ORACLE BUSINESS INTELLIGENCE APPLICATIONS

11.1.1.9 PROJECT ANALYTICS


METRIC REFERENCE GUIDE

VERSION 1.2

May 2015

Disclaimer
This document is provided for information purposes only, and the contents hereof are subject to change without
notice. This document is not warranted to be error-free, nor is it subject to any other warranties or conditions,
whether expressed orally or implied in law, including implied warranties and conditions of merchantability or
fitness for a particular purpose.
We specifically disclaim any liability with respect to this document, and no contractual obligations are formed
either directly or indirectly by this document. This document may not be reproduced or transmitted in any form or
by any means, electronic or mechanical, for any purpose, without our prior written permission.
Copyright 2015, Oracle. All Rights Reserved.

Contents
Chapter 1. Introduction
Chapter 2. Project Analytics
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

Project - Billing ..................................................................................................................... 2-1


Project - Budget ................................................................................................................... 2-6
Project Commitments ..................................................................................................... 2-19
Project Cost .................................................................................................................... 2-21
Project - Cost GL Reconciliation........................................................................................ 2-30
Project - Cross Charge ...................................................................................................... 2-32
Project Forecast ............................................................................................................. 2-57
Project Funding .............................................................................................................. 2-64
Project Performance ....................................................................................................... 2-76
Project - Resource Management ................................................................................... 2-108
Project Revenue ......................................................................................................... 2-115
Project - Revenue GL Reconciliation ............................................................................ 2-119
Project Earned Value Management ........................................................................... 2-121
Project Construction in Progress ................................................................................ 2-123

Metric Reference Guide iii

Introduction

This document describes metrics available in the Project Analytics in Release 11.1.1.9.X of Oracle Business
Intelligence Applications. These metrics are exposed in the Presentation Layer of the Oracle Business
Intelligence Applications repository. They are used in the pre-built analyses, and / or are available for customers
to use via Oracle Answers in building new analyses or extending existing analyses. Oracle Answers is the adhoc query and reporting tool used for building and modifying analyses.
.

Metric Reference Guide 1-1

Project Analytics

2.1 Project - Billing


No

Metric Name

Description

1.1

# of Accepted Invoices

Count of invoices with status = "ACCEPTED"

1.2

# of Approved Invoices

Number of invoices with a status of 'Released',


Approved, Transferred', or 'Accepted'.

1.3

# of Projects

1.4

# of Tasks

1.5

# of Unapproved Invoices

Number of distinct projects that have been included on


invoices.
Number of distinct tasks that have been included on
invoices.
Number of invoices with status equal to "CREATED"

1.6

# of Write-off Invoices

Number of invoices created to write-off a portion of an


existing invoice.

1.7

Accepted Invoice Amount

Amount of invoices with status = "ACCEPTED"

1.8

Approved Invoice Amount

Total amount of approved invoices.

1.9

Current Withheld Amount

Part of the original invoice which has been retained as


part of the customer agreement.

1.10

External Invoice Amount

1.11

Intercompany Invoice Amount

1.12

Interproject Invoice Amount

1.13
1.14

Invoice Amount
Invoice Write-off Amount

Total amount of the invoices billed to external


customers.
Total amount of the invoices billed to intercompany
contracts.
Total amount of the invoices billed on interproject
contracts.
Total amount of all invoices.
Total amount of write-off invoices.

Metric Reference Guide 2-1

Project Analytics

No

Metric Name

Description

1.15

Retention Billed

Amount that has been retained and billed as part of a


customer agreement.

1.16

Retention Write-off

Depreciated Billed Retention Amount.

1.17

Total Retained Amount

Part of the original invoice which has been retained


according to the customer agreement and not billed
yet. Invoice retention is used to reduce a project
invoice by a percentage amount that you specify for a
particular project. It applies to both expendit...

1.18

Unapproved Invoice Amount

Total amount of unapproved invoices.

1.19

Unbilled Receivables

Value of work done which has not been billed yet

1.20

Unearned Revenue

Value of revenue recognized for which the work has


not been performed yet.

1.21

Contract Amount

Total amount on project based contract lines.

1.22

Contract Amount - ITD

Inception to date amount on project based contract


lines.

1.23

Contract Amount - MTD

Month to date amount on project based contract lines.

1.24

Contract Amount - QTD

Quarter to date amount on project based contract


lines.

Metric Reference Guide 2-2

Project Analytics

No

Metric Name

Description

1.25

Contract Amount - YTD

Year to date amount on project based contract lines.

1.26

# of Projects - ITD

Number of distinct projects that have been included on


invoices.

1.27

# of Tasks - ITD

Number of distinct tasks with an Invoice Distribution


Line since the Project inception

1.28

Accepted Invoice Amount - ITD

Amount of accepted invoices - ITD

1.29

Approved Invoice Amount - ITD

Inception to date amount of approved invoices.

1.30

Current Withheld Amount - ITD

Inception to Date amount retained from the original


invoice, as part of a customer agreement.

1.31

External Invoice Amount - ITD

Inception to date amount of invoices billed to external


customers.

1.32

Intercompany Invoice Amount - ITD

Inception to date amount of invoices billed to


intercompany contracts.

1.33

Interproject Invoice Amount - ITD

Inception to date amount of invoices billed on


interproject contracts.

1.34

Invoice Amount - ITD

Inception to date total invoice amount.

1.35

Invoice Write-off Amount - ITD

Inception to date amount of write-off invoices.

1.36

Retention Billed - ITD

Inception to Date amount that has been retained and


billed as part of a customer agreement.

1.37

Retention Write-off - ITD

Inception to Date of Depreciated Billed Retention


Amount.

Metric Reference Guide 2-3

Project Analytics

No

Metric Name

Description

1.38

Total Retained Amount - ITD

Inception to Date value retained from the original


invoice according to the customer agreement and not
billed yet.

1.39

Unapproved Invoice Amount - ITD

Inception to date amount of unapproved invoices.

1.40

Unbilled Receivables - ITD

Inception to Date value of work done which has not


been billed yet

1.41

Unearned Revenue - ITD

Inception to Date value of revenue recognized for


which the work has not been performed yet.

1.42

Accepted Invoice Amount - MTD

Amount of accepted invoices - MTD

1.43

Approved Invoice Amount - MTD

Inception to date amount of approved invoices.

1.44

Current Withheld Amount - MTD

Month to Date amount retained from the original


invoice, as part of a customer agreement.

1.45

External Invoice Amount - MTD

1.46
1.47

Intercompany Invoice Amount MTD


Interproject Invoice Amount - MTD

1.48

Invoice Amount - MTD

Month to date amount of invoices billed to external


customers.
Month to date amount of invoices billed to
intercompany contracts.
Month to date amount of invoices billed on interproject
contracts.
Month to date total invoice amount.

1.49

Invoice Write-off Amount - MTD

Month to date amount of write-off invoices.

1.50

Retention Billed - MTD

Month to Date amount that has been retained and


billed as part of a customer agreement.

1.51

Retention Write-off - MTD

Month to Date value of Depreciated Billed Retention


Amount.

1.52

Total Retained Amount - MTD

Month to Date value retained from the original invoice


according to the customer agreement and not billed
yet.

1.53

Unapproved Invoice Amount - MTD

Month to date amount of unapproved invoices.

1.54

Unbilled Receivables - MTD

1.55

Unearned Revenue - MTD

Month to Date value of work done which has not been


billed yet
Month to Date value of revenue recognized for which
the work has not been performed yet.

Metric Reference Guide 2-4

Project Analytics

No

Metric Name

Description

1.56

Accepted Invoice Amount - QTD

Amount of accepted invoices - QTD

1.57

Approved Invoice Amount - QTD

Quarter to date amount of approved invoices.

1.58

Current Withheld Amount - QTD

Quarter to Date amount retained from the original


invoice, as part of a customer agreement.

1.59

External Invoice Amount - QTD

1.60
1.61

Intercompany Invoice Amount QTD


Interproject Invoice Amount - QTD

1.62

Invoice Amount - QTD

Quarter to date amount of invoices billed to external


customers.
Quarter to date amount of invoices billed to
intercompany contracts.
Quarter to date amount of invoices billed on
interproject contracts.
Quarter to date total invoice amount.

1.63

Invoice Write-off Amount - QTD

Quarter to date amount of write-off invoices.

1.64

Retention Billed - QTD

Quarter to Date amount that has been retained and


billed as part of a customer agreement.

1.65

Retention Write-off - QTD

Quarter to Date value of Depreciated Billed Retention


Amount.

1.66

Total Retained Amount - QTD

Quarter to Date value retained from the original


invoice according to the customer agreement and not
billed yet.

1.67

Unapproved Invoice Amount - QTD

Quarter to date amount of unapproved invoices.

1.68

Unbilled Receivables - QTD

Quarter to Date value of work done which has not


been billed yet

1.69

Unearned Revenue - QTD

Quarter to Date value of revenue recognized for which


the work has not been performed yet.

1.70

Accepted Invoice Amount - YTD

Amount of accepted invoices - YTD

1.71

Approved Invoice Amount - YTD

Year to date amount of approved invoices.

1.72

Current Withheld Amount - YTD

Year to Date amount retained from the original invoice,


as part of a customer agreement.

1.73

External Invoice Amount - YTD

1.74

Intercompany Invoice Amount - YTD

Year to date amount of invoices billed to external


customers.
Year to date amount of invoices billed to intercompany
contracts.

Metric Reference Guide 2-5

Project Analytics

No

Metric Name

Description

1.75

Interproject Invoice Amount - YTD

1.76
1.77

Invoice Amount - YTD


Invoice Write-off Amount - YTD

1.78

Retention Billed - YTD

Year to Date amount that has been retained and billed


as part of a customer agreement.

1.79

Retention Write-off - YTD

1.80

Total Retained Amount - YTD

Year to Date value of Depreciated Billed Retention


Amount.
Year to Date value retained from the original invoice
according to the customer agreement and not billed
yet.

1.81

Unapproved Invoice Amount - YTD

Year to date amount of unapproved invoices.

1.82

Unbilled Receivables - YTD

1.83

Unearned Revenue - YTD

Year to Date value of work done which has not been


billed yet
Year to Date value of revenue recognized for which
the work has not been performed yet.

Year to date amount of invoices billed on interproject


contracts.
Year to date total invoice amount.
Year to date amount of write-off invoices.

2.2 Project - Budget


No

Metric Name

Description

2.1

BAC Burdened Cost

Budget at completion cost amount

2.2

BAC Current Budget Cost

Budget at completion cost for the current


budget version.

2.3

BAC Current Budget Raw Cost

Budget at completion raw cost for the current


budget version.

Metric Reference Guide 2-6

Project Analytics

2.4

BAC Current Budget Revenue

Total planned revenue at completion for the


current baseline budget in user-preferred
currency for the approved revenue budget
financial plan type.

2.5

BAC Original Budget Cost

Budget at completion cost for the original


budget version.

2.6

BAC Original Budget Raw Cost

Budget at completion raw cost of the original


budget version.

2.7

BAC Original Budget Revenue

Total planned revenue at completion for the


original baseline budget in user-preferred
currency for the approved revenue budget
financial plan type.

2.8
2.9

BAC Raw Cost


BAC Revenue

Budget at completion raw cost.


Budget at Completion revenue amount

2.10

# of Projects

Number of distinct projects with budgets.

2.11

Current Budget Billable Cost

Amount of billable cost in the current version of


the budget.

2.12

Current Budget Capitalizable Cost

Inception to date amount of billable cost in the


current version of the budget.

2.13

Current Budget Cost

Cost amount in the current version of the


budget

2.14

Current Budget Equipment Cost

Amount of equipment cost in the current


version of the budget.

Metric Reference Guide 2-7

Project Analytics

2.15

Current Budget Labor Cost

Amount of labor cost in the current version of


the budget.

2.16

Current Budget Labor Effort

2.17

Current Budget Margin

Units of labor cost in the current version of the


budget.
Difference between the revenue and the costs
in the current budget

2.18

Current Budget Margin Percentage

Difference between the revenue and the costs


divided by revenue in the current budget

2.19

Current Budget Revenue

2.20

Original Budget Billable Cost

Revenue budget amount in the current version


of the budget.
Amount of billable cost in the current version of
the budget.

2.21

Original Budget Capitalizable Cost

Amount of capitalizable cost in the original


version of the budget.

2.22

Original Budget Cost

Cost amount in the original version of the


budget.

2.23

Original Budget Equipment Cost

Cost of equipment in the original version of the


budget.

2.24

Original Budget Labor Cost

Amount of labor cost in the original version of


the budget.

2.25

Original Budget Labor Effort

2.26

Original Budget Margin

Units of labor in the original version of the


budget
Difference between revenue and cost in the
original version of the budget

Metric Reference Guide 2-8

Project Analytics

2.27

Original Budget Margin Percentage

Difference between the revenue and the costs


divided by revenue in the original budget

2.28

Original Budget Revenue

Revenue amount in the original version of the


budget.

2.29

Current Budget Billable Cost

Amount of billable cost in the current version of


the budget.

2.30

Current Budget Capitalizable Cost

Inception to date amount of billable cost in the


current version of the budget.

2.31

Current Budget Cost

Cost amount in the current version of the


budget

2.32

Current Budget Equipment Cost

Amount of equipment cost in the current


version of the budget.

2.33

Current Budget Labor Cost

Amount of labor cost in the current version of


the budget.

2.34

Current Budget Labor Effort

2.35

Current Budget Margin

Units of labor cost in the current version of the


budget.
Difference between the revenue and the costs
in the current budget

2.36

Current Budget Margin Percentage

Difference between the revenue and the costs


divided by revenue in the current budget

2.37

Current Budget Revenue

Revenue budget amount in the current version


of the budget.

Metric Reference Guide 2-9

Project Analytics

2.38

Original Budget Billable Cost

Amount of billable cost in the current version of


the budget.

2.39

Original Budget Capitalizable Cost

Amount of capitalizable cost in the original


version of the budget.

2.40

Original Budget Cost

Cost amount in the original version of the


budget.

2.41

Original Budget Equipment Cost

Cost of equipment in the original version of the


budget.

2.42

Original Budget Labor Cost

Amount of labor cost in the original version of


the budget.

2.43

Original Budget Labor Effort

2.44

Original Budget Margin

Units of labor in the original version of the


budget
Difference between revenue and cost in the
original version of the budget

2.45

Original Budget Margin Percentage

Difference between the revenue and the costs


divided by revenue in the original budget

2.46

Original Budget Revenue

Revenue amount in the original version of the


budget.

2.47

# of Projects - ITD

Number of distinct Projects with Budgets since


Project Inception

2.48

Current Budget Billable Equipment Cost


ITD

Amount of billable cost in the current version of


the budget.

Metric Reference Guide 2-10

Project Analytics

2.49

Current Budget Billable Equipment Effort


ITD

Inception to date billable units of equipment


included in the current version of the budget

2.50

Current Budget Billable Labor Cost ITD

Inception to date amount of billable cost in the


current version of the budget.

2.51

Current Budget Billable Labor Effort ITD

Inception to date billable units of labor


approved in the current version of the budget

2.52

Current Budget Cost - ITD

Inception to date cost amount in the current


version of the budget

2.53

Current Budget Equipment Cost - ITD

Inception to date amount of equipment cost in


the current version of the budget.

2.54

Current Budget Labor Cost - ITD

Inception to date amount of labor cost in the


current version of the budget.

2.55

Current Budget Margin - ITD

Inception to date difference between the


revenue and the costs in the current budget

2.56

Current Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the current budget

2.57

Current Budget Revenue - ITD

Inception to date revenue amount in the current


version of the budget.

2.58

Original Budget Cost - ITD

Inception to date cost amount in the original


version of the budget.

Metric Reference Guide 2-11

Project Analytics

2.59

Original Budget Equipment Cost - ITD

Inception to date cost of equipment in the


original version of the budget.

2.60

Original Budget Labor Cost - ITD

Inception to date amount of labor cost in the


original version of the budget.

2.61

Original Budget Margin - ITD

Inception to date difference between revenue


and cost in the original version of the budget

2.62

Original Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the original budget

2.63

Original Budget Revenue - ITD

Inception to date revenue amount in the


original version of the budget.

2.64

Current Budget Billable Equipment Cost ITD

Amount of billable raw and burden costs


related to equipment usage approved in the
current version of the budget since inception.
This total results from adding all chargeable
items from tasks denoted as billable

2.65

Current Budget Billable Equipment Effort ITD

Units of equipment approved in the current


version of the budget since inception. This total
results from adding all chargeable items from
tasks denoted as billable

2.66

Current Budget Billable Labor Cost - ITD

Amount of billable raw and burden costs


related to people usage approved in the current
version of the budget since inception. This total
results from adding all chargeable items from
tasks denoted as billable

2.67

Current Budget Billable Labor Effort - ITD

Units of labor approved in the current version


of the budget since inception. This total results
from adding all chargeable items from tasks
denoted as billable

Metric Reference Guide 2-12

Project Analytics

2.68

Current Budget Cost - ITD

Inception to date cost amount in the current


version of the budget

2.69

Current Budget Equipment Cost - ITD

Inception to date amount of equipment cost in


the current version of the budget.

2.70

Current Budget Labor Cost - ITD

Inception to date amount of labor cost in the


current version of the budget.

2.71

Current Budget Margin - ITD

Inception to date difference between the


revenue and the costs in the current budget

2.72

Current Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the current budget

2.73

Current Budget Revenue - ITD

Inception to date revenue amount in the current


version of the budget.

2.74

Original Budget Cost - ITD

Inception to date cost amount in the original


version of the budget.

2.75

Original Budget Equipment Cost - ITD

Inception to date cost of equipment in the


original version of the budget.

2.76

Original Budget Labor Cost - ITD

Inception to date amount of labor cost in the


original version of the budget.

2.77

Original Budget Margin - ITD

Inception to date difference between revenue


and cost in the original version of the budget

2.78

Original Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the original budget

Metric Reference Guide 2-13

Project Analytics

2.79

Original Budget Revenue - ITD

Inception to date revenue amount in the


original version of the budget.

