You are on page 1of 2

Federal Register / Vol. 71, No.

138 / Wednesday, July 19, 2006 / Notices 40999

FOR FURTHER INFORMATION CONTACT: Mr. Secretariat will be submitting to the This clearance covers the following
Jeremy Olson, Contract Policy Division, Office of Management and Budget requirements:
GSA, (202) 501–3221. (OMB) a request to review and approve (a) FAR 45.307–2(b) requires a
SUPPLEMENTARY INFORMATION: an extension of a currently approved contractor to notify the contracting
information collection requirement officer if it intends to acquire or
A. Purpose concerning Government Property. This fabricate special test equipment.
FAR Subpart 30.6 and the provision at OMB clearance expires on October 31, (b) FAR 45.502–1 requires a
52.230–5 include pertinent rules and 2006. contractor to furnish written receipts for
regulations related to the Cost Public comments are particularly Government property.
Accounting Standards along with invited on: Whether this collection of (c) FAR 45.502–2 requires a contractor
necessary administrative policies and information is necessary for the proper to submit a discrepancy report upon
procedures. These administrative performance of functions of the FAR, receipt of Government property when
policies require certain contractors to and whether it will have practical overages, shortages, or damages are
submit cost impact estimates and utility; whether our estimate of the discovered.
public burden of this collection of (d) FAR 45.504 requires a contractor
descriptions in cost accounting
information is accurate, and based on to investigate and report all instances of
practices and also to provide
valid assumptions and methodology; loss, damage, or destruction of
information on CAS-covered
ways to enhance the quality, utility, and Government property.
subcontractors. (e) FAR 45.505–1 requires that basic
clarity of the information to be
B. Annual Reporting Burden information be placed on the
collected; and ways in which we can
contractor’s property control records.
Number of Respondents: 644. minimize the burden of the collection of
(f) FAR 45.505–3 requires a contractor
Responses Per Respondent: 2.27. information on those who are to
to maintain records for Government
Total Responses: 1,462. respond, through the use of appropriate
material.
Average Burden Hours Per Response: technological collection techniques or (g) FAR 45.505–4 requires a contractor
175.00 other forms of information technology. to maintain records of special tooling
Total Burden Hours: 255,829. DATES: Submit comments on or before and special test equipment.
OBTAINING COPIES OF September 18, 2006. (h) FAR 45.505–5 requires a
PROPOSALS: Requesters may obtain a ADDRESSES: Submit comments, contractor to maintain records of plant
copy of the information collection including suggestions for reducing this equipment.
documents from the General Services burden to the General Services (i) FAR 45.505–7 requires a contractor
Administration, Regulatory Secretariat Administration, FAR Secretariat (VIR), to maintain records of real property.
(VIR), Room 4035, Washington, DC 1800 F Street, NW, Room 4035, (j) FAR 45.505–8 requires a contractor
20405, telephone (202) 501–4755. Please Washington, DC 20405. to maintain scrap and salvage records.
cite OMB Control Number 9000–0129, FOR FURTHER INFORMATION CONTACT:
(k) FAR 45.505–9 requires a
Cost Accounting Standards Jeritta Parnell, Contract Policy Division, contractor to maintain records of related
Administration, in all correspondence. GSA (202) 501–4082. data and information.
Dated: July 10, 2006. (l) FAR 45.505–10 requires a
SUPPLEMENTARY INFORMATION: contractor to maintain records for
Linda Nelson,
A. Purpose completed products.
Deputy Director,Contract Policy Division. (m) FAR 45.505–11 requires a
[FR Doc. 06–6333 Filed 7–18–06; 8:45 am] Property, as used in Part 45, means all contractor to maintain records of
BILLING CODE 6820–EP–S property, both real and personal. It transportation and installation costs of
includes facilities, material, special plant equipment.
tooling, special test equipment, and (n) FAR 45.505–12 requires a
DEPARTMENT OF DEFENSE agency-peculiar property. Government contractor to maintain records of
property includes both Government- misdirected shipments.
GENERAL SERVICES furnished property and contractor- (o) FAR 45.505–13 requires a
ADMINISTRATION acquired property. contractor to maintain records of
Contractors are required to establish property returned for rework.
NATIONAL AERONAUTICS AND and maintain a property system that (p) FAR 45.505–14 requires a
SPACE ADMINISTRATION will control, protect, preserve, and contractor to submit an annual report of
maintain all Government property Government property accountable to
[OMB Control No. 9000–0075]
because the contractor is responsible each agency contract.
Federal Acquisition Regulation; and accountable for all Government (q) FAR 45.508–2 requires a
Information Collection; Government property under the provisions of the contractor to report the results of
Property contract including property located with physical inventories.
subcontractors. The contractor’s (r) FAR 45.509–1(a)(3) requires a
AGENCIES: Department of Defense (DOD), property control records shall constitute contractor to record work accomplished
General Services Administration (GSA), the Government’s official property in maintaining Government property.
and National Aeronautics and Space records and shall be used to— (s) FAR 45.509–1(c) requires a
Administration (NASA). (a) Provide financial accounts for contractor to report the need for major
ACTION: Notice of request for public Government-owned property in the repair, replacement and other
comments regarding an extension to an contractor’s possession or control; rehabilitation work.
(b) Identify all Government property (t) FAR 45.509–2(b)(2) requires a
sroberts on PROD1PC70 with NOTICES

