48390 Federal Register / Vol. 70, No.

158 / Wednesday, August 17, 2005 / Notices

compliance filing if you have previously DEPARTMENT OF ENERGY with the Commission to serve a copy of
intervened in the same docket. Protests that document on each person on the
will be considered by the Commission Federal Energy Regulatory official service list for the project.
in determining the appropriate action to Commission Further, if an intervenor files comments
be taken, but will not serve to make [Project No. 2165–022] or documents with the Commission
protestants parties to the proceeding. relating to the merits of an issue that
Anyone filing a motion to intervene or Alabama Power Company; Notice of may affect the responsibilities of a
protest must serve a copy of that Application Tendered for Filing With particular resource agency, they must
document on the Applicant. In reference the Commission, and Establishing also serve a copy of the document on
Procedural Schedule for Relicensing that resource agency.
to filings initiating a new proceeding,
and a Deadline for Submission of Final Requests for cooperating agency status
interventions or protests submitted on may be filed electronically via the
or before the comment deadline need Amendments
Internet in lieu of paper. The
not be served on persons other and the August 11, 2005. Commission strongly encourages
Applicant. Take notice that the following electronic filings. See 18 CFR
The Commission encourages hydroelectric application has been filed 385.2001(a)(1)(iii) and the instructions
electronic submission of protests and with the Commission and is available on the Commission’s Web site (http://
interventions in lieu of paper, using the for public inspection. www.ferc.gov) under the ‘‘e-Filing’’ link.
FERC Online links at http:// a. Type of Application: New Major The Commission strongly encourages
License. electronic filing.
www.ferc.gov. To facilitate electronic b. Project No.: P–2165–022.
service, persons with Internet access l. This application has not been
c. Date Filed: July 28, 2005. accepted for filing. We are not soliciting
who will eFile a document and/or be d. Applicant: Alabama Power motions to intervene, protests, or final
listed as a contact for an intervenor Company. terms and conditions at this time.
must create and validate an e. Name of Project: Warrior River m. Description of Project: The
eRegistration account using the Hydroelectric Project, which includes proposed Warrior River Project would
eRegistration link. Select the eFiling the Lewis Smith and Bankhead consist of two developments. The Lewis
link to log on and submit the Developments. Smith and Bulkhead developments
intervention or protests. f. Location: The Lewis Smith would operate in peaking mode. The
development is located in northwestern total capacity for all developments is
Persons unable to file electronically Alabama in the headwaters of the Black
should submit an original and 14 copies 211.05 MW, generating about 463,094
Warrior River on the Sipsey Fork in MWh of energy annually. The project
of the intervention or protest to the Cullman, Walker, and Winston
Federal Energy Regulatory Commission, works would include the following:
Counties. The Bankhead development is Lewis Smith Development: The Lewis
888 First St. NE., Washington, DC located in central Alabama downstream Smith development, located on the
20426. of the Lewis Smith development, on the Sipsey Fork of the Black Warrior River,
The filings in the above proceedings Black Warrior River in Tuscaloosa consists of: (1) A total of 2,200 feet of
are accessible in the Commission’s County. The Lewis Smith development water retaining structures which
eLibrary system by clicking on the affects 2691.44 acres of federal lands includes a 300-foot-high earth and rock
appropriate link in the above list. They and the Bankhead development affects fill dam, an uncontrolled spillway with
are also available for review in the 18.7 acres of Federal lands. fixed crest elevation 522 feet m.s.l., and
g. Filed Pursuant to: Federal Power powerhouse consisting of: (a) A 95-foot-
Commission’s Public Reference Room in
Act 16 U.S.C. 791 (a)–825(r). long uncontrolled spillway, (b) a 350-
Washington, DC. There is an h. Applicant Contact: Mr. Jerry L.
eSubscription link on the web site that foot-wide channel which originates at
Stewart, Senior Vice President and
enables subscribers to receive e-mail the spillway and discharges into Mill
Senior Production Officer, Alabama
notification when a document is added creek about 3,000 feet downstream of
Power Company, 600 North 18th Street,
to a subscribed docket(s). For assistance the spillway, (c) a concrete intake
P.O. Box 2641, Birmingham, AL 35291–
with any FERC Online service, please e- located 120 feet upstream of the dam
8180.
mail FERCOnlineSupport@ferc.gov. or i. FERC Contact: Janet Hutzel, (202) which provides flows to two 23-foot-
502–8675 or janet.hutzel@ferc.gov. diameter, 630-foot-long power tunnels;
call (866) 208–3676 (toll free). For TTY,
j. Cooperating agencies: We are asking (2) a 35-mile-long, 21,200-acre reservoir
call (202) 502–8659.
Federal, State, local, and tribal agencies at normal pool elevation 510 feet m.s.l.,
Linda Mitry, with jurisdiction and/or special and capacity of 1,390,000 acre-ft at
Deputy Secretary. expertise with respect to environmental normal pool elevation 510 feet m.s.l.
[FR Doc. E5–4465 Filed 8–16–05; 8:45 am] issues to cooperate with us in the and 1,670,600 acre-feet at spillway crest
preparation of the environmental elevation 522-ft m.s.l; (3) a 193-foot-long
BILLING CODE 6717–01–P
document. Agencies who would like to concrete power house, housing two
request cooperating status should follow 111,500 horse power vertical fixed-
the instructions for filing such requests blade turbines and generating units,
described in item k below. each rated at 78.75 MW, a total rated
k. Deadline for request for cooperating capacity of 157.5 MW, maximum
agency status: September 26, 2005. hydraulic capacity of 5,700 cfs each,
All documents (original and eight and total hydraulic capacity of 11,400
copies) should be filed with: Magalie R. cfs. The estimated generation is 282,864
Salas, Secretary, Federal Energy MWh.; (4) trashracks located at the
Regulatory Commission, 888 First turbine intakes with 6-inch bar spacing;
Street, NE., Washington, DC 20426. (5) a substation; and (6) other
The Commission’s Rules of Practice appurtenances. One 115-kilovolt
require all intervenors filing documents transmission line, and two 161-kilovolt

