1.1 INTRODUCTION
Research is an objective and systematic scientific inquiry or investigation into a
specific problem that needs a solution that provides the needed information that
guides managers to make decisions to successfully deal with problems. The
information provided could be the result of a careful analysis of data gathered
firsthand or of data that are already available. While business research is a systematic
and organized effort to investigate a specific problem or opportunity encountered in
the work setting that needs a solution. Managers need to recognize that the most
problems are opportunities in disguise.
In this chapter, discussion will be focused on identifying and stating the research
problem, formulating the research questions and purposes of the research, deciding on
scope of the research and underlining the significance of the research. In general this
topic will able to give an insight of the direction of the research and its deliverables.
The main purpose of the project research conducted are to seek the truth, to discover
new knowledge, to describe, explain, and predict, to provide solution to a problem
and to help in decision making. Underpinning this broad aim were objectives
articulating the scale, scope and focus of the project. These involved exploring how
research impact was currently understood by the higher education community and in
particular, exploring what standards were guiding decisions about what impacts were
sought, and the methodological approaches deployed in providing evidence of impact.
was going through an underproduction due to the fact that demand is more than the
supply. Thats why, the company need to increase their maintenance downtime in
order to help them in satisfied the customer demand and also indirectly increasing
their profit. Therefore, they need a consistent way to solve their problem of poor
maintenance downtime. They need improve their maintenance downtime by, first
using maintenance schedule (PAS) such as Automatically Control Equipment and
Computerized Technology and software. Secondly, they may use overall Equipment
effectiveness. Thirdly, by improving staff accountability and lastly, using Data
Envelopment Analysis (DEA) and Equipment Qualification.
1.3 REASERCH
MODEL
1. Prepare the daily checklist
2. Prepare the monthly service
checklist
3. Record the schedule
Problem Statement
4. Man Power
1. Maintenance
Schedule
Maintenance Downtime
URC Snack Foods Sdn Bhd
(Dependent Variable)
Improvement The
Maintenance Downtime
2. Monitor the
Efficiency of
Manufacturing
Processes
CHAPTERS
1
2
3
4
5
SUBJECT
INTRODUCTION
ORGANIZATION BACKGROUND
RESEARCH DESIGN
DATA ANALYSIS AND FINDING
RECOMMENDATION AND CONCLUSION
1.8 SUMMARY
This chapter is discussed to formulate an excellent strategy of improvement the
maintenance downtime URC Snack Foods Sdn Bhd. From the problem statement part,
the conclusion that can be made is that the URC Snack Foods Sdn Bhd needs to
consider on many aspects in improvement their maintenance downtime. The area of
improvement will be focus on the preparing the maintenance schedule; monitoring the
efficiency of manufacturing process; updating or servicing the machinery; and
improve staff accountability or manpower. This report is completed and written out
focusing on URC Snack Foods Sdn Bhd.
2.1 INTRODUCTION
In this chapter, discussion will be focused on identifying and stating the company are
selected to formulating the research. In general this topic will able to give an insight
6
of explanations, the company background, corporate history and others thing. The
main purpose of the identification of the company conducted is to describe, explain,
and predict, to provide solution to a problem and to help them in decision making.
This chapter also performed to give an initial figure about the company before
conducting further research.
country, such as Nestle and Procter & Gamble thus conceiving the first local MNC
borne out of their best practices to shape URC to where it is today
Blend 45 rose to become the largest-selling coffee brand in the market, even
beating out market leaders Caf Puro and Nescafe.
The birth of NIPS, a panned chocolate that soon became a staple in every
Filipinos childhood
1963:
1966:
Other successful snack products were introduced to blaze through the industry
and become market leaders even till now, such as Pretzels, Piattos and Maxx.
Early 1970s:
Early 1980s:
URC Sugar was born with the acquisition of three sugar mills and refineries.
Early 1990s:
Today, URC has carved its niche into the ASEAN region with a strong foothold in
Thailand, Malaysia, Indonesia, China, Hong Kong SAR, Singapore and Vietnam.
URC in Malaysia
URC Snack Foods (Malaysia) Sdn. Bhd was first incorporated in 1982 and
commercial operation started in 1984. The first product that was produced and sold by
URC Malaysia was Jack n Jill Potato Chips. Over the many years of continued
success, we have added other brands to our stable:
Roller Coaster
JIGS
Corn Curls
9
Cloud 9
NIPS
Chooey Choco
Magic
C2
URC Malaysia also exports to Singapore, Brunei, Taiwan, Hong Kong SAR,
Mauritius, Maldives, New Zealand, Australia, Indonesia, Vietnam, Cambodia,
Mongolia, Thailand, Nepal, India, Seoul Korea & Japan
10
Integrity
We are guided by transparency, ethics and fairness. We build the business with honor
and are commited to good governance. Our processes and products meet the highest
standards. We are credible in our dealings with both internal and external stakeholders
Courage
We seize opportunities in building long-term, sustainable business. We make tough
people and business decisions to ensure competitive advantage
11
3.1 INTRODUCTION
This chapter demonstrates the methods of implementing a research work, primarily
delineating the research model, identifying the appropriate research design, discussion
on the possible data collection methods, targeting the right population- sample,
formulating questionnaires and measurement / scale, and identifying the appropriate
statistical analysis techniques.