existing OMB clearance (9000–0075).


(to include a complete, current, contractor to maintain utilization
SUMMARY: Under the provisions of the auditable record of all transactions); records.
Paperwork Reduction Act of 1995 (44 (c) Locate any item of Government (u) FAR 45.606–1 requires a
U.S.C. Chapter 35), the Federal property within a reasonable period of contractor to submit inventory
Acquisition Regulation (FAR) time. schedules.

VerDate Aug<31>2005 18:28 Jul 18, 2006 Jkt 208001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\19JYN1.SGM 19JYN1
41000 Federal Register / Vol. 71, No. 138 / Wednesday, July 19, 2006 / Notices

(v) FAR 45.606–3(a) requires a (jj) FAR 52.245–17 requires a DEPARTMENT OF DEFENSE
contractor to correct and resubmit contractor to maintain special tooling
inventory schedules as necessary. records. Office of the Secretary
(w) FAR 52.245–2(a)(3) requires a (kk) FAR 52.245–18(b) requires a
contractor to notify the contracting contractor to notify the contracting [DoD–2006–OS–0155]
officer when Government-furnished officer 30 days in advance of the
property is received and is not suitable contractor’s intention to acquire or Privacy Act of 1974; System of
for use. fabricate special test equipment (STE). Records
(x) FAR 52.245–2(a)(4) requires a (ll) FAR 52.245–18(d) and (e) requires
AGENCY: Office of the Secretary, DoD.
contractor to notify the contracting a contractor to furnish the names of
officer when government-furnished subcontractors who acquire or fabricate ACTION: Notice to amend systems of
property is not timely delivered and the special test equipment (STE) or records.
contracting officer will make a components and comply with paragraph
(d) of this clause, and contractors must SUMMARY: The Office of the Secretary of
determination of the delay, if any,
caused the contractor. comply with paragraph (b) of this clause Defense is amending a system of records
if an engineering change requires notice in its existing inventory of record
(y) FAR 52.245–2(b) requires a
acquisition or modification of STE. In so systems subject to the Privacy Act of
contractor to submit a written request
complying, the contractor shall identify 1974, (5 U.S.C. 552a), as amended.
for an equitable adjustment if
Government-furnished property is the change order which requires the DATES: This proposed action will be
decreased, substituted, or withdrawn by proposed acquisition, fabrication, or effective without further notice on
the Government. modification. August 18, 2006 unless comments are
(z) FAR 52.245–4 requires a contractor (mm) FAR 52.245–19 requires a received which result in a contrary
to submit a timely written request for an contractor to notify the contracting determination.
equitable adjustment when officer if there is any change in the ADDRESSES: Send comments to the OSD
Government-furnished property is not condition of property furnished ‘‘as is’’ Privacy Act Coordinator, Records
furnished in a timely manner. from the time of inspection until time of Management Section, Washington
(aa) FAR 52.245–5(a)(4) requires a receipt. Headquarters Services, 1155 Defense
contractor to notify the contracting (nn) FAR 49.602–2(a) through (e) Pentagon, Washington, DC 20301–1155.
officer when Government-furnished refers to the inventory schedule forms,
SF’s 1426 through 1434. FOR FURTHER INFORMATION CONTACT: Ms.
property is received that is not suitable Juanita Irvin at (703) 696–4940.
for use. This information is used to facilitate
