You are on page 1of 3

Federal Register / Vol. 73, No.

26 / Thursday, February 7, 2008 / Notices 7285

The filings in the above proceedings (Trunkline), P. O. Box 4967, Houston, Commission’s Procedural Rules (18 CFR
are accessible in the Commission’s Texas 77210–4967, filed in Docket No. 385.214) a motion to intervene or notice
eLibrary system by clicking on the CP08–61–000, a prior notice request of intervention and, pursuant to section
appropriate link in the above list. They pursuant to sections 157.205, 157.210, 157.205 of the Commission’s
are also available for review in the and 157.216 of the Federal Energy Regulations under the Natural Gas Act
Commission’s Public Reference Room in Regulatory Commission’s regulations (NGA) (18 CFR 157.205) a protest to the
Washington, DC. There is an under the Natural Gas Act for request. If no protest is filed within the
eSubscription link on the Web site that authorization to relocate an existing time allowed therefore, the proposed
enables subscribers to receive e-mail interconnect with Enbridge Pipeline activity shall be deemed to be
notification when a document is added (East Texas) L.P. (Enbridge), located in authorized effective the day after the
to a subscribed docket(s). For assistance Hardin County, Texas, and increase the time allowed for protest. If a protest is
with any FERC Online service, please e- certificated capacity of Trunkline’s filed and not withdrawn within 30 days
mail FERCOnlineSupport@ferc.gov or North Texas transmission system by 40 after the time allowed for filing a
call (866) 208–3676 (toll free). For TTY, MMcf/d, all as more fully set forth in protest, the instant request shall be
call (202) 502–8659. the application, which is on file with treated as an application for
the Commission and open to public authorization pursuant to section 7 of
Nathaniel J. Davis, Sr.,
inspection. The filing may also be the NGA.
Deputy Secretary.
viewed on the Web at http:// The Commission strongly encourages
[FR Doc. E8–2249 Filed 2–6–08; 8:45 am] www.ferc.gov using the ‘‘eLibrary’’ link. electronic filings of comments, protests,
BILLING CODE 6717–01–P Enter the docket number excluding the and interventions via the Internet in lieu
last three digits in the docket number of paper. See 18 CFR 385.2001(a)(1)(iii)
field to access the document. For and the instructions on the
DEPARTMENT OF ENERGY assistance, contact FERC at Commission’s Web site (http://
Federal Energy Regulatory FERCOnlineSupport@ferc.gov or call www.ferc.gov) under the ‘‘e-Filing’’ link.
Commission toll-free, (886) 208–3676 or TYY, (202)
502–8659. Kimberly D. Bose,
[Docket No. PL07–2–000] Specifically, Trunkline proposes to Secretary.
relocate the Enbridge Pipeline (East [FR Doc. E8–2203 Filed 2–6–08; 8:45 am]
Composition of Proxy Groups for Texas) L.P. Meter Station from its BILLING CODE 6717–01–P
Determining Gas and Oil Pipeline current location at Trunkline’s existing
Return on Equity; Notice of Kountze Compressor Station, located in
Opportunity for Filing Reply Kountze, Hardin County, Texas, to a ENVIRONMENTAL PROTECTION
Comments new location near Silsbee, Hardin AGENCY
January 31, 2008. County, Texas. Trunkline states that the
[FRL–8526–6]
On January 23, 2008, a technical relocation will increase the certificated
conference was held in this proceeding capacity of Trunkline’s North Texas Proposed Settlement Agreement,
on the issue of master limited transmission system expansion facilities Clean Air Act Citizen Suit
partnership growth rates.1 As required by 40 MMcf/d. Trunkline asserts that
the increase in capacity will benefit AGENCY: Environmental Protection
by the Commission’s December 13, 2007
Trunkline’s shippers. Trunkline Agency (EPA).
notice, initial post-conference
comments must be filed on or before declares that it will be able to receive, ACTION: Notice of Proposed Settlement
February 11, 2008. In addition, notice is and, at the same time, Enbridge will be Agreement; Request for Public
hereby given that reply comments may able to increase the volumes of natural Comment.
be filed on or before February 20, 2008. gas being delivered to Trunkline for
further transportation to natural gas SUMMARY: In accordance with section
Kimberly D. Bose, markets. Trunkline proposes to relocate 113(g) of the Clean Air Act, as amended
Secretary. the Enbridge facilities located at the (‘‘Act’’), 42 U.S.C. 7413(g), notice is
[FR Doc. E8–2201 Filed 2–6–08; 8:45 am] Kountze Compressor Station hereby given of a proposed settlement
BILLING CODE 6717–01–P approximately 15 miles east and install agreement, to address a lawsuit filed by
and own two 12-inch hot tap assemblies the Battery Council International
on existing 24-inch Lines 100–1 and (‘‘BCI’’) in the United States Court of
DEPARTMENT OF ENERGY 100–2, and install a 16-inch above-grade Appeals for the District of Columbia
valve that will function as the Circuit: Battery Council International v.
Federal Energy Regulatory overpressure protection device and EPA, No. 07–1364 (D.C. Cir.). On
Commission RTU. Trunkline estimates the cost to September 13, 2007, BCI filed a petition
relocate the meter station to be for review challenging regulations
[Docket No. CP08–61–000]
$983,040. promulgated by EPA in a final rule
Trunkline Gas Company, LLC; Notice Any questions regarding the entitled ‘‘National Emission Standards
of Request Under Blanket application should be directed to for Hazardous Air Pollutants for Area
Authorization Stephen T. Veatch, Regulatory Affairs, Sources: Acrylic and Modacrylic Fibers
Trunkline Gas Company, LLC, 5444 Production, Carbon Black Production,
January 31, 2008. Westheimer Road, Houston Texas Chemical Manufacturing: Chromium
Take notice that on January 23, 2008, 77056, call (713) 989–2024, fax (713) Compounds, Flexible Polyurethane
Trunkline Gas Company, LLC 989–1158, or by e-mail Foam Production and Fabrication, Lead
jlentini on PROD1PC65 with NOTICES

