&
{o
\
J
*-r<-
Vr
lI- o.r' ,\-,^rr'\ rv'red c\\o . lV.. Q-rtrc \V-o. r<- O{-\
L{t. Se-r\ .\--) Orc o l-\ \^rl Cr^o.qb. \-e-\-v-,e-d r.<c) bl
Cr. C or.,
\e,r q..
\r- S\c<e \ \r
{.\
\S
lo..,
q) \\cr()Se S\x-<-e\-S
{\..e-
\<_
mmercial Areas:
Other Comments:
-_-I
\ re-v(
S
l>tot
o4za
\\rrs \:
ot\c\
of {v<-x-r
<-<c^c-\\
E*c\
\.,
-SR-urro(
.--J
olJ
<I
\s \
\r.\
S.ro-.. t \
\) \<s-
\q\
\o
OMMENTS
\i
April30th,20l5
/?'"t*c,,
(n
m d\
tALZor
t-l'naf
t:t:T .t
tt l,&- -ik iJa-L
tlJ
'fu.n
\r
LJ
41-4,-
4^i j.l
'
l"
It d
(%b^
(-
l.&"",'ru'i1\t/Ll-J*"r*{
u'"'' il *n
.\-
C.tw(--,1
C"/.crA
xo
in
) utL,ru^{;
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
^(
lro",-5
Mixed Use
zrv-i'n
c.
,^
1_a_
<z^-f .
mmercial Areas:
-(
lr
M\-
ts
n-- 5
a.,n^,,<l,e-
7. -f-lr^,.-rtt!
Ir
.'L,urt->=l-
,1)
jrc
;r
,, , 'u*)n-.f'
5
Lx- l-
'7
6-_
.{
L
i S t "n",er
Clr
# I o--
-42-t-wd
' I
*n ,E
vy-)l)lJ tn{
> /e\4t
\"$+t
w-o) - /,
t..{t
-1)
+9 yen
---tt
-o.
>.'v
', -4\-]z
Vt
-ll -3;
fS'V
.>2.
'={ vf-z-'t
rnL)*ry -
t'
q-Arl O
a\)<vfY'
-r1r-o >
tr> L+ ltv
n
-\2
\.^"-19
Y><V-t
"lvl
I*
W3
,2 4
t
w
)tlr-n q
.+-^1
\I
*-\q *4
Q-Y
,rC +"\
)llnn
I'
L1
^ot-"-tS tv1Ll
+l+l -tT @
w12
t)
^y"
-yt
)Cy-)
J'rn-r""}rc!
)r>s 3
47
-)')
'Li-J
t'
'L
tr.
-/O
5-vtn/s'
>4L
''
tl
Y
v'o
) .,o'4-4
tL"
l
U
)-''z-r" C*f O
c.
COMMENTS
April30th, 2015
(}/l
.L) i
&
,,1
\\L
il'ii(;'r,-t
f^
w" "
he.
Ir.
\)
t,
-'3rlt'rq-
l-..i \
v^r-:l ri
n f\
\t cr,,.ii
/- \4 '.r-J {/\
\n
\
,!o, {v"a.<l
*-'?
--.
'{n.
;,n
P,
I
''
V\
grar
cl
L{ll''-t'
lr1i
cl.17:t:.).;.
'
{--,
,,,t\-
+'- ;'^\ 5
q,
i).,;'\a-.
t'''V,-
rl.
ftr'rt:r.
\ f-\ S
' L,
\r
'l v'\ \
f;\
-)
/r
'i
c.
,'i$.
dt,t-,
q.
-\.
L:,
,L
Other Comments:
L4! \
:; i:is- $, ivie
I
v\,
(-'l :,,
'.'.y'i,r
11r
'-lrr'l.r-fl-
!r-'l{ij.
1ti
/'..1 l
t
l'\''"1'xl. !
f'
\r)
i,,
VJa
/\
t t/'
,;;\\ iJr.^]
tl.,t.ut-
{ur-,e'i"d'.
("
(.'-'1
,i-.
J,-i.. _.,.1
."1 .'
'.1-
c!*,"*rr
\r
t?
ct'l
l
''J.
-
fc
,,
T'-r
/
}
r*i,-\ +t \l*^
,n
y'
{. 7 -=}
!r'
-/
..$"!-rnr;{"" -T='
-\.',
i,,'n*
,,-;, 'r\[i
\.:i,,,r,r,i.ir
f rn*;ri,l,i:}
,'+i
-]r'Lr,'ri
'i,
i"r'"ii;'-)'r."i
tJ.
i},1,;"n.o,,,.),,t.li{;ii-i ?
i!\o'. i:;'.i
it; )
t'}\
'!;i
';;i"),[5*;
Dean Strachan
From:
Sent:
lo:
development
zoning on Nichol road
Subject:
is
ond
own
f.
the
Anorrowroadwill notollowforosnowplowtotempororilyplowsnowintothe
reguire snow removolto be picked up immediotely every time it snows - this is jusl not goingto hoppen. The most
important
thing is to keep roods open ond initiolly this is done with plows or groders - ond done multiple tmes o doy during
h*vy snowfolls. When people pork on both sides of these
norrow roods - there will be 5orely room for o smoll cor to trovel down these streets when this hoppens. And with
the high density of this development there will not beenoughoff street porking considering two plus cars per unif
ond then visitors. And even i there wos enough off street porking there would be no ploce to shovel the snow
except onto the porking spot of the person odjocent. Underground porking is out of the guesfion considering the
low cost estimote of these units. Nqrrow streets
arenot theqnswer foraheavy snowfall arealkeRevelstoke. Sellingguolityunitsfor$99.OOO.OOisopipe
dreom. This is
o promise thot sounds good when it comes to of fordoble housing, but it is unrealistic. The city should put more
incentives
f or people integroting suites into new or exitsting housing - with odeguote off street porking. A ew yeors ogo the
trend wqs
to eliminate suites from Cities, but now if is o very gteen ond low cost woy to more low cost housing.
