Federal Register / Vol. 71, No.

206 / Wednesday, October 25, 2006 / Notices 62425

Total Responses: 200. minimize the burden of the collection of (e) FAR 45.505–1 requires that basic
Average Burden Hours Per Response: information on those who are to information be placed on the
3. respond, through the use of appropriate contractor’s property control records.
Total Burden Hours: 600. technological collection techniques or (f) FAR 45.505–3 requires a contractor
Obtaining Copies of Proposals: other forms of information technology. to maintain records for Government
Requesters may obtain a copy of the DATES: Submit comments on or before material.
information collection documents from November 24, 2006. (g) FAR 45.505–4 requires a contractor
the General Services Administration, FOR FURTHER INFORMATION CONTACT: to maintain records of special tooling
FAR Secretariat (VIR), Room 4035, 1800 Jeritta Parnell, Contract Policy Division, and special test equipment.
F Street, NW, Washington, DC 20405, GSA (202) 501–4082. (h) FAR 45.505–5 requires a
telephone (202) 501–4755. Please cite ADDRESSES: Submit comments,
contractor to maintain records of plant
OMB Control No. 9000–0114, Right of including suggestions for reducing this equipment.
First Refusal of Employment, in all burden to: FAR Desk Officer, OMB, (i) FAR 45.505–7 requires a contractor
correspondence. Room 10102, NEOB, Washington, DC to maintain records of real property.
(j) FAR 45.505–8 requires a contractor
Dated: October 3, 2006. 20503, and a copy to the General
Services Administration, FAR to maintain scrap and salvage records.
Ralph De Stefano, (k) FAR 45.505–9 requires a
Director, Contract Policy Division. Secretariat (VIR), 1800 F Street, NW,
contractor to maintain records of related
[FR Doc. 06–8863 Filed 10–24–06; 8:45 am] Room 4035, Washington, DC 20405.
data and information.
SUPPLEMENTARY INFORMATION:
BILLING CODE 6820–EP–S (l) FAR 45.505–10 requires a
A. Purpose contractor to maintain records for
‘‘Property,’’ as used in Part 45, means completed products.
DEPARTMENT OF DEFENSE (m) FAR 45.505–11 requires a
all property, both real and personal. It
includes facilities, material, special contractor to maintain records of
GENERAL SERVICES transportation and installation costs of
ADMINISTRATION tooling, special test equipment, and
agency-peculiar property. Government plant equipment.
(n) FAR 45.505–12 requires a
NATIONAL AERONAUTICS AND property includes both Government-
furnished property and contractor- contractor to maintain records of
SPACE ADMINISTRATION misdirected shipments.
acquired property.
[OMB Control No. 9000–0075] Contractors are required to establish (o) FAR 45.505–13 requires a
and maintain a property system that contractor to maintain records of
Federal Acquisition Regulation; will control, protect, preserve, and property returned for rework.
Submission for OMB Review; maintain all Government property (p) FAR 45.505–14 requires a
Government Property because the contractor is responsible contractor to submit an annual report of
and accountable for all Government Government property accountable to
AGENCIES: Department of Defense (DOD), each agency contract.
General Services Administration (GSA), property under the provisions of the
contract including property located with (q) FAR 45.508–2 requires a
and National Aeronautics and Space contractor to report the results of
Administration (NASA). subcontractors.
The contractor’s property control physical inventories.
ACTION: Notice of request for public records shall constitute the (r) FAR 45.509–1(a)(3) requires a
comments regarding an extension to an Government’s official property records contractor to record work accomplished
existing OMB clearance (9000–0075). and shall be used to— in maintaining Government property.
(a) Provide financial accounts for (s) FAR 45.509–1(c) requires a
SUMMARY: Under the provisions of the contractor to report the need for major
Paperwork Reduction Act of 1995 (44 Government-owned property in the
contractor’s possession or control; repair, replacement and other
U.S.C. Chapter 35), the Federal rehabilitation work.
(b) Identify all Government property
Acquisition Regulation (FAR) (t) FAR 45.509–2(b)(2) requires a
(to include a complete, current,
Secretariat has submitted to the Office contractor to maintain utilization
auditable record of all transactions);
of Management and Budget (OMB) a (c) Locate any item of Government records.
request to review and approve an property within a reasonable period of (u) FAR 45.606–1 requires a
extension of a currently approved time. contractor to submit inventory
information collection requirement This clearance covers the following schedules.
concerning Government Property. A requirements: (v) FAR 45.606–3(a) requires a
request for public comments was (a) FAR 45.307–2(b) requires a contractor to correct and resubmit
published in the Federal Register at 71 contractor to notify the contracting inventory schedules as necessary.
FR 40999, on July 19, 2006. No public officer if it intends to acquire or (w) FAR 52.245–2(a)(3) requires a
comments were received. fabricate special test equipment. contractor to notify the contracting
Public comments are particularly (b) FAR 45.502–1 requires a officer when Government-furnished
invited on: Whether this collection of contractor to furnish written receipts for property is received and is not suitable
information is necessary for the proper Government property. for use.
performance of functions of the FAR, (c) FAR 45.502–2 requires a contractor (x) FAR 52.245–2(a)(4) requires a
and whether it will have practical to submit a discrepancy report upon contractor to notify the contracting
utility; whether our estimate of the receipt of Government property when officer when government-furnished
mstockstill on PROD1PC61 with NOTICES