Stephen.Veatch@SUG.com. Acid Battery Manufacturing, and Wood


1 The technical conference was established by
Any person or the Commission’s Staff Preserving’’ published at 72 FR 38864
Commission order issued November 15, 2007. See
Composition of Proxy Groups for Determining Gas
may, within 60 days after the issuance (July 16, 2007) (the ‘‘Battery NESHAP’’).
and Oil Pipeline Return on Equity, 121 FERC of the instant notice by the Commission, Specifically, BCI is challenging the Lead
¶ 61,165 (2007). file pursuant to Rule 214 of the Acid Battery Manufacturing NESHAP

VerDate Aug<31>2005 17:02 Feb 06, 2008 Jkt 214001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\07FEN1.SGM 07FEN1
7286 Federal Register / Vol. 73, No. 26 / Thursday, February 7, 2008 / Notices

regarding the scope of the performance and thereafter publishes in the Federal submitted electronically or in paper,
test requirement in Subpart PPPPPP, 40 Register a final rule that contains a will be made available for public
CFR 63.11423(c)(1). Under the terms of technical amendment to the Battery viewing online at www.regulations.gov
the proposed settlement agreement, EPA NESHAP that is substantially the same without change, unless the comment
shall sign a notice of proposed in substance as set forth in Attachment contains copyrighted material, CBI, or
rulemaking and/or direct final A to the settlement agreement, BCI and other information whose disclosure is
rulemaking that contains a technical EPA will file the appropriate pleading restricted by statute. Information
amendment to the Battery NESHAP that for the dismissal of the petition for claimed as CBI and other information
is substantially the same in substance as review with prejudice in accordance whose disclosure is restricted by statute
set forth in Attachment A of the with Rule 42(b) of the Federal Rules of is not included in the official public
proposed settlement agreement. Appellate Procedures, with each party docket or in the electronic public
DATES: Written comments on the to bear its own costs and attorneys’ fees. docket. EPA’s policy is that copyrighted
proposed settlement agreement must be For a period of thirty (30) days material, including copyrighted material
received by March 10, 2008. following the date of publication of this contained in a public comment, will not
ADDRESSES: Submit your comments, notice, the Agency will receive written be placed in EPA’s electronic public
identified by Docket ID number EPA– comments relating to the proposed docket but will be available only in
HQ–OGC–2008–0076, online at settlement agreement. EPA or the printed, paper form in the official public
www.regulations.gov (EPA’s preferred Department of Justice may withdraw or docket. Although not all docket
method); by e-mail to withhold consent to the proposed materials may be available
oei.docket@epa.gov; mailed to EPA settlement agreement if the comments electronically, you may still access any
Docket Center, Environmental disclose facts or considerations that of the publicly available docket
indicate that such consent is materials through the EPA Docket
Protection Agency, Mailcode: 2822T,
inappropriate, improper, inadequate, or Center.
1200 Pennsylvania Ave., NW.,
Washington, DC 20460–0001; or by inconsistent with the requirements of B. How and To Whom Do I Submit
hand delivery or courier to EPA Docket the Act. Unless EPA or the Department Comments?
Center, EPA West, Room 3334, 1301 of Justice determines, based on any
comment which may be submitted, that You may submit comments as
Constitution Ave., NW., Washington, provided in the ADDRESSES section.
DC, between 8:30 a.m. and 4:30 p.m. consent to the settlement agreement