2. Norrow streets willnot mokestreets sofer for bicycles. First of ollyou musf remember fhot Revelstoke hos
o bylow that does not permit bicycles to ride on sidewolks. There is going to be two way troffic on these norrow
roods - ond then porked cors all olong both sides of the street becouse of the high housing density - and then
bicycles
in thot mix. fn no woy is a norrow street moking t sofer for bicycles. f ride o bicycle o lot - do you? And tho
rule
of no bicycles
on sidewolks is not
safe. Mony times there is no one ot oll on o sidewalk for blocks ond it would be
much
sofer to ride on the sidewolk. Some cities hove an ordinonce thot stotes thot whenever o person is riding o bike on
o
sidewolk this person must give right of woy to o pedestrion and give on oudible warning when overtoking or possing.
Do not
let thedesire for unrealistic low cost housing,tobethegreen light for unsotisfactory development permit.
Stncerely
Comments
Residential Housing areas:
The very attractive display placards at the Arrow heights school presentation did not
accurately portray the narrow spacing of the units at the premises.
Transportation/Roads/trail Network
.
just
Assuming the residents-to-be are
like most of the rest of us, there will be L580/2000
personal vehicles travelling on the premises and on the lllecillewaet Bridge and local
roadways, (conservatively estimated, as there are proposed 2, 3, 4 bedroom
residences), is there enough room planned for these vehicles? My minivan's footprint is
90 sq. feet and allowing for manoeuvering, door opening etc. another 90 sq. ft. per
vehicle, is L80 sq. ft. times 1580 housing units = 284400 sq. ft. or there goes +/- 2.6
hectares oufof the L4.4 ha. Minus of course the unspecified number of underground
parking spaces.
Narrow roads will not lower accident rates as stated, or make snow removal easy.
Mixed Residential/Commercial areas: (see the above Residential Housing areas comments)
Other Comments:
Our reasons for choosing Revelstoke and the Arrow heights area was because it is so quiet,
and spacious. Our son, visiting from Vancouver marvels at how he can talk in a normal
voice to a neighbour across the street.
A bonus for night sky gazers is that it's so naturally dark at night in Arrow Heights that the
Milky Way is clearly visible from our property on Tillen road.
Please note:
Present R-1 density in Arrow Heights: 6 homes/hectare, or 87 homes on 14.4 Hectares
Proposed project density:
109 units/hectare, or 1580 units on 14.4 Hectares
This wouldbe/r, repeat, % of Revelstoke's present population, on one housing project.
I realize that Revelstoke must grow, but I do not see how Revelstoke City Council can in
any way be serious about allowing a project at even %this density to proceed and pray
they are not seriously considering letting this development go forward.
Bigger does not equate to better. ln my humble opinion, Revelstoke is
place to live than Vernon or Kelowna. That is why we live here.
Thank you for asking for my thoughts on the proposed development
COMMENTS
April30th,2015
&
ht
et/e
I
'%ns
CleJ
mercial
LlhL
7u.o/s
Other C
5
CT
L,
Ctn
n t4
t
b
5i4L a
/oa/Ar'C
/<
ar'e
<3
\\ \)
wq
(/<+k vecptpn
-1oU V,tl ol- vH (lnacY
tqq /
P
ry
' u?u
( JVT
rtrx/g Y /
w
fuiW*, q<)/
u v vr
fartVkcWW1
,F /Qrug V l^r4
7u.r
d fsvl
(
k!\
a)
tl
or
Y4-Vs
aC"l
?c1
>^
(
lJYL
tc"l
wvry
IU OJJ
of
vo fl
{;va
(Qa/rv
JO
tr f?t
Atsl u .(
9r'. real
,)<)
v v
4q
,^t YSeTM
!/ 7'tv -^JAL
qc l! vT u rg
'a()
qo) )
h2
t7
5, \4t )
,(-?
Uoyc; ,dA
A-?a./'K7'l
ctl
'45
fre rryl
nlrs Al
t+e K6u
ool
fr
su ry
aGO
/o
a )
9I8I
008I 'yLI ro3i slcedse ueld luerudole^e( eql uo sffinoql rno,( sn e^r
erl plnolll e[
no,( uro4 reeq o]
Ioz'qro IIdv
STNIflIAII,IIOJ
>Jl
r72fl
rr+?
2Wd
'cr.t
-r'r"!r1 Fyr@!q
1f*
W t
/[fS
aq 9,Wl(S{,rt
ttu,
'"9f v0'l
f,/cr' / irzrylr
/:a
't^t-ft(Q'
t u
COMMENTS
'We
Give us your thoughts on the Development Plan aspects for 1750, 1800
Transnortatio
&
Network:
6
Mixed Use
A
(-,
er
omments:
Yn+
de'{ri"[
mmctl hua
6le
)n tt
'T*',r)a, .rC-LrJ
11tt1
'J'1tt
-ni,i. 1-
tY:
,iti
?'nl1.r,i)c1qc
C.!'ut:li
;'Y/yt;' \rlt,'r
Y 7l'1
?t
-i52'vt
\"'J,,,
ltl
),1lt4
I l{ ,5
tr'v"'Tt,t-tr
r\
t u)
ryi ,.1 it
l'
-.', 'J
1/ h\')
o
"t'U
\l
I
\L+ca^f1,:11
^nT, !
tli. -l'Ji, )l i',,1 ^.r ti-.l'' l'V'll )
J"rl\.4/
t'
eru
)l,ru
,r\1
vl
/i
l,1t1p
,n
-+-
t\
l^^C J Ltt4,r
lJ
l4nv
?nu /fyl
,)(fi,JA''' 'ttV
(i
pU loqclN
toz'qrot IFdv
eql uo
sffinoql
no.,( sn eAI
SINIflIAIWOf,
COMMENTS
April30th, 2015
jai
vA
,+(
ia.
L,
iutJ L\
[q,,,\]- L q-
r..'ar
i.J
itQ,lr{ $u.c-\ A
f;
nr.
i-n\arij",'-
-,
o\^nv.S-
+- cLs-r."e[f u'*."r*\
-JJ*a
c\o
-"-.L
\\:, Q-.eS
F"
,N
"l-
CeQ.'\^
t'
S
c2>
i,-re- Y.-or<- r)
e^c
( g'r^o:-.. -._.ad
-.,cL
iJ
Ca
".t
d*- -',
rit'
e--
L\
Lt e,-.c'}.
"
L^
la \t^".f
!r iwrfr-k
.
