You are on page 1of 2

38128 Federal Register / Vol. 70, No.

126 / Friday, July 1, 2005 / Notices

Description: Miami Valley Lighting, are also available for review in the year summary report on the licensees’
LLC submits its notice of cancellation of Commission’s Public Reference Room in chinook salmon studies, monitoring,
its FERC Electric Rate Schedule No. 1 Washington, DC. There is an and non-flow mitigation efforts in the
which was accepted for filing by order eSubscription link on the Web site that Tuolumne River since 1995. The filing
issued 12/22/00. enables subscribers to receive e-mail also includes the licensees’ proposals
Filed Date: 06/21/2005. notification when a document is added for continuing their current monitoring
Accession Number: 20050623–0112. to a subscribed dockets(s). For program, consultation and reporting
Comment Date: 5 p.m. eastern time on assistance with any FERC Online efforts, flow release schedule, flow
Tuesday, July 12, 2005. service, please e-mail fluctuation controls, and habitat
Docket Numbers: ER97–2801–007. FERCOnlinSupport@ferc.gov. or call restoration projects. Proposals to
Applicants: PacifiCorp. (866) 208–3676 (toll free). For TTY, call implement measures to increase
Description: PacifiCorp submits a (202) 502–8659. utilization of spawning habitat and to
notice of change in status informing the reduce smolt predation are described in
Linda Mitry, the filing. These efforts would continue
Commission of a departure from the
Deputy Secretary. through the current license period
characteristics relied upon by the
Commission in its 6/11/02 order [FR Doc. E5–3455 Filed 6–30–05; 8:45 am] (2016). The Commission also invites
accepting its updated market power BILLING CODE 6717–01–P comments on consideration of the
analysis. Endangered Species Act issues
Filed Date: 06/21/2005. involving Central Valley steelhead that
Accession Number: 20050623–0113. DEPARTMENT OF ENERGY were deferred pending completion of
Comment Date: 5 p.m. eastern time on ongoing studies and informal
Federal Energy Regulatory consultation, by order issued on
Tuesday, July 12, 2005. Commission December 22, 2003 (105 FERC ¶ 61,332).
Any person desiring to intervene or to
l. Location of the Applications: The
protest in any of the above proceedings Notice of Filing of Fisheries Studies
filing is available for inspection and
must file in accordance with Rules 211 Report and Study Proposals, and review at the Commission’s Public
and 214 of the Commission’s Rules of Soliciting Comments, Motions To Reference Room, located at 888 First
Practice and Procedure (18 CFR 385.211 Intervene, and Protests Street, NE., Room 2A, Washington, DC
and 385.214) on or before 5 p.m. eastern 20426, or by calling (202) 502–8371.
time on the specified comment date. It June 24, 2005.
Take notice that the following This filing may also be viewed on the
is not necessary to separately intervene Commission’s Web site at http://
again in a subdocket related to a hydroelectric report has been filed with
the Commission and is available for www.ferc.gov using the ‘‘eLibrary’’ link.
compliance filing if you have previously Enter the docket number (excluding the
intervened in the same docket. Protests public inspection:
a. Type of Filing: Ten-year summary last three digits) into the ‘‘Docket
will be considered by the Commission Number’’ field to access the document.
in determining the appropriate action to report on fisheries studies conducted in
the Tuolumne River and You may also register online at http://
be taken, but will not serve to make www.ferc.gov/docs-filing/
protestants parties to the proceeding. recommendations for additional studies,
as required by Paragraph G of the Order esubscription.asp to be notified via e-
Anyone filing a motion to intervene or mail of new filings and issuances
protest must serve a copy of that Amending License and Dismissing
Hearing Requests issued July 31, 1996 related to this or other pending projects.
document on the Applicant. In reference For assistance, call the 1–866–208–3676
to filings initiating a new proceeding, (76 FERC ¶ 61,117).
b. Project No.: 2299–057. or e-mail FERCOnlineSupport@ferc.gov,
interventions or protests submitted on for TTY, contact (202) 502–8659. A copy
c. Date Filed: March 25, 2005.
or before the comment deadline need d. Licensees: Turlock and Modesto is also available for inspection and
not be served on persons other and the Irrigation Districts. reproduction at the address in item (h)
Applicant. e. Name of Project: Don Pedro. above.
The Commission encourages f. Location: The project is located on m. Individuals desiring to be included
electronic submission of protests and the Tuolumne River in Stanislaus and on the Commission’s mailing list should
interventions in lieu of paper, using the Tuolumne Counties, California. so indicate by writing to the Secretary
FERC Online links at http:// g. Filed Pursuant to: Federal Power of the Commission.
www.ferc.gov. To facilitate electronic Act, 16 U.S.C. 791(a)–825(r). n. Comments, Protests, or Motions to
service, persons with Internet access h. Licensees’ Contacts: Mr. Larry Intervene—Anyone may submit
who will eFile a document and/or be Weis, General Manager, Turlock comments, a protest, or a motion to
listed as a contact for an intervenor Irrigation District, P.O. Box 949, intervene in accordance with the
must create and validate an Turlock, California 95381; Mr. Allen requirements of Rules of Practice and
eRegistration account using the Short, General Manager, Modesto Procedure, 18 CFR 385.210, .211, .214.
eRegistration link. Select the eFiling Irrigation District, P.O. Box 4060, In determining the appropriate action to
link to log on and submit the Modesto, California 95352. take, the Commission will consider all
intervention or protests. i. FERC Contact: Any questions on protests or other comments filed, but
Persons unable to file electronically this notice should be directed to Philip only those who file a motion to
should submit an original and 14 copies Scordelis at 415–369–3335, or e-mail intervene in accordance with the
of the intervention or protest to the address philip.scordelis@ferc.gov. Commission’s Rules may become a
Federal Energy Regulatory Commission, j. Deadline for filing comments and/ party to the proceeding. Any comments,
888 First St. NE., Washington, DC or motions: July 25, 2005. Deadline for protests, or motions to intervene must
20426. filing replies to comments and/or be received on or before the specified
The filings in the above proceedings motions: 60 days from the date of this comment date for the particular
are accessible in the Commission’s notice. application.
eLibrary system by clicking on the k. Description of Filing and Related o. Filing and Service of Responsive
appropriate link in the above list. They Matters: The filing consists of the ten- Documents—Any filings must bear in

VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1
Federal Register / Vol. 70, No. 126 / Friday, July 1, 2005 / Notices 38129

all capital letters the title a. Type of Application: Small wheel penstock gate controlling flows
‘‘COMMENTS’’, hydroelectric power project exemption into a 66-inch-diameter steel penstock
‘‘RECOMMENDATIONS FOR TERMS from licensing. running through the dam; (4) river
AND CONDITIONS’’, ‘‘PROTEST’’, OR b. Project No.: 2204–024. outlet works on the face of the dam,
‘‘MOTION TO INTERVENE’’, as c. Date filed: December 30, 2004. leading to a 54-inch-diameter steel
applicable, and the Project Number of d. Applicant: City and County of embedded pipe that conveys water to
the particular application to which the Denver, Colorado, acting by and through the outlet works valves; (5) a 66-foot-
filing refers (P–2299–057). All its Board of Water Commissioners. long, 30-foot-wide, 60-foot-high
documents (including an original and e. Name of Project: Williams Fork concrete powerhouse at the toe of the
eight copies) should be filed with: Ms. Reservoir Project. dam, containing one vertical-axis
Magalie R. Salas, Secretary, Federal f. Location: On the Williams Fork turbine/generator with a capacity of
Energy Regulatory Commission, 888 River near its confluence with the 3,150 kilowatts (kW); (6) a tailrace
First Street NE., Washington, DC 20426. Colorado River at Parshall, in Grand excavated in the streambed rock,
A copy of any motion to intervene must County, Colorado. No federal lands carrying the combined powerhouse and
also be served upon each licensee would be affected. river outlet discharges; (7) a 60-foot by
representative specified in the particular g. Filed Pursuant to: Public Utility 40-foot switchyard; (8) and appurtenant
filing. Regulatory Policies Act of 1978, 16 equipment.
p. Agency Comments—Federal, state, U.S.C. 2705, 2708. The applicant would increase the
and local agencies are invited to file h. Applicant Contact: Kevin Urie, project’s generating capacity to 3,650
comments on the described filing. A Environmental Planner, Denver Water, kW by installing a second, 500-kW
copy of the filing may be obtained by 1600 W. 12th Ave., Denver, CO 80204, vertical turbine/generator. The new unit
agencies directly from the Licensees. If (303) 628–5987. would be located adjacent to the
an agency does not file comments i. FERC Contact: Dianne Rodman, existing powerhouse inside the river
within the time specified for filing (202) 502–6077 or outlet works structure and would
comments, it will be presumed to have dianne.rodman@ferc.gov. discharge into the same tailrace as the
j. Deadline for filing motions to existing turbine via a weir box. The new
no comments. One copy of an agency’s
intervene and protests, comments, and unit would use water being released
comments must also be sent to the
terms and conditions is 60 days from from the reservoir for other purposes,
Licensees’ representatives.
q. Comments, protests, and the issuance of this notice; reply and operation of the dam would not be
interventions may be filed electronically comments are due 105 days from the changed to increase power production.
via the internet in lieu of paper. See 18 issuance date of this notice. m. A copy of the application is
All documents (original and eight available for review at the Commission
CFR 385.2001(a)(1)(iii) and the
copies) should be filed with: Magalie R. in the Public Reference Room or may be
instructions on the Commission’s Web
Salas, Secretary, Federal Energy viewed on the Commission’s Web site at
