You are on page 1of 1

14958 Federal Register / Vol. 71, No.

57 / Friday, March 24, 2006 / Notices

Signed at Washington, DC, this 10th day of administrative judges in accordance All correspondence, documents, and
March, 2006. with 10 CFR 2.202. other materials shall be filed with the
Elliott S. Kushner, administrative judges in accordance
Issued at Rockville, Maryland, this 16th
Certifying Officer, Division of Trade day of March 2006. with 10 CFR 2.202.
Adjustment Assistance. G. Paul Bollwerk, III, Issued at Rockville, Maryland, this 16th
[FR Doc. E6–4294 Filed 3–23–06; 8:45 am] day of March 2006.
Chief Administrative Judge, Atomic Safety
BILLING CODE 4510–30–P and Licensing Board Panel. G. Paul Bollwerk, III,
[FR Doc. E6–4269 Filed 3–23–06; 8:45 am] Chief Administrative Judge, Atomic Safety
BILLING CODE 7590–01–P and Licensing Board Panel.
NUCLEAR REGULATORY [FR Doc. E6–4272 Filed 3–23–06; 8:45 am]
COMMISSION BILLING CODE 7590–01–P
NUCLEAR REGULATORY
[IA–05–052; ASLBP No. 06–845–01–EA] COMMISSION
NUCLEAR REGULATORY
In the Matter of David Geisen; [IA–05–053; ASLBP No. 06–846–02–EA] COMMISSION
Establishment of Atomic Safety and
Licensing Board In the Matter of Dale L. Miller;
[IA–05–054; ASLBP No. 06–847–03–EA]
Establishment of Atomic Safety and
Pursuant to delegation by the Licensing Board In the Matter of Steven P. Moffitt;
Commission dated December 29, 1972,
Establishment of Atomic Safety and
published in the Federal Register, 37 FR Pursuant to delegation by the Licensing Board
28,710 (1972), and the Commission’s Commission dated December 29, 1972,
regulations, see 10 CFR 2.104, 2.202, published in the Federal Register, 37 FR
2.300, 2.303, 2.309, 2.311, 2.318, and Pursuant to delegation by the
28,710 (1972), and the Commission’s Commission dated December 29, 1972,
2.321, notice is hereby given that an regulations, see 10 CFR 2.104, 2.202,
Atomic Safety and Licensing Board is published in the Federal Register, 37 FR
2.300, 2.303, 2.309, 2.311, 2.318, and 28,710 (1972), and the Commission’s
being established to preside over the 2.321, notice is hereby given that an
following proceeding: regulations, see 10 CFR 2.104, 2.202,
Atomic Safety and Licensing Board is 2.300, 2.303, 2.309, 2.311, 2.318, and
David Geisen (Enforcement Action) being established to preside over the 2.321, notice is hereby given that an
following proceeding: Atomic Safety and Licensing Board is
This proceeding concerns a request
for a hearing submitted on February 23, Dale L. Miller (Enforcement Action) being established to preside over the
2006, by David Geisen in response to a following proceeding:
This proceeding concerns a request
January 4, 2006 NRC staff ‘‘Order for a hearing submitted on February 23, Steven P. Moffitt (Enforcement Action)
Prohibiting Involvement in NRC-License 2006, by Dale L. Miller in response to
Activities,’’ 71 FR 2571 (January 17, a January 4, 2006 NRC staff ‘‘Order This proceeding concerns a request
2006). Under the terms of that Prohibiting Involvement in NRC-License for a hearing submitted on February 23,
immediately effective staff order, the Activities,’’ 71 FR 2579 (January 17, 2006, by Steven P. Moffitt in response
staff concluded that because Mr. Geisen 2006). Under the terms of that to a January 4, 2006 NRC staff ‘‘Order
(1) had knowledge of the degraded immediately effective staff order, the Prohibiting Involvement in NRC-License
condition of the reactor pressure vessel staff concluded that because Mr. Miller Activities,’’ 71 FR 2581 (January 17,
(RPV) head at the Davis-Besse Nuclear (1) had knowledge of the degraded 2006). Under the terms of that
Power Station and the limitations condition of the reactor pressure vessel immediately effective staff order, the
experienced during RPV head (RPV) head at the Davis-Besse Nuclear staff concluded that because Mr. Moffitt
inspections; and (2) had deliberately Power Station and the limitations (1) had knowledge of the degraded
provided materially incomplete and experienced during RPV head condition of the reactor pressure vessel
inaccurate information in connection inspections; and (2) had deliberately (RPV) head at the Davis-Besse Nuclear
with the continued operation of the provided materially incomplete and Power Station and the limitations
Davis-Besse facility for a period prior to inaccurate information in connection experienced during RPV head
a February 2002 refueling outage that with the continued operation of the inspections; and (2) had deliberately
resulted in a significant adverse Davis-Besse facility for a period prior to provided materially incomplete and
condition going uncorrected, Mr. Geisen a February 2002 refueling outage that inaccurate information in connection
was, among other things, prohibited for resulted in a significant adverse with the continued operation of the
five years from engaging in NRC- condition going uncorrected, Mr. Miller Davis-Besse facility for a period prior to
licensed activities. was, among other things, prohibited for a February 2002 refueling outage that
The Board is comprised of the five years from engaging in NRC- resulted in a significant adverse
following administrative judges: licensed activities. condition going uncorrected, Mr. Moffitt
Michael C. Farrar, Chair, U.S. Nuclear The Board is comprised of the was, among other things, prohibited for
Regulatory Commission, Washington, following administrative judges: five years from engaging in NRC-
DC 20555–0001. licensed activities.
Michael C. Farrar, Chair, U.S. Nuclear
E. Roy Hawkens, U.S. Nuclear The Board is comprised of the
Regulatory Commission, Washington,
Regulatory Commission, Washington, following administrative judges:
DC 20555–0001.
DC 20555–0001. E. Roy Hawkens, U.S. Nuclear Michael C. Farrar, Chair, U.S. Nuclear
wwhite on PROD1PC61 with NOTICES

Nicholas G. Trikouros, U.S. Nuclear Regulatory Commission, Washington, Regulatory Commission, Washington,
Regulatory Commission, Washington, DC 20555–0001. DC 20555–0001.
DC 20555–0001. Nicholas G. Trikouros, U.S. Nuclear E. Roy Hawkens, U.S. Nuclear
All correspondence, documents, and Regulatory Commission, Washington, Regulatory Commission, Washington,
other materials shall be filed with the DC 20555–0001. DC 20555–0001.

VerDate Aug<31>2005 18:26 Mar 23, 2006 Jkt 208001 PO 00000 Frm 00127 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1

You might also like