should be withdrawn, the terms of the Please ensure that your comments are
Monday through Friday, excluding legal submitted within the specified comment
holidays. Comments on a disk or CD– agreement will be affirmed.
period. Comments received after the
ROM should be formatted in Word or II. Additional Information About close of the comment period will be
ASCII file, avoiding the use of special Commenting on the Proposed marked ‘‘late.’’ EPA is not required to
characters and any form of encryption, Settlement Agreement consider these late comments.
and may be mailed to the mailing If you submit an electronic comment,
address above. A. How Can I Get a Copy of the
EPA recommends that you include your
FOR FURTHER INFORMATION CONTACT: Paul
Settlement Agreement?
name, mailing address, and an e-mail
Versace, Air and Radiation Law Office Direct your comments to the official address or other contact information in
(2344A), Office of General Counsel, U.S. public docket for this action under the body of your comment and with any
Environmental Protection Agency, 1200 Docket ID No. EPA–HQ–OGC–2008– disk or CD ROM you submit. This
Pennsylvania Ave., NW., Washington, 0076, which contains a copy of the ensures that you can be identified as the
DC 20460; telephone: (202) 564–0219; settlement agreement. The official submitter of the comment and allows
fax number (202) 564–5603; e-mail public docket is available for public EPA to contact you in case EPA cannot
address: versace.paul@epa.gov. viewing at the Office of Environmental read your comment due to technical
SUPPLEMENTARY INFORMATION: Information (OEI) Docket in the EPA difficulties or needs further information
Docket Center, EPA West, Room 3334, on the substance of your comment. Any
I. Additional Information About the 1301 Constitution Ave., NW., identifying or contact information
Proposed Settlement Washington, DC. The EPA Docket provided in the body of a comment will
Battery Council International (BCI) Center Public Reading Room is open be included as part of the comment that
filed a petition for review of the rules from 8:30 a.m. to 4:30 p.m., Monday is placed in the official public docket,
applicable to Lead Acid Battery through Friday, excluding legal and made available in EPA’s electronic
Manufacturing on September 13, 2007. holidays. The telephone number for the public docket. If EPA cannot read your
BCI raised issues regarding the scope of Public Reading Room is (202) 566–1744, comment due to technical difficulties
the performance test requirement in and the telephone number for the OEI and cannot contact you for clarification,
Subpart PPPPPP, 40 CFR 63.11423(c)(1) Docket is (202) 566–1752. EPA may not be able to consider your
of the Battery NESHAP. An electronic version of the public comment.
The settlement agreement provides docket is available through Use of the www.regulations.gov Web
that within three days after the www.regulations.gov. You may use the site to submit comments to EPA
agreement is executed BCI and EPA will www.regulations.gov Web site to submit electronically is EPA’s preferred method
jointly notify the Court of this or view public comments, access the for receiving comments. The electronic
settlement agreement and request that index listing of the contents of the public docket system is an ‘‘anonymous
the case continue to be held in official public docket, and access those access’’ system, which means EPA will
abeyance. The settlement agreement documents in the public docket that are not know your identity, e-mail address,
states that EPA shall sign a notice of available electronically. Once in the or other contact information unless you
jlentini on PROD1PC65 with NOTICES