2.80

Current Budget Cost - MTD

Month to date amount of raw and burden cost


approved in the current version of the budget

2.81

Current Budget Margin - MTD

Month to date difference between the revenue


and the costs in the current budget

2.82

Current Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the current
budget

2.83

Current Budget Revenue - MTD

Month to date revenue budget amount


approved in the current version of the budget.

2.84

Original Budget Cost - MTD

Month to date amount of raw and burden cost


in the original approved baseline version of the
budget

2.85

Original Budget Margin - MTD

Month to date difference between revenue and


cost in the original version of the budget

2.86

Original Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the original
budget

2.87

Original Budget Revenue - MTD

Month to date revenue amount in the original


baseline approved version of the budget.

2.88

Current Budget Cost - MTD

Month to date amount of raw and burden cost


approved in the current version of the budget

2.89

Current Budget Margin - MTD

Month to date difference between the revenue


and the costs in the current budget

Metric Reference Guide 2-14

Project Analytics

2.90

Current Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the current
budget

2.91

Current Budget Revenue - MTD

Month to date revenue budget amount


approved in the current version of the budget.

2.92

Original Budget Cost - MTD

Month to date amount of raw and burden cost


in the original approved baseline version of the
budget

2.93

Original Budget Margin - MTD

Month to date difference between revenue and


cost in the original version of the budget

2.94

Original Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the original
budget

2.95

Original Budget Revenue - MTD

Month to date revenue amount in the original


baseline approved version of the budget.

2.96

Current Budget Cost - QTD

Quarter to date amount of raw and burden cost


approved in the current version of the budget

2.97

Current Budget Margin - QTD

Quarter to date difference between the revenue


and the costs in the current budget

2.98

Current Budget Margin Percent - QTD

Month to date difference between the revenue


and the costs divided by revenue in the current
budget

2.99

Current Budget Revenue - QTD

Quarter to date revenue budget amount


approved in the current version of the budget.

Metric Reference Guide 2-15

Project Analytics

2.100

Original Budget Cost - QTD

Quarter to date amount of raw and burden cost


in the original approved baseline version of the
budget

2.101

Original Budget Margin - QTD

Quarter to date difference between revenue


and cost in the original version of the budget

2.102

Original Budget Margin Percent - QTD

Month to date difference between the revenue


and the costs divided by revenue in the original
budget

2.103

Original Budget Revenue - QTD

Quarter to date revenue amount in the original


baseline approved version of the budget.

2.104

Current Budget Cost - QTD

Quarter to date amount of raw and burden cost


approved in the current version of the budget

2.105

Current Budget Margin - QTD

Quarter to date difference between the revenue


and the costs in the current budget

2.106

Current Budget Margin Percent - QTD

Month to date difference between the revenue


and the costs divided by revenue in the current
budget

2.107

Current Budget Revenue - QTD

Quarter to date revenue budget amount


approved in the current version of the budget.

2.108

Original Budget Cost - QTD

Quarter to date amount of raw and burden cost


in the original approved baseline version of the
budget

2.109

Original Budget Margin - QTD

Quarter to date difference between revenue


and cost in the original version of the budget

Metric Reference Guide 2-16

Project Analytics

2.110

Original Budget Margin Percent - QTD

Month to date difference between the revenue


and the costs divided by revenue in the original
budget

2.111

Original Budget Revenue - QTD

Quarter to date revenue amount in the original


baseline approved version of the budget.

2.112

Current Budget Equipment Bill Rate

Current Budget Equipment Revenue/ Current


Budget Equipment Effort

2.113

Current Budget Equipment Cost Rate

2.114

Current Budget Labor Bill Rate

2.115

Current Budget Labor Cost Rate

2.116

Original Budget Equipment Bill Rate

Current Budget Equipment Cost/ Current


Budget Equipment Effort
Current Budget Labor Revenue / Current
Budget Labor Effort
Current Budget Labor Cost / Current Budget
Labor Effort
Original Budget Equipment Revenue / Original
Budget Equipment Effort

2.117

Original Budget Equipment Cost Rate

2.118

Original Budget Labor Bill Rate

2.119

Original Budget Labor Cost Rate

2.120

Current Budget Cost - YTD

2.121

Current Budget Margin - YTD

Year to date difference between the revenue


and the costs in the current budget

2.122

Current Budget Margin Percent - YTD

Quarter to date difference between the revenue


and the costs divided by revenue in the current
budget

2.123

Current Budget Revenue - YTD

Year to date revenue budget amount approved


in the current version of the budget.

Original Budget Equipment Cost/ Original


Budget Equipment Effort
Original Budget Labor Revenue / Original
Budget Labor Effort
Original Budget Labor Cost / Original Budget
Labor Effort
Year to date amount of raw and burden cost
approved in the current version of the budget

Metric Reference Guide 2-17

Project Analytics

2.124

Original Budget Cost - YTD

Year to date amount of raw and burden cost in


the original approved baseline version of the
budget

2.125

Original Budget Margin - YTD

Year to date difference between revenue and


cost in the original version of the budget

2.126

Original Budget Margin Percent - YTD

Quarter to date difference between the revenue


and the costs divided by revenue in the original
budget

2.127

Original Budget Revenue - YTD

Year to date revenue amount in the original


baseline approved version of the budget.

2.128

Current Budget Cost - YTD

Year to date amount of raw and burden cost


approved in the current version of the budget

2.129

Current Budget Margin - YTD

Year to date difference between the revenue


and the costs in the current budget

2.130

Current Budget Margin Percent - YTD

Quarter to date difference between the revenue


and the costs divided by revenue in the current
budget

2.131

Current Budget Revenue - YTD

Year to date revenue budget amount approved


in the current version of the budget.

2.132

Original Budget Cost - YTD

Year to date amount of raw and burden cost in


the original approved baseline version of the
budget

2.133

Original Budget Margin - YTD

Year to date difference between revenue and


cost in the original version of the budget

Metric Reference Guide 2-18

Project Analytics

2.134

Original Budget Margin Percent - YTD

Quarter to date difference between the revenue


and the costs divided by revenue in the original
budget

2.135

Original Budget Revenue - YTD

Year to date revenue amount in the original


baseline approved version of the budget.

2.3 Project Commitments


No

Metric Name

Description

3.1

External Committed Cost

Amount of external commitment transactions

3.2

External Committed Raw Cost

3.3

Original Quantity Ordered

3.4

Purchase Order Committed Cost

Amount of raw cost of external commitment


transactions
Total number of units that have been ordered and
are committed
The outstanding balance of project related
purchase order distributions that have not been
matched to receipts or invoices, or canceled, after
applying burden.

3.5

Purchase Order Committed Raw Cost

The outstanding balance of project related


purchase order distributions that have not been
matched to receipts or invoices, or canceled,
before applying burden.

3.6

Purchase Requisition Committed Cost

The outstanding balance of project related


requisition distributions that have not been
converted to Purchase Orders or Canceled, after
applying burden.

3.7

Purchase Requisition Committed Raw


Cost

The outstanding balance of project related


requisition distributions that have not been
converted to purchase orders or canceled, before
applying burden.

3.8

Quantity Cancelled

Total number of units committed that have been


cancelled

Metric Reference Guide 2-19

Project Analytics

3.9

Quantity Delivered

3.10

Quantity Invoiced

3.11

Quantity Ordered

3.12

Quantity Outstanding Delivery

3.13

Quantity Outstanding Invoice

3.14

Quantity Overbilled

3.15

Supplier Invoice Committed Cost

3.16

Supplier Invoice Committed Raw Cost

The outstanding balance of project related invoice


distributions that have not been passed to
Projects as an actual cost yet, either via a receipt
accrual or standard interface to projects, before
applying burden.

3.17

Total Commitment Quantity

Total number of units committed. For example,


hours of labor committed in a purchase order,
purchase requisition or supplier invoice

3.18

Total Committed Cost

The sum of commitments from purchase


requisitions, purchase orders, supplier invoices,
and external commitments, including raw and
burden costs, in user-preferred currency. Raw
costs are directly attributable to work performed.
Burden costs are indirect costs such as overhead
allocations.

3.19

Total Committed Raw Cost

The sum of raw cost commitments from purchase


requisitions, purchase orders, supplier invoices,
and external commitments in user-preferred
currency. Raw costs are directly attributable to
work performed.

Total number of units committed that have been


already delivered
Total number of units committed that have been
already invoiced
Total number of units committed that have been
ordered
Total number of units committed that have not
been delivered
Total number of units committed that have not
been invoiced
Total number of units committed that have been
overbilled
The outstanding burdened cost balance of project
related invoice distributions that have not been
passed to projects as an actual cost yet, either via
a receipt accrual or standard interface to projects,
after applying burden.

Metric Reference Guide 2-20

Project Analytics

2.4 Project Cost


No

Metric Name

Description

4.1

Cost MAGO

Cost amount in the month previous to that


selected by the user

4.2

Cost QAGO

Cost amount in the quarter previous to that


selected by the user

4.3

Cost YAGO

4.4

Equipment Cost MAGO

Cost amount in the year previous to that


selected by the user
Equipment cost amount in the month
previous to that selected by the user

4.5

Equipment Cost QAGO

Equipment cost amount in the quarter


previous to that selected by the user

4.6

Equipment Cost YAGO

Equipment cost amount in the year


previous to that selected by the user

4.7

Equipment Effort MAGO

Total units (time or quantity) of equipment


used. Month ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.8

Equipment Effort QAGO

Total units (time or quantity) of equipment


used. Quarter ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.9

Equipment Effort YAGO

Total units (time or quantity) of equipment


used. Year ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.10

Labor Cost MAGO

Labor cost amount in the month previous to


that selected by the user

4.11

Labor Cost QAGO

Labor cost amount in the month previous to


that selected by the user

Metric Reference Guide 2-21

Project Analytics

4.12

Labor Cost YAGO

Labor cost amount in the month previous to


that selected by the user

4.13

Labor Effort MAGO

Units of labor used month ago. People


expenditure items result from multiplying
units by the corresponding usage rate

4.14

Labor Effort QAGO

Units of labor used quarter ago. People


expenditure items result from multiplying
units by the corresponding usage rate

4.15

Labor Effort YAGO

Units of labor used year ago. People


expenditure items result from multiplying
units by the corresponding usage rate

4.16
4.17

----------------Quarter Ago Measures------------------# of Cost Lines Not Transferred

4.18

# of Projects

4.19

# of Tasks

4.20

Billable and Capitalizable Burden Cost

4.21

Billable and Capitalizable Cost

4.22

Billable and Capitalizable Raw Cost

4.23

Billable Cost

4.24
4.25

Billable Labor Effort


Burden Cost

Billable units of labor used


Total of expenditure items not directly
attributed to work performed, such as fringe
benefits and office space.

4.26

Capitalizable Cost

Raw and burden costs from asset building


projects. These costs are posted to the
asset's balance account and remain there
until the asset is in service

4.27

Capitalizable Net Billable Burden Cost

The amount of capitalizable burden cost


that is not billable and cannot be recovered.

4.28

Capitalizable Net Billable Cost

The amount of capitalizable cost that is not


billable and cannot be recovered.

Count of cost lines with transfer status


equal to not transferred
Number of distinct projects with expenditure
items
Number of distinct tasks that have been
included on invoices.
Burden cost of transactions that are both
billable and capitalizable
Cost of transactions that are both billable
and capitalizable
Raw cost of transactions that are both
billable and capitalizable
Cost flagged as billable as they result from
transactions that are chargeable and tasks
denoted as billable.

Metric Reference Guide 2-22

Project Analytics

4.29

Capitalizable Net Billable Raw Cost

The amount of capitalizable raw cost that is


not billable and cannot be recovered.

4.30

Cost

Total raw plus burden cost

4.31

Cost - Cost Lines Not Transferred

Amount value of cost lines with transfer


status equal to not transferred

4.32

Debit Cost

4.33

Equipment Cost

4.34

Equipment Effort

Burdened cost amount debited to an


account
Amount of cost related to the use of
equipment
Total units (time or quantity) of equipment
used. Equipment expenditure items result
from multiplying units by the corresponding
usage rate

4.35

Expenses

(Cost - Capitalizable Cost)

4.36

Labor Cost

Amount of cost related to the use of labor

4.37

Labor Effort

Units of labor used. People expenditure


items result from multiplying units by the
corresponding usage rate

4.38

Nonbillable Burden Cost

Nonbillable burden cost transactions

4.39

Nonbillable Cost

Raw and burden costs not flagged as


billable because the transactions are not
chargeable or the tasks where they were
performed are not denoted as billable.

4.40
4.41

Nonbillable Labor Effort


Nonbillable Raw Cost

Nonbillable units of labor used


Non billable direct cost transactions

4.42

Noncapitalizable Burden Cost

Amount of noncapitalizable burden cost

4.43

Noncapitalizable Cost

4.44

Noncapitalizable Raw Cost

4.45

Posted Debit Cost

Cost amount of transactions that are of


noncapitalizable
Raw cost amount of transactions that are of
noncapitalizable
Burdened cost amount debited to an
account and that has been already posted
to the General Ledger (GL Status = posted)

Metric Reference Guide 2-23

Project Analytics

4.46

Posted Raw Cost

Raw cost amount debited to an account


and that has been already posted to the
General Ledger (GL Status = posted)

4.47

Quantity

Number of units related to an expenditure


item

4.48

Raw Cost

4.49

Unposted Debit Cost

Direct cost, such as raw salaries and travel


expenses.
Burdened cost amount debited to an
account and that has not been posted to
the General Ledger (GL Status = unposted)

4.50

Unposted Raw Cost

Raw cost amount debited to an account


and that has not been posted to the
General Ledger (GL Status = unposted)

4.51

# of Projects - ITD

Number of distinct projects with expenditure


items since inception

4.52

# of Tasks - ITD

Number of distinct tasks with an Invoice


Distribution Line since the Project inception

4.53

Billable and Capitalizable Burden Cost - ITD

Inception to date burden cost of


transactions that are both billable and
capitalizable

4.54

Billable and Capitalizable Cost - ITD

Inception to date cost of transactions that


are both billable and capitalizable

4.55

Billable and Capitalizable Raw Cost - ITD

Inception to date raw cost of transactions


that are both billable and capitalizable

4.56

Billable Cost - ITD

4.57

Billable Labor Effort - ITD

Inception to date cost amount of


transactions that are billable
Inception to date billable units of labor used

4.58

Burden Cost - ITD

Inception to date amount in burden cost


transactions

4.59

Capitalizable Cost - ITD

Inception to date capitalizable cost

4.60

Capitalizable Net Billable Burden Cost - ITD

Inception to date amount of capitalizable


burden cost that is not billable and cannot
be recovered.

Metric Reference Guide 2-24

Project Analytics

4.61

Capitalizable Net Billable Cost - ITD

Inception to Date amount of capitalizable


cost that is not billable and cannot be
recovered.

4.62

Capitalizable Net Billable Raw Cost - ITD

Inception to Date amount of capitalizable


raw cost that is not billable and cannot be
recovered.

4.63

Cost - ITD

Inception to date cost amount

4.64

Equipment Cost - ITD

Inception to date amount of cost related to


the use of equipment

4.65

Equipment Effort - ITD

Inception to date units of equipment used

4.66

Expenses - ITD

(Cost ITD - Capitalizable Cost ITD)

4.67

Labor Cost - ITD

Inception to date amount of cost related to


the use of labor

4.68

Labor Effort - ITD

Units of labor used. People expenditure


items result from multiplying units by the
corresponding usage rate

4.69

Nonbillable Burden Cost - ITD

4.70

Nonbillable Cost - ITD

Inception to date nonbillable burden cost


transactions
Inception to Date raw and burdened costs
not flagged as billable

4.71

Nonbillable Labor Effort - ITD

4.72

Nonbillable Raw Cost - ITD

4.73

Noncapitalizable Burden Cost - ITD

4.74

Noncapitalizable Cost - ITD

4.75

Noncapitalizable Raw Cost - ITD

Inception to date nonbillable units of labor


used
Inception to date nonbillable direct cost
transactions
Inception to date mount of noncapitalizable
burden cost
Inception to date cost amount of
transactions that are of noncapitalizable
Inception to date raw cost amount of
transactions that are of noncapitalizable

Metric Reference Guide 2-25

Project Analytics

4.76

Raw Cost - ITD

Inception to date raw cost

4.77

Billable Labor Effort % - ITD

100*(Inception to date billable units of labor


used /Total units of labor used)

4.78

Equipment Cost % - ITD

100*(Inception to date Equipment Cost /


Inception to date Equipment Cost in the
current version of the budget)

4.79

Equipment Effort % - ITD

Inception to date units of equipment used


as a percent of the inception to date units of
equipment included in the current budget

4.80

Labor Cost % - ITD

100*(Inception to date Labor Cost /


Inception to date Labor Cost in the current
version of the budget)

4.81

Labor Effort % - ITD

100*(Inception to date Labor Effort /


Inception to date Labor Effort in the current
version of the budget)

4.82

Nonbillable Cost % - ITD

100*(Inception to Date Non-Billable Cost)/


Inception to Date Cost

4.83

Nonbillable Labor Effort % - ITD

100*(Inception to date non billable units of


labor used/ Inception to date units of labor
used)

4.84

Billable and Capitalizable Burden Cost - MTD

Month to date burden cost of transactions


that are both billable and capitalizable

4.85

Billable and Capitalizable Cost - MTD

Month to date cost of transactions that are


both billable and capitalizable

4.86

Billable and Capitalizable Raw Cost - MTD

Month to date raw cost of transactions that


are both billable and capitalizable

4.87

Billable Cost - MTD

4.88

Burden Cost - MTD

4.89

Capitalizable Cost - MTD

Month to date cost amount of transactions


that are billable
Month to date amount in burden cost
transactions
Month to date capitalizable cost

4.90

Capitalizable Net Billable Burden Cost - MTD

Month to date amount of capitalizable


burden cost that is not billable and cannot
be recovered.

