You are on page 1of 2

46246 Federal Register / Vol. 71, No.

155 / Friday, August 11, 2006 / Notices

For further details with respect to this hold a 14.9 percent ownership interest is filed, to transfer (excluding grants of
Order, see the application dated January in St. Lucie Unit 2, but are not involved security interests or liens) from FPL to
20, 2006, and the safety evaluation in this action. its parent, or to any other affiliated
dated August 3, 2006, which are According to the application filed by company, facilities for the production,
available for public inspection at the FPL, St. Lucie Unit 1 is wholly owned transmission, or distribution of electric
Commission’s Public Document Room by FPL and St. Lucie Unit 2 is 85.1 energy having a depreciated book value
(PDR), located at One White Flint North, percent owned by FPL. exceeding ten percent (10%) of FPL’s
Public File Area 01 F21, 11555 As stated in the application, in net utility plant, as recorded on its
Rockville Pike (first floor), Rockville, connection with the proposed merger of books of accounts.
Maryland and accessible electronically FPL’s parent company, FPL Group, Inc. (2) Should the proposed merger not be
from the Agencywide Documents (FPL Group), and Constellation Energy completed within one year from the
Access and Management System Group, Inc. (CEG, Inc.), FPL Group will date of issuance, this Order shall
(ADAMS) Public Electronic Reading become a wholly owned subsidiary of become null and void, provided,
Room on the Internet at the NRC Web CEG, Inc. At the closing of the merger, however, upon written application and
site, http://www.nrc.gov/reading-rm/ the former shareholders of FPL Group good cause shown, such date may, in
adams.html. Persons who do not have will own approximately 60 percent of writing, be extended.
access to ADAMS or who encounter the outstanding stock of CEG, Inc., and This Order is effective upon issuance.
problems in accessing the documents the premerger shareholders of CEG, Inc., For further details with respect to this
located in ADAMS, should contact the will own the remaining approximately Order, see the application dated January
NRC PDR Reference staff by telephone 40 percent. In addition, the CEG, Inc., 20, 2006, and the safety evaluation
at 1–800–397–4209, 301–415–4737, or Board of Directors will be composed of dated August 3, 2006, which are
by e-mail to pdr@nrc.gov. fifteen members, nine of whom will be available for public inspection at the
named by FPL Group, and six of whom Commission’s Public Document Room
Dated at Rockville, Maryland this 3rd day
will be named by the current CEG, Inc. (PDR), located at One White Flint North,
of August 2006.
Approval of the indirect transfer of Public File Area 01 F21, 11555
For the Nuclear Regulatory Commission. the facility operating licenses was Rockville Pike (first floor), Rockville,
Catherine Haney, requested by FPL pursuant to 10 CFR Maryland and accessible electronically
Director, Division of Operating Reactor 50.80. Notice of the request for approval from the Agencywide Documents
Licensing, Office of Nuclear Reactor and an opportunity for a hearing was Access and Management System
Regulation. published in the Federal Register on (ADAMS) Public Electronic Reading
[FR Doc. E6–13125 Filed 8–10–06; 8:45 am] February 22, 2006 (71 FR 9171). No Room on the Internet at the NRC Web
BILLING CODE 7590–01–P comments or petitions to intervene were site, http://www.nrc.gov/reading-rm/
received. adams.html. Persons who do not have
Pursuant to 10 CFR 50.80, no license, access to ADAMS or who encounter
NUCLEAR REGULATORY or any right thereunder, shall be problems in accessing the documents
COMMISSION transferred, directly or indirectly, located in ADAMS, should contact the
[Docket Nos. 50–335 and 50–389; License through transfer of control of the NRC PDR Reference staff by telephone
Nos. DPR–67 and NPF–16] license, unless the Commission shall at 1–800–397–4209, 301–415–4737, or
give its consent in writing. Upon review by e-mail to pdr@nrc.gov.
In the Matter of Florida Power And of the information in the application by
Dated at Rockville, Maryland this 3rd day
Light Company (St. Lucie Nuclear FPL and other information before the of August 2006.
Plant, Unit Nos. 1 and 2); Order Commission, the NRC staff concludes
For the Nuclear Regulatory Commission.
Approving Application Regarding that the proposed merger and resulting
Proposed Corporate Merger Catherine Haney,
indirect transfer of control of the
licenses will not affect the qualifications Director, Division of Operating Reactor
I Licensing, Office of Nuclear Reactor
of FPL as holder of the facility licenses,
Florida Power and Light Company Regulation.
and that the indirect transfer of control
(FPL or the licensee) exclusively holds [FR Doc. E6–13126 Filed 8–10–06; 8:45 am]
of the licenses as held by FPL, is
Facility Operating License No. DPR–67 otherwise consistent with applicable BILLING CODE 7590–01–P
and co-holds Facility Operating License provisions of law, regulations, and
No. NPF–16, which authorize the orders issued by the Commission
possession, use, and operation of the St. NUCLEAR REGULATORY
pursuant thereto.
Lucie Nuclear Plant, Units 1 and 2 (the The findings set forth above are COMMISSION
facility). FPL is licensed by the U.S. supported by a safety evaluation dated [Docket No. 50–331; License No. DPR–49]
Nuclear Regulatory Commission (NRC August 3, 2006.
or Commission) to operate the facility. In the Matter of Fpl Energy Duane
The facility is located at the licensee’s III Arnold, Llc; (Duane Arnold Energy
site in St. Lucie County, Florida. Accordingly, pursuant to sections Center); Order Approving Application
161b, 161i, 161o, and 184 of the Atomic Regarding Proposed Corporate Merger
II Energy Act of 1954, as amended (the
By application dated January 20, 2006 Act), 42 U.S.C. 2201(b), 2201(i), 2201(o), I
(the application), FPL requested that the and 2234; and 10 CFR 50.80, It is hereby FPL Energy Duane Arnold, LLC (FPL
NRC, pursuant to 10 CFR 50.80, consent ordered that the application regarding Energy Duane Arnold or the licensee) is
hsrobinson on PROD1PC67 with NOTICES1

