CURSO: INGENIERA DE LA CONSTRUCCIN I
Calcular:
a) ancho del cimiento 2-2
b) volumen de excavacin, relleno y material
excedente.
VISTA EN
PLANTA
Calcular:
a) Ancho del cimiento 2-2
b) Volumen de excavacin, relleno y material
excedente.
R = 5
= 4.31
1 = 10.12
2
= 20
= 17.2288
= 0.6
20 17.2288
2 = 20
0.6
2
2 = 11.16862
1 = 1
1 =
10.12
1 =
15.153
1.5
2 = 2
2 = 11.16862 1.5
2 = 16.7533
= 1 + 2
= 15.153 + 16.7533
= 31.9033
(2 2 )
1 =
2
(4.832 4.312 )
1 =
2
1 = 1 2
1 = 7.4662 1.0
1 = 7.4663
R = 4.83 = 4.31
1 = 7.4662
2 =
2
= 19.3066
= 17.2288
= 0.45
19.3 17.2288
2 = 19.3
0.6
2
2 = 8.222
2 = 2 2
2 = 8.222 0.25
2 = 2.0553
= 1 + 2
= 7.4663 + 2.055
= 9.5213
Metrados
INTEGRANTES:
LOGO
PROBLEMA
Se tiene un terreno hexagonal regular de 6.00 metros de lado.
Calcular:
Volumen Excavado
Volumen Rellenado
Volumen de Sobrecimiento
Volumen de Cimiento Corrido
GRFICO
www.jessca.com.
SOLUCIN
VOLUMEN DE EXCAVADO (VE)
VE = 6ladosx6mx0.5mx1.5m
VE = 27m3
SOLUCION
VOLUMEN DE RELLENADO (VR)
VR = 6ladosx6mx0.35mx0.70m
VR = 8.82 3
SOLUCION
VOLUMEN DE MATERIAL
ELIMINADO (VME)
VME = VE - VR = 27 3 - 8.82 3
VME = 18.18 3
SOLUCION
VOLUMEN DE SOBRECIMIENTO (VSC)
VSC = (6ladosx6mx0.80mx0.15m) (6columnasx0.40mx0.15mx0.80m)
SOLUCION
VOLUMEN DE CIMIENTO CORRIDO (VcC)
VcC = 14.4 m3
Integrantes:
-Alvarado Cornejo James
-Palacios lazo max
-Piedra Pasapera Rodil Rafael
-Villegas Yovera Katty
-Honores Adanaque Alejandra
Marco Terico
b) Volumen de relleno
En zapatas:
(1*1*0.5)-(0.4*0.4*0.5)=0.42m3 * 6 zapatas = 2.52
relleno de cimientos:
(0.5*0.25*16) = 2.00
2.52+
2.00
4.52m3
c) Volumen de material.
Un m3 de tierra natural = 1.25 m3 de tierra suelta
un m3 de tierra natural = 0.8 m3 de tierra compactada
volumen excavado = 18.60 * (1/0.8)
volumen de relleno = 4.52 * (1.25/0.8)
volumen de material excedente = volumen de excavado volumen de relleno
volumen de material excedente = 23.25-70.625
volumen de material excedente = 16.187