Metric Reference Guide 2-26

Project Analytics

4.91

Capitalizable Net Billable Cost - MTD

Month to Date amount of capitalizable cost


that is not billable and cannot be recovered.

4.92

Capitalizable Net Billable Raw Cost - MTD

Month to date amount of capitalizable raw


cost that is not billable and cannot be
recovered.

4.93

Cost - MTD

Month-to-date cost amount

4.94

Equipment Cost - MTD

Month to date amount of cost related to the


use of equipment

4.95

Equipment Effort - MTD

Month to date units of equipment used

4.96

Labor Cost - MTD

4.97

Labor Effort - MTD

4.98

Nonbillable Burden Cost - MTD

4.99

Nonbillable Cost - MTD

4.100

Nonbillable Raw Cost - MTD

4.101

Noncapitalizable Burden Cost - MTD

4.102

Noncapitalizable Cost - MTD

Moth to date amount of cost related to the


use of labor
Month to date units (time or quantity) of
labor used
Month to date nonbillable burden cost
transactions
Month to Date raw and burdened costs not
flagged as billable
Month to date nonbillable direct cost
transactions
Month to date mount of noncapitalizable
burden cost
Month to date cost amount of transactions
that are of noncapitalizable

4.103

Noncapitalizable Raw Cost - MTD

Month to date raw cost amount of


transactions that are of noncapitalizable

4.104

Raw Cost - MTD

Month to date raw cost

4.105
4.106

Billable Cost %
Billable Labor Effort %

4.107
4.108

Burden Cost %
Capitalizable Cost %

100*(Billable Cost / Cost)


100*(Billable labor units used/Total units of
labor used)
100 * Burden cost / Cost
100*(Capitalizable Cost /Cost).

4.109
4.110
4.111

Cost Change compare to Previous Month


Cost Change compared to Previous Quarter
Equipment Cost % Spent

Cost - Cost MAGO


Cost - Cost QAGO
100* (Equipment Cost /Equipment Cost in
the current version of the budget)

Metric Reference Guide 2-27

Project Analytics

4.112

Equipment Effort % Spent

100*(Units of equipment used/ Units of


equipment budgeted in the current version
of the budget)

4.113

Expenses %

100*(Cost - Capitalizable Cost)/Cost

4.114
4.115

Labor Cost %
Labor Cost % Spent

100*(Labor Cost / Cost)


100*(Actual Labor Cost / Labor Cost in the
current version of the budget)

4.116

Labor Effort % Spent

100*(Units of labor used/ Units of labor


budgeted in the current version of the
budget)

4.117
4.118

Nonbillable Cost %
Nonbillable Labor Effort %

4.119

Billable and Capitalizable Burden Cost - QTD

100*(Non-Billable Cost)/Cost
100*(Non billable units of labor used/ Units
of labor used)
Quarter to date burden cost of transactions
that are both billable and capitalizable

4.120

Billable and Capitalizable Cost - QTD

Quarter to date cost of transactions that are


both billable and capitalizable

4.121

Billable and Capitalizable Raw Cost - QTD

Quarter to date raw cost of transactions


that are both billable and capitalizable

4.122

Billable Cost - QTD

4.123

Burden Cost - QTD

4.124

Capitalizable Cost - QTD

Quarter to date cost amount of transactions


that are billable
Quarter to date amount in burden cost
transactions
Quarter to date capitalizable cost

4.125

Capitalizable Net Billable Burden Cost - QTD

Quarter to date amount of capitalizable


burden cost that is not billable and cannot
be recovered.

4.126

Capitalizable Net Billable Cost - QTD

Quarter to Date amount of capitalizable


cost that is not billable and cannot be
recovered.

4.127

Capitalizable Net Billable Raw Cost - QTD

Quarter to date amount of capitalizable raw


cost that is not billable and cannot be
recovered.

4.128

Cost - QTD

Quarter-to-date cost amount

4.129

Equipment Cost - QTD

Quarter to date amount of cost related to


the use of equipment

4.130

Equipment Effort - QTD

Quarter to date units of equipment used

Metric Reference Guide 2-28

Project Analytics

4.131

Labor Cost - QTD

4.132

Labor Effort - QTD

4.133

Nonbillable Burden Cost - QTD

4.134

Nonbillable Cost - QTD

4.135

Nonbillable Raw Cost - QTD

4.136

Noncapitalizable Burden Cost - QTD

4.137

Noncapitalizable Cost - QTD

4.138

Noncapitalizable Raw Cost - QTD

Quarter to date raw cost amount of


transactions that are of noncapitalizable

4.139

Raw Cost - QTD

Quarter to date raw cost

4.140

Billable and Capitalizable Burden Cost - YTD

Year to date burden cost of transactions


that are both billable and capitalizable

4.141

Billable and Capitalizable Cost - YTD

Year to date cost of transactions that are


both billable and capitalizable

4.142

Billable and Capitalizable Raw Cost - YTD

Year to date raw cost of transactions that


are both billable and capitalizable

4.143

Billable Cost - YTD

4.144

Burden Cost - YTD

4.145

Capitalizable Cost - YTD

Year to date cost amount of transactions


that are billable
Year to date amount in burden cost
transactions
Year to date capitalizable cost

4.146

Capitalizable Net Billable Burden Cost - YTD

Year to date amount of capitalizable burden


cost that is not billable and cannot be
recovered.

4.147

Capitalizable Net Billable Cost - YTD

Year to Date amount of capitalizable cost


that is not billable and cannot be recovered.

4.148

Capitalizable Net Billable Raw Cost - YTD

Year to date amount of capitalizable raw


cost that is not billable and cannot be
recovered.

Quarter to date amount of cost related to


the use of labor
Quarter to date units (time or quantity) of
labor used
Quarter to date nonbillable burden cost
transactions
Quarter to Date raw and burdened costs
not flagged as billable
Quarter to date nonbillable direct cost
transactions
Quarter to date mount of noncapitalizable
burden cost
Quarter to date cost amount of transactions
that are of noncapitalizable

Metric Reference Guide 2-29

Project Analytics

4.149

Cost - YTD

Year-to-date cost amount

4.150

Equipment Cost - YTD

Year to date amount of cost related to the


use of equipment

4.151

Equipment Effort - YTD

Year to date units of equipment used

4.152

Labor Cost - YTD

4.153

Labor Effort - YTD

4.154

Nonbillable Burden Cost - YTD

4.155

Nonbillable Cost - YTD

4.156

Nonbillable Raw Cost - YTD

4.157

Noncapitalizable Burden Cost - YTD

4.158

Noncapitalizable Cost - YTD

Year to date amount of cost related to the


use of labor
Year to date units (time or quantity) of labor
used
Year to date nonbillable burden cost
transactions
Year to Date raw and burdened costs not
flagged as billable
Year to date nonbillable direct cost
transactions
Year to date mount of noncapitalizable
burden cost
Year to date cost amount of transactions
that are of noncapitalizable

4.159

Noncapitalizable Raw Cost - YTD

Year to date raw cost amount of


transactions that are of noncapitalizable

4.160

Raw Cost - YTD

Year to date raw cost

2.5 Project - Cost GL Reconciliation


No

5.1

Metric Name

# of Amount Mismatch

Description

Count of journals lines with transaction amounts


that do not match the total amount of their
matching cost distributions lines

Metric Reference Guide 2-30

Project Analytics

5.2

# of Cost Line Transfer Exceptions

5.3

# of Cost Lines not in GL

5.4

# of Cost Lines with Unposted Journals

Count of transferred cost distribution lines, with


journal lines created but not posted to the
General Ledger

5.5

# of Manual Journal Lines

Count of journal lines that do not have matching


cost distribution lines

5.6

Amount - Cost Line Transfer Exceptions

5.7

Amount - Cost Lines not in GL

Debit amount of cost distribution lines transferred


out of Projects but not found at their destination.
For EBS R12 users this is those lines not found
in Sub Ledger Accounting. For EBS 11.5.10 this
is those lines not found in General Ledger. For
PeopleSoft customers with Single Feed, this is
those lines not found in the Accounting Lines
table. This metric does not apply for PeopleSoft
users with dual feed.
Debit amount of transferred cost distribution lines
that have no corresponding journal lines created
in General Ledger. For EBS R12 users this is
exceptions in the transfer from Sub Ledger
Accounting to General Ledger. For PeopleSoft
Customers, this is exceptions in the transfer from
Accounting Lines to General Ledger. This metric
does not apply for EBS 11.5.10 users or
PeopleSoft customers with Dual Feed.

5.8

Amount - Cost Lines with Unposted


Journals

Amount of transferred cost distribution lines, with


journal lines created but not posted to the
General Ledger

5.9

Cost Lines - Credit Amount

Amount of credit entries for a cost line

Count of cost distribution lines transferred out of


Projects but not found at their destination. For
EBS R12 users this is those lines not found in
Sub Ledger Accounting. For EBS 11.5.10 this is
those lines not found in General Ledger. For
PeopleSoft customers with single feed, this is
those lines not found in the Accounting Lines
table. This metric does not apply for PeopleSoft
users with Dual Feed.
Count of transferred cost distribution lines that
have no corresponding journal lines created in
General Ledger. For EBS R12 users this is
exceptions in the transfer from Sub Ledger
Accounting to General Ledger. For PeopleSoft
Customers, this is exceptions in the transfer from
Accounting Lines to General Ledger. This metric
does not apply for EBS 11.5.10 users or
PeopleSoft customers with Dual Feed.

Metric Reference Guide 2-31

Project Analytics

5.10

Cost Lines - Debit Amount

Amount of debit entries for cost lines

5.11

Credit Amount - Manual Journal Lines

Transaction amount of credit journal lines that do


not have matching cost distribution lines

5.12

Debit Amount - Manual Journal Lines

Transaction amount of debit journal lines that do


not have matching cost distribution lines

5.13

Journal Lines - Credit Amount

Credit amount value of journal lines

5.14

Journal Lines - Debit Amount

Debit amount value of journal lines

5.15

Transaction Amount

Amount of cost transactions

2.6 Project - Cross Charge


No

Metric Name

Description

6.1

Cost MAGO

Cost amount in the month previous to that


selected by the user

6.2

Cost QAGO

Cost amount in the quarter previous to that


selected by the user

6.3

Cost YAGO

6.4

Organization Own Cost MAGO

Cost amount in the year previous to that selected


by the user
Cost incurred by resources working on projects
owned by their organization in the month
previous to that selected by the user.

6.5

Organization Own Cost QAGO

Cost incurred by resources working on projects


owned by their organization in the quarter
previous to that selected by the user.

6.6

Organization Own Cost YAGO

Cost incurred by resources working on projects


owned by their organization in the year previous
to that selected by the user.

Metric Reference Guide 2-32

Project Analytics

No

Metric Name

Description

6.7

Organization Own Revenue MAGO

The externally recognized revenue during the


previous month from resources working on
projects owned by their organization, or
organizations where there is no cross charge
relationship

6.8

Organization Own Revenue QAGO

The externally recognized revenue during the


previous quarter from resources working on
projects owned by their organization, or
organizations where there is no cross charge
relationship

6.9

Organization Own Revenue YAGO

The externally recognized revenue during the


previous year from resources working on projects
owned by their organization, or organizations
where there is no cross charge relationship

6.10

Own Cost % of Organization Cost


MAGO

Percentage of the organization's cost in the


previous month that corresponds to cost incurred
by resources working on projects owned by their
organization.

6.11

Own Cost % of Organization Cost


QAGO

Percentage of the organization's cost in the


previous quarter that corresponds to cost
incurred by resources working on projects owned
by their organization.

6.12

Own Cost % of Organization Cost


YAGO

Percentage of the organization's cost in the


previous year that corresponds to cost incurred
by resources working on projects owned by their
organization.

6.13

Own Revenue % of Organization


Revenue MAGO

Percentage of the total revenue that corresponds


to own revenue during the previous month

6.14

Own Revenue % of Organization


Revenue QAGO

Percentage of the total revenue that corresponds


to own revenue during the previous quarter

6.15

Own Revenue % of Organization


Revenue YAGO

Percentage of the total revenue that corresponds


to own revenue during the previous year

Metric Reference Guide 2-33

Project Analytics

No

Metric Name

Description

6.16
6.17

----------------Quarter Ago Measures------------------Cost In % of Organization Cost

6.18

Cost Out % of Resource Cost

The percentage of cost the organization transfers


out for lending their resources to other
organizations.

6.19

Organization External Revenue for


borrowed resources

The externally recognized revenue from


resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.20

Organization External Revenue for


borrowed resources - B&L

The externally recognized B&L revenue from


resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.21

Organization External Revenue for


borrowed resources - Intercompany

The externally recognized Intercompany revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.22

Organization External Revenue for


borrowed resources - Pending

Value of cross charge transactions once they


have been identified as cross charge, but before
its determined if they are B&L or intercompany

6.23

Organization Internal Actual Cost

Total actual cost incurred by resources working


on projects owned by another organization.

6.24

Organization Internal Actual Cost - B&L

Actual cost incurred by resources working on


projects owned by another organization where
there is a borrowed and lent relationship.

6.25

Organization Internal Actual Cost Intercompany

Actual cost incurred by resources working on


projects owned by another organization where
there is a intercompany relationship

The percentage of cost the organization incurs


from borrowing resources from other
organizations.

Metric Reference Guide 2-34

Project Analytics

No

Metric Name

Description

6.26

Organization Internal Actual Cost Pending

Value of cross charge transactions once they


have been identified as cross charge, but before
its determined if they are B&L or intercompany

6.27

Organization Internal Cost In - B&L

The cost transferred into an organization for work


performed by resources belonging to another
organization that they have a B&L relationship
with.

6.28

Organization Internal Cost In Intercompany

The cost transferred into an organization for work


performed by resources belonging to another
organization that they have an intercompany
billing relationship with. *This is the intercompany
invoice amount generated by the provider and
sent to AP for the...

6.29

Organization Internal Cost Out - B&L

The cost transferred to another organization for


work performed by resources belonging to
another organization

6.30

Organization Internal Cost Out Intercompany

The cost transferred to another organization for


work performed by resources belonging to
another organization that they have an
intercompany relationship with.

6.31

Organization Internal Revenue Intercompany

The intercompany revenue generated by an


organization for work done by its resources on
projects owned by another organization that they
have an Intercompany billing relationship with.

6.32

Organization Internal Revenue In - B&L

The revenue transferred into an organization for


work done by its resources on projects owned by
another organization that they have a B&L
relationship with.

6.33

Organization Internal Revenue Out B&L

The Revenue transferred to another organization


for work performed by resources belonging to
another organization

Metric Reference Guide 2-35

Project Analytics

No

Metric Name

Description

6.34

Organization Margin

The actual margin for the organization taking into


account the borrowed and lent and intercompany
transactions.

6.35

Organization Margin %

The actual margin percentage for the


organization taking into account the borrowed
and lent and intercompany transactions

6.36

Organization Own Cost

Cost incurred by resources working on projects


owned by their organization.

6.37

Organization Own Revenue (External)

The externally recognized revenue from


resources working on projects owned by their
organization, or organizations where there is no
cross charge relationship.

6.38

Organization Retained Cost - B&L

The portion of the actual cost retained by the


organization for work performed by its resources
on projects owned by another organization where
there is a borrowed and lent relationship. A
negative value means that the total transfer price
is greater than the total transfer price

6.39

Organization Retained Cost Intercompany

The cost transferred into an organization for work


performed by resources belonging to another
organization that they have a B&L relationship
with.

6.40

Organization Retained Revenue - B&L

The portion of the externally recognized revenue


retained by the organization for work performed
by a resource belonging to another organization
in which there is a B&L relationship.

Metric Reference Guide 2-36

Project Analytics

No

Metric Name

Description

6.41

Organization Retained Revenue Intercompany

The portion of the externally recognized revenue


retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.42

Own Cost % of Organization Cost

The percentage of cost the organization incurs


from their own resources working on their
projects.

6.43

Own Cost % of Resource Cost

The percentage of cost the organizations


resources incur from working on their own
projects versus being lent to other organizations
projects.

6.44

Own Revenue % of Direct Revenue

Own Revenue + Retained Revenue

6.45

Own Revenue % of Organization


Revenue

The percentage of revenue the organization


earns from their own resources working on their
projects.

6.46

Own Revenue % of Resource Revenue

The percentage of revenue the organizations


resources earn from working on their own
projects versus being lent to other organizations
projects.

6.47

Resource Margin

The actual margin for resources owned by the


receiver taking into account the borrowed and
lent and intercompany transactions.

6.48

Resource Margin %

The actual margin percentage for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions

6.49

Revenue In % of Organization
Revenue

The percentage of revenue the organization


earns from lending resources to other
organizations.

6.50

Revenue In to Own Revenue

The ratio of revenue transferred into the


organization to the organizations own revenue.

Metric Reference Guide 2-37

Project Analytics

No

Metric Name

Description

6.51

Revenue Out % of Direct Revenue

Organization internal revenue out B&L


expressed as a percent of the direct revenue.
Direct revenue = Own Revenue + Retained
Revenue

6.52

Revenue Out % of Resource Revenue

The percentage of revenue the organization


shares versus revenue earned by the
organizations resources working on any project.

6.53

Revenue Out to Own Revenue

The ratio of revenue transferred out of the


organization to the organizations own revenue

6.54

Total Organization Cost

The total cost incurred by the organization taking


into account the costs transferred in and out.

6.55

Total Organization Internal Cost In

Total actual cost incurred by resources working


on projects owned by another organization.

6.56

Total Organization Internal Revenue In

Total revenue brought into the organization by


resources working on other organizations
projects. (Organization Internal Revenue In - B&L
+ Organization Internal Revenue In Intercompany)

6.57

Total Organization Retained Revenue

The portion of the externally recognized revenue


retained by the organization for work performed
by a resource belonging to another organization
in which there is a B&L relationship.

6.58

Total Organization Revenue

The total revenue recognized by the organization


taking into account the revenue transferred in
and out.