OS
1.""
|r 1..
uu^-a'
co
.' f
t*s,r--qJJ,25 '.-a-J< !c
r^ -, -"n -{-a-.^ ril.'.,'e\s tt^- c-r'^r- "'-'-'\
r}5l
1 \uf-
l^
u-,,.-J,.
-t
Ctl
(-,
arcou^" >{i
i- u.-efc. ?'i
Other Co mments:
^.^
Cc
c^J
t^".,e-t
o.-crl
Ju'-
(,.n
t-r.}
^t,.-.,-- u,,.[Le
ce ,-o
-F
t{^r-
+{"*-
.oY*t
.\" -I
N..L-l
,p. * . L-
Ar u.\ug \-i-Ji-
l'{^ J
of cc\..-'rc-,at
- +L.e-l- ,{^q.^.
..,/'^oi
I;.c<L^--
fl',r.rJ.c\
of"
I. t e-
v.|,la".,
f .tt'e- '
.oJJ
-,u-,L
(.,"efu*o)'lL.s ...j.
9-. (":,U
"k"i
l,^-*ve.- 0'6
Np- cr*{
.",[",{- L(
@o.-' I \^
t\a,t
c-o r.\^tr-\-r..
s..-(\J.
cri
11,^-
-n-"JS+*=-
COMMEI{TS
April30th, 2015
&
Give us your thoughts on the Development Plan aspects for 1750, 1800
i i,ro"
{
o\
,f
-l
,'1,
-\
i\
Network:
.*.,i
(jrc
v"--' y'r r, ot
6tt6.,..,.t<
\-lr*u 1o"
ur"4t
i-,rr.,{
(-
\c,. k< .
.-
r'nr''"-
\.1,r-oz-
-<nz,
i^.|\.e
(>'-'
1-]-: \JrY\.'t.
(.'>
/7
, le;s,nz..ui\+etacci
'z^1P
(b'rvtfuB ,J
{'A * t.-li l\
r-.1 ra"^
Tl1,*t
t*i'i \
l-a
I,r
fr
L'-t*.X
irr< Jrci^qr
q*.*
f4\
c)"ut4tu-s
a vr.S
a.n-"rf
'coca-,-tls
$ntz-tn
.:.(
nfi>
\L(r
- d: izn/''-<-
Other Comments:
'vlrr'ru,/tctrt \*.|'f
t^r-i3
\c.
pxtl\,.rw.,^.,
ee
\:oqr',-.h.-.-,\ ('vv,r'rp'req
\^ty..l.i-clgJ:=ar-
(^
l,ri
D+<i^ \r.2rlr'<-
^o-*A-
Loo-
';L &^
rvra-rr,.,v-1
'r
\trv\
1J
(^,r
\-
\.|.
7c
-v( ll t.a."..,l--,'.o.,-"
L(
a-(
Ql.sC
r3-
t,
.r.,v'ezj \^-o
tUhC
, ,^ti'a1n, -<Jr:lez--X-tt
..,'1.1, l'rz -'-o -n a " dv', ^ ,-*fru.e- ?Q z-/:^V9
" t4\ to org'=r-"-rJ-
et'e*J ty
d''dr,-rnzzr'T
'.ub
'-\
nl f.fl--'-
.{fr-
COMMENTS
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
&
(/u
/I
tio
-1
7
7
77
Other Comments:
)---14
,/*z
r'/L
COMMENTS
April30th,20l5
c,Jcd
(tt c/
I
Transoortation/Roads/Trail Network:
I
q fI
t-t
,4.
n ilj,
V.L
roht)!,nlr"(
Q t("'t
r\
(,)
,t{ec/c/. /ll,*
(a^
Le-
'tE-
B.
llt
(r.,c
L,.JA
)<:e- 4/r,]a
Other Comments:
l.<
COMMENTS
April30th,2015
&
Sib;uo
?s-nno
r S ?.t "
rJ)
9C
LCNK
vsiOptS7 TUyt tS
otltl
Mixed
^lcf Use Residential/Commercial Areas:
ACf r,l
iT17 No )GHy.^Q
,)D ou F ft6aSlOtccl.
Ng \Dpy /,J
OF
nDD
sHot,
i",
5(/
oTa
),
Other Comments:
ln
ctT
7O tqrrlt icQS
ttl.
THc-
ctrl
NwS
f Rt cog,s,z
l L BlZev
Dr)a?cmr";T
(\)
tr
lt>
rh
s),TW Nq
'-'1G'+7.
o
("
PubPbr
t 7 s\
IAT R\klrOS.
fur
f,6Q6: rH
no{Z
li
)?
COMMENTS
April30th,20l5
&
-\
\-\
Transnortation/Roads/Trail Network:
Areas:
(
vs!v
Other Comments:
6'
cv
Lt
q.
^(\
r*.r
\h'N
L ;-,. \r r
- -r.\ar,
QS \,t.i\\' \o C
\^,1\^N.&o
v
( ,'l,^'f'Ac r- ,\
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
lr'
-.,
.'/.*.'t
7'n.!,1,1-
.-? /
,''/
/,i
l,/
A%**-
,
/
rk:
--{-+4-.,--o
J.-/" '
'/
L/
Other Comments:
7
r:/
-.'7',"7-/,-zJ'
-l
/14-4-
,9/l'
'
/_
.+ 4/"2
COMMENTS
April30th,2015
/\
dl
N
t-/
Areas
(-;ex
(,/
n /o*-
l/
Other Comments:
,',/'
\/
COMMENTS
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
Transportation/Roadsrail Network:
Other Comments:
(/
hrzA .nryFt/7
v 7
k/ 7r/2
/Mrao rf ,/r=Ql<,2/Zf,z z7ar( ,Za
zzil
COMMENTS
April30th,2015
Ao-.,/-.
,u,-,,/
/,'(.
a-c-enz
<J/
Transoortation/Roads/Trail Network:
,'(i
4
(
A1 S
,+
Ctir
t/tS
Other Comments:
{) t'o.t'.tl-
J/
?
o/r.o"1,,, A.
.o
/.
t48
<* //;-"
*our-
COMMEI{TS
'We
April30th,20l5
Give us your thoughts on the Development Plan aspects for 1750, 1800
tion/Roads/T
Network:
L L---t
mercial
Other Comments:
"',,;/--,)
t/
',
,,,/7-t .'7 fl
:") ,';*(Ky.-t
" ut
COMMENTS
April30th,2015
NJvl+
--e^.L
tt
,'>
.Lo.
r<vr!4{
Hrro^t
t)\,
Trans
t
: ))c l-.