proposed rulemaking and/or direct final system, select ‘‘search,’’ then key in the provide it in the body of your comment.
rulemaking that contains a technical appropriate docket identification In contrast to EPA’s electronic public
amendment to the Battery NESHAP that number. docket, EPA’s electronic mail (e-mail)
is substantially the same in substance as It is important to note that EPA’s system is not an ‘‘anonymous access’’
set forth in Attachment A. If EPA signs policy is that public comments, whether system. If you send an e-mail comment

VerDate Aug<31>2005 17:02 Feb 06, 2008 Jkt 214001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\07FEN1.SGM 07FEN1
Federal Register / Vol. 73, No. 26 / Thursday, February 7, 2008 / Notices 7287

directly to the Docket without going Room 1–C823, 445 12th Street, SW., February 18, 2009 or later may file a
through www.regulations.gov, your e- Washington, DC 20554. notification of an event that would toll
mail address is automatically captured FOR FURTHER INFORMATION CONTACT: For their deadline to construct their final,
and included as part of the comment additional information about the post-transition (DTV) facility using FCC
that is placed in the official public information collection(s), contact Cathy Informal Application Form.
docket, and made available in EPA’s Williams at (202) 418–2918 or send an Federal Communications Commission.
electronic public docket. e-mail to PRA@fcc.gov. Marlene H. Dortch,
Dated: January 30, 2008. SUPPLEMENTARY INFORMATION: Secretary.
Richard B. Ossias, OMB Control Number: 3060–0407. [FR Doc. E8–2100 Filed 2–6–08; 8:45 am]
Associate General Counsel. Type of Review: Revision of a BILLING CODE 6712–01–P
[FR Doc. E8–2252 Filed 2–6–08; 8:45 am] currently approved collection.
BILLING CODE 6560–50–P
Title: Application for Extension of
Time to Construct a Digital Television
FEDERAL MARITIME COMMISSION
Broadcast Station, FCC Form 337;
Section 73.3598, Period of Construction. Notice of Agreements Filed
FEDERAL COMMUNICATIONS Form Number: FCC Form 337.
COMMISSION Respondents: Business or other for- The Commission hereby gives notice
profit entities; Not-for-profit of the filing of the following agreements
Notice of Public Information institutions. under the Shipping Act of 1984.
Collection(s) Being Reviewed by the Number of Respondents: 160. Interested parties may submit comments
Federal Communications Commission, Estimated Time per Response: 0.25 to on agreements to the Secretary, Federal
Comments Requested 3 hours. Maritime Commission, Washington, DC
Frequency of Response: On occasion 20573, within ten days of the date this
January 30, 2008.
reporting requirement; Recordkeeping notice appears in the Federal Register.
SUMMARY: The Federal Communications Copies of agreements are available
requirement.
Commission, as part of its continuing through the Commission’s Office of
Total Annual Burden: 263 hours.
effort to reduce paperwork burdens, Total Annual Cost: $37,000. Agreements (202–523–5793 or
invites the general public and other Needs and Uses: Congress has tradeanalysis@fmc.gov).
Federal agencies to take this mandated that after February 17, 2009, Agreement No.: 011654–019.
opportunity to comment on (PRA) of full-power television broadcast stations Title: The Middle East Indian
1995 (PRA), Public Law No. 104–13. An must transmit only in digital signals, Subcontinent Discussion Agreement.
agency may not conduct or sponsor a and may no longer transmit analog Parties: A.P. Moller-Maersk A/S; CMA
collection of information unless it signals. On December 22, 2007, the CGM S.A.; Hapag-Lloyd AG; National
displays a currently valid control Commission adopted a Report and Shipping Company of Saudi Arabia;