6.59

Total Project Cost

The total cost incurred by projects owned by the


organization taking into account the costs
transferred in for resources belonging to another
organization.

Metric Reference Guide 2-38

Project Analytics

No

Metric Name

Description

6.60

Total Project Margin

(Total Organization Direct Revenue - Total


organization Cost). This is the actual margin for
projects owned by the receiver, taking into
account the borrowed and lent and intercompany
transactions.

6.61

Total Project Margin %

100* (Project Margin / Total Project Revenue).


This is the actual margin percentage for projects
owned by the receiver, taking into account the
B&L and intercompany transactions

6.62

Total Project Revenue

The total revenue recognized by the projects


owned by the organization taking into account
the revenue transferred in and out. = Own
Revenue + Total Organization Retained
Revenue

6.63

Total Resource Cost

The total cost incurred by the organizations


resources regardless of whose organizations
projects they worked on.

6.64

Total Resource Revenue

The total revenue recognized by resources


belonging to the organization regardless of
whose organizations projects they worked on.

6.65

Cost In % of Organization Cost - ITD

Inception to date percentage of cost the


organization incurs from borrowing resources
from other organizations.

6.66

Organization External Revenue for


borrowed resources - B&L - ITD

Inception to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.67

Organization External Revenue for


borrowed resources - Intercompany ITD

Inception to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

Metric Reference Guide 2-39

Project Analytics

No

Metric Name

Description

6.68

Organization External Revenue for


borrowed resources - ITD

Inception to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.69

Organization External Revenue for


borrowed resources - Pending - ITD

Inception to date Value of cross charge


transactions once they have been identified as
cross charge, but before its determined if they
are B&L or intercompany

6.70

Organization Internal Actual Cost - B&L


- ITD

Inception to date actual cost incurred by


resources working on projects owned by another
organization where there is a borrowed and lent
relationship

6.71

Organization Internal Actual Cost Intercompany - ITD

Inception to date actual cost incurred by


resources working on projects owned by another
organization where there is a intercompany
relationship

6.72

Organization Internal Actual Cost - ITD

Inception to date Actual cost incurred by


resources working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.73

Organization Internal Actual Cost Pending - ITD

Inception to date value of cross charge


transactions identified as cross charge, but
before its determined if they are B&L or
intercompany

6.74

Organization Internal Cost In - B&L ITD

Inception to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.75

Organization Internal Cost In Intercompany - ITD

Inception to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
an intercompany billing relationship with. *This is
the intercompany invoice amount generated by
the provider and sent...

Metric Reference Guide 2-40

Project Analytics

No

Metric Name

Description

6.76

Organization Internal Cost Out - B&L ITD

Inception to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.77

Organization Internal Cost Out Intercompany - ITD

Inception to date cost transferred to another


organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.78

Organization Internal Revenue Intercompany - ITD

Inception to date intercompany revenue


generated by an organization for work done by
its resources on projects owned by another
organization that they have an Intercompany
billing relationship with.

6.79

Organization Internal Revenue In - B&L


- ITD

Inception to date revenue transferred into an


organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.80

Organization Internal Revenue Out B&L - ITD

Inception to date Revenue transferred to another


organization for work performed by resources
belonging to another organization

6.81

Organization Margin - ITD

Inception to date actual margin for the


organization taking into account the borrowed
and lent and intercompany transactions.

6.82

Organization Own Cost - ITD

Inception to date cost incurred by resources


working on projects owned by their organization.

6.83

Organization Own Revenue (External)


- ITD

Inception to date externally recognized revenue


from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

Metric Reference Guide 2-41

Project Analytics

No

Metric Name

Description

6.84

Organization Retained Cost - B&L ITD

Inception to date portion of the actual cost


retained by the organization for work performed
by its resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost.

6.85

Organization Retained Cost Intercompany - ITD

Inception to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.86

Organization Retained Revenue - B&L


- ITD

Inception to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.87

Organization Retained Revenue Intercompany - ITD

The portion of the externally recognized revenue


retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.88

Own Cost % of Organization Cost - ITD

Inception to date percentage of cost the


organization incurs from their own resources
working on their projects.

6.89

Own Revenue % of Direct Revenue ITD

ITD Own Revenue + ITD Retained Revenue

6.90

Resource Margin - ITD

Inception to date actual margin for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.91

Revenue In to Own Revenue - ITD

Inception to date ratio of revenue transferred into


the organization to the organizations own
revenue.

Metric Reference Guide 2-42

Project Analytics

No

Metric Name

Description

6.92

Revenue Out % of Direct Revenue ITD

Inception to date percentage of revenue the


organization shares for all resources working on
their projects.

6.93

Revenue Out to Own Revenue - ITD

Inception to date ratio of revenue transferred out


of the organization to the organizations own
revenue

6.94

Total Organization Cost - ITD

Inception to date total cost incurred by the


organization taking into account the costs
transferred in and out.

6.95

Total Organization Internal Cost In ITD

Inception to date Total actual cost incurred by


resources working on projects owned by another
organization.

6.96

Total Organization Internal Revenue In


- ITD

Inception to date total revenue brought into the


organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.97

Total Organization Retained Revenue ITD

Inception to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.98

Total Organization Revenue - ITD

Inception to date total revenue recognized by the


organization taking into account the revenue
transferred in and out.

6.99

Total Project Cost - ITD

Inception to date total cost incurred by projects


owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.100

Total Project Margin - ITD

Inception to date actual margin for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

Metric Reference Guide 2-43

Project Analytics

No

Metric Name

Description

6.101

Total Project Revenue - ITD

The total revenue recognized by the projects


owned by the organization taking into account
the revenue transferred in and out. = Own
Revenue + Total Organization Retained
Revenue

6.102

Total Resource Cost - ITD

Inception to date total cost incurred by the


organizations resources regardless of whose
organizations projects they worked on.

6.103

Total Resource Revenue - ITD

Inception to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.104

Organization External Revenue for


borrowed resources - B&L - MTD

Month to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.105

Organization External Revenue for


borrowed resources - Intercompany MTD

Month to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.106

Organization External Revenue for


borrowed resources - MTD

Month to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.107

Organization External Revenue for


borrowed resources - Pending - MTD

Month to date Value of cross charge transactions


once they have been identified as cross charge,
but before its determined if they are B&L or
intercompany

6.108

Organization Internal Actual Cost - B&L


- MTD

Month to date actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

Metric Reference Guide 2-44

Project Analytics

No

Metric Name

Description

6.109

Organization Internal Actual Cost Intercompany - MTD

Month to date actual cost incurred by resources


working on projects owned by another
organization where there is a intercompany
relationship

6.110

Organization Internal Actual Cost MTD

Month to date Actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.111

Organization Internal Actual Cost Pending - MTD

Month to date value of cross charge transactions


identified as cross charge, but before its
determined if they are B&L or intercompany

6.112

Organization Internal Cost In - B&L MTD

Month to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.113

Organization Internal Cost In Intercompany - MTD

Month to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.114

Organization Internal Cost Out - B&L MTD

Month to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.115

Organization Internal Cost Out Intercompany - MTD

Month to date cost transferred to another


organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.116

Organization Internal Revenue Intercompany - MTD

Month to date intercompany revenue generated


by an organization for work done by its resources
on projects owned by another organization that
they have an Intercompany billing relationship
with.

Metric Reference Guide 2-45

Project Analytics

No

Metric Name

Description

6.117

Organization Internal Revenue In - B&L


- MTD

Month to date revenue transferred into an


organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.118

Organization Internal Revenue Out B&L - MTD

Month to date Revenue transferred to another


organization for work performed by resources
belonging to another organization

6.119

Organization Margin - MTD

Month to date actual margin for the organization


taking into account the borrowed and lent and
intercompany transactions.

6.120

Organization Own Cost - MTD

Month to date cost incurred by resources working


on projects owned by their organization.

6.121

Organization Own Revenue (External)


- MTD

Month to date externally recognized revenue


from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

6.122

Organization Retained Cost - B&L MTD

Month to date portion of the actual cost retained


by the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost

6.123

Organization Retained Cost Intercompany - MTD

Month to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.124

Organization Retained Revenue - B&L


- MTD

Month to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

Metric Reference Guide 2-46

Project Analytics

No

Metric Name

Description

6.125

Organization Retained Revenue Intercompany - MTD

The portion of the externally recognized revenue


retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.126

Resource Margin - MTD

Month to date actual margin for resources owned


by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.127

Revenue In to Own Revenue - MTD

Month to date ratio of revenue transferred into


the organization to the organizations own
revenue.

6.128

Revenue Out to Own Revenue - MTD

Month to date ratio of revenue transferred out of


the organization to the organizations own
revenue

6.129

Total Organization Cost - MTD

Month to date total cost incurred by the


organization taking into account the costs
transferred in and out.

6.130

Total Organization Internal Cost In MTD

Month to date Total actual cost incurred by


resources working on projects owned by another
organization.

6.131

Total Organization Internal Revenue In


- MTD

Month to date total revenue brought into the


organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.132

Total Organization Retained Revenue MTD

Month to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.133

Total Organization Revenue - MTD

Month to date total revenue recognized by the


organization taking into account the revenue
transferred in and out.

Metric Reference Guide 2-47

Project Analytics

No

Metric Name

Description

6.134

Total Project Cost - MTD

Month to date total cost incurred by projects


owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.135

Total Project Margin - MTD

Month to date actual margin for resources owned


by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.136

Total Project Revenue - MTD

Month to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.137

Total Resource Cost - MTD

Month to date total cost incurred by the


organizations resources regardless of whose
organizations projects they worked on.

6.138

Total Resource Revenue - MTD

Month to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.139

Organization External Revenue for


borrowed resources - B&L - QTD

Quarter to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.140

Organization External Revenue for


borrowed resources - Intercompany QTD

Quarter to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.141

Organization External Revenue for


borrowed resources - Pending - QTD

Quarter to date of cross charge transactions


once they have been identified as cross charge,
but before its determined if they are B&L or
intercompany

Metric Reference Guide 2-48

Project Analytics

No

Metric Name

Description

6.142

Organization External Revenue for


borrowed resources - QTD

Quarter to date externally recognized revenue


from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.143

Organization Internal Actual Cost - B&L


- QTD

Quarter to date actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.144

Organization Internal Actual Cost Intercompany - QTD

Quarter to date actual cost incurred by resources


working on projects owned by another
organization where there is a intercompany
relationship

6.145

Organization Internal Actual Cost Pending - QTD

Quarter to date value of cross charge


transactions identified as cross charge, but
before its determined if they are B&L or
intercompany

6.146

Organization Internal Actual Cost QTD

Quarter to date Actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.147

Organization Internal Cost In - B&L QTD

Quarter to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.148

Organization Internal Cost In Intercompany - QTD

Quarter to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.149

Organization Internal Cost Out - B&L QTD

Quarter to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

Metric Reference Guide 2-49

Project Analytics

No

Metric Name

Description

6.150

Organization Internal Cost Out Intercompany - QTD

Quarter to date cost transferred to another


organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.151

Organization Internal Revenue Intercompany - QTD

Quarter to date intercompany revenue generated


by an organization for work done by its resources
on projects owned by another organization that
they have an Intercompany billing relationship
with.

6.152

Organization Internal Revenue In - B&L


- QTD

Quarter to date revenue transferred into an


organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.153

Organization Internal Revenue Out B&L - QTD

Quarter to date Revenue transferred to another


organization for work performed by resources
belonging to another organization

6.154

Organization Margin - QTD

Quarter to date actual margin for the organization


taking into account the borrowed and lent and
intercompany transactions.

6.155

Organization Own Cost - QTD

Quarter to date cost incurred by resources


working on projects owned by their organization.

6.156

Organization Own Revenue (External)


- QTD

Quarter to date externally recognized revenue


from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

6.157

Organization Retained Cost - B&L QTD

Quarter to date portion of the actual cost retained


by the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost

Metric Reference Guide 2-50

Project Analytics

No

Metric Name

Description

6.158

Organization Retained Cost Intercompany - QTD

Quarter to date cost transferred into an


organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.159

Organization Retained Revenue - B&L


- QTD

Quarter to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.160

Organization Retained Revenue Intercompany - QTD

Quarter to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is an
intercompany billing relationship.

6.161

Resource Margin - QTD

Quarter to date actual margin for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.162

Revenue In to Own Revenue - QTD

Quarter to date ratio of revenue transferred into


the organization to the organizations own
revenue.

6.163

Revenue Out to Own Revenue - QTD

Quarter to date ratio of revenue transferred out of


the organization to the organizations own
revenue

6.164

Total Organization Cost - QTD

Quarter to date total cost incurred by the


organization taking into account the costs
transferred in and out.

6.165

Total Organization Internal Cost In QTD

Quarter to date Total actual cost incurred by


resources working on projects owned by another
organization.

Metric Reference Guide 2-51

Project Analytics

No

Metric Name

Description

6.166

Total Organization Internal Revenue In


- QTD

Quarter to date total revenue brought into the


organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.167

Total Organization Retained Revenue QTD

Quarter to date portion of the externally


recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.168

Total Organization Revenue - QTD

Quarter to date total revenue recognized by the


organization taking into account the revenue
transferred in and out.

6.169

Total Project Cost - QTD

Quarter to date total cost incurred by projects


owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.170

Total Project Margin - QTD

Quarter to date actual margin for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.171

Total Project Revenue - QTD

Quarter to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.172

Total Resource Cost - QTD

Quarter to date total cost incurred by the


organizations resources regardless of whose
organizations projects they worked on.

6.173

Total Resource Revenue - QTD

Quarter to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

Metric Reference Guide 2-52

Project Analytics

No

Metric Name

Description

6.174

Organization External Revenue for


borrowed resources - B&L - YTD

Year to date externally recognized revenue from


resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.175

Organization External Revenue for


borrowed resources - Intercompany YTD

Year to date externally recognized revenue from


resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.176

Organization External Revenue for


borrowed resources - Pending - YTD

Year to date of cross charge transactions once


they have been identified as cross charge, but
before its determined if they are B&L or
intercompany

6.177

Organization External Revenue for


borrowed resources - YTD

Year to date externally recognized revenue from


resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.178

Organization Internal Actual Cost - B&L


- YTD

Year to date actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.179

Organization Internal Actual Cost Intercompany - YTD

Year to date actual cost incurred by resources


working on projects owned by another
organization where there is a intercompany
relationship

6.180

Organization Internal Actual Cost Pending - YTD

Year to date value of cross charge transactions


identified as cross charge, but before its
determined if they are B&L or intercompany

6.181

Organization Internal Actual Cost YTD

Year to date Actual cost incurred by resources


working on projects owned by another
organization where there is a borrowed and lent
relationship.

Metric Reference Guide 2-53

Project Analytics

No

Metric Name

Description

6.182

Organization Internal Cost In - B&L YTD

Year to date cost transferred into an organization


for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.183

Organization Internal Cost In Intercompany - YTD

Year to date cost transferred into an organization


for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.184

Organization Internal Cost Out - B&L YTD

Year to date cost transferred into an organization


for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.185

Organization Internal Cost Out Intercompany - YTD

Year to date cost transferred to another


organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.186

Organization Internal Revenue Intercompany - YTD

Year to date intercompany revenue generated by


an organization for work done by its resources on
projects owned by another organization that they
have an Intercompany billing relationship with.

6.187

Organization Internal Revenue In - B&L


- YTD

Year to date revenue transferred into an


organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.188

Organization Internal Revenue Out B&L - YTD

Year to date Revenue transferred to another


organization for work performed by resources
belonging to another organization

6.189

Organization Margin - YTD

Year to date actual margin for the organization


taking into account the borrowed and lent and
intercompany transactions.

6.190

Organization Own Cost - YTD

Year to date cost incurred by resources working


on projects owned by their organization.

Metric Reference Guide 2-54

Project Analytics

No

Metric Name

Description

6.191

Organization Own Revenue (External)


- YTD

Year to date externally recognized revenue from


resources working on projects owned by their
organization, or organizations where there is no
cross charge relationship.

6.192

Organization Retained Cost - B&L YTD

Year to date portion of the actual cost retained by


the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the total
transfer price

6.193

Organization Retained Cost Intercompany - YTD

Year to date cost transferred into an organization


for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.194

Organization Retained Revenue - B&L


- YTD

Year to date portion of the externally recognized


revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is a B&L relationship.

6.195

Organization Retained Revenue Intercompany - YTD

Year to date portion of the externally recognized


revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is an intercompany
billing relationship.

6.196

Resource Margin - YTD

Year to date actual margin for resources owned


by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.197

Revenue In to Own Revenue - YTD

Year to date ratio of revenue transferred into the


organization to the organizations own revenue.

Metric Reference Guide 2-55

Project Analytics

No

Metric Name

Description

6.198

Revenue Out to Own Revenue - YTD

Year to date ratio of revenue transferred out of


the organization to the organizations own
revenue

6.199

Total Organization Cost - YTD

Year to date total cost incurred by the


organization taking into account the costs
transferred in and out.

6.200

Total Organization Internal Cost In YTD

Year to date Total actual cost incurred by


resources working on projects owned by another
organization.

6.201

Total Organization Internal Revenue In


- YTD

Year to date total revenue brought into the


organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.202

Total Organization Retained Revenue YTD

Year to date portion of the externally recognized


revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is a B&L relationship.

6.203

Total Organization Revenue - YTD

Year to date total revenue recognized by the


organization taking into account the revenue
transferred in and out.

6.204

Total Project Cost - YTD

Year to date total cost incurred by projects


owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.205

Total Project Margin - YTD

Year to date actual margin for resources owned


by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.206

Total Project Revenue - YTD

Year to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

Metric Reference Guide 2-56

Project Analytics

No

Metric Name

Description

6.207

Total Resource Cost - YTD

Year to date total cost incurred by the


organizations resources regardless of whose
organizations projects they worked on.

6.208

Total Resource Revenue - YTD

Year to date total revenue recognized by


resources belonging to the organization
regardless of whose organizations projects they
worked on.