6l
t*1l*f
.s
l'r..-m.are" .*r".
&-
yt.DLg-,ol U
b-ld--d *-
"lt
uf
,11 CC.n
cL't.n
St
L-r*1.
U
Other Comments:
a
[r^,44
5i ?
J
l"-',.p
5t
(_
a,
dt-..v
*ns
k- "ilL
5
l{-
ln
ilh
-{ .)
tv-nJ
fw+
-(,\r
fl^o
{s
Itna.
d+e
w\aoc)
aawf)
f\"+ c"+
gv$,h^
lwo,l t RnvelsUt e
okv
lft
I
,*\.re c{ Pfeciitet-l -f=.r-+t s.'
-\-,^
be
L+ nqx
a4e r' t
*J,l
t,
me^rd
.a bcrb
av. --LaJeA
ihv
-Q-
(.,e'
o ,\'r-ri*-"
COMMENTS
April30th,2015
&
4,
b'-'\-
4-ut-
Trans
-r^A
d-7-^-
I Areas:
1,>*v^- .Q-.tq-v
u-.
^/,."/
--L
'.-* .t/'
.L "T7f,
c-&./L-
4tuaa*
k4
b,
.^l
7
J
?
62.__
('/"*
r--L*f,
,,-,5 kn-ot
COMMEI{TS
April30th,2015
&
rQc* tooks
I
rr ?
Transnortation/Roads/Trail Network:
Other Comments:
va
COMMENTS
April30th, 2015
4-c
,k
CC-v1
\
Mixed Use Residential/Commercial Areas:
,JJ
+.* = <-
c^ae<-2.-9Jr.(l
vv\vt-g-{C
,a
Other Comments:
c)
1-
t".-l
,'r'
br+ I
-{--
pl*zq
COMMENTS
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
..\
&
{U
Other Comments:
It
A-<etzUl
I o 0'4 M
4,-ut
rL
ln
D Lu lt
()
u*l
fu
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
St=
L3
Sc
rtl
z-t
NJ
(25
tion/Roads/Trail Network:
,J
T-f\d vhrnJ
1K
N> lr
cZTt
(>
vwalLcqAL
u) v\>-T>_
(28 \.-Vlo
$A
cT
At
fU
oi
.,._
f--!.
NO.,.,2
Other Comments
C-,--rJAu
Qr=-
lf,r
r1^\
t-'
V\,
lt+.
5,".-..9-<)
41 bes
\o
C
t \-.
7
T
\)
F T"Tl1
|
Anrfcr--^ - .-r.r.-\\ Ltl6 i- fc-:
)ovue,-
\o
^)o
I\
vloo
ptlrnc-rZ1
rrroY s
f\r
\\ rlrL-
uFl r\
*+r
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
&
?o,{^
i-,
-t
^sp
+L"..
rS SOU- u-,-Jx
re-J
C{
l^
+.
{Le.
voo L.-
l).-
ln.
ski se
h-((
Ct
!^
C-t
Other Comments:
<-
ac.\
(/; .Lr( Ul
+"
el
COMMENTS
April30th,2015
t-t l
d n zgT /c,rl2-r
.7/ . ,a-o
-z.l
./tr 2r-
-?/.e r ,?C///1
Z
f/C zlrz" n7 /.{.2/J
,/lL
4/ 7- ./J -r-."/,./I %
al /80 r
.'t/r
/-
,oaa?/-.'fi
Transoortation/Roadsrail Network:
//L
,ry,2lafz
7ZZ- .il
Z,t
-,ry./-
-rJ
../
ElaP
.7//
,4a.-.rr'..2
/o.Zt7: ,/2-
///-
F
JVzZZ/.7J
'2 lz'J' Are
r/./z
/1/'
//',-,r2,7,7-/.2'./
2o
//r2
./ztT/t
*'D7
fZz
-rz-.
-'/ /
l"z-r
_J-i-,-l^
a//- 2 t'
22.2'/
27az-a
,.-Ur/ ?
-,
J'z'+?s
/'1--
irt/c,2<,2c-P 2
./J
a/-zz-"/-
2Z <-&
,4r
/t/ :Jt../
,fztd-Zz-t' - ^///,/--
/zz 7/,/l/
Other Comments:
,42/
O L"rZ
aary.
.ryFZ
.-21r,2-.r/
/ .77
t/-f,f
Z//..J
p/.r ryZJ-ue;z-. 2.t
r.t-zr?
c zl
-2
Z-(
afC ,t.A---t/^l--
--
COMMENTS
'We
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
Slrv/-tlLvn,[], dt-:Qhtrva\
p-rnk
iJe,,r
kr
u'-dt\
rk:
cLlno
wnt
6L
ftt
q nli\ hcl<,
l^)
in4t
rr.*Mixed
Yvt
lrtl
0/t
oo'cj,o
]_ t\.J
ac
lra,r LS ctrm
{-
l'..e
ctr
ercial Areas:
aL u,t(
,t
/g
le
\--n
o Cj.
V{
L.,r lnr{-,
Ae(
Other Commen
h o-[
o oQ
nA
$---.UO
lv<e
c*S
- W'rac Lr.J S
14-t
, tr
O-*tI
ri
a-uo- i c,f.o-
4o,^
\l
"
/t *
^G ,r TLo- VltLt
l',
r1
,^
J-/
I n s I 1 t'vc^ Lt-t c . S'-i ^ t-t/'
}vut{ 61 tte-q^-t v'e.n l]i.. ( o, ski e r l.'>r.C t nct
Si,rna,t
pt
it tJf),1 + ,/)
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
o.,)
,ol
\)
rr"un.)
,s ",
f, k /'ri/t, 74-
ca",/J
'e
/4,t
tc
/s
TransnortationlRoadsrail Network:
l
CA
l:'
A
o-q
C)r'/l
-i
re.t I
Qa.
r /1c,-
Other Comments:
ct
1lOt''
l,,t
fl*
t,,
l,]
C-
fk
s'
i/,
//-t'-
COMMENTS
April30th,2015
l5--r>
tvf,-rt
Transportation/Roads/Trail Network:
b,ro\
)o'
fz,
b*,
tr\
f*rr-c_
%
Other Comments:
r*n'
:5
- rv*
o
,2
].-
,l
-
-]v
r,L
4s
CONfMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
Housin Areas:
,/
L-/
l/" -
L..i
,{
/,/
//
\_
Transportation/Roads/Trail Network:
L."