to the proposed indirect transfer of the proposed merger and indirect a holder of Facility Operating License
control of the licenses to the extent license transfers is approved, subject to No. DPR–49, which authorizes the
currently held by FPL. The Orlando the following conditions: possession, use, and operation of the
Utilities Commission of the City of (1) FPL shall provide the Director of Duane Arnold Energy Center (the
Orlando, Florida, and the Florida the Office of Nuclear Reactor Regulation facility). FPL Energy Duane Arnold is
Municipal Power Agency collectively a copy of any application, at the time it licensed by the U.S. Nuclear Regulatory

VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\11AUN1.SGM 11AUN1
Federal Register / Vol. 71, No. 155 / Friday, August 11, 2006 / Notices 46247

Commission (NRC or Commission) to The findings set forth above are NPF–86, which authorizes the
operate the facility. The facility is supported by a safety evaluation dated possession, use, and operation of the
located at the licensee’s site 8 miles August 3, 2006. Seabrook Station, Unit 1 (Seabrook or
northwest of Cedar Rapids, Iowa. the facility). FPL Energy Seabrook is
III
licensed by the U.S. Nuclear Regulatory
II Accordingly, pursuant to Sections Commission (NRC or Commission) to
By application dated January 20, 2006 161b, 161i and 184 of the Atomic operate the facility. The facility is
(the application), FPL Energy Duane Energy Act of 1954, as amended (the located at the licensee’s site 13 miles
Arnold requested that the NRC, Act), 42 U.S.C. 2201(b), 2201(i) and south of Portsmouth, New Hampshire.
pursuant to 10 CFR 50.80, consent to the 2234; and 10 CFR 50.80, It Is Hereby
proposed indirect transfer of control of Ordered that the application regarding II
the license to the extent currently held the proposed merger and indirect By application dated January 20, 2006
by FPL Energy Duane Arnold. The other license transfer is approved, subject to (the application), FPL Energy Seabrook
co-owners of the facility, Central Iowa the following condition: requested that the NRC, pursuant to 10
Power Cooperative and Corn Belt Power Should the proposed merger not be CFR 50.80, consent to the proposed
Cooperative, are not involved in this completed within one year from the indirect transfer of control of the license
action. date of issuance, this Order shall to the extent currently held by FPL
According to the application filed by become null and void, provided, Energy Seabrook. The other co-owners
FPL Energy Duane Arnold, FPL Energy however, upon written application and of the facility, Hudson Light & Power
Duane Arnold will continue to own a 70 good cause shown, such date may in Department, Massachusetts Municipal
percent ownership interest in the writing be extended. Wholesale Electric Company, and
facility. This Order is effective upon issuance. Taunton Municipal Light Plant, are not
As stated in the application, in For further details with respect to this involved in this action.
connection with the proposed merger of Order, see the application dated January According to the application filed by
FPL Energy Duane Arnold’s ultimate 20, 2006, and the safety evaluation FPL Energy Seabrook, FPL Energy
parent company, FPL Group, Inc. (FPL dated August 3, 2006, which are Seabrook will continue to own an 88.23
Group), and Constellation Energy available for public inspection at the percent ownership interest in the
Group, Inc. (CEG, Inc.), FPL Group will Commission’s Public Document Room facility.
become a wholly owned subsidiary of (PDR), located at One White Flint North, As stated in the application, in
CEG, Inc. At the closing of the merger, Public File Area 01 F21, 11555 connection with the proposed merger of
the former shareholders of FPL Group Rockville Pike (first floor), Rockville, FPL Energy Seabrook’s ultimate parent
will own approximately 60 percent of Maryland and accessible electronically company, FPL Group, Inc. (FPL Group),