2.7 Project Forecast


No

Metric Name

Description

7.1

Current Actual Cost

Burdened cost amount in the current forecast


version

7.2

Current Actual Effort

7.3

Current Actual Revenue

Actual effort in the current primary cost forecast


version
Actual revenue amount in the current primary
revenue forecast version

7.4

Current EAC Cost

Estimate at completion cost amount in the current


forecast version.

7.5

Current EAC Effort

Estimate at completion effort in the current forecast


version. EAC equals actual effort + remaining
forecasted effort as required to complete the
project

7.6

Current EAC Revenue

Estimate at completion revenue amount in the


current revenue forecast version

7.7

Current ETC Cost

Estimate to complete cost amount in the current


forecast version.

7.8

Current ETC Effort

7.9

Current ETC Revenue

Estimate to complete effort in the current primary


forecast version.
Estimated to complete revenue amount in the
current primary revenue forecast version

Metric Reference Guide 2-57

Project Analytics

No

Metric Name

Description

7.10

Original Actual Cost

Actual burdened cost amount (Raw + burden cost)


in the original primary cost forecast version

7.11

Original Actual Effort

7.12

Original Actual Revenue

Actual effort in the original primary cost forecast


version
Actual revenue amount in the original primary
revenue forecast version

7.13

Original EAC Cost

Estimate at completion burdened cost amount in


the original cost forecast

7.14

Original EAC Effort

Estimate at completion effort in the original primary


cost forecast version. EAC equals actual effort +
remaining forecasted effort as required to complete
the project

7.15

Original EAC Revenue

Estimate at completion revenue amount in the


original primary revenue forecast version

7.16

Original ETC Cost

Estimate to complete burdened cost amount in the


original version of the forecast

7.17

Original ETC Effort

7.18

Original ETC Revenue

Estimate to complete effort in the original primary


forecast version.
Estimated to complete revenue amount in the
original primary revenue forecast version

7.19

Total Current EAC Cost

Estimate at completion amount (raw + burden


costs) in the current primary cost forecast version.
EAC equals actual costs plus remaining cost
forecasted as required to complete the project

7.20

Total Current EAC Revenue

Estimate at completion revenue amount in current


primary revenue forecast version

7.21

Total Original EAC Cost

Estimate at completion burdened cost amount (raw


+ burden costs) in the original primary cost forecast
version. EAC equals actual costs plus remaining
cost forecasted as required to complete the project

7.22

Total Original EAC Revenue

Estimate at completion revenue amount in the


original primary revenue forecast version

7.23

Current EAC Billable Equipment Cost


ITD

Inception to date estimate at completion (EAC)


billable cost of equipment

Metric Reference Guide 2-58

Project Analytics

No

Metric Name

Description

7.24

Current EAC Billable Equipment Effort


ITD

Inception to date estimate at completion (EAC)


billable units of equipment

7.25

Current EAC Billable Labor Cost ITD

Inception to date estimate at completion (EAC)


billable cost of equipment

7.26

Current EAC Billable Labor Effort ITD

Inception to date estimate at completion (EAC)


billable units of labor

7.27

Current EAC Cost - ITD

Inception to date estimate at completion cost


amount in the current forecast version.

7.28

Current EAC Effort - ITD

Inception to date estimate at completion (EAC)


effort in the current forecast version

7.29

Current EAC Equipment Cost - ITD

Inception to date estimate at completion cost of


equipment in the current forecast version.

7.30

Current EAC Equipment Effort - ITD

Inception to date estimate at completion (EAC)


units of equipment in the current version of the
forecast

7.31

Current EAC Labor Cost - ITD

Inception to date estimate at completion cost of


labor in the current forecast version.

7.32

Current EAC Labor Effort - ITD

Inception to date estimate at completion (EAC)


units of labor in the current version of the forecast

7.33

Current EAC Revenue - ITD

Estimate at completion revenue amount in the


current revenue forecast version.

7.34

Original EAC Cost - ITD

Inception to date estimate at completion burdened


cost amount in the original cost forecast

7.35

Original EAC Effort - ITD

Inception to date estimate at completion (EAC)


effort in the original cost forecast version

Metric Reference Guide 2-59

Project Analytics

No

Metric Name

Description

7.36

Original EAC Equipment Cost - ITD

Inception to date estimate at completion cost of


equipment in the original forecast version.

7.37

Original EAC Equipment Effort - ITD

Inception to date Estimate At Completion of Units


of equipment used in the original version of the
forecast

7.38

Original EAC Labor Cost - ITD

Inception to date estimate at completion cost


amount in the original forecast

7.39

Original EAC Labor Effort - ITD

Inception to date Estimate At Completion of Units


of labor used in the original version of the forecast

7.40

Original EAC Revenue - ITD

Inception to date estimate at completion (EAC)


revenue amount in the original revenue forecast
version

7.41

Current EAC Cost - MTD

Month to date estimate at completion cost amount


in the current forecast version.

7.42

Current EAC Effort - MTD

Month to date estimate at completion (EAC) effort


in the current forecast version

7.43

Current EAC Equipment Cost - MTD

Month to date estimate at completion cost of


equipment in the current forecast version.

7.44

Current EAC Equipment Effort - MTD

Month to date estimate at completion (EAC) units


of equipment in the current version of the forecast

7.45

Current EAC Labor Cost - MTD

Month to date estimate at completion cost of labor


in the current forecast version.

Metric Reference Guide 2-60

Project Analytics

No

Metric Name

Description

7.46

Current EAC Labor Effort - MTD

Month to date estimate at completion (EAC) units


of labor in the current version of the forecast

7.47

Current EAC Revenue - MTD

Estimate at completion revenue amount in the


current revenue forecast version.

7.48

Original EAC Cost - MTD

Month to date estimate at completion burdened


cost amount in the original cost forecast

7.49

Original EAC Effort - MTD

Month to date estimate at completion (EAC) effort


in the original cost forecast version

7.50

Original EAC Equipment Cost - MTD

Month to date estimate at completion cost of


equipment in the original forecast version.

7.51

Original EAC Equipment Effort - MTD

Month to date Estimate At Completion of Units of


equipment used in the original version of the
forecast

7.52

Original EAC Labor Cost - MTD

Month to date estimate at completion cost amount


in the original forecast

7.53

Original EAC Labor Effort - MTD

Month to date Estimate At Completion of Units of


labor used in the original version of the forecast

7.54

Original EAC Revenue - MTD

Month to date estimate at completion (EAC)


revenue amount in the original revenue forecast
version

7.55

Current EAC Cost - QTD

Quarter to date estimate at completion cost amount


in the current forecast version.

7.56

Current EAC Effort - QTD

Quarter to date estimate at completion (EAC) effort


in the current forecast version

Metric Reference Guide 2-61

Project Analytics

No

Metric Name

Description

7.57

Current EAC Equipment Cost - QTD

Quarter to date estimate at completion cost of


equipment in the current forecast version.

7.58

Current EAC Equipment Effort - QTD

Quarter to date estimate at completion (EAC) units


of equipment in the current version of the forecast

7.59

Current EAC Labor Cost - QTD

Quarter to date estimate at completion cost of labor


in the current forecast version.

7.60

Current EAC Labor Effort - QTD

Quarter to date estimate at completion (EAC) units


of labor in the current version of the forecast

7.61

Current EAC Revenue - QTD

Estimate at completion revenue amount in the


current revenue forecast version.

7.62

Original EAC Cost - QTD

Quarter to date estimate at completion burdened


cost amount in the original cost forecast

7.63

Original EAC Effort - QTD

Quarter to date estimate at completion (EAC) effort


in the original cost forecast version

7.64

Original EAC Equipment Cost - QTD

Quarter to date estimate at completion cost of


equipment in the original forecast version.

7.65

Original EAC Equipment Effort - QTD

Quarter to date Estimate At Completion of Units of


equipment used in the original version of the
forecast

7.66

Original EAC Labor Cost - QTD

Quarter to date estimate at completion cost amount


in the original forecast

Metric Reference Guide 2-62

Project Analytics

No

Metric Name

Description

7.67

Original EAC Labor Effort - QTD

Quarter to date Estimate At Completion of Units of


labor used in the original version of the forecast

7.68

Original EAC Revenue - QTD

Quarter to date estimate at completion (EAC)


revenue amount in the original revenue forecast
version

7.69

Current EAC Cost - YTD

Year to date estimate at completion cost amount in


the current forecast version.

7.70

Current EAC Effort - YTD

Year to date estimate at completion (EAC) effort in


the current forecast version

7.71

Current EAC Equipment Cost - YTD

Year to date estimate at completion cost of


equipment in the current forecast version.

7.72

Current EAC Equipment Effort - YTD

Year to date estimate at completion (EAC) units of


equipment in the current version of the forecast

7.73

Current EAC Labor Cost - YTD

Year to date estimate at completion cost of labor in


the current forecast version.

7.74

Current EAC Labor Effort - YTD

Year to date estimate at completion (EAC) units of


labor in the current version of the forecast

7.75

Current EAC Revenue - YTD

Estimate at completion revenue amount in the


current revenue forecast version.

7.76

Original EAC Cost - YTD

Year to date estimate at completion burdened cost


amount in the original cost forecast

7.77

Original EAC Effort - YTD

Year to date estimate at completion (EAC) effort in


the original cost forecast version

Metric Reference Guide 2-63

Project Analytics

No

Metric Name

Description

7.78

Original EAC Equipment Cost - YTD

Year to date estimate at completion cost of


equipment in the original forecast version.

7.79

Original EAC Equipment Effort - YTD

Year to date Estimate At Completion of Units of


equipment used in the original version of the
forecast

7.80

Original EAC Labor Effort - YTD

Year to date Estimate At Completion of Units of


labor used in the original version of the forecast

7.81

Original EAC Labor Raw Cost - YTD

Year to date estimate at completion cost amount in


the original forecast

7.82

Original EAC Revenue - YTD

Year to date estimate at completion (EAC) revenue


amount in the original revenue forecast version

2.8 Project Funding


No

8.1

Metric Name

Cancelled Contract Amount - ITD

Description

Inception to date amount on project based contract


lines on canceled contracts. 'This metric is only
available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

Metric Reference Guide 2-64

Project Analytics

No

Metric Name

Description

8.2

Contract Amount - ITD

Inception to date amount on project based contract


lines. 'This metric is only available in Contract
Currency and Global Currency preferences. It is not
available in Project and Local Currency Preference'.

8.3

Expired Contract Amount - ITD

Expired Contract Amount - ITD 'This metric is only


available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

8.4

External Contract Amount - ITD

Inception to date amount on project based contract


lines related to external customers. 'This metric is only
available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

8.5

Intercompany Contract Amount ITD

Inception to date amount on project based contract


lines related to intercompany contracts. 'This metric is
only available in Contract Currency and Global
Currency preferences. It is not available in Project
and Local Currency Preference'.

8.6

Interproject Contract Amount - ITD

Inception to date amount on project based contract


lines related to interproject contracts. 'This metric is
only available in Contract Currency and Global
Currency preferences. It is not available in Project
and Local Currency Preference'.

8.7

Cancelled Contract Amount - MTD

The total amount of project based contract lines on


canceled contracts.

Metric Reference Guide 2-65

Project Analytics

No

Metric Name

Description

8.8

Contract Amount - MTD

Month to date amount on project based contract lines.

8.9

Expired Contract Amount - MTD

Expired Contract Amount - MTD

8.10

External Contract Amount - MTD

Month to date amount on project based contract lines


related to external customers

8.11

Intercompany Contract Amount MTD

Month to date amount on project based contract lines


related to intercompany contracts

8.12

Interproject Contract Amount - MTD

Month to date amount on project based contract lines


related to interproject contracts

8.13

Cancelled Contract Amount - QTD

Quarter to date amount on project based contract


lines on canceled contracts.

8.14

Contract Amount - QTD

Quarter to date amount on project based contract


lines.

8.15

Expired Contract Amount - QTD

Expired Contract Amount - QTD

8.16

External Contract Amount - QTD

Quarter to date amount on project based contract


lines related to external customers

8.17

Intercompany Contract Amount QTD

Quarter to date amount on project based contract


lines related to intercompany contracts

8.18

Interproject Contract Amount - QTD

Quarter to date amount on project based contract


lines related to interproject contracts

Metric Reference Guide 2-66

Project Analytics

No

Metric Name

Description

8.19

Cancelled Contract Amount - YTD

Year to date amount on project based contract lines


on canceled contracts.

8.20

Contract Amount - YTD

Year to date amount on project based contract lines.

8.21

Expired Contract Amount - YTD

Expired Contract Amount - YTD

8.22

External Contract Amount - YTD

Year to date amount on project based contract lines


related to external customers

8.23

Intercompany Contract Amount YTD

Year to date amount on project based contract lines


related to intercompany contracts

8.24

Interproject Contract Amount - YTD

Year to date amount on project based contract lines


related to interproject contracts

8.25

# of Canceled Contracts

The total number of project based contract lines on


canceled contracts.

8.26

# of Closed Contracts

The number of contracts that have been closed

8.27

# of Contracts

8.28

# of Contracts on Hold

Total number of contracts with project based contract


lines
The number of contracts that are on hold

8.29

# of Expired Agreements

The total number of project based contract lines


whose end date has passed.

8.30

# of Expired Contracts

The total number of project based contract lines


whose end date has passed.

Metric Reference Guide 2-67

Project Analytics

No

Metric Name

Description

8.31

# of External Contracts

Total number of contracts with project based contract


lines and related to external customers

8.32

# of Intercompany Contracts

Total number of contracts with project based contract


lines on intercompany contracts

8.33

# of Interproject Contracts

Total number of contracts with project based contract


lines on interproject contracts

8.34

# of Projects with Additional Funding

The number of projects that have been associated


with at least one contract.

8.35

# of Projects with Cancelled Funding

The number of projects that have been associated


with at least one contract.

8.36

# of Projects with Contract Funding

The number of projects that have been associated


with at least one contract.

8.37

# of Projects with Funding


Adjustments

The number of projects that have been associated


with at least one contract.

8.38

# of Projects with Initial Funding

The number of projects that have been associated


with at least one contract.

8.39

# of Tasks with Additional Funding

The number of tasks that have been associated with


at least one contract.

8.40

# of Tasks with Cancelled Funding

The number of tasks that have been associated with


at least one contract.

8.41

# of Tasks with Contract Funding

The number of tasks that have been associated with


at least one contract.

8.42

# of Tasks with Funding


Adjustments

The number of tasks that have been associated with


at least one contract.

8.43

# of Tasks with Initial Funding

The number of tasks that have been associated with


at least one contract.

8.44

# of Unexpired Agreements

The number of contracts that have not reached their


end date.
Metric Reference Guide 2-68

Project Analytics

No

Metric Name

Description

8.45

# of Unexpired Contracts

8.46

# of Unexpired External Contracts

8.47

# of Unexpired Intercompany
Contracts

The number of intercompany contracts that have not


reached their end date.

8.48

# of Unexpired Interproject
Contracts

The number of interproject contracts that have not


reached their end date.

8.49

Cancelled Contract Amount

The total amount of project based contract lines on


cancelled contracts.

8.50

Contract Amount

Total amount on project based contract lines.

8.51

Expired Contract Amount

Expired Contract Amount

8.52

External Contract Amount

The total amount of project based contract lines on


contracts with external customers.

The number of contracts that have not reached their


end date.
The number of contracts with external customers that
have not reached their end date.

Metric Reference Guide 2-69

Project Analytics

No

Metric Name

Description

8.53

Intercompany Contract Amount

The total amount of project based contract lines on


intercompany contracts.

8.54

Interproject Contract Amount

The total amount of project based contract lines on


interproject contracts.

8.55

% Backlog Amount

100* (Backlog Amount)/Funding Amount

8.56

Additional Funding Amount

Amount of Funding Allocated to a project in addition to


original funding.

8.57

Adjustment Funding Amount

Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers

8.58

Backlog Amount

(Funding Amount - Revenue Amount)

8.59

Baselined Amount

Amount of funding allocated to a project which has


been baselined. Only Baselined Amount can be used
for Revenue or Invoice Generation

8.60

Cancelled Funding Amount

Amount of Funding Allocated to a project which is


cancelled subsequently.

8.61

Funding Amount

The total amount of project based contract lines

Metric Reference Guide 2-70

Project Analytics

No

Metric Name

Description

8.62

Initial Funding Amount

Amount of proposed/planned Funding to be given


initially to perform a project or a task.

8.63
8.64

Invoice Amount
Not Allocated Amount

Total amount of all invoices.


(Contract Amount - Funding Amount)

8.65

Realized Gains Amount

The amount realized gains debit by the draft revenue

8.66

Realized Losses Amount

8.67

Revenue Amount

The amount realized losses credited by the draft


revenue
Amounts recognized as income or expected billing to
be received for work on a project

8.68

Unbaselined Amount

Amount of Funding Allocated to a project which has


not been baselined. This amount can't be used for
revenue or invoice generation.

8.69

# of Tasks - ITD

Number of distinct tasks with an Invoice Distribution


Line since the Project inception

8.70

% Backlog Amount - ITD

100* (Backlog Amount ITD)/Funding Amount ITD

8.71

Additional Funding Amount - ITD

Amount of Funding Allocated to a project in addition to


original funding ITD

8.72

Adjustment Funding Amount - ITD

Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers - ITD

8.73

Backlog Amount - ITD

(Funding Amount ITD - Revenue Amount ITD)

8.74

Cancelled Funding Amount - ITD

Amount of Funding Allocated to a project which is


cancelled subsequently ITD

Metric Reference Guide 2-71

Project Analytics

No

Metric Name

Description

8.75

Funding Amount - ITD

Inception to date value of project based contract lines


associated to the selected project or projects

8.76

Initial Funding Amount - ITD

Amount of proposed/planned Funding to be given


initially to perform a project or a task ITD

8.77

Invoice Amount - ITD

Inception to date total invoice amount.

