47852 Federal Register / Vol. 70, No.

156 / Monday, August 15, 2005 / Notices

Anasazi Heritage Center in Dolores, DEPARTMENT OF THE INTERIOR Southeast Region, National Park
Colorado. They are available for public Service, 100 Alabama Street SW., 1924
inspection and reproduction during National Park Service Building, Atlanta, Georgia 30303.
regular business hours within thirty (30) Dated: July 1, 2005.
days of the meeting. In addition, Notice of Availability of a Final
Environmental Impact Statement for Patricia A. Hooks,
minutes and other information
the Low Country Gullah Culture Regional Director, Southeast Region.
concerning the Committee can be
obtained from the Monument planning Special Resource Study [FR Doc. 05–16083 Filed 8–12–05; 8:45 am]
Web site at: http://www.blm.gov/rmp/ BILLING CODE 4312–52–P
AGENCY: National Park Service.
canm which will be updated following ACTION: Notice.
each Committee meeting.
SUMMARY: This notice is being published
DEPARTMENT OF THE INTERIOR
Dated: August 9, 2005.
in accordance with 40 CFR 1506.6. National Park Service
Stephen J. Kandell,
Pursuant to section 102(2)(c) of the
Acting Monument Manager, Canyons of the
National Environmental Policy Act of Notice of Availability of a Draft
Ancients National Monument.
1969 the National Park Service Environmental Impact Statement for
[FR Doc. 05–16104 Filed 8–12–05; 8:45 am]
announces the availability of a Final the Castillo de San Marcos National
BILLING CODE 4310–JB–P
Environmental Impact Statement (EIS) Monument General Management Plan
for the Low Country Gullah Culture
Special Resource Study. The document AGENCY: National Park Service, Interior.
DEPARTMENT OF THE INTERIOR ACTION: Notice.
describes ways that the National Park
Bureau of Land Management Service can assist in preserving Gullah
SUMMARY: Pursuant to section 102(2) (C)
culture (more commonly known as
Geechee in Georgia and Florida) by of the National Environmental Policy
[WY–957–05–1910–BJ–5115]
outlining four management alternatives Act of 1969 and National Park Service
for consideration by Congress, and a no- policy in Director’s Order Number 2
Notice of Filing of Plats of Survey, (Park Planning) and Director’s Order
Nebraska action alternative. The EIS analyzes the
environmental impacts of those Number 12 (Conservation Planning,
AGENCY: Bureau of Land Management, alternatives considered for the future Environmental Impact Analysis, and
Interior. protection, interpretation, and Decision-making) the National Park
management of Gullah cultural Service announces the availability of a
SUMMARY: The Bureau of Land
resources. There have been no Draft Environmental Impact Statement/
Management (BLM) is scheduled to file
substantive changes to the alternatives General Management Plan (DEIS/GMP)
the plats of surveys of the lands
as presented in the Draft EIS. The study for the Castillo de San Marcos National
described below thirty (30) calendar
area stretches along the southeastern Monument in St. Augustine, Florida.
days from the date of this publication in
United States coast roughly from the The authority for publishing this notice
the BLM Wyoming State Office,
Cape Fear River in North Carolina to the is contained in 40 CFR 1506.6.
Cheyenne, Wyoming.
St. John’s River in Florida and The document provides a framework
FOR FURTHER INFORMATION CONTACT: for management, use, and development
Bureau of Land Management, 5353 approximately 30 miles inland.
options for the national monument by
Yellowstone Road, Cheyenne, Wyoming ADDRESSES: Copies of the Final EIS are
the National Park Service for the next
82009. available by contacting John Barrett,
15–20 years. The document describes
National Park Service, 100 Alabama St.,
SUPPLEMENTARY INFORMATION: These four management alternatives for
SW, Atlanta, GA 30303. An electronic
surveys were executed at the request of consideration, including a no-action
copy of the Final EIS is available on the
the Bureau of Indian Affairs and are alternative that continues current
Internet at http://www.nps.gov/sero/
necessary for the management of these management policies, and analyzes the
planning/gg_srs/gg_res.htm.
lands. The lands surveyed are: environmental impacts of those
SUPPLEMENTARY INFORMATION: The alternatives. The Castillo de San Marcos
The plats (in 5 sheets) representing
the dependent resurvey of the First National Park Service held community National Monument is located on
Guide Meridian East through T. 26 N., and stakeholder meetings to gather Matanzas Bay, adjacent to the historic
between Rs. 8 and 9 E., the Treaty advice and feedback on desired district of St. Augustine, Florida.
Boundary of March 8, 1865, through R. outcomes of the study. The meetings
DATES: There will be a 60-day comment
8 E., portions of the subdivisional lines assisted the National Park Service in
period beginning with the
and the subdivision of certain sections, developing alternatives for managing
Environmental Protection Agency’s
the corrective dependent resurvey of a associated cultural and natural
publication of its notice of availability
portion of the First Guide Meridian East, resources and creating interpretive and
in the Federal Register.
and the survey of the subdivision of educational programs. The alternatives
were presented at community forums in ADDRESSES: Copies of the DEIS are
certain sections, Township 26 North, available by contacting the Park
Range 8 East, Sixth Principal Meridian, October and November 2002. Responses
from the meetings were incorporated Superintendent at Castillo de San
Nebraska, was accepted August 3, 2005. Marcos National Monument, 1 South
Copies of the preceding described into the four alternatives described in
the study. There have been no Castillo Drive, St. Augustine, Florida
plats are available to the public. 32084. An electronic copy of the DEIS
substantive changes to the alternatives
Dated: August 3, 2005. as presented in the Draft EIS. is available on the Internet at http://
John P. Lee, parkplanning.nps.gov.
FOR FURTHER INFORMATION CONTACT: John
Chief Cadastral Surveyor, Division of Support Barrett, 404–562–3124, extension 637. SUPPLEMENTARY INFORMATION: The
Services. The responsible official for this National Park Service held public and
[FR Doc. 05–15694 Filed 8–12–05; 8:45 am] Environmental Impact Statement is stakeholder meetings and consulting
BILLING CODE 4310–22–P Patricia A. Hooks, Regional Director, party meetings as outlined in 36 CFR

VerDate jul<14>2003 13:17 Aug 12, 2005 Jkt 205001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\15AUN1.SGM 15AUN1