VerDate jul<14>2003 13:34 Aug 16, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\17AUN1.SGM 17AUN1
Federal Register / Vol. 70, No. 158 / Wednesday, August 17, 2005 / Notices 48391

transmission lines connect substations Issue acceptance letter or deficiency Requests to participate in the meeting
to Alabama Power’s transmission letter and request additional may be submitted to the technical
system. information, if needed: September 2005. person listed under FOR FURTHER
Bankhead Development: The Notice soliciting final terms and INFORMATION CONTACT.
Bankhead development is located at the conditions: December 2005. FOR FURTHER INFORMATION CONTACT: For
Notice of the availability of the EA: general information contact: Colby
U.S. Army Corps of Engineers (Corps)
July 2006. Lintner, Regulatory Coordinator,
Lock and Dam No. 17 on the Black Ready for Commission’s decision on
Warrior River. The dam, a 1,230-foot- Environmental Assistance Division
the application: November 2006.
long gated spillway, and 78-mile-long Final amendments to the application (7408M), Office of Pollution Prevention
reservoir are owned and operated by the must be filed with the Commission no and Toxics, Environmental Protection
Corps. The Bankhead development later than 30 days from the issuance Agency, 1200 Pennsylvania Ave., NW.,
consists of a powerhouse and intake date of the notice of ready for Washington, DC 20460–0001; telephone
canal consisting of: (1) A 54-foot-wide environmental analysis. number: (202) 554–1404; e-mail address:
by 100-foot-long gated intake canal; (2) TSCA-Hotline@epa.gov.
a 135-foot-long powerhouse housing one Linda Mitry, For technical information contact:
71,400 horse power vertical propeller Deputy Secretary. John Shoaff, OPPT International Team
turbine and generating unit, rated at [FR Doc. E5–4472 Filed 8–16–05; 8:45 am] Leader, Environmental Assistance
53.985 MW, and a maximum hydraulic BILLING CODE 6717–01–P Division (7408M), Office of Pollution
capacity of 10,388 cfs. The estimated Prevention and Toxics (OPPT),
generation is 180,230 MWh; (3) thirty- Environmental Protection Agency, 1200
five trashracks located at the turbine ENVIRONMENTAL PROTECTION Pennsylvania Ave., NW., Washington,
intakes with 6-inch bar spacing; (4) AGENCY DC 20460–0001; telephone number:
penstocks; (5) a substation; and (6) other (202) 564–0531; e-mail address:
appurtenances. One 115-kilovolt [OPPT–2005–0029; FRL–7732–2]
shoaff.john@epa.gov.
transmission line connects the Third Preparatory Committee Meeting SUPPLEMENTARY INFORMATION:
substation to Alabama Power’s on the Strategic Approach to
transmission system. International Chemicals Management; I. General Information
n. A copy of the application is Notice of Public Meeting A. Does this Action Apply to Me?
available for review at the Commission
in the Public Reference Room or may be AGENCY: Environmental Protection This action is directed to the public
viewed on the Commission’s Web site at Agency (EPA). in general, and may be of particular
http://www.ferc.gov using the ACTION: Notice. interest to industry, trade associations,
‘‘eLibrary’’ link. Enter the docket and non-governmental organizations
SUMMARY: This notice announces that that deal with and are interested in
number excluding the last three digits in EPA and the State Department are
the docket number field to access the international chemicals management. If
hosting a meeting for stakeholders to you have any questions regarding the