8.78

Not Allocated Amount - ITD

Not Allocated Amount - ITD

8.79

Realized Gains Amount - ITD

8.80

Realized Losses Amount - ITD

8.81

Revenue Amount - ITD

The amount realized gains debit by the draft revenue


ITD
The amount realized gains debit by the draft revenue ITD
Amounts recognized as income or expected billing to
be received for work on a project since project
inception until the current date

8.82

% Backlog Amount - MTD

100* (Backlog Amount MTD)/Funding Amount MTD

8.83

Additional Funding Amount - MTD

Amount of Funding Allocated to a project in addition to


original funding MTD

8.84

Adjustment Funding Amount - MTD

Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers MTD

Metric Reference Guide 2-72

Project Analytics

No

Metric Name

Description

8.85

Backlog Amount - MTD

(Funding Amount MTD - Revenue Amount MTD)

8.86

Cancelled Funding Amount - MTD

Amount of Funding Allocated to a project which is


cancelled subsequently MTD

8.87

Funding Amount - MTD

Month to date value of project based contract lines


associated to the selected project or projects

8.88

Initial Funding Amount - MTD

Amount of proposed/planned Funding to be given


initially to perform a project or a task MTD

8.89

Invoice Amount - MTD

Month to date total invoice amount.

8.90

Not Allocated Amount - MTD

Not Allocated Amount - MTD

8.91

Realized Gains Amount - MTD

8.92

Realized Losses Amount - MTD

8.93

Revenue Amount - MTD

The amount realized gains debit by the draft revenue


MTD
The amount realized gains debit by the draft revenue MTD
Amounts recognized as income or expected billing to
be received for work on a project during the selected
period until the current date

8.94

% Backlog Amount - QTD

100* (Backlog Amount QTD)/Funding Amount QTD

Metric Reference Guide 2-73

Project Analytics

No

Metric Name

Description

8.95

Additional Funding Amount - QTD

Amount of Funding Allocated to a project in addition to


original funding QTD

8.96

Adjustment Funding Amount - QTD

Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers QTD

8.97

Backlog Amount - QTD

(Funding Amount QTD - Revenue Amount QTD)

8.98

Cancelled Funding Amount - QTD

Amount of Funding Allocated to a project which is


cancelled subsequently QTD

8.99

Funding Amount - QTD

Quarter to date value of project based contract lines


associated to the selected project or projects

8.100

Initial Funding Amount - QTD

Amount of proposed/planned Funding to be given


initially to perform a project or a task QTD

8.101

Invoice Amount - QTD

Quarter to date total invoice amount.

8.102

Not Allocated Amount - QTD

Not Allocated Amount - QTD

8.103

Realized Gains Amount - QTD

8.104

Realized Losses Amount - QTD

The amount realized gains debit by the draft revenue


QTD
The amount realized gains debit by the draft revenue QTD

Metric Reference Guide 2-74

Project Analytics

No

Metric Name

Description

8.105

Revenue Amount - QTD

Amounts recognized as income or expected billing to


be received for work on a project during the selected
quarter until the current date

8.106

% Backlog Amount - YTD

100* (Backlog Amount YTD)/Funding Amount YTD

8.107

Additional Funding Amount - YTD

Amount of Funding Allocated to a project in addition to


original funding YTD

8.108

Adjustment Funding Amount - YTD

Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers YTD

8.109

Backlog Amount - YTD

100* (Backlog Amount YTD)/Funding Amount YTD

8.110

Cancelled Funding Amount - YTD

Amount of Funding Allocated to a project which is


cancelled subsequently YTD

8.111

Funding Amount - YTD

Year to date value of project based contract lines


associated to the selected project or projects

8.112

Initial Funding Amount - YTD

Amount of proposed/planned Funding to be given


initially to perform a project or a task YTD

8.113
8.114

Invoice Amount - YTD


Not Allocated Amount - YTD

Year to date total invoice amount.


Not Allocated Amount - YTD

Metric Reference Guide 2-75

Project Analytics

No

Metric Name

8.115

Realized Gains Amount - YTD

8.116

Realized Losses Amount - YTD

8.117

Revenue Amount - YTD

Description

The amount realized gains debit by the draft revenue


YTD
The amount realized gains debit by the draft revenue YTD
Amounts recognized as income or expected billing to
be received for work on a project during the selected
year until the current date

2.9 Project Performance


No

Metric Name

Description

9.1

# of Projects - ITD

Number of projects with budgets since


inception

9.2

# of Tasks - ITD

Number of distinct tasks with an Invoice


Distribution Line since the Project inception

9.3

Accepted Invoice Amount - ITD

Amount of accepted invoices - ITD

9.4

Approved Invoice Amount - ITD

Inception to date amount of approved


invoices.

9.5

Current Withheld Amount - ITD

Inception to Date amount retained from the


original invoice, as part of a customer
agreement.

9.6

External Invoice Amount - ITD

Inception to date amount of invoices billed to


external customers.

Metric Reference Guide 2-76

Project Analytics

No

Metric Name

Description

9.7

Intercompany Invoice Amount - ITD

Inception to date amount of invoices billed to


intercompany contracts.

9.8

Interproject Invoice Amount - ITD

Inception to date amount of invoices billed on


interproject contracts.

9.9

Invoice Amount - ITD

Inception to date total invoice amount.

9.10

Retention Billed - ITD

Inception to Date amount that has been


retained and billed as part of a customer
agreement.

9.11

Retention Write-off - ITD

9.12

Total Retained Amount - ITD

Inception to Date of Depreciated Billed


Retention Amount.
Inception to Date value retained from the
original invoice according to the customer
agreement and not billed yet.

9.13

Unapproved Invoice Amount - ITD

9.14

Unbilled Receivables - ITD

9.15

Unearned Revenue - ITD

Inception to Date value of revenue recognized


for which the work has not been performed
yet.

9.16

Accepted Invoice Amount - MTD

Amount of accepted invoices - MTD

9.17

Approved Invoice Amount - MTD

9.18

Current Withheld Amount - MTD

Inception to date amount of approved


invoices.
Month to Date amount retained from the
original invoice, as part of a customer
agreement.

9.19

External Invoice Amount - MTD

9.20

Intercompany Invoice Amount - MTD

9.21

Interproject Invoice Amount - MTD

9.22

Invoice Amount - MTD

Month to date amount of invoices billed to


external customers.
Month to date amount of invoices billed to
intercompany contracts.
Month to date amount of invoices billed on
interproject contracts.
Month to date total invoice amount.

9.23

Invoice Write-off Amount - MTD

Month to date amount of write-off invoices.

9.24

Retention Billed - MTD

Month to Date amount that has been retained


and billed as part of a customer agreement.

Inception to date amount of unapproved


invoices.
Inception to Date value of work done which
has not been billed yet

Metric Reference Guide 2-77

Project Analytics

No

Metric Name

Description

9.25

Retention Write-off - MTD

Month to Date value of Depreciated Billed


Retention Amount.

9.26

Total Retained Amount - MTD

Month to Date value retained from the original


invoice according to the customer agreement
and not billed yet.

9.27

Unapproved Invoice Amount - MTD

Month to date amount of unapproved invoices.

9.28

Unbilled Receivables - MTD

9.29

Unearned Revenue - MTD

Month to Date value of work done which has


not been billed yet
Month to Date value of revenue recognized for
which the work has not been performed yet.

9.30

Accepted Invoice Amount - QTD

Amount of accepted invoices - QTD

9.31

Approved Invoice Amount - QTD

Quarter to date amount of approved invoices.

9.32

Current Withheld Amount - QTD

Quarter to Date amount retained from the


original invoice, as part of a customer
agreement.

9.33

External Invoice Amount - QTD

9.34

Intercompany Invoice Amount - QTD

9.35

Interproject Invoice Amount - QTD

9.36

Invoice Amount - QTD

Quarter to date amount of invoices billed to


external customers.
Quarter to date amount of invoices billed to
intercompany contracts.
Quarter to date amount of invoices billed on
interproject contracts.
Quarter to date total invoice amount.

9.37

Invoice Write-off Amount - QTD

Quarter to date amount of write-off invoices.

9.38

Retention Billed - QTD

Quarter to Date amount that has been


retained and billed as part of a customer
agreement.

9.39

Retention Write-off - QTD

Quarter to Date value of Depreciated Billed


Retention Amount.

9.40

Total Retained Amount - QTD

Quarter to Date value retained from the


original invoice according to the customer
agreement and not billed yet.

9.41

Unapproved Invoice Amount - QTD

Quarter to date amount of unapproved


invoices.

Metric Reference Guide 2-78

Project Analytics

No

Metric Name

Description

9.42

Unbilled Receivables - QTD

Quarter to Date value of work done which has


not been billed yet

9.43

Unearned Revenue - QTD

Quarter to Date value of revenue recognized


for which the work has not been performed
yet.

9.44

Accepted Invoice Amount - YTD

Amount of accepted invoices - YTD

9.45

Approved Invoice Amount - YTD

Year to date amount of approved invoices.

9.46

Current Withheld Amount - YTD

Year to Date amount retained from the original


invoice, as part of a customer agreement.

9.47

External Invoice Amount - YTD

9.48

Intercompany Invoice Amount - YTD

9.49

Interproject Invoice Amount - YTD

9.50
9.51

Invoice Amount - YTD


Invoice Write-off Amount - YTD

Year to date amount of invoices billed to


external customers.
Year to date amount of invoices billed to
intercompany contracts.
Year to date amount of invoices billed on
interproject contracts.
Year to date total invoice amount.
Year to date amount of write-off invoices.

9.52

Retention Billed - YTD

Year to Date amount that has been retained


and billed as part of a customer agreement.

9.53

Retention Write-off - YTD

9.54

Total Retained Amount - YTD

Year to Date value of Depreciated Billed


Retention Amount.
Year to Date value retained from the original
invoice according to the customer agreement
and not billed yet.

9.55

Unapproved Invoice Amount - YTD

Year to date amount of unapproved invoices.

9.56

Unbilled Receivables - YTD

9.57

Unearned Revenue - YTD

Year to Date value of work done which has


not been billed yet
Year to Date value of revenue recognized for
which the work has not been performed yet.

9.58

# of Projects - ITD

Number of projects with budgets since


inception

9.59

Current Budget Cost - ITD

Inception to date cost amount in the current


version of the budget

Metric Reference Guide 2-79

Project Analytics

No

Metric Name

Description

9.60

Current Budget Equipment Cost - ITD

Inception to date amount of equipment cost in


the current version of the budget.

9.61

Current Budget Labor Cost - ITD

Inception to date amount of labor cost in the


current version of the budget.

9.62

Current Budget Margin - ITD

Inception to date difference between the


revenue and the costs in the current budget

9.63

Current Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the current budget

9.64

Current Budget Revenue - ITD

Inception to date revenue amount in the


current version of the budget.

9.65

Current Revenue Variance % - ITD

100*(Revenue ITD - Current Budget Revenue


ITD)/ ( Current Budget Revenue ITD)

9.66

Original Budget Cost - ITD

Inception to date cost amount in the original


version of the budget.

9.67

Original Budget Equipment Cost - ITD

Inception to date cost of equipment in the


original version of the budget.

9.68

Original Budget Labor Cost - ITD

Inception to date amount of labor cost in the


original version of the budget.

9.69

Original Budget Margin - ITD

Inception to date difference between revenue


and cost in the original version of the budget

Metric Reference Guide 2-80

Project Analytics

No

Metric Name

Description

9.70

Original Budget Margin Percent - ITD

Inception to date difference between the


revenue and the costs divided by revenue in
the original budget

9.71

Original Budget Revenue - ITD

Inception to date revenue amount in the


original version of the budget.

9.72

Remaining Budget - ITD

(Current Budget Cost ITD - Cost ITD)

9.73

Remaining Budget % ITD

9.74

Current Budget Cost - MTD

(Current Budget Cost ITD - Cost ITD)/Current


Budget Cost ITD.
Month to date cost amount in the current
version of the budget

9.75

Current Budget Margin - MTD

Month to date difference between the revenue


and the costs in the current budget

9.76

Current Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the
current budget

9.77

Current Budget Revenue - MTD

Month to date revenue amount in the current


version of the budget.

9.78

Original Budget Cost - MTD

Month to date cost amount in the original


version of the budget.

9.79

Original Budget Margin - MTD

Month to date difference between revenue


and cost in the original version of the budget

Metric Reference Guide 2-81

Project Analytics

No

Metric Name

Description

9.80

Original Budget Margin Percent - MTD

Month to date difference between the revenue


and the costs divided by revenue in the
original budget

9.81

Original Budget Revenue - MTD

Month to date revenue amount in the original


version of the budget.

9.82

Current Budget Cost - QTD

Quarter to date cost amount in the current


version of the budget

9.83

Current Budget Margin - QTD

Quarter to date difference between the


revenue and the costs in the current budget

9.84

Current Budget Margin Percent - QTD

Quarter to date difference between the


revenue and the costs divided by revenue in
the current budget

9.85

Current Budget Revenue - QTD

Quarter to date revenue amount in the current


version of the budget.

9.86

Original Budget Cost - QTD

Month to date cost amount in the original


version of the budget.

9.87

Original Budget Margin - QTD

Quarter to date difference between revenue


and cost in the original version of the budget

9.88

Original Budget Margin Percent - QTD

Quarter to date difference between the


revenue and the costs divided by revenue in
the original budget

9.89

Original Budget Revenue - QTD

Quarter to date revenue amount in the original


version of the budget.

Metric Reference Guide 2-82

Project Analytics

No

Metric Name

Description

9.90

Current Budget Cost - YTD

Year to date cost amount in the current


version of the budget

9.91

Current Budget Margin - YTD

Year to date difference between the revenue


and the costs in the current budget

9.92

Current Budget Margin Percent - YTD

Year to date difference between the revenue


and the costs divided by revenue in the
current budget

9.93

Current Budget Revenue - YTD

Year to date revenue amount in the current


version of the budget.

9.94

Original Budget Cost - YTD

Year to date cost amount in the original


version of the budget.

9.95

Original Budget Margin - YTD

Year to date difference between revenue and


cost in the original version of the budget

9.96

Original Budget Margin Percent - YTD

Year to date difference between the revenue


and the costs divided by revenue in the
original budget

9.97

Original Budget Revenue - YTD

Year to date revenue amount in the original


version of the budget.

9.98

Cost MAGO

Cost amount in the month previous to that


selected by the user

9.99

Cost QAGO

Cost amount in the quarter previous to that


selected by the user

9.100

Cost YAGO

Cost amount in the year previous to that


selected by the user

Metric Reference Guide 2-83

Project Analytics

No

Metric Name

Description

9.101

Equipment Cost MAGO

Equipment cost amount in the month previous


to that selected by the user

9.102

Equipment Cost QAGO

Equipment cost amount in the quarter


previous to that selected by the user

9.103

Equipment Cost YAGO

Equipment cost amount in the year previous


to that selected by the user

9.104

Equipment Effort MAGO

Total units (time or quantity) of equipment


used. Month ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

9.105

Equipment Effort QAGO

Total units (time or quantity) of equipment


used. Quarter ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

9.106

Equipment Effort YAGO

Total units (time or quantity) of equipment


used. Year ago Equipment expenditure items
result from multiplying units by the
corresponding usage rate

9.107

Labor Cost MAGO

Labor cost amount in the month previous to


that selected by the user

9.108

Labor Cost QAGO

Labor cost amount in the month previous to


that selected by the user

9.109

Labor Cost YAGO

Labor cost amount in the month previous to


that selected by the user

9.110

Labor Effort MAGO

Units of labor used month ago. People


expenditure items result from multiplying units
by the corresponding usage rate

9.111

Labor Effort QAGO

Units of labor used quarter ago. People


expenditure items result from multiplying units
by the corresponding usage rate

9.112

Labor Effort YAGO

Units of labor used year ago. People


expenditure items result from multiplying units
by the corresponding usage rate

Metric Reference Guide 2-84

Project Analytics

No

Metric Name

Description

9.113
9.114

----------------Quarter Ago Metrics------------------# of Projects - ITD

9.115

# of Tasks - ITD

Number of distinct tasks with an Invoice


Distribution Line since the Project inception

9.116

Billable Cost - ITD

9.117

Budget Cost % Spent - ITD

Inception to date cost amount of transactions


that are billable
100 * Cost ITD / Current Budget Cost ITD

9.118

Burden Cost - ITD

Inception to date expenditure items not


directly attributed to work performed, such as
fringe benefits and office space.