the outstanding stock of CEG, Inc., and from the Agencywide Documents and Constellation Energy Group, Inc.
the premerger shareholders of CEG, Inc., Access and Management System (CEG, Inc.), FPL Group will become a
will own the remaining approximately (ADAMS) Public Electronic Reading wholly owned subsidiary of CEG, Inc.
40 percent. In addition, the CEG, Inc., Room on the Internet at the NRC Web At the closing of the merger, the former
Board of Directors will be composed of site, http://www.nrc.gov/reading-rm/ shareholders of FPL Group will own
fifteen members, nine of whom will be adams.html. Persons who do not have approximately 60 percent of the
named by FPL Group, and six of whom access to ADAMS or who encounter outstanding stock of CEG, Inc., and the
will be named by the current CEG, Inc. problems in accessing the documents premerger shareholders of CEG, Inc.,
Approval of the indirect transfer of located in ADAMS, should contact the will own the remaining approximately
the facility operating license was NRC PDR Reference staff by telephone 40 percent. In addition, the CEG, Inc.,
requested by FPL Energy Duane Arnold at 1–800–397–4209, 301–415–4737, or Board of Directors will be composed of
pursuant to 10 CFR 50.80. Notice of the by e-mail to pdr@nrc.gov. fifteen members, nine of whom will be
request for approval and an opportunity named by FPL Group, and six of whom
for a hearing was published in the Dated at Rockville, Maryland this 3rd day will be named by the current CEG, Inc.
Federal Register on February 22, 2006 of August 2006. Approval of the indirect transfer of
(71 FR 9172). No comments or petitions For the Nuclear Regulatory Commission. the facility operating license was
to intervene were received. Catherine Haney, requested by FPL Energy Seabrook
Pursuant to 10 CFR 50.80, no license, Director, Division of Operating Reactor pursuant to 10 CFR 50.80. Notice of the
or any right thereunder, shall be Licensing, Office of Nuclear Reactor request for approval and an opportunity
transferred, directly or indirectly, Regulation. for a hearing was published in the
through transfer of control of the [FR Doc. E6–13121 Filed 8–10–06; 8:45 am] Federal Register on February 22, 2006
license, unless the Commission shall BILLING CODE 7590–01–P (71 FR 9173). No comments or petitions
give its consent in writing. Upon review to intervene were received.
of the information in the application by Pursuant to 10 CFR 50.80, no license,
FPL Energy Duane Arnold and other NUCLEAR REGULATORY or any right thereunder, shall be
information before the Commission, the COMMISSION transferred, directly or indirectly,
NRC staff concludes that the proposed [Docket No. 50–443; License No. NPF–86] through transfer of control of the
merger and resulting indirect transfer of license, unless the Commission shall
control of the license will not affect the In the Matter of FPL Energy Seabrook, give its consent in writing. Upon review
qualifications of FPL Energy Duane LLC (Seabrook Station, Unit No. 1); of the information in the application by
Arnold as holder of the facility license, Order Approving Application FPL Energy Seabrook and other
hsrobinson on PROD1PC67 with NOTICES1

and that the indirect transfer of control Regarding Proposed Corporate Merger information before the Commission, the
of the license as held by FPL Energy NRC staff concludes that the proposed
Duane Arnold, is otherwise consistent I merger and resulting indirect transfer of
with applicable provisions of law, FPL Energy Seabrook, LLC (FPL control of the license will not affect the
regulations, and orders issued by the Energy Seabrook or the licensee) is a qualifications of FPL Energy Seabrook
Commission pursuant thereto. holder of Facility Operating License No. as a holder of the facility license, and

VerDate Aug<31>2005 15:03 Aug 10, 2006 Jkt 208001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\11AUN1.SGM 11AUN1

You might also like