site at http://www.ferc.gov under the e-
Regulatory Commission, 888 First http://www.ferc.gov using the
Filing link.
Street, NE., Washington, DC 20426. ‘‘eLibrary’’ link. Enter the docket
Magalie R. Salas, The Commission’s Rules of Practice number excluding the last three digits in
Secretary. require all intervenors filing documents the docket number field to access the
[FR Doc. E5–3449 Filed 6–30–05; 8:45 am] with the Commission to serve a copy of document. For assistance, contact FERC
BILLING CODE 6717–01–P
that document on each person on the Online Support at
official service list for the project. FERCOnlineSupport@ferc.gov or toll-
Further, if an intervenor files comments free at 1–866–208–3676, or for TTY,
DEPARTMENT OF ENERGY or documents with the Commission (202) 502–8659. A copy is also available
relating to the merits of an issue that for inspection and reproduction at the
Federal Energy Regulatory may affect the responsibilities of a address in item h above.
Commission particular resource agency, they must n. Anyone may submit comments, a
[Project No. 2204–024]
also serve a copy of the document on protest, or a motion to intervene in
that resource agency. accordance with the requirements of
City and County of Denver, CO; Notice Motions to intervene and protests, Rules of Practice and Procedure, 18 CFR
of Application and Applicant-Prepared comments, and terms and conditions 385.210, .211, .214. In determining the
EA Accepted for Filing, Soliciting may be filed electronically via the appropriate action to take, the
Motions To Intervene and Protests, Internet in lieu of paper. The Commission will consider all protests or
and Soliciting Comments, and Terms Commission strongly encourages other comments filed, but only those
and Conditions electronic filings. See 18 CFR who file a motion to intervene in
385.2001(a)(1)(iii) and the instructions accordance with the Commission’s
June 24, 2005. on the Commission’s Web site (http:// Rules may become a party to the
Take notice that the following www.ferc.gov) under the ‘‘e-Filing’’ link. proceeding. Any comments, protests, or
hydroelectric application and applicant- k. This application has been accepted motions to intervene must be received
prepared environmental assessment for filing. on or before the specified comment date
have been filed with the Commission l. The existing project consists of: (1) for the particular application.
and are available for public inspection. The 209-foot-high, 670-foot-long All filings must (1) bear in all capital
A similar notice was issued in the concrete thin arch dam with a crest letters the title ‘‘PROTEST’’, ‘‘MOTION
Federal Register on April 28, 2005. This elevation of 7,814 feet above mean sea TO INTERVENE’’, ‘‘COMMENTS,’’
notice is being issued to provide level (msl); (2) the Williams Fork ‘‘REPLY COMMENTS,’’ or ‘‘TERMS
additional opportunity to respond. reservoir with a surface area of 1,628 AND CONDITIONS;’’ (2) set forth in the
Those who have already responded to acres and storage of 96,822 acre-feet at heading the name of the applicant and
the first notice are not required to elevation 7,811 feet msl; (3) a reinforced the project number of the application to
respond again to this notice but may do concrete penstock intake on the face of which the filing responds; (3) furnish
so if they wish. the dam, with a 7-foot by 5-foot fixed the name, address, and telephone

VerDate jul<14>2003 18:11 Jun 30, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\01JYN1.SGM 01JYN1

You might also like