document. For assistance, contact FERC inform the development of the U.S.
Online Support at applicability of this action to a
Government’s viewpoints for the particular entity, consult the technical
FERCOnlineSupport@ferc.gov or toll- upcoming 3rd Preparatory Committee
free at 1–866–208–3676, or for TTY, person listed under FOR FURTHER
(PrepComm 3) meeting on the Strategic INFORMATION CONTACT.
(202) 502–8659. A copy is also available Approach to International Chemicals
for inspection and reproduction at the Management (SAICM) and a number of B. How Can I Get Copies of this
address in item h above. updates to the inter-sessional working Document and Other Related
You may also register online at documents. Comments are being sought Information?
http://www.ferc.gov/docs-filing/ to help provide guidance to U.S. 1. Docket. EPA has established an
esubscription.asp to be notified via e- Government Agencies as to how they official public docket for this action
mail of new filings and issuances should work with other countries to under docket identification (ID) number
related to this or other pending projects. develop a SAICM that promotes the OPPT–2005–0029. The official public
For assistance, contact FERC Online sound management of chemicals while docket consists of the documents
Support. facilitating the movement of chemicals specifically referenced in this action,
o. Procedural schedule and final and their products across borders any public comments received, and
amendments: At this time we do not without compromising human health or other information related to this action.
anticipate the need for preparing a draft the environment. There are several Although a part of the official docket,
environmental assessment (EA). updates to the inter-sessional working the public docket does not include
Recipients will have 60 days to provide documents that will serve as a basis for Confidential Business Information (CBI)
the Commission with any written the structural development of a SAICM. or other information whose disclosure is
comments on the EA. All comments This meeting will serve as an restricted by statute. The official public
filed with the Commission will be opportunity for stakeholders to share docket is the collection of materials that
considered in the Order taking final their views on these documents before is available for public viewing at the
action on the license applications. they are finalized at the third and final EPA Docket Center, Rm. B102-Reading
However, should substantive comments session of the PrepComm on SAICM in Room, EPA West, 1301 Constitution
requiring re-analysis be received on the the third week of September 2005. Ave., NW., Washington, DC. The EPA
EA document, we would consider DATES: The meeting will be held on Docket Center is open from 8:30 a.m. to
preparing a subsequent EA document. Wednesday, August 31, 2005, from 1 to 4:30 p.m., Monday through Friday,
The application will be processed 3 p.m. excluding legal holidays. The EPA
according to the following Hydro ADDRESSES: The meeting will be held at Docket Center Reading Room telephone
Licensing Schedule. Revisions to the 1201 Constitution Ave., NW., Rm. 1153, number is (202) 566–1744, and the
schedule will be made as appropriate. EPA East (1st Floor), Washington, DC. telephone number for the OPPT Docket,

VerDate jul<14>2003 13:34 Aug 16, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\17AUN1.SGM 17AUN1