U/
Other Comments:
-(_*,v
,y
COMMEI{TS
April30th,2015
&
?
Other Comments:
Arct? ar A<
U
2
-2
/:/
t--
+ C)oO
Y
I
I.
--1/\ lJ
L/
6-(
-2
-a
t ooJ
:sluoluluoJ Jeqlo
I Y
lt
'rt
2
C
/)
.1,
4
2
tv.
l-z
V4
a
,/
tl
<t
</
gIgI
Ioz'q IFdv
e{
plno.,\\
e^[
STNIflI,{I,\TOJ
COMMENTS
April30th,2015
&
/JL
un2-{
tz*,
A V/o
/-"1
..>"4
*o,-/^
u,o,
-r-'L -
7"J
L..
/,/11
L.
&t-rZ-'
-/-hl
l'rya
Az--L
"4
.'1-
/-1
A,u-
2L
/-- ,4
a-J
"^-.,y'at:
/r"1
Other Comments:
//r1--
/JL-{-
-4'r'J
2
(/
&
/r"-"
)*n', ,/.Z* 4
jooa o-4/,
tu
)
COMMENTS
April30th,2015
'
Transnortation/Roadsrail Network:
Other Comments:
2
;-
COMMENTS
April30th,2015
Transportation/Roads/Trail Network:
Other Comments:
l"
[-a.A
J
r)
COMMENTS
April30th,2015
Other Comments:
COMMENTS
April30th, 2015
,'^rnL(
A r',
-t
Transnortation/Roads/Trail Network:
Ut
..
..Lra
<.
fi ll.t 8,,
"t
la
fe-
-'lv
a(//
hn-*
Other Comments:
/^
tr'
;--(..
Q.-,-(
ec
a
etL
a/h
ba
*A/l'Y
/
Q/i
^.
hr'L
,/r/
COMMENTS
April30th, 2015
Transportation/Roadsrail Network:
t\.r-
\s
Other Comments:
..\^,
t K.
\-."
" ,\\
:r
2
\J
COMMEI{TS
April30th,2015
.^s
<t
ct t r,(
o.;t
\
\
*trrt,-l
os<
+1
(-,\t
rSc{
c{
4e+--..5cdZ
"
t)
^k
LT \,r.-)qI S
\Nett
Other Comments:
rh,-1 li f\tE
te
e.
q
I
e.
fo \ gcrT
\t
.-tlr [l
JSr-r
tce
c(
(e
\I
\AJ
\s
COMMENTS
April30th,2015
Other Comments:
COMMENTS
April30th,2015
&
e"
l
no-{-
JrI)J\rr
h*
t.
rl_
tI
Other Comments:
/'1
\-\_
TI
>)
\_,
oL
Vf
of
ct
COMMENTS
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
&
/t-
-r-
tr
/'/
/s
7-,'
/
Transportation/Roads/Trail Network:
zlt/
7
L4-4/fr,
Other Comments:
/'i't,
4//
f*
-z'/ Zz
fi-lA /url
/=
./,,
4.
Dean Strachan,
Development Services,
City of Revelstoke.
Comments
RE:
Road
Residential Housing
..get it over
lstoke
network
rking.
Other comments
Great to see someone would like to make develop happen. Yes
encou rage
But please let's not sell out for short term brand spanking new
Ask yourself council what would a super high density location
After when they purchased they knew what the zoning was.
COMMEI{TS
April30th, 2015
sc it'e
(.e^g +
A/1
tion/Roads/Trail N
Sr
rk:
(/
CT
\S {h.o 6( I to
>
Other Comments:
U\Q_-
R,
COMMENTS
April30th,20l5
Transportation/Roads/Trail Network:
?-
1,
\
Other Comments:
I lXi",\ ttl.
I
rooe)o\\
<,
.o
o.,.J
["f tl r
COMMENTS
April30th, 2015
&
$I
Transnortation/Roads/Trail Netwo rk:
(-,*:
-'
,5
fv'l
Areas:
Mixed Use
jt
vtt
ek
Other Comments:
I
CL
V(
{
aa!1
tt
COMMENTS
April30th,2015
&
T+u. \ k
\.
ou
rq-
,5
t\
t^
{t
G-\+
li
LO
Transportation/Roads/Trail Network:
Tr OL\
l{nll el s
co
" d
<-
ol
o-\
e-
tJb
foo-d
@':)
(-
t"
LJO
g eo p 1e-
+" +i-.
e-
l,-.'tc-u.
al's
t a-
tll
f\
do
)ffi-F-
"
t^
ot I n,
" Jel 5 t o
P..u.lcf . I
Other Comments:
'li
,..V-' d
+o
orV
f --
l;-'
tt
U--, t
}I
+Goz
e
I
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
4"..
o.\s\\.a-
oN>
SS
()
Fo,
Q-rr
k:
IrL
r.L\
gc!
t
\
+> ? ec_
a-
C,-w
t,
l"l1
I.\x
So.
,^J
Q-
Qr(-
Other Comments:
\,
cr\ti-ns
(-
e_
av\
e_
^Ou
\*-
L.--
u-) \
L."-
\)\ .
SrQr ..
Cqr
t-r-tQ
\C-
r\
\^"- +
'4._tr t
\/\(
COMMENTS
April30th,2015
&
F v-./ /?,E.rvt.F
iK.rz-,o ) )<- )E
Give us your thoughts on the Development Plan aspects for 1750, 1800
Transnortation/Roads/Trail Network:
(cA7-
lpZ
OF -ruF
1t
i't
,O,s<,,a;,tV
c-2F Bn-eZ S
/i)./) /
,QF
l/'tt.1 Et,/)/-
P.9/er</,r()..* .>-<
E7-a
Other Comments:
.:-4,D1'a;a g) rPr<tst
Ft').)t).r?tE^)'j,fZF
H5
J
Fr?