the management of Government SUPPLEMENTARY INFORMATION: The Office
(bb) FAR 52.245–5(a)(5) requires a
contractor to notify the contracting property in the possession of the of the Secretary of Defense Systems of
officer when Government-furnished contractor. records notices subject to the Privacy
property is not received in a timely Act of 1974, (5 U.S.C. 552a), as
B. Annual Reporting Burden amended, have been published in the
manner.
Number of Respondents: 27,884. Federal Register and are available from
(cc) FAR 52.245–5(b)(2) requests a
Responses per Respondent: 488.6. the address above.
contractor to submit a written request
for an equitable adjustment if Total Responses: 13,624,759. The specific changes to the record
Government-furnished property is Average Burden Hours Per Response: system being amended are set forth
decreased, substituted, or withdrawn by .4826. below followed by the notice, as
the Government. Total Burden Hours: 6,575,805. amended, published in its entirety. The
The total burden hours have changed proposed amendments are not within
(dd) FAR 52.245–7(f) requires a
under this OMB clearance 9000–0075 to the purview of subsection (r) of the
contractor to notify the contracting
reflect the incorporation of hours Privacy Act of 1974, (5 U.S.C. 552a), as
officer when use of all facilities falls
currently associated with OMB amended, which requires the
below 75% of total use.
clearance 9000–0151 (FAR Case l995– submission of a new or altered system
(ee) FAR 52.245–7(l)(2) requires a report.
contractor to alert the contracting officer 013) which is due to expire in June 2000
within 30 days of receiving facilities and will not be renewed. The OMB Dated: July 13, 2006.
that are not suitable for use. collection burden associated with C.R. Choate,
Government property nonetheless Alternate OSD Federal Register Liaison
(ff) FAR 52.245–9(f) requires a
remains unchanged. Officer, Department of Defense.
contractor to submit a facilities use
statement to the contracting officer OBTAINING COPIES OF
PROPOSALS: Requesters may obtain a DPR 31
within 90 days after the close of each
rental period. copy ofthe information collection
SYSTEM NAME:
documents from the General Services
(gg) FAR 52.245–10(h)(2) requires a Personal Commercial Solicitation
Administration, FAR Secretariat (VIR),
contractor to notify the contracting Evaluation (June 19, 2006, 71 FR 35259).
Room 4035, 1800 F Street,NW,
officer if facilities are received that are
Washington, DC 20405, telephone (202)
not suitable for the intended use. CHANGES:
501–4755. Please cite OMB Control No.
(hh) FAR 52.245–11(e) requires a 9000–0075, Government Property, in all * * * * *
contractor to notify the contracting correspondence.
officer when use of all facilities falls NOTIFICATION PROCEDURES
sroberts on PROD1PC70 with NOTICES

below 75% of total use. Dated:July 13, 2006. In the first paragraph, delete ‘‘1745
(ii) FAR 52.245–11(j)(2) requires a Ralph De Stefano Jefferson Davis Highway’’ and replace
contractor to notify the contracting Director, Contract Policy Division. with ‘‘241 S. 18th Street’’.
officer within 30 days of receiving [FR Doc. 06–6334 Filed 7–18–06; 8:45 am] In the second paragraph, change the
facilities not suitable for intended use. BILLING CODE 6820–EP–S word ‘‘much’’ to ‘‘such’’.

VerDate Aug<31>2005 18:28 Jul 18, 2006 Jkt 208001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\19JYN1.SGM 19JYN1

You might also like