public burden of this collection of overages, shortages, or damages are property is not timely delivered and the
information is accurate, and based on discovered. contracting officer will make a
valid assumptions and methodology; (d) FAR 45.504 requires a contractor determination of the delay, if any,
ways to enhance the quality, utility, and to investigate and report all instances of caused the contractor.
clarity of the information to be loss, damage, or destruction of (y) FAR 52.245–2(b) requires a
collected; and ways in which we can Government property. contractor to submit a written request

VerDate Aug<31>2005 15:12 Oct 24, 2006 Jkt 211001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\25OCN1.SGM 25OCN1
62426 Federal Register / Vol. 71, No. 206 / Wednesday, October 25, 2006 / Notices

for an equitable adjustment if proposed acquisition, fabrication, or ACTION: Notice of request for comments
Government-furnished property is modification. regarding an extension to an existing
decreased, substituted, or withdrawn by (mm) FAR 52.245–19 requires a OMB clearance (9000–0136).
the Government. contractor to notify the contracting
(z) FAR 52.245–4 requires a contractor officer if there is any change in the SUMMARY: Under the provisions of the
to submit a timely written request for an condition of property furnished ‘‘as is’’ Paperwork Reduction Act of 1995 (44
equitable adjustment when from the time of inspection until time of U.S.C. Chapter 35), the Federal
Government-furnished property is not receipt. Acquisition Regulation (FAR)
furnished in a timely manner. (nn) FAR 49.602–2(a) through (e) Secretariat will be submitting to the
(aa) FAR 52.245–5(a)(4) requires a refers to the inventory schedule forms, Office of Management and Budget
contractor to notify the contracting SF’s 1426 through 1434. (OMB) a request to review and approve
officer when Government-furnished This information is used to facilitate an extension of a currently approved
property is received that is not suitable the management of Government information collection requirement
for use. property in the possession of the concerning the clauses and provisions
(bb) FAR 52.245–5(a)(5) requires a contractor. required for use in commercial item
contractor to notify the contracting acquisitions. A request for public
officer when Government-furnished B. Annual Reporting Burden comments was published in the Federal
property is not received in a timely Number of Respondents: 27,884. Register at 71 FR 38867, July 10, 2006.
manner. Responses per Respondent: 488.6. No comments were received. The OMB
(cc) FAR 52.245–5(b)(2) requests a Total Responses: 13,624,122. clearance expires on October 31, 2006.
contractor to submit a written request Public comments are particularly
Average Burden Hours Per Response:
for an equitable adjustment if invited on: Whether this collection of
.4826.
Government-furnished property is information is necessary for the proper
Total Burden Hours: 6,575,805.
decreased, substituted, or withdrawn by performance of functions of the FAR,
The total burden hours have changed
the Government. and whether it will have practical
under this OMB clearance 9000–0075 to
(dd) FAR 52.245–7(f) requires a utility; whether our estimate of the
reflect the incorporation of hours
contractor to notify the contracting public burden of this collection of
currently associated with OMB
officer when use of all facilities falls information is accurate, and based on
clearance 9000–0151 (FAR Case l995–
below 75% of total use. valid assumptions and methodology;
013) which expired as of June 2000 and
(ee) FAR 52.245–7(l)(2) requires a ways to enhance the quality, utility, and
was not renewed. The OMB collection