9.119

Capitalizable Cost - ITD

Inception to date capitalizable cost

9.120

Cost - ITD

Inception-to-date cost amount

9.121

Cost Variance - ITD

(Actual Cost ITD Current Cost Budget ITD)

9.122

Cost Variance % - ITD

100*(Cost ITD - Current Budget Cost


ITD)/Current Budget Cost - ITD

9.123

Equipment Cost - ITD

Inception to date amount of cost related to the


use of equipment

9.124

Equipment Effort - ITD

Inception to date units of equipment used

9.125

Forecast Cost Variance - ITD

(Current EAC Cost ITD Current Budget Cost


ITD)

9.126

Labor Cost - ITD

Inception to date amount of cost related to the


use of labor

Number of projects with budgets since


inception

Metric Reference Guide 2-85

Project Analytics

No

Metric Name

Description

9.127

Labor Effort - ITD

Units of labor used. People expenditure items


result from multiplying units by the
corresponding usage rate

9.128

Nonbillable Cost - ITD

Inception to Date raw and burdened costs not


flagged as billable

9.129

Raw Cost - ITD

Inception to Date cost directly attributable to


work performed approved in the current
version of the budget

9.130

Billable Cost - MTD

9.131

Capitalizable Cost - MTD

Month to date cost amount of transactions that


are billable
Month to date capitalizable cost

9.132

Cost - MTD

Month-to-date cost amount

9.133

Equipment Cost - MTD

Month to date amount of cost related to the


use of equipment

9.134

Equipment Effort - MTD

Month to date units of equipment used

9.135

Labor Cost - MTD

9.136

Labor Effort - MTD

9.137

Nonbillable Cost - MTD

9.138

Billable Cost - QTD

9.139

Capitalizable Cost - QTD

Month to date amount of cost related to the


use of labor
Month to date units (time or quantity) of labor
used
Month to Date raw and burdened costs not
flagged as billable
Quarter to date cost amount of transactions
that are billable
Quarter to date capitalizable cost

9.140

Cost - QTD

Quarter-to-date cost amount

9.141

Equipment Cost - QTD

Quarter to date amount of cost related to the


use of equipment

9.142

Equipment Effort - QTD

Quarter to date units of equipment used

9.143

Labor Cost - QTD

Quarter to date amount of cost related to the


use of labor

Metric Reference Guide 2-86

Project Analytics

No

Metric Name

Description

9.144

Labor Effort - QTD

9.145

Nonbillable Cost - QTD

9.146

Billable Cost - YTD

9.147

Budget Cost % Spent - YTD

Quarter to date units (time or quantity) of labor


used
Quarter to Date raw and burdened costs not
flagged as billable
Year to date cost amount of transactions that
are billable
100 * Cost YTD / Current Budget Cost YTD

9.148

Capitalizable Cost - YTD

Year to date capitalizable cost

9.149

Cost - YTD

Year-to-date cost amount

9.150

Equipment Cost - YTD

Year to date amount of cost related to the use


of equipment

9.151

Equipment Effort - YTD

Year to date units of equipment used

9.152

Labor Cost - YTD

9.153

Labor Effort - YTD

9.154

Nonbillable Cost - YTD

9.155

Difference Current to Budget Margin %

Year to date amount of cost related to the use


of labor
Year to date units (time or quantity) of labor
used
Year to Date raw and burdened costs not
flagged as billable
Margin % - Current Budget Margin %. This is
the different in percent points between the
actual margin % and the margin % in the
current budget.

9.156

Difference Current to Budget Margin % - ITD

Margin % ITD - Current Budget Margin % ITD.


This is the different in percent points between
the actual margin % ITD and the margin% ITD
in the current budget.

9.157

Margin - YTD

Revenue YTD - Cost YTD

9.158

Margin % - ITD

100*(Revenue ITD - Cost ITD) /Revenue ITD

9.159

Margin % - YTD

9.160

Margin Variance - ITD

100*(Revenue YTD - Cost YTD )/(Revenue


YTD)
Margin ITD - Current Budget Margin ITD

Metric Reference Guide 2-87

Project Analytics

No

Metric Name

Description

9.161

Margin Variance %

9.162

Margin Variance % - ITD

9.163

Project Health Based on Cost

Project shown as 'Critical' if Cost Variance %


>= 30, 'On Track' if Cost Variance %" < 0 and
'At Risk' if Cost Variance % if between 30 and
0

9.164

Project Health Based on Margin

Project shown as 'On Track' if Margin % >=


30, 'Critical' if Margin %" < 0 and 'At Risk' if
Cost Variance % if between 30 and 0

9.165

# of Projects

Number of distinct projects with budgets.

9.166

# of Tasks

9.167

Accepted Invoice Amount

9.168

Approved Invoice Amount

Number of distinct tasks that have been


included on invoices.
Amount of invoices with status =
"ACCEPTED"
Total amount of approved invoices.

9.169

Current Withheld Amount

Part of the original invoice which has been


retained as part of the customer agreement.

9.170

External Invoice Amount

9.171

Intercompany Invoice Amount

9.172

Interproject Invoice Amount

9.173
9.174

Invoice Amount
Invoice Write-off Amount

Total amount of the invoices billed to external


customers.
Total amount of the invoices billed to
intercompany contracts.
Total amount of the invoices billed on
interproject contracts.
Total amount of all invoices.
Total amount of write-off invoices.

9.175

Retention Billed

Amount that has been retained and billed as


part of a customer agreement.

9.176

Retention Write-off

Depreciated Billed Retention Amount.

100*(Margin - Current Budget Margin


)/(Current Budget Margin)
100*(Margin ITD - Current Budget Margin ITD
)/(Current Budget Margin ITD)

Metric Reference Guide 2-88

Project Analytics

No

Metric Name

Description

9.177

Total Retained Amount

Part of the original invoice which has been


retained according to the customer agreement
and not billed yet. Invoice retention is used to
reduce a project invoice by a percentage
amount that you specify for a particular
project. It applies to both expendit...

9.178

Unapproved Invoice Amount

Total amount of unapproved invoices.

9.179

Unbilled Receivables

9.180

Unearned Revenue

Value of work done which has not been billed


yet
Value of revenue recognized for which the
work has not been performed yet.

9.181

# of Projects

Number of distinct projects with budgets.

9.182

Current Budget Billable Cost

Amount of billable cost in the current version


of the budget.

9.183

Current Budget Capitalizable Cost

Amount of capitalizable cost in the current


version of the budget.

9.184

Current Budget Cost

Cost amount in the current version of the


budget

9.185

Current Budget Equipment Cost

Amount of equipment cost in the current


version of the budget.

9.186

Current Budget Labor Cost

Amount of labor cost in the current version of


the budget.

9.187

Current Budget Labor Effort

9.188

Current Budget Margin

Units of labor cost in the current version of the


budget.
Difference between the revenue and the costs
in the current budget

Metric Reference Guide 2-89

Project Analytics

No

Metric Name

Description

9.189

Current Budget Margin Percentage

Difference between the revenue and the costs


divided by cost in the current budget

9.190

Current Budget Revenue

9.191

Current Revenue Variance %

Revenue budget amount in the current version


of the budget.
100*(Revenue - Current Budget Revenue)/ (
Current Budget Revenue)

9.192

Labor Effort Spent %

100*(Units of labor used/ Total units of labor


included in the current version of the budget)

9.193

Original Budget Billable Cost

Amount of billable cost in the current version


of the budget.

9.194

Original Budget Capitalizable Cost

Amount of capitalizable cost in the original


version of the budget.

9.195

Original Budget Cost

Cost amount in the original version of the


budget.

9.196

Original Budget Equipment Cost

Cost of equipment in the original version of


the budget.

9.197

Original Budget Labor Cost

Amount of labor cost in the original version of


the budget.

9.198

Original Budget Labor Effort

9.199

Original Budget Margin

Units of labor in the original version of the


budget
Difference between revenue and cost in the
original version of the budget

Metric Reference Guide 2-90

Project Analytics

No

Metric Name

Description

9.200

Original Budget Margin Percentage

Difference between the revenue and the costs


divided by revenue in the original budget

9.201

Original Budget Revenue

Revenue amount in the original version of the


budget.

9.202

% Cost Budget Committed

100 * Cost Including Commitments/Current


Budget Cost for the time period selected.

9.203
9.204

Cost Including Commitments


External Committed Cost

Cost + Total Committed Cost


Amount of external commitment transactions

9.205

External Committed Raw Cost

9.206

Original Quantity Ordered

9.207

Purchase Order Committed Cost

Amount of raw cost of external commitment


transactions
Total number of units that have been ordered
and are committed
Purchase order commitment burdened cost,
including raw and burden costs, in userpreferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

9.208

Purchase Order Committed Raw Cost

Purchase order commitment raw cost in userpreferred currency. Raw costs are directly
attributable to work performed.

9.209

Purchase Requisition Committed Cost

Purchase requisition commitment burdened


cost, including raw and burden costs, in userpreferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

9.210

Purchase Requisition Committed Raw Cost

Purchase requisition commitment raw cost in


user-preferred currency. Raw costs are
directly attributable to work performed.

9.211

Quantity Cancelled

Total number of units committed that have


been cancelled

Metric Reference Guide 2-91

Project Analytics

No

Metric Name

Description

9.212

Quantity Delivered

9.213

Quantity Invoiced

9.214

Quantity Ordered

9.215

Quantity Outstanding Delivery

9.216

Quantity Outstanding Invoice

9.217

Quantity Overbilled

9.218
9.219

Raw Cost Including Commitments


Remaining Budget % Including
Commitments

9.220

Remaining Budget Including Commitments

9.221

Supplier Invoice Committed Cost

9.222

Supplier Invoice Committed Raw Cost

Supplier invoice commitment raw cost in userpreferred currency. Raw costs are directly
attributable to work performed.

9.223

Total Commitment Quantity

Total number of units committed. For


example, hours of labor committed in a
purchase order, purchase requisition or
supplier invoice

Total number of units committed that have


been already delivered
Total number of units committed that have
been already invoiced
Total number of units committed that have
been ordered
Total number of units committed that have not
been delivered
Total number of units committed that have not
been invoiced
Total number of units committed that have
been overbilled
Raw Cost + Committed Raw Cost
(Current Budget Cost - Cost Including
Commitments)/Current Budget Cost
Current Budget Cost - Cost Including
Commitments
Supplier invoice commitment burdened cost,
including raw and burden costs, in userpreferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

Metric Reference Guide 2-92

Project Analytics

No

Metric Name

Description

9.224

Total Committed Cost

The sum of commitments from purchase


requisitions, purchase orders, supplier
invoices, and external commitments, including
raw and burden costs, in user-preferred
currency. Raw costs are directly attributable to
work performed. Burden costs are indirect
costs such as overhead allocations.

9.225

Total Committed Raw Cost

The sum of raw cost commitments from


purchase requisitions, purchase orders,
supplier invoices, and external commitments
in user-preferred currency. Raw costs are
directly attributable to work performed.

9.226

# of Projects

Number of distinct projects with budgets.

9.227

# of Tasks

9.228

Billable Cost

Number of distinct tasks that have been


included on invoices.
Cost flagged as billable as they result from
transactions that are chargeable and tasks
denoted as billable.

9.229

Budget Cost % Spent

100 * Cost / Current Budget Cost

9.230

Burden Cost

Total of expenditure items not directly


attributed to work performed, such as fringe
benefits and office space.

9.231
9.232

Burden Cost %
Capitalizable Cost

100 * Burden cost / Cost


Raw and burden costs from asset building
projects. These costs are posted to the asset's
balance account and remain there until the
asset is in service

9.233

Cost

Total raw plus burden cost

9.234

Cost Variance

(Actual Cost Current Cost Budget)

Metric Reference Guide 2-93

Project Analytics

No

Metric Name

Description

9.235

Cost Variance %

9.236

Equipment Cost

9.237

Equipment Effort

9.238

Expenses %

100*(Cost - Capitalizable Cost)/Cost

9.239

Forecast Cost Variance

Current EAC Cost Current Budget Cost

9.240

Labor Cost

Amount of cost related to the use of labor

9.241
9.242

Labor Cost %
Labor Effort

100*(Labor Cost / Cost)


Units of labor used. People expenditure items
result from multiplying units by the
corresponding usage rate

9.243

Nonbillable Cost

Raw and burden costs not flagged as billable


because the transactions are not chargeable
or the tasks where they were performed are
not denoted as billable.

9.244

Raw Cost

9.245

Current Actual Cost

Direct cost, such as raw salaries and travel


expenses.
Burdened cost amount in the current forecast
version

9.246

Current Actual Effort

9.247

Current Actual Revenue

9.248

Current EAC Cost

(Cost - Current Budget Cost)/Current Budget


Cost
Amount of cost related to the use of
equipment
Total units (time or quantity) of equipment
used. Equipment expenditure items result
from multiplying units by the corresponding
usage rate

Actual effort in the current primary cost


forecast version
Actual revenue amount in the current primary
revenue forecast version
Estimate at completion cost amount in the
current forecast version.

Metric Reference Guide 2-94

Project Analytics

No

Metric Name

Description

9.249

Current EAC Effort

Estimate at completion effort in the current


forecast version. EAC equals actual effort +
remaining forecasted effort as required to
complete the project

9.250

Current EAC Equipment Cost

Estimate at completion cost of equipment in


the current forecast version.

9.251

Current EAC Equipment Effort

Estimate at completion (EAC) units of


equipment in the current version of the
forecast

9.252

Current EAC Labor Cost

Estimate at completion cost of labor in the


current forecast version.

9.253

Current EAC Labor Effort

Estimate at completion (EAC) units of labor in


the current version of the forecast

9.254

Current EAC Revenue

Estimate at completion revenue amount in the


current revenue forecast version

9.255

Current ETC Cost

Estimate to complete cost amount in the


current forecast version.

9.256

Current ETC Effort

9.257

Current ETC Equipment Cost

Estimate to complete effort in the current


primary forecast version.
Estimate to complete cost of equipment in the
current forecast version.

9.258

Current ETC Equipment Effort

Estimate To Complete of Units of equipment


used in the current version of the forecast

9.259

Current ETC Labor Cost

Estimate to complete cost of labor in the


current forecast version.

9.260

Current ETC Labor Effort

Estimate To Complete of Units of labor used


in the current version of the forecast

Metric Reference Guide 2-95

Project Analytics

No

Metric Name

Description

9.261

Current ETC Revenue

Estimated to complete revenue amount in the


current primary revenue forecast version

9.262

Difference Forecast to Budget Margin %

Forecast Margin % - Current Budget Margin


%. This is the difference in percent points
between the forecasted and budgeted
margins.

9.263

Forecast Cost Variance %

100*(Current EAC Labor Effort - Current


Budget Labor Effort )/Current Budget Labor
Effort ITD

9.264

Forecast Labor Effort Variance %

100*(Current EAC Labor Effort - Current


Budget Labor Effort)/Current Budget Labor
Effort

9.265

Forecast Margin %

Forecast Margin Amount multiply 100 and


divide by Current EAC Revenue

9.266

Forecast Margin Amount

EAC revenue - EAC cost, in the current cost


forecast

9.267

Forecast Margin Variance %

100*(Forecast Margin-Current Budget Margin"


)/(Current Budget Margin)

9.268

Forecast Revenue Variance

9.269

Forecast Revenue Variance %

Current EAC Revenue - Current Budget


Revenue
100*(Current EAC Revenue - Current Budget
Revenue )/Current Budget Revenue

9.270

Forecast to Budget Labor Effort Variance

9.271

Forecast to Budget Labor Effort Variance %

9.272

Original Actual Cost

Actual burdened cost amount (Raw + burden


cost) in the original primary cost forecast
version

9.273

Original Actual Effort

9.274

Original Actual Revenue

Actual effort in the original primary cost


forecast version
Actual revenue amount in the original primary
revenue forecast version

Current EAC Labor Effort - Current Budget


Labor Effort
100*(Current EAC Labor Effort - Current
Budget Labor Effort)/Current Budget Labor
Effort

Metric Reference Guide 2-96

Project Analytics

No

Metric Name

Description

9.275

Original EAC Cost

Estimate at completion burdened cost amount


in the original cost forecast

9.276

Original EAC Effort

Estimate at completion effort in the original


primary cost forecast version. EAC equals
actual effort + remaining forecasted effort as
required to complete the project

9.277

Original EAC Equipment Cost

Estimate at completion cost of equipment in


the original forecast version.

9.278

Original EAC Equipment Effort

Estimate At Completion of Units of equipment


used in the original version of the forecast

9.279

Original EAC Labor Cost

Estimate at completion cost amount in the


original forecast

9.280

Original EAC Labor Effort

Estimate At Completion of Units of labor used


in the original version of the forecast

9.281

Original EAC Revenue

Estimate at completion revenue amount in the


original primary revenue forecast version

9.282

Original ETC Cost

Estimate to complete burdened cost amount


in the original version of the forecast

9.283

Original ETC Effort

9.284

Original ETC Equipment Cost

Estimate to complete effort in the original


primary forecast version.
Estimate to complete cost of equipment in the
original version of the forecast

9.285

Original ETC Equipment Effort

Estimate To Complete of Units of equipment


used in the original version of the forecast

Metric Reference Guide 2-97

Project Analytics

No

Metric Name

Description

9.286

Original ETC Labor Cost

Estimate to complete cost of labor in the


original version of the forecast

9.287

Original ETC Labor Effort

Estimate To Complete of units of labor used in


the original version of the forecast

9.288

Original ETC Revenue

Estimated to complete revenue amount in the


original primary revenue forecast version

9.289

# of Projects

Number of distinct projects with budgets.

9.290

# of Tasks

9.291

Margin

9.292

Margin %

9.293

Realized Gains Amount

9.294

Realized Losses Amount

9.295

Revenue Amount

Number of distinct tasks that have been


included on invoices.
Difference between the project revenue and
burdened cost
Margin as a percentage of the accrued
revenue
The amount realized gains debit by the draft
revenue
The amount realized losses credited by the
draft revenue
Amounts recognized as income or expected
billing to be received for work on a project

9.296

Revenue Quantity

Number of Units (of Material or Hours) used


for this Revenue Distribution Line

9.297

Revenue Signed Backlog

Difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'ACTIVE' or 'EXPIRED'

9.298

Revenue Unsigned Backlog

Difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'DRAFT', 'PENDING
ACCEPTANCE', 'HOLD' or 'UNDER
AMENDMENT'

Metric Reference Guide 2-98

Project Analytics

No

Metric Name

Description

9.299

Unbilled Receivable

Identifies the potential revenue amount of the


expenditure item to be charged to the GL
account, in chart of account/ group/ global
currency of the organization against which a
transaction is carried out, which is attributable
to the revenue generated as a...

9.300

Unearned Revenue

Value of revenue recognized for which the


work has not been performed yet.

9.301

Actual Margin - ITD

Inception to date difference between the


project revenue and burdened cost

9.302

Actual to Budget Margin Variance - ITD

9.303

Actual to Budget Margin Variance % - ITD

Actual Margin ITD - Current Budget Margin


ITD
(Actual Margin ITD - Current Budget Margin
ITD)/Current Budget Margin ITD

9.304

Current EAC Cost - ITD

Inception to date estimate at completion cost


amount in the current forecast version.

9.305

Current EAC Equipment Cost - ITD

Inception to date estimate at completion cost


of equipment in the current forecast version.

9.306

Current EAC Equipment Effort - ITD

Inception to date estimate at completion


(EAC) units of equipment in the current
version of the forecast

9.307

Current EAC Labor Cost - ITD

Inception to date estimate at completion cost


of labor in the current forecast version.