3.2 METHODOLOGY
The Methodology design consists in setting up the approach that will allow the
evaluation team to answer the questions and to come to an overall assessment. To get
12
14
element. Even if it were possible, it would be prohibitive in terms of time, cost and
other human resources.
Therefore, for the questionnaires distribution, the researcher used the probability
sampling called simple random sampling techniques in order to select the respondent.
This is because it has the least bias and offers the most generalizability.
3.7 POPULATION & SAMPLE SIZE
According to Cooper and Schindler, (2001), population refer to the entire group of
people, events, or things of the interest that researcher wishes to investigate. The
population for this study refers to the workers of URC Snack Foods Sdn Bhd.
Sampling sizes refer to a number of units of respondents to be included in a study and
determined based on the size of the population. For this research, respondents will be
selected from the total population is 30 persons out of the total amount workers and
later answers all the questions in the questionnaires.
3.8 MEASUREMENT & SCALING TECHNIQUE
In order to have significant and reliable information that appropriate with the
fieldwork study, certain proper scaling technique must be adopted. Therefore,
questionnaires should include of the following scaling:
3.8.1 Closed- Ended Question- Dichotomous Scale
The respondents are required to choose either YES or NO answer.
Example:
Do you think that inventory is one of the important elements that can
affect company profit?
15
YES
NO
16
3.9 SUMMARY
The primary reason for the study was to learn through administration of
questionnaires on the improvement of maintenance downtime in URC Snack Foods
Sdn Bhd. Baring in the mind the limitation of this study, only a small - scale
investigation could be executed due time constraint and confidentiality. More studies
of the same nature need to be conducted before any conclusive result can be claimed.
Elements
Yes (%)
No (%)
66.67
33.33
76.67
23.33
93.33
6.67
18
100
90
93.33
90.00
83.33
80
70
60
50
40
30
20
16.67 Yes
No
10.00
10
6.67
Based on the chart 1 above, it show the effectiveness of preparing the maintenance
schedule in improving the maintenance downtime in terms of providing daily
checklist, the monthly service checklist and the record of maintenance job. The
highest number of worker agree that the most effectiveness using the maintenance
schedule is record all the maintenance job, followed by preparing the monthly service
checklist and lastly, providing the daily checklist. While the highest number of worker
that disagree the most effectiveness using the maintenance schedule is providing daily
checklist, then preparing the monthly service checklist and lastly, record all the
maintenance job.
4.3 MONITORING THE EFFICIENCY IN MANUFACTURING PROCESS
19
Elements
Reduce the breakdown time
Reduce the minor stop for other production
line
Reduce the production losses
Yes (%)
No (%)
70
30
76.67
23.33
50
50
20
90%
80%
70%
76.67%
70.00%
60%
50.00%
50%
40%
30%
50.00%
30.00%
23.33%
20%
10%
0%
Yes
No
21
Elements
Yes (%)
No (%)
70
30
90
10
76.67
23.33
22
100.00
90.00
90
83.33
76.67
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
16.67
10
Yes
23.33
No
0.00
23
Table 4: Factors of man power that may improve the maintenance downtime.
Elements
Qualification / Education level
Experience
Training method
Yes (%)
No (%)
73.33
26.67
80
20
73.33
26.67
24
80
73.33
73.33
70
60
Yes
50
Percentage
No
40
30
26.67
26.67
20
20
10
0
Qualification/ Educational level
Training method
The chart 4 above shows the factor that may improve the maintenance downtime. The
highest factor agreed by the workers that may improve the maintenance downtime is
by experience worker which is 80%. Then, followed by the training and having high
qualification and educational level with the equally percentage of 73.33%. While, the
highest disagree percentage on the factor that may improve maintenance downtime is
by the training of worker and having high qualification and educational level with the
equally percentage of 26.67%. Then, the lowest disagree is by experience workers
which is 20%.
CHAPTER 5: RECOMANDATION AND CONCLUSION
25
5.1 INTRODUCTION
The previous chapter discussed the findings of the study, and gives a picture of
whether this study supported the purpose of research or otherwise. This chapter
summarizes the main points of the results and shows how they addressed the research
objectives. Recommendations are made based primarily on the research findings, and
from survey feedback and from relevant literature of similar case. The primary reason
for this study is to improve the poor maintenance downtime in URC Snack Foods Sdn
Bhd.