7,4F
..I))
rT7,cltJ7/)L)t4J
'T/)
s7A9/*E
-.tzz>,O -s'/7-ES
/.tt11-
FY,F4,2<t//F
CtTt
tF),,F
15
4)c:t .rfsrnou:ez
'7./.t
)9R8,9
7-uE
/oFtolE
Z,<" 4T
O )AyeP/1-78T'
7,7/-5 PZtgZ)
k)tLL
COMMEI{TS
April30th,2015
&
J- 0e
2
rZ.e
4 ?c,
&oc.e ff,e(4 7
CNc^eaa/; Aoul t{es/o5 Frttzcrotra6 + C4,qzztil tG ln/fs
,fn
a ar5*u.s>'
"
A Fdr> n^,-tv.)
V ./o7 UctCtltt/a fv
o
Transportation/Roads/Trail Network:
,-.t
n/e{ t+sa.l
fuo
/+
/ n t- MAa.loe
n-t
l2AbS Nt
e J /r-t tg lsfi<l
(-
a)
h,rn,n
../-(
.L*
LJ t t-t- C H
t,
/1
tb
Other Comments:
/er z,
a
- Srrloul lerno04c- tn ?;r\,/j
lrcrZ
-/ v'.s
7
(Su Als
Sa/,
c,)..n
Et-s
:fc
t(
r
/
t-o PC=r
ll)t t- ltt Qrzorr cvt t a) tF -rt+ lots A-- 8L. Sa'/>a)-ottb
L LC. # So c tbL y,
A t> fU e .o,->t nt'S FTae Bu, -f
('
. rt/o'7 \f lFs l/ee> 3$ .J E LC-<
T) H
)
g tu
7
f
f77 o SCO..tt fa
,c
><
12- /
s
Sfe-nz,e 7 5o
sxlou,J @az
/ rt f e-/t o x)
)r//t+ztto /T', A 6L G -to
s7 s
Pt-E
/c
c,-1et)r
*/a.--rs 2
7*ta,
ON tt/a,</z-+L) ,Q-O+S i
.L
tHe
7a,5 f
4
Pu f Sa r)1 4N/ tt/ 5ue.4
7o
1,at't4-
.d.-
O H<-. C
rf
Aaen |
'
72rT>5"
J- 74=/x
;
Zr?V"
v-F,
'24
4tr -?
E :,
S V-t>)t/)
/ry
7vo /2./<tz7
32a
2'l
>s a^ff, .4
/ J?/LA
t-/Alrqa2tl 7/
r5auoz
U'A
//
{J
5e-2
'2
-->< a 7t )
v7z-e77,t-a-/
nf _/soq
) v fn
Oa./-?// oQ
7
2A
o
Ss
/ rt ",'t'/ -'
/
-'VLl/r/-F
o
,?
)"?
%'
v/
2f
l-t
2u ")-{,
vvool,
?J ,'1 P/,
v4v
s-/
P% t','
-.L 9
)0
nog1
/y,2vvv"ll
vc -)
,-/:"1Q{/
:slueuruoJ Joqlo
-Vru 7-o"
'//
tr
?'*-T7
ol s
?2 7
y2
7T'
)o
tt
,Y2 v,/
at2/,
-4x s'/'4
/ ./'"'r-/ +-
,{
H"
\r' o,/\'/.
<)
o
/_,v?55"2
LU
u./
n pexu l
,ol
fo
:>rome IIBrI/spBoI/uoIlBlrodsuBrI
o_r
f-2
-N
vo
n-Zrrr}.tvtZOT '7lz
:sBoJV ulsnoH Isqueplsou
pU loqclN
gIgI
loz'qloI urdv
erl plnorrl. e[
STNIflIAIWOJ
Dean Strachan
From:
Sent:
To:
Subject:
Hi Dean,
Thank you for your quick response and the information. Can you please also include my responses to your
information?
Thanks again,
From : DStracha
@revelstoke.ca
To:
the development. I have lived in Arrow Heights f or 37 years and enjoyed the
neighbourhood very much. The flavor of the neighbourhood is family homes with relatively large lots. This is
in extreme contrast to anything currently existing in the area. I live far enough down Hay Road that I would
not be right next to the development. However, the development would affect me.
I am not in favour of
Do you know how many residential units are in Revelstoke? I'm guessing about 3,500? Can you please
confirm? To put t,2OO to 1,800 units in a field in a neighbourhood is putting half of Revelstoke in a corner of
neighbourhood. lt's too big, too much and too different.
Yes Revelstoke currently has -3500 residential units.
would worry about the impact on the housing market if in the next couple of years the equivalent of half the existing
housing stock available in Revelstoke came on the market. The housing market in Revelstoke is slow right now, I don't
see how it could accommodate this much stock.
I
; .,.
The development density in comparison to what currently exists is alarming. This is literally half of the number of units
that exist in Revelstoke currently.
Where are the people going to come from to fill the units? ls there an influx of people moving to town? More
jobs coming because some major industry is coming to Revelstoke and there will be work? Or willthese most
likely be vacation condos that are empty much of the year other than peak times? We already see enough of
this in our neighbourhood with vacation homes and 6-Tvehicles being parked all overthe road in a
home. Much more traffic and difficulties with snow removal.
The developer has indicated their market would be 1,/3 retirees, 1/3 families and the remainder other residential users
and seasonal workers. The developer would be required to engineer the roads and would need to account for snow
removll in that process.
Does the developer have anything to back this up? Studies? Analysis? Where are retirees to fill 600 units coming
from? I am surprised to hear that Revelstoke is a retirement destination. I find people often move to the south
workers are going to buy homes. I don't think those coming to live and work for the ski season are interested in home
ownership or going to buy homes for the ski season.
".
a*
Are they going to be hooked up to our sewage plant? ls the traffic from allthese new residents going to be in
addition to the steady flow of traffic already on their way to the ski hill waiting to turn at the four way stop?
would be connected to City Sewer and would be contributing to services through offsite works and
to provide design and analysis on infrastructure requirements for the
proposed project. This would include a traffic study looking at not only access to the site but the four way stop through
to fourth street Victoria Road intersection.
ls
this
DCCs ad
ilar to the
Wa\
RMR played out with hooking up to City Sewer and then the money being recouped through
taxes?
to my questions
Dean Strachan
From:
Nikki
Sent:
To:
Subject:
Ball
Dean Strachan
of his emaill
Nikki Ball
City of Revelstoke
Administrative Receptionist
250-837-291,L
Box 170, Revelstoke BC
VOE 2S0 revelstoke.ca
Please note that this email is subject to the Freedom of lnformation and Protection of Privacy Act
-----Origina I Message----From
Sent: May-04-1-5 L0:54 AM
To: Nikki Ball
Subject: Development plans for 1-750,1800 and1816 Nichol Road
Hi Nikk,
fl"rrmably
increase in this area ever happens there wil undoubtedly be improvements needed to existing
infrastructu( rhds, bridge, water and sewerage). Has the developer addressed these issues?
