You are on page 1of 1

59066 Federal Register / Vol. 70, No.

195 / Tuesday, October 11, 2005 / Notices

Washington, DC. There is an particular resource agency, they must motions to intervene must be received
eSubscription link on the web site that also serve a copy of the document on on or before the specified deadline date
enables subscribers to receive e-mail that resource agency. for the particular application.
notification when a document is added Motions to intervene and protests may All filings must (1) bear in all capital
to a subscribed dockets(s). For be filed electronically via the Internet in letters the title ‘‘PROTEST’’ or
assistance with any FERC Online lieu of paper. The Commission strongly ‘‘MOTION TO INTERVENE’’; (2) set
service, please e-mail encourages electronic filings. See CFR forth in the heading the name of the
FERCOnlineSupport@ferc.gov. or call 385.2001 (a)(1)(iii) and the instructions applicant and the project number of the
(866) 208–3676 (toll free). For TTY, call on the Commission’s Web site (http:// application to which the filing
(202) 502–8659. www.ferc.gov) under the ‘‘eFiling’’ link. responds; (3) furnish the name, address,
k. This application has been accepted, and telephone number of the person
Magalie R. Salas, but is not ready for environmental protesting or intervening; and (4)
Secretary. analysis at this time. otherwise comply with the requirements
[FR Doc. E5–5547 Filed 10–7–05; 8:45 am] l. The existing Danbury Project of 18 CFR 385.2001 through 385.2005.
BILLING CODE 6717–01–P consists of: (1) A 35-foot-high concrete Agencies may obtain copies of the
dam with a 48-foot-wide spillway with application directly from the applicant.
three sections, each of which is A copy of any protest or motion to
DEPARTMENT OF ENERGY equipped with 7-foot-high slide gates; intervene must be served upon each
(2) a 300-foot-long earthen dike representative of the applicant specified
Federal Energy Regulatory connecting to the right side of the in the particular application.
Commission concrete dam; (3) a powerhouse (Plant o. Procedural schedule and final
[Project No. 9184–013] 1) integral to the dam containing a 176- amendments: The application will be
kW turbine generating unit and a 300- processed according to the following
Flambeau Hydro, LLC; Notice of kW turbine generating unit; (4) a 255- Hydro Licensing Schedule. Revisions to
Application Accepted for Filing and acre reservoir with a negligible net the schedule will be made as
Soliciting Motions To Intervene and storage capacity at a water surface appropriate. The Commission staff
Protests elevation of 929.21 feet NGVD from proposes to issue one environmental
April through October and 928.11 feet assessment rather than issue a draft and
October 3, 2005. NGVD from November through March; final EA. Comments, terms and
Take notice that the following (5) a 2,500-foot-long power canal that conditions, recommendations,
hydroelectric application has been filed conveys water to; (6) a second prescriptions, and reply comments, if
with the Commission and is available powerhouse (Plant 2) containing a any, will be addressed in the EA. Staff
for public inspection. single 600-kW turbine generating unit; intends to give at least 30 days for
a. Type of Application: Subsequent and (7) appurtenant facilities. The entities to comment on the EA before
License. applicant estimates that the total final action is taken on the license
b. Project No.: P–9184–013. average annual generation is 3,844 application.
c. Date Filed: June 10, 2005. megawatt-hours. Issue Scoping Document for
d. Applicant: Flambeau Hydro, LLC. m. A copy of the application is Comments—September 2005.
e. Name of Project: Danbury available for review at the Commission Notice application ready for
Hydroelectric Project. in the Public Reference Room or may be environmental analysis—November
f. Location: On the Yellow River in viewed on the Commission’s Web site at 2005.
Burnett County, Wisconsin. The project http://www.ferc.gov using the Notice of the availability of the EA—
does not occupy federal lands. ‘‘eLibrary’’ link. Enter the docket March 2006.
g. Filed Pursuant to: Federal Power number excluding the last three digits in Ready for Commission’s decision on the
Act 16 U.S.C. 791 (a)–825(r). the docket number field to access the Application—May 2006.
h. Applicant Contact: Scott Klabunde, document. For assistance, contact FERC Final amendments to the application
North American Hydro, Inc., P.O. Box Online Support at must be filed with the Commission no
167, Neshkoro, WI 54960; 920–293– FERCOnlineSupport@ferc.gov or toll- later than 30 days from the issuance
4628 ext. 14. free at 1–866–208–3676, or for TTY, date of the notice of ready for
i. FERC Contact: Tim Konnert, (202) (202) 502–8659. A copy is also available environmental analysis.
502–6359 or timothy.konnert@ferc.gov. for inspection and reproduction at the
j. Deadline for filing motions to address in item h. above. Magalie R. Salas,
intervene and protests: 60 days from the You may also register online at Secretary.
issuance date of this notice. http://www.ferc.gov/esubscribenow.htm [FR Doc. E5–5548 Filed 10–7–05; 8:45 am]
All documents (original and eight to be notified via email of new filings BILLING CODE 6717–01–P
copies) should be filed with: Magalie R. and issuances related to this or other
Salas, Secretary, Federal Energy pending projects. For assistance, contact
Regulatory Commission, 888 First FERC Online Support. DEPARTMENT OF ENERGY
Street, NE., Washington, DC 20426. n. Anyone may submit a protest or a
The Commissions Rules of Practice motion to intervene in accordance with Federal Energy Regulatory
and Procedure require all intervenors the requirements of Rules of Practice Commission
filing documents with the Commission and Procedure, 18 CFR 385.210, Notice of Application for Transfer of
to serve a copy of that document on 385.211, and 385.214. In determining License and To Change Name of
each person whose name appears on the the appropriate action to take, the Project and Soliciting Comments,
official service list for the project. Commission will consider all protests Motions To Intervene, and Protests
Further, if an intervenor files comments filed, but only those who file a motion
or documents with the Commission to intervene in accordance with the October 4, 2005.
relating to the merits of an issue that Commission’s Rules may become a Take notice that the following
may affect the responsibilities of a party to the proceeding. Any protests or hydroelectric application has been filed

VerDate Aug<31>2005 16:40 Oct 07, 2005 Jkt 208001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1

You might also like