contractor to alert the contracting officer clarity of the information to be
burden associated with Government
within 30 days of receiving facilities collected; and ways in which we can
property nonetheless remains
that are not suitable for use. minimize the burden of the collection of
(ff) FAR 52.245–9(f) requires a unchanged.
information on those who are to
contractor to submit a facilities use Obtaining Copies of Proposals:
respond, through the use of appropriate
statement to the contracting officer Requesters may obtain a copy ofthe
technological collection techniques or
within 90 days after the close of each information collection documents from
other forms of information technology.
rental period. the General ServicesAdministration,
DATES: Submit comments on or before
(gg) FAR 52.245–10(h)(2) requires a FAR Secretariat (VIR), Room 4035, 1800
F Street, NW, Washington, DC 20405, November 24, 2006.
contractor to notify the contracting
telephone (202) 501–4755. Please cite FOR FURTHER INFORMATION CONTACT:
officer if facilities are received that are
OMB Control No. 9000–0075, Michael Jackson, Contract Policy
not suitable for the intended use.
(hh) FAR 52.245–11(e) requires a Government Property, in all Division, GSA (202) 208–4949.
contractor to notify the contracting correspondence. ADDRESSES: Submit comments regarding
officer when use of all facilities falls Dated: October 6, 2006. this burden estimate or any other aspect
below 75% of total use. Ralph De Stefano,
of this collection of information,
(ii) FAR 52.245–11(j)(2) requires a including suggestions for reducing this
Director, Acquisition Policy Division.
contractor to notify the contracting burden to the General Services
[FR Doc. 06–8864 Filed 10–24–06; 8:45 am] Administration, Regulatory Secretariat
officer within 30 days of receiving
BILLING CODE 6820–EP–S (VIR), 1800 F Street, NW, Room 4035,
facilities not suitable for intended use.
(jj) FAR 52.245–17 requires a Washington, DC 20405.
contractor to maintain special tooling DEPARTMENT OF DEFENSE SUPPLEMENTARY INFORMATION:
records.
(kk) FAR 52.245–18(b) requires a A. Purpose
GENERAL SERVICES
contractor to notify the contracting ADMINISTRATION The Federal Acquisition Streamlining
officer 30 days in advance of the Act of 1994 included Title VIII, entitled
contractor’s intention to acquire or NATIONAL AERONAUTICS AND Commercial Items. The title made
fabricate special test equipment (STE). SPACE ADMINISTRATION numerous additions and revisions to
(ll) FAR 52.245–18(d) & (e) requires a both the civilian agency and Armed
contractor to furnish the names of Service acquisition statutes to encourage
[OMB Control No. 9000–0136]
subcontractors who acquire or fabricate and facilitate the acquisition of
special test equipment (STE) or Federal Acquisition Regulation; commercial items and services by
components and comply with paragraph Information Collection; Commercial Federal Government agencies.To
mstockstill on PROD1PC61 with NOTICES

(d) of this clause, and contractors must Item Acquisitions implement these changes, DOD, NASA,
comply with the (b) paragraph of this and GSA amended the Federal
clause if an engineering change requires AGENCIES: Department of Defense (DOD), Acquisition Regulation (FAR) to include
acquisition or modification of STE. In so General Services Administration (GSA), several streamlined and simplified
complying, the contractor shall identify and National Aeronautics and Space clauses and provisions to be used in
the change order which requires the Administration (NASA). place of existing clauses and provisions.

VerDate Aug<31>2005 15:12 Oct 24, 2006 Jkt 211001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:\FR\FM\25OCN1.SGM 25OCN1