number. Subject to the PRA, no person Order in the matter of the Third Swire Shipping Limited; and United
shall be subject to any penalty for failing Periodic Review of the Commission’s Arab Shipping Company (S.A.G.).
to comply with a collection of Rules and Policies Affecting the Filing Party: Wayne R. Rohde, Esq.;
information that does not display a Conversion to Digital Television, MB Sher & Blackwell LLP; 1850 M Street,
valid control number. Comments are Docket No. 07–91, FCC 07–228, to NW; Suite 900; Washington, DC 20036.
requested concerning (a) whether the establish the rules, policies and Synopsis: The amendment deletes
proposed collection of information is procedures necessary to complete the Emirates Shipping Line FZE; Shipping
necessary for the proper performance of nation’s transition to Digital TV (DTV). Corporation of India Ltd.; and Zim
the functions of the Commission, With the DTV transition deadline less Integrated Shipping Services, Ltd. as
including whether the information shall than 14 months away, the Commission parties to the agreement.
have practical utility; (b) the accuracy of must ensure that broadcasters meet their Agreement No.: 011794–008.
the Commission’s burden estimate; (c) statutory responsibilities and complete Title: COSCON/KL/YMUK/Hanjin/
ways to enhance the quality, utility, and construction of, and begin operations Senator Worldwide Slot Allocation &
clarity of the information collected; and on, the facility on their final, post- Sailing Agreement.
(d) ways to minimize the burden of the transition (digital) channel that will Parties: COSCO Container Lines
collection of information on the reach viewers in their authorized Company, Limited; Kawasaki Kisen
respondents, including the use of service areas by the statutory transition Kaisha, Ltd.; Yangming (UK) Ltd.;
automated collection techniques or deadline, when they must cease Hanjin Shipping Co., Ltd.; and Senator
other forms of information technology. broadcasting in analog. The Commission Lines GmbH.
DATES: Written PRA comments should wants to ensure that no consumers are Filing Party: Robert B. Yoshitomi,
be submitted on or before April 7, 2008. left behind in the DTV transition. Esq.; Nixon Peabody LLP; 555 West
If you anticipate that you will be Specifically, the Report and Order Fifth Street, 46th Floor; Los Angeles, CA
submitting comments, but find it requires the following: 90013.
difficult to do so within the period of • Extension Requests. Stations with a Synopsis: The amendment revises the
time allowed by this notice, you should construction deadline on or before vessel contributions and fleet capacities
advise the contact listed below as soon February 17, 2009 may file a request for of the parties.
as possible. an extension of time to construct their Agreement No.: 012024.
ADDRESSES: You may submit all PRA final, post-transition (DTV) facility Title: K-Line/NYK Atlantic Space
comments by e-mail or U.S. post mail. using FCC Form 337. Charter Agreement.
jlentini on PROD1PC65 with NOTICES

To submit your comments by e-mail, • Revisions to FCC Form 337. FCC Parties: Kawasaki Kisen Kaisha and
send them to PRA@fcc.gov. To submit Form 337 was revised to reflect the Nippon Yusen Kaisha.
your comments by U.S. mail, mark them stricter standard of review. Filing Party: Wayne R. Rohde, Esq.;
to the attention of Cathy Williams, • Tolling Requests. Stations with a Sher & Blackwell LLP; 1850 M Street,
Federal Communications Commission, construction deadline occurring NW; Suite 900; Washington, DC 20036.

VerDate Aug<31>2005 17:02 Feb 06, 2008 Jkt 214001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\07FEN1.SGM 07FEN1

You might also like