5.2.1
Daily Checklist
26
Maintenance schedule may lead to daily checklist. The daily checklist can be
said as simple checking procedure just to check on the condition of the
machinery and others. There are many reasons to do the daily checking on
machinery or production line. One of the reasons is to improve the
maintenance downtime. My research found that the majority of the sample
workers agree daily checklist is one the effectiveness of maintenance schedule
that will reduce the maintenance downtime.
Recommendation
Based on our research, URC Snack Foods Sdn Bhd need the daily checklist in
order to reduce their maintenance downtime because it will lead to a better
take care of the equipment. By having a checklist, this will help to reduce a
mistake made by the worker by just memorizing what they should have done
daily in order to ensure the machinery is in a good condition. The daily
checklist also can act as a prove that the worker already perform their job
accordingly.
5.2.2
Recommendation
URC Snack Foods Sdn Bhd may use a computerised system that will remind
the workers to do the monthly service on the machinery. This will lead to a
proper system and the service will be conduct frequently as per recommended
by the management.
5.2.3
Recommendation
28
Based on my opinion, URC Snack Foods Sdn Bhd may use a computerised
system to compile all the database or record so that it will be easier for the
management or any other members on duty to use the data as their reference.
The data or the record should be kept properly and should be done accordingly
in order to ensure that the service have been done and this will help to reduce
the downtime in maintenance
machine
related
technical
malfunction/failure/breakdown.
The
system throughput. My research found that 90% of the workers sample agreed
that Monitoring The Efficiency Of Manufacturing Process may lead to
reducing the breakdown time and minors stop that indirectly increase the
maintenance downtime.
Recommendation
Based on my research, URC Snack Foods Sdn Bhd needs to monitor the
efficiency or manufacturing process as a way to reduce the breakdown time
and minor stop in improving their company capacity. It is because, if a
machine breakdown occurs in a production system, throughput, which is one
of the performance measures, might change; therefore, production planners
must take precautions against this happening. Throughput is one of the most
significant performance measures in a production system. Companies need to
reach the target throughput which was planned before. While system
throughput is decreasing, customer needs cannot be met and deadlines have to
be revised by the production planners. So this method will help the company
to produce the product according to the customer demand.
5.3.2
30
in-charge should have plan if there are any problem on the production line,
they have to ensure that it will not affected the overall manufacturing process.
Recommendation
In increase the maintenance downtime, URC Snack Foods Sdn Bhd need to
monitor the efficiency of manufacturing process in order to reduce the minor
stop from other production line and implement preventive maintenance
schedule that may improve their maintenance downtime because advanced
control systems control the process as each variable relates to overall
productivity or effectiveness. These systems are not single-loop controls, but a
multi-variable envelope representing the constraints of pressure, temperature,
and other factors. Within the envelope, the process is continuously maximizing
effectiveness. They are especially valuable where production targets or the
quality and availability of raw materials can all change relatively quickly, so
that the operating constraints and the scope for improvement vary from day to
day and indirectly may increase the maintenance downtime of company.
5.3.3
Production losses can impact small and large companies, and they usually
result from unexpected problems that arise during what should be a routine
manufacturing process. Time is added to the process, or the number of items
produced falls short of goals, because of issues tied to machinery
malfunctions, supply shortages, human error, weather and other issues that
31
Recommendation
In reducing their maintenance downtime, URC Snack Foods Sdn Bhd may
monitor the efficiency of manufacturing process to reduce the production
losses. By monitoring the production line, it may reduce the machine losses
which, in others word the machine can move smoothly without any breakdown
time. So, when machine move smoothly, the maintenance downtime also can
be improved and the production losses can be reduced. Moreover, by
monitoring the manufacturing process, it also may improve the efficiency of
machine. The efficient machine indirectly may reduce the production losses.
32
could just have a machine that will bring a better margin for the company.
Therefore, a proper maintenance and service for the machinery should be done
regularly to prevent it from the malfunction of the machine and prevent
production losses from the downtime.
5.4.1
Recommendation
33
5.4.1
Recommendation
After have identified the problem and collecting data, it have come into
conclusion that the maintenance team should propose to management to hire
and body or authorised company to do the calibration on the machinery. This
is because different type of machinery may require a proper calibration
process and the maintenance team may not have the ability as such. Therefore,
upon approval by the company, maintenance team should prepare a schedule
34
for the calibration process to be done periodically. This in return will improve
the maintenance downtime and enhance the manufacturing process.