$tr:tffi|*jir,r.,"n
Dean Strachan
From:
Sent:
To:
Thursday, Ap n 30,
15 10:05 PM
Subject:
development
My Opinion. I think building a huge complex in a nice quiet residential neighbourhood is wrong. 1500 units is a
lot of people. They'll all be trying to go over our tiny bridge, speeding thru my daughter's school zone, and
putting strain on our systems. Can we actually supply them with water and sewer? I think no one has given
this any proper thought. You say you're going to have narrower streets and ditches instead of storm drains.
Are you stupid? We live in Revelstoke. lt's not going to work. We are a nice community up here and don't need
a huge eye sore ruining it. Build a nice subdivision with nice homes that are different from one another. Make
Revelstoke unique and desirable to live in. The developers are being greedy and just trying to get as much
money as possible and not caring about the residents.
Sent from my BlackBerry 10 smartphone on the TELUS network.
Dean Strachan
From:
Monday,
04,20157:23 AM
Sent:
To:
development
Subject:
Mackenzie Village
Dean Strachan
From:
Sent:
To:
Y,
ay 01,20
deelopment
Subiect:
1-750
Hi,
I was at the public open house last night about the rezoning for Mackenzie Landing. I have not had time to
review all the information that w3s available there yet and generally I am in favour of development. However, I
hve some concerns about this pperty that I would like to express to you.
a
The proposed number of housing units (1580) seems too large given the size of the property and also in
comparison to the number of units in the whole rest of the city.
Can our aging sewage system handle the future volume? If not, how will the city be able to pay for a
new sewage system?
Illecillawaet bridge issues - eventually the bridge will need replacing to handle traffic. How will the city
be able to pay for this?
I may have more or different opinions as I read through your online information and, if so, I will let you know. I
am interested to see how this development unfolds.
Thanks,
Dean Strachan
t
From:
Sent:
lo:
development
Subject:
Mackenzie Village
I I
ft
Hello - sorry, I missed the open house last night, I was in Salmon Arm
the development. I have lived in Arrow Heights for 37 years and enjoyed the
neighbourhood very much. The flavor of the neighbourhood is family homes with relatively large lots. This is
in extreme contrast to anything currently existing in the area. I live far enough down Hay Road that I would
not be right next to the development. However, the development would affect me.
I am not in favour of
Do you know how many residential units are in Revelstoke? I'm guessing about 3,500? Can you please
Where are the people going to come from to fill the units? ls there an influx of people moving to town? More
jobs coming because some major industry is coming to Revelstoke and there will be work? Or will these most
likely be vacation condos that are empty much of the year other than peak times? We already see enough of
this in our neighbourhood with vacation homes and 6-7 vehicles being parked all over the road in a
home. Much more traffic and difficulties with snow removal.
gortg to be hooked up to our sewage plant? ls the traffic from all these new residents going to be in
iddton to the steady flow of traffic already on their way to the ski hill waiting to turn at the four way stop?
\re they
Revelstoke
to my questions.
Dean Strachan
From:
Sent:
To:
Subject:
Hi Dean,
would like to submit my comments for rezoning applications for 1750, 1800 & L816 Nichol
Road. Unfortunately I was unable to make it for the presentation so some of my comments may have already
I
been addressed.
What willthe City be responsible for with respect to snow removal, garbage collection etc? Are there
appropriate areas for snow dumps? Has the developer considered a gated community style approach where
all these responsibilities would be borne by the development?
Will/how does the trail system link up to down town? Who will pay for the connection?
Thanks again Dean. I heard the turnout was excellent.
Regards,
qs -Ltar\4
4o
l.O y. t'-' r\ o
I
cCI9 fl'vr' -r7f.)v <a'oV
/>l-l<\ ru
r tS
-rl
l-24
-n1
'*"t'-9
".t1
? >r,!
.\2.7.t<)
"rorzp
,^a
l'(')'
e+L,> T lC )
2nn
v\
aYrzV
Ll 1^ I t ,f 5 { 4-}n{:f-.
^,{c\rpr._t\r_ /2\'eqn ?i"}?11 \^0
c1 ,..,|
r>
r;"vlT
f
sq
a-\
I ,9 \
\u'2\S n9
'l
1r.t
<4-\
t\
't
J5 '.r!
'
l-V:f
-i 7)1)
rt\
aO t.
-7
n
Y1
)r\
Y7
,'?$q' {1^cn
_'d"l
\rr"q
ft
1\r
)"1
n?r
l*oz-Ll
7
T1
-!
l:"1 I -
9'q
2-.ery
"r\tr Y-ro
o.zF,l.2-.XJ
\roc"q
/fl
^P
'U
- .\)
:slueuuof, Jeqlo
''1lA
1^L
-Yl
\)
r[
LtlJJ
P",Y \on\N
.ffi'..*-co
T
'l
r
?1-gJl^r
1,1.'
