You are on page 1of 1

Federal Register / Vol. 72, No.

60 / Thursday, March 29, 2007 / Notices 14795

n. Anyone may submit comments, a DEPARTMENT OF ENERGY related to this or other pending projects.
protest, or a motion to intervene in For assistance, contact FERC Online
accordance with the requirements of Federal Energy Regulatory Support.
Rules of Practice and Procedure, 18 CFR Commission
Philis J. Posey,
385.210, 385.211, 385.214. In
determining the appropriate action to Notice of Intent To File License Acting Secretary.
take, the Commission will consider all Application, Filing of Pre-Application [FR Doc. E7–5762 Filed 3–28–07; 8:45 am]
protests or other comments filed, but Document, and Approval of Use of the BILLING CODE 6717–01–P
only those who file a motion to Traditional Licensing Process
intervene in accordance with the March 23, 2007.
Commission’s Rules may become a DEPARTMENT OF ENERGY
a. Type of Filing: Notice of Intent to
party to the proceeding. Any comments,
File License Application and Request to Federal Energy Regulatory
protests, or motions to intervene must
Use the Traditional Licensing Process. Commission
be received on or before the specified
b. Project No.: 12455–003.
comment date for the particular Notice of Application Accepted for
c. Dated Filed: September 1, 2006.
application. Filing and Soliciting Motions To
All filings must: (1) Bear in all capital d. Submitted by: Borough of Leighton,
Pennsylvania. Intervene, Protests, and Comments
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’ e. Name of Project: Beltzville
March 23, 2007.
‘‘REPLY COMMENTS,’’ Hydroelectric Project.
f. Location: The project would be Take notice that the following
‘‘RECOMMENDATIONS,’’ ‘‘TERMS hydroelectric application has been filed
AND CONDITIONS,’’ or connected to the U.S. Army Corps of
Engineers Beltzville Dam, located on with the Commission and is available
‘‘PRESCRIPTIONS;’’ (2) set forth in the for public inspection:
heading the name of the applicant and Pohopoco Creek, in the Borough of
a. Type of Application: Preliminary
the project number of the application to Leighton, Carbon County, Pennsylvania.
Permit.
which the filing responds; (3) furnish g. Filed Pursuant to: 18 CFR 5.3 of the
b. Project No.: 12760–000.
the name, address, and telephone Commission’s regulations. c. Date filed: December 28, 2006 and
number of the person protesting or h. Applicant Contact: Mr. John F. amended on February 22, 2007.
intervening; and (4) otherwise comply Hanosek, P.E., Borough Manager, P.O. d. Applicant: Hydro Green Energy,
with the requirements of 18 CFR Box 29, Municipal Building, Second LLC.
385.2001 through 385.2005. All and South Street, Leighton, PA 18235, e. Name of Project: Mississippi 5
comments, recommendations, terms and (610) 377–4002. Project.
conditions or prescriptions must set i. FERC Contact: Jack Hannula, (202) f. Location: The project would be
forth their evidentiary basis and 502–8917 or john.hannula@ferc.gov. located at the U.S. Army Corps of
otherwise comply with the requirements j. The Borough of Leighton, Engineers’ existing Arkabutla Reservoir
of 18 CFR 4.34(b). Agencies may obtain Pennsylvania filed its request to use the Dam, on the Yazoo River, in DeSoto and
copies of the application directly from Traditional Licensing Process on August Tate Counties, Mississippi.
the applicant. A copy of any protest or 31, 2006. The Borough of Leighton, g. Filed Pursuant to: Federal Power
motion to intervene must be served Pennsylvania filed public notice of its Act, 16 U.S.C. §§ 791(a)–825(r).
upon each representative of the request on September 19, 2006. In a h. Applicant Contacts: Mr. James H.
applicant specified in the particular letter dated October 27, 2006, the Hancock, Jr., Batch & Bingham LLP,
application. A copy of all other filings Director of the Office of Energy Projects 1710 Sixth Avenue North, Birmingham,
in reference to this application must be approved the Borough of Leighton, AL 35203–2014, (205) 226–3418. Mr.
accompanied by proof of service on all Pennsylvania’s request to use the James R. Kunkel, PhD, P.E., Knight
persons listed in the service list Traditional Licensing Process. Piesold and Co., 1050 Seventeenth
prepared by the Commission in this k. The Borough of Leighton, Street, Suite 450, Denver, CO 80265,
proceeding, in accordance with 18 CFR Pennsylvania filed a Pre-Application (303) 629–8788.
4.34(b) and 385.2010. Document (PAD; including a proposed i. FERC Contact: Etta Foster, (202)
You may also register online at process plan and schedule) with the 502–8769.
http://www.ferc.gov/docs-filing/ Commission, pursuant to 18 CFR 5.6 of j. Deadline for filing comments,
esubscription.asp to be notified via e- the Commission’s regulations. protests, and motions to intervene: 60
mail of new filings and issuances l. A copy of the PAD is available for days from the issuance date of this
related to this or other pending projects. review at the Commission in the Public notice.
For assistance, contact FERC Online Reference Room or may be viewed on The Commission’s Rules of Practice
Support. the Commission’s Web site (http:// and Procedure require all intervenors
o. A license applicant must file, no www.ferc.gov), using the ‘‘eLibrary’’ filing documents with the Commission
later than 60 days following the date of link. Enter the docket number, to serve a copy of that document on
issuance of this notice: (1) A copy of the excluding the last three digits in the each person in the official service list
water quality certification; (2) a copy of docket number field to access the for the project. Further, if an intervenor
the request for certification, including document. For assistance, contact FERC files comments or documents with the
proof of the date on which the certifying Online Support at Commission relating to the merits of an
agency received the request; or (3) FERCOnlineSupport@ferc.gov or toll issue that may affect the responsibilities
evidence of waiver of water quality free at 1–866–208–3676, of for TTY, of a particular resource agency, they
certification. (202) 502–8659. A copy is also available must also serve a copy of the document
jlentini on PROD1PC65 with NOTICES

for inspection and reproduction at the on that resource agency.


Philis J. Posey, address in paragraph h. k. Description of Project: The
Acting Secretary. Register online at http://ferc.gov/docs- proposed project would utilize the U.S.
[FR Doc. E7–5699 Filed 3–28–07; 8:45 am] filing/esubscription.asp to be notified Army Corps of Engineers’ Arkabutla
BILLING CODE 6717–01–P via e-mail of new filing and issuances Dam, reservoir and all appurtenant

VerDate Aug<31>2005 17:20 Mar 28, 2007 Jkt 211001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1

You might also like