5.4.3
Recommendation
In order to improve the maintenance downtime, URC Snack Foods Sdn Bhd
35
5.5.1
36
Recommendation
In order to increase their maintenance downtime, employer of URC Snack
Foods Sdn Bhd needs to hire a qualified and educated person to work on the
best interest their company because the qualification and educational level
acquired by workers is a property for them that represents their skill, ability or
reputation. Their skill, ability or reputation becomes priority in conducting the
operation of company. So, URC Snack Foods Sdn Bhd needs to arrange a
good decision to meet the employee that accompany with the requirement.
5.5.2
Experience
Experience is the knowledge or mastery of an event or subject gained through
involvement in or exposure to it. It refers more on-the-job training rather
than book-learning. Terms in philosophy, such as "empirical knowledge" or "a
posteriori knowledge," are used to refer to knowledge based on experience. A
person with considerable experience in a specific field can gain a reputation as
an expert. Based on my research, experience plays an important role to
improve the maintenance downtime. My research found that the most effective
factor that may increase the maintenance downtime is workers experience.
Recommendation
URC Snack Foods Sdn Bhd needs to hire more experiences workers to
conduct their production activities because the experiences workers are more
37
5.5.3 Training
Training is
teaching,
or
developing
in
oneself
or
others,
any skills and knowledge that relate to specific useful competencies. Training has
specific
goals
of
improving
one's capability,
38
Recommendation
In improve the maintenance downtime, URC Snack Foods Sdn Bhd need to train
their workers because trough training, the workers will be more motivated to
perform their job more accountability. There are several ways of train that can be
conducted by them such as classroom test, train by experience trainer and send
workers for conferences. Moreover, besides the workers will work more
effectively, the maintenance downtime of the company also can be increase.
5.6 CONCLUSION
This paper has surveyed a number of issues relating to different aspects of
solutions that can be taken by URC Snack Foods Sdn Bhd such as maintenance
schedule; overall equipment effectiveness; data envelopment analysis (DEA) and
equipment qualification; and staff accountability to improve the poor maintenance
downtime and reach the customer demand.
Some of the main data issues related to improve the capacity production were
identified and the recommendations for the problem also have been highlighted.
39
REFERENCES
Cooper D.R and Schindler P.S., (2001) Business Research Methods, 7th Edition, New
York, McGraw-Hill Irwin.
Davis D.,(1995) Business Research for decision Making, 4th Edition, United States of
America, Duxbury Press.
Hackey C., (2003) Doing Research Projects in Marketing, Management and
Consumer Research, London, Routledge, Taylor & Francis Group.
Hussey J ., and Hussey R., (1997) Business Research : A Practical guide for
undergraduate and postgraduate students, New York, Palgrave.
Koop G., 2000) Analysis of Economic Data, England, John Wiley & Sons, Ltd.
Moore, N. (2006) How to do Research : A practical guide to designing and managing
research projects 3rd Edition, London, Facet Publication.
Partington D., (2002) Essential Skills for Management Research, London, SAGE
Publication.
Sekaran U., (2004) Research Methodology for Business : A Skill Building Approach
4th Edition, Sourthern Illinois University, John Wiley & Son, Inc.
Shamsuri S., (2004) Research Method: A Simple Guide for Business Undergraduates,
University Publication- UiTM, Shah Alam, Malaysia.
URC Snack Foods Sdn Bhd, Annual Repor,t 2009
40
QUESTIONNAIRES
The Question is divides into four parts. Answer the entire question below.
Gender:
Male:
Female:
Range of age:
20-30 :
41-45:
31-40:
Above 45:
Q1: If the company provide the daily maintenance checklist, they can improve the
maintenance downtime?
_____________________________________________________________________
_____________________________________________________________________
41
Yes
No
Q2: Did the monthly service checklist may improve the maintenance downtime?
_____________________________________________________________________
_____________________________________________________________________
Yes
No
Q3: Did the record of previous maintenance report will help to reduce the
maintenance downtime?
_____________________________________________________________________
Yes
No
42
Yes
No
Q5: Did the efficiency of manufacturing process may reduce the production losses?
_____________________________________________________________________
Yes
No
43
Yes
No
Q7: Servicing or updating the machinery will prevent the malfunctions of the
machine?
___________________________________________________________________
Yes
No
Yes
No
44
Q9: By using the right spare parts, will it help in reducing the maintenance breakdown
or machinery breakdowns?
_____________________________________________________________________
Yes
No
Q10: Did past experience of the worker will influence in reducing the maintenance
downtime?
_____________________________________________________________________
Yes
No
Q11: Did training is a method that a company can be use to increase the ability and
expertise of their workers?
_____________________________________________________________________
Yes
No
45
Q12: The employee Qualification and education level is staff accountability. Did them
will influence the maintenance downtime?
_____________________________________________________________________
Yes
No
46
47