.1
>"
]J
t ? {tr0.rt
71
.r4p
lNl
7-v.\ 11,
'7'n'1
pexlntr
ft
a\f "prt
oor
1l
I '\f)"
<
1a
.$9i0p
| 'n
) frt
\,\q!)"J 0
t n,
v<
)1c
19
"1
-,
^,
()
yDn
'qcilc'lw9 J 0
4l"r-'p
{"a-'J
:a2 7l )')4,'' ?7
..1)
',(y' c -t;9rt
+^4
)4\'r)..^
r)
37)
gIgI T
,}\
7 )%.{/+V
ueplsau as
:SBEJV
k+t *O v\\frrl
{"r0
/?lrr-
).), llll
'\ Y
l
5
s 7'nyn
-y\'41
e-r.j
>
--r5-nt2 ) cI
pu loqclN
)5x..v1
vnol
aoy\,
1"
P ?1
1.4's<a
Sli-., l?d
-)
(r',,\)
{)w"'L
]\o
^t,
i"
I0z'qlOI llrdv
STNIflI^[ruOJ
1'oro't n) ll 1t'
'fT-'t''*/tL'"1'{ntetsz'1nla'id'"1'"'-(Y+^5'r1fi5
Ytwil i'
,"1 'Tt;t''
s ag
ndott)
ilt'
i.*"P
.-r,* -, r
"'''l'*-n
(''I
) Y-tv
11 ,'t)ot
04 uv\
- r'-cl
- '. :t
nv<
j,
^ *,n
zz4
4?:*
;'
v4
Q$
:(r;
lt. ^ntn
r:,;"',,|h'-l:'
Nr
.'rTll-gvero"P
zto
o
-r.0 -vrrz-t-vs'o-rrr'f
Q**
Clr
I
z
a|'>lh'r
t
c-r6
'qrc+ -{rig "f-"'v)
lr\ +v:tz)
. (=-rtfltt!llr\\7'
'''\i
y22n:zry:"-\t/ vn l."rf o* v/Y) < Fuipt'"nq ! 1r.,r1 f
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
9.
/r/ u) at/atual
tD nnnf,th)
,hrll fs1;lnfr.r-mlMl
.t
Q "A,t g 0C,m.
ry U}-u)
$
l=
Rr
)N {
h
Iq
). \
\{
s
t
\s
R
\
,l
t)
\
\)
I
\
COMMENTS
April30th,2015
f
t5
,
oa2
sp
COMMENTS
'We
April30th, 2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
1l'- //d* ,2 tJ
tz,
,,a
- rL t6 /,
not
/7lt
n^.-'
(-.
)ennk-
UA
vv
^lt
^+
Transoortation/Roads/Trail Nefwork:
II/WL
A
a/t
4a.^-a-
/'
Other Comments:
^tf
L/{
W".
t"^r*J 3
h
/Y_
COMMENTS
April30th,2015
&
.\crne*Lr^q
\J
Trans
{c.r
I
',,S
b,\
hcl-
. cls
-,
\\',s
r^r,\\
W\o
Kp -,L
$\
Other Comments:
c\^c^+raJe\
COMMENITS
'We
Give us your thoughts on the Development Plan aspects for 1750, 1800
--/
'7-l-
ts:
//
\!
-" tt
(-/
t
April3rh,2015
-t
&
COMMENTS
April30th,2015
Give us your thoughts on the Development Plan aspects for 1750, 1800
&
fvt
?vt \
S +D
CP)>
500D
-t
t-
Y(
la &__t f O1"-)
l/
noqls 7 lL t
3z O a
o
37',L
Other Comments:
- ?
+rr- .1t
?J L-t
/"
3) n)o
a
4.5
I tow,.-^,
I
)
C>.-*
-J
rt
4o
dT
D c
- /ttta-:
?
?
COMMENTS
April30th, 2015
&
-fL"
ou(
on
I,[l
($
rta
I
w\ \t
Areas:
tr*^
Other Comments:
o{onl
I
u
,
nvl
VN\
l<
Figure 6
0929468 BC Ltd.
David Evans
3669 Catherwood Road
Revelstoke, BC V0E 2S3
1 (604) 932-9835
dnevanshk@gmail.com
- no further comments
2. CONCERNS ABOUT THE NUMBER OF RESIDENTIAL UNITS PROPOSED.
- At the public hearing residents were focusing on the incorrect number of units being 1580 which was a
very early release number this has subsequently been reduced to between a maximum of 1100-1200.
- The number of units is a high number as a result of the perceived requirement for smaller 400-750 sqft
units, which vary from studio to 2 bed units.
- We have also proposed allowing suites in townhouses, duplexes, and single-family homes to allow for
flexible living and additional income generation as is the case currently in all single-family homes in
Revelstoke. These units may never be used as suites. So while the building footprint itself may be that
of a single unit this also accounts for a higher number of total units.
- The plan is intended to be flexible and built out over 15 years. If we find that the smaller apartment and
townhouse units are not sought, then we are able to provide duplex and single family options that are in
demand. In which case we would have far fewer number of units. If we consider the visual and
aesthetic impact of the development, we are looking at a few apartment/mixed use buildings with small,
medium and large apartments and 300-400 townhouse, duplex and single family units.
- no further comments
- We believe that the capacity that was identified to support the development of Revelstoke Mountain
Resort is also capable of supporting the proposed Nichol Road development. The studies we are
completing on infrastructure capacity will better answer these questions at the next public hearing.
- The Nichol Road development will increase traffic, but will only help trigger road and infrastructure
improvements sooner, as these improvements are expected with the development of RMR in the
future.
- We intend to plug in to the existing sewer line that is currently underused. By plugging into the existing
sewer line the development helps pay more of the maintenance cost. This allows the City to reduce
their financial burden and in combination with the proposed density of the development, ensures that
the City will recover costs over the long term.
- We will be developing roads as statutory rights-of-way, meaning that the property owners will pay for
the majority of their infrastructure costs. Road construction and maintenance, snow removal, garbage
and recycling collection will be paid for by the development, and not be a City responsibility.
- The addition of this development is going to give the city the future tax revenues to deal with these
already present issues.
5. SUPPORT FOR THE CONCEPT OF LIMITED NEIGHBOURHOOD COMMERCIAL USES BEING
INCLUDED
- no further comments
6. CONCERNS ABOUT IMPACTS OF SHORT TERM RENTAL OF UNITS.
- Short term rentals are a required part of this offering for a number of reasons:
1. Flexibility in use
2. Providing a yield to future owners
3. Concentrating rentals within a given neighbourhood rather than spreading out across many
existing residential neighbourhoods
- For the city of Revelstoke to be a successful and vibrant resort town in the future it needs a strong
owner vacation program, by integrating that zoning within this new development it will provide that and
also centralize nightly rentals that gives two other major benefits to the existing residential areas:
1. You do not get nightly renters between families disrupting their everyday routines.
2. Existing housing does not get valued on a yield basis, potentially making it unaffordable to local
families.
We appreciate your feedback and look forward to the next steps in this project.