9.308

Current EAC Labor Effort - ITD

Inception to date estimate at completion


(EAC) units of labor in the current version of
the forecast

9.309

Current EAC Margin - ITD

Current EAC Revenue ITD - Current EAC


Cost ITD

Metric Reference Guide 2-99

Project Analytics

No

Metric Name

Description

9.310

Current EAC Revenue - ITD

Estimate at completion revenue amount in the


current revenue forecast version.

9.311

Forecast Cost Variance % - ITD

100*(Current EAC Labor Effort ITD - Current


Budget Labor Effort ITD )/Current Budget
Labor Effort ITD

9.312

Forecast Margin % - ITD

Inception to date Forecast Margin Amount


multiply 100 and divide by Current EAC
Revenue

9.313

Forecast Margin Amount - ITD

ITD EAC revenue - ITD EAC cost, in the


current cost forecast

9.314

Forecast Revenue Variance % - ITD

100*(Current EAC Revenue ITD - Current


Budget Revenue ITD )/Current Budget
Revenue ITD

9.315

Forecast to Budget Margin Variance - ITD

9.316

Forecast to Budget Margin Variance % - ITD

Current EAC Margin ITD - Current Budget


Margin ITD
Current EAC Margin ITD - Current Budget
Margin ITD/Current Budget Margin ITD

9.317

Forecast to Budget Revenue Variance - ITD

9.318

Forecast to Budget Revenue Variance % ITD

9.319

Original EAC Cost - ITD

Inception to date estimate at completion


burdened cost amount in the original cost
forecast

9.320

Original EAC Equipment Cost - ITD

Inception to date estimate at completion cost


of equipment in the original forecast version.

9.321

Original EAC Equipment Effort - ITD

Inception to date Estimate At Completion of


Units of equipment used in the original version
of the forecast

Current EAC Revenue ITD - Current Budget


Revenue ITD
100*(Current EAC Revenue ITD - Current
Budget Revenue ITD)/Current Budget
Revenue ITD

Metric Reference Guide 2-100

Project Analytics

No

Metric Name

Description

9.322

Original EAC Labor Cost - ITD

Inception to date estimate at completion cost


amount in the original forecast

9.323

Original EAC Labor Effort - ITD

Inception to date Estimate At Completion of


Units of labor used in the original version of
the forecast

9.324

Original EAC Revenue - ITD

Inception to date estimate at completion


(EAC) revenue amount in the original revenue
forecast version

9.325

Current EAC Cost - MTD

Month to date estimate at completion cost


amount in the current forecast version.

9.326

Current EAC Revenue - MTD

Estimate at completion revenue amount in the


current revenue forecast version.

9.327

Original EAC Cost - MTD

Month to date estimate at completion


burdened cost amount in the original cost
forecast

9.328

Original EAC Revenue - MTD

Month to date estimate at completion (EAC)


revenue amount in the original revenue
forecast version

9.329

Current EAC Cost - QTD

Quarter to date estimate at completion cost


amount in the current forecast version.

9.330

Current EAC Revenue - QTD

Estimate at completion revenue amount in the


current revenue forecast version.

Metric Reference Guide 2-101

Project Analytics

No

Metric Name

Description

9.331

Original EAC Cost - QTD

Quarter to date estimate at completion


burdened cost amount in the original cost
forecast

9.332

Original EAC Revenue - QTD

Quarter to date estimate at completion (EAC)


revenue amount in the original revenue
forecast version

9.333

Current EAC Cost - YTD

Year to date estimate at completion cost


amount in the current forecast version.

9.334

Current EAC Revenue - YTD

Estimate at completion revenue amount in the


current revenue forecast version.

9.335

Original EAC Cost - YTD

Year to date estimate at completion burdened


cost amount in the original cost forecast

9.336

Original EAC Revenue - YTD

Year to date estimate at completion (EAC)


revenue amount in the original revenue
forecast version

9.337

Equipment Cost % - ITD

100*(Inception to date Equipment Cost /


Inception to date Equipment Cost in the
current version of the budget)

9.338

Equipment Effort % - ITD

Inception to date units of equipment used as a


percent of the inception to date units of
equipment included in the current budget

9.339

Labor Cost % - ITD

100*(Inception to date Labor Cost / Inception


to date Labor Cost in the current version of
the budget)

9.340

Labor Effort % - ITD

100*(Inception to date Labor Effort / Inception


to date Labor Effort in the current version of
the budget)

Metric Reference Guide 2-102

Project Analytics

No

Metric Name

Description

9.341

Nonbillable Cost % - ITD

100*(Inception to Date Non-Billable Cost)/


Inception to Date Cost

9.342

Nonbillable Labor Effort % - ITD

100*(Inception to date non billable units of


labor used/ Inception to date units of labor
used)

9.343
9.344

Billable Cost %
Billable Labor Effort %

100*(Billable Cost / Cost)


100*(Inception to date billable units of labor
used /Total units of labor used)

9.345

Capitalizable Cost %

100*(Capitalizable Cost /Cost).

9.346
9.347
9.348

Cost Change compare to Previous Month


Cost Change compared to Previous Quarter
Equipment Cost % Spent

Cost - Cost MAGO


Cost - Cost QAGO
100* (Equipment Cost /Equipment Cost in the
current version of the budget)

9.349

Equipment Effort % Spent

100*(Units of equipment used/ Units of


equipment budgeted in the current version of
the budget)

9.350

Labor Cost % Spent

100*(Actual Labor Cost / Labor Cost in the


current version of the budget)

9.351

Labor Effort % Spent

100*(Units of labor used/ Units of labor


budgeted in the current version of the budget)

9.352
9.353

Nonbillable Cost %
Nonbillable Labor Effort %

9.354

Margin % Annual Change

100*(Non-Billable Cost)/Cost
100*(Non billable units of labor used/ Units of
labor used)
Difference between the Margin percentage
from the last year and the Margin percentage
from the current year

9.355

Margin % Quarter Ago

Margin as a percentage of the accrued


revenue for the last quarter

9.356

Margin % Quarterly Change

Difference between the Margin percentage


from the last quarter and the Margin
percentage from the current quarter

9.357

Margin % Year Ago

9.358

Margin Quarter Ago

Margin as a percentage of the accrued


revenue for the last year
Difference between the project revenue and
burdened cost for the last quarter

Metric Reference Guide 2-103

Project Analytics

No

Metric Name

Description

9.359

Margin Year Ago

9.360

Realized Gains Amount MAGO

9.361

Realized Gains Amount QAGO

9.362

Realized Gains Amount YAGO

9.363

Realized Losses Amount QAGO

9.364

Realized Losses Amount MAGO

9.365

Realized Losses Amount YAGO

9.366

Revenue Amount MAGO

9.367

Revenue Amount QAGO

Amounts recognized as income or expected


billing to be received for work on a project
during the previous quarter

9.368

Revenue Amount YAGO

Amounts recognized as income or expected


billing to be received for work on a project
during the previous year

9.369

# of Projects - ITD

Number of projects with budgets since


inception

9.370

# of Tasks - ITD

Number of distinct tasks with an Invoice


Distribution Line since the Project inception

Margin on the same period as selected but


previous year
The amount realized gains debit by the draft
revenue - Month Ago
The amount realized gains debit by the draft
revenue - Quarter Ago
The amount realized gains debit by the draft
revenue - Year Ago
The amount realized gains debit by the draft
revenue - Quarter Ago
The amount realized gains debit by the draft
revenue - Month Ago
The amount realized gains debit by the draft
revenue - Year Ago
Amounts recognized as income or expected
billing to be received for work on a project
during the previous period

Metric Reference Guide 2-104

Project Analytics

No

Metric Name

Description

9.371

Actual to Budget Revenue Variance - ITD

Revenue ITD - Current Budget Revenue ITD

9.372

Actual to Budget Revenue Variance % - ITD

100*(Revenue ITD - Current Budget Revenue


ITD)/ (Current Budget Revenue ITD)

9.373

Bill Amount - ITD

Inception to date total invoice amount.

9.374

Margin - ITD

Inception to date difference between the


project revenue and burdened cost

9.375

Margin % - ITD

100*(Revenue ITD - Cost ITD) /Revenue ITD

9.376

Realized Gains Amount - ITD

9.377

Realized Losses Amount - ITD

9.378

Revenue Amount - ITD

The amount realized gains debit by the draft


revenue ITD
The amount realized gains debit by the draft
revenue - ITD
Amounts recognized as income or expected
billing to be received for work on a project
since project inception until the current date

9.379

Revenue Signed Backlog - ITD

ITD difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'ACTIVE' or 'EXPIRED'

9.380

Revenue Unsigned Backlog - ITD

ITD difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'DRAFT', 'PENDING
ACCEPTANCE', 'HOLD' or 'UNDER
AMENDMENT'

9.381

Revenue Variance - ITD

Revenue ITD - Current Budget Revenue ITD

9.382

Revenue Variance to Budget Amount - ITD

Revenue ITD - Current Budget Revenue ITD

9.383

Revenue Variance to Forecast Amount - ITD

Revenue ITD - Current EAC Revenue ITD

9.384

Unbilled Receivable - ITD

Revenue amount accrued since project


inception by the selected items of the WBS

9.385

Unearned Revenue - ITD

Inception to Date value of revenue recognized


for which the work has not been performed
yet.

Metric Reference Guide 2-105

Project Analytics

No

Metric Name

Description

9.386

Bill Amount - MTD

Month to date total invoice amount.

9.387

Realized Gains Amount - MTD

9.388

Realized Losses Amount - MTD

9.389

Revenue Amount - MTD

The amount realized gains debit by the draft


revenue MTD
The amount realized gains debit by the draft
revenue - MTD
Amounts recognized as income or expected
billing to be received for work on a project
during the selected period until the current
date

9.390

Revenue Signed Backlog - MTD

Month to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'

9.391

Revenue Unsigned Backlog - MTD

Month to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

9.392

Revenue Variance to Budget Amount - MTD

Revenue MTD - Current Budget Revenue


MTD

9.393

Revenue Variance to Forecast Amount MTD

Difference of Revenue and Current EAC


Revenue for the selected month

9.394

Unbilled Receivable - MTD

Period to Date value for the revenue amount


of the expenditure item or event

9.395

Unearned Revenue - MTD

Month to Date value of revenue recognized for


which the work has not been performed yet.

9.396

Bill Amount - QTD

Quarter to Date total invoice amount.

9.397

Realized Gains Amount - QTD

9.398

Realized Losses Amount - QTD

9.399

Revenue Amount - QTD

The amount realized gains debit by the draft


revenue QTD
The amount realized gains debit by the draft
revenue - QTD
Amounts recognized as income or expected
billing to be received for work on a project
during the selected quarter until the current
date

Metric Reference Guide 2-106

Project Analytics

No

Metric Name

Description

9.400

Revenue Signed Backlog- QTD

Quarter to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'

9.401

Revenue Unsigned Backlog - QTD

Quarter to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

9.402

Revenue Variance to Budget Amount - QTD

Revenue QTD - Current Budget Revenue


QTD

9.403

Revenue Variance to Forecast Amount QTD

Difference of Revenue and Current EAC


Revenue for the selected quarter

9.404

Unbilled Receivable - QTD

Quarter to Date value for the revenue amount


of the expenditure item or event

9.405

Unearned Revenue - QTD

Quarter to Date value of revenue recognized


for which the work has not been performed
yet.

9.406
9.407

Bill Amount - YTD


Realized Gains Amount - YTD

9.408

Realized Losses Amount - YTD

9.409

Revenue Amount - YTD

Year to Date total invoice amount.


The amount realized gains debit by the draft
revenue YTD
The amount realized gains debit by the draft
revenue - YTD
Amounts recognized as income or expected
billing to be received for work on a project
during the selected year until the current date

9.410

Revenue Signed Backlog- YTD

Year to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'

9.411

Revenue Unsigned Backlog- YTD

Year to date difference between Funding


Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

Metric Reference Guide 2-107

Project Analytics

No

Metric Name

Description

9.412

Revenue Variance to Budget Amount - YTD

Revenue YTD - Current Budget Revenue YTD

9.413

Revenue Variance to Forecast Amount YTD

Difference of Revenue and Current EAC


Revenue for the selected year

9.414

Unbilled Receivable - YTD

Year to Date for the revenue amount of the


expenditure item or event

9.415

Unearned Revenue - YTD

Year to Date value of revenue recognized for


which the work has not been performed yet.

2.10 Project - Resource Management


No

Metric Name

Description

10.1

# Of Employees

10.2

# Of Employees MAGO

10.3

# Of Employees QAGO

Count of employees having a given


competency in the quarter previous to that
selected

10.4

# Of Employees YAGO

Count of employees having a given


competency in the year previous to that
selected

10.5

Available Resource Count For Bucket1

Count of resources available for five


consecutive working days starting from the
selected day

10.6

Available Resource Count For Bucket2

Count of resources available for five


consecutive working days starting a week
from the selected day

10.7

Available Resource Count For Bucket3

Count of resources available for five


consecutive working days starting two
weeks from the selected day

Count of employees having a given


competency
Count of employees having a given
competency in the month previous to that
selected

Metric Reference Guide 2-108

Project Analytics

No

Metric Name

Description

10.8

Available Resource Count For Bucket4

Count of resources available for five


consecutive working days starting three
weeks from the selected day

10.9

# of Requirements

10.10

Required Resource Count

10.11

Required Time

Count of requirements for the selected filter


conditions
Number of resources requested in a project
resource requirement
Time for which a resource is requested in a
project resource requirement

10.12

Unfulfilled Resource Count

Number of resources that as of the selected


date has not yet been assigned

10.13

Unfulfilled Time

Requested time that has not been fulfilled


that as of the selected date

10.14

# of Assignments

Count of assignments for the selected filters

10.15

Actual Time

Time reported in time cards by resources

10.16
10.17

Available Resource Count


Available Resources

10.18

Available Resources %

Filter metric that returns


Count of resources available at a given point
in time
Available Resources /Total Resources

10.19
10.20
10.21

Available Time
Available Time Difference
Available Time Percent

10.22

Billable Organization Utilization %

10.23

Billable Resource Utilization %

10.24
10.25

Billable Time
Capacity Time

10.26

Confirmed Assigned Resource Count

10.27

Confirmed Billable Time

Scheduled billable time with assignment


status code = Confirmed

10.28

Confirmed Nonbillable Time

Scheduled non billable time with assignment


status code = Confirmed

Capacity Time - Confirmed Time


Available Time Difference
Available time as a percent of Capacity
Time
Billable Organization Utilization Weighted
Time / Capacity Time
Billable Resource Utilization Weighted Time
/ Capacity Time
Billable actual time
Total usable time based on each resource's
calendar
Total count of resources assigned to a
project at a given point in time

Metric Reference Guide 2-109

Project Analytics

No

Metric Name

Description

10.29

Confirmed Time

Scheduled time where assignment status


code = Confirmed

10.30

Confirmed Time %

Confirmed time as a percent of Capacity


time

10.31
10.32

----------Effort Metrics----------Expected Billable Organization Utilization %

10.33

Expected Billable Resource Utilization %

10.34

Expected Organization Utilization %

10.35

Expected Organization Weighted Time

10.36

Expected Resource Utilization %

10.37

Expected Resource Weighted Time

Expected Resource Weighted Time /


Capacity Time
Expected time weighted by the different
classifications of work (work types) using the
set of weights for the resource level

10.38

Expected Training Time

Expected time for work classified as training

10.39

Expected Training Time %

Expected training time as a percent of total


expected time

10.40
10.41

----------Expected Utilization Metrics----------Expected Utilization Time

10.42
10.43

Missing Time
Nonbillable Organization Utilization %

Capacity Time - Actual Time


Non Billable Organization Utilization
Weighted Time / Capacity Time

10.44

Nonbillable Resource Utilization %

10.45
10.46

Nonbillable Time
Organization Billable Weighted Time

Non Billable Resource Utilization Weighted


Time / Capacity Time
Non billable actual time
Billable time weighted by the different
classifications of work (work types) with the
set of weights for the organization level

10.47

Organization Utilization %

Expected Organization Weighted Billable


Time / Capacity Time
Expected Resource Weighted Billable Time
/ Capacity Time
Expected Organization Weighted Time /
Capacity Time
Expected time weighted by the different
classifications of work (work types) using the
set of weights for the organization level

For a given period, actual time for days


previous to the current + scheduled time for
subsequent to the current

Organization Utilization Weighted


Time/Capacity Time

Metric Reference Guide 2-110

Project Analytics

No

Metric Name

Description

10.48

Organization Utilization Weighted Time

Actual Time weighted by the different


classifications of work (work types) with the
set of weights for the organization level

10.49

Provisional Billable Time

10.50

Provisional Nonbillable Time

10.51

Provisional Time

10.52

Provisional Time %

10.53
10.54

Resource Availability %
Resource Billable Weighted Time

Scheduled billable time with status code =


Provisional
Non billable Time scheduled with status
code = Provisional
Scheduled time with status code =
Provisional
Provisional time as a percent of Capacity
time
Available Time / Capacity Time
Billable time weighted by the different
classifications of work (work types) with the
set of weights for the resource level

10.55

Resource Utilization %

10.56

Resource Utilization Weighted Time

10.57

Scheduled Billable Organization Utilization %

Billable Scheduled Organization Utilization


Weighted Time / Capacity Time

10.58

Scheduled Billable Resource Utilization %

Billable Scheduled Resource Utilization


Weighted Time / Capacity Time

10.59
10.60

Scheduled Billable Time


Scheduled Nonbillable Organization Utilization
%

Billable time scheduled


Non Billable Scheduled Organization
Utilization Weighted Time / Capacity Time

10.61

Scheduled Nonbillable Resource Utilization %

Non Billable Scheduled Resource Utilization


Weighted Time / Capacity Time

10.62
10.63

Scheduled Nonbillable Time


Scheduled Organization Utilization %

Non billable time scheduled


Scheduled Organization Utilization
Weighted Time / Capacity Time

10.64

Scheduled Resource Utilization %

10.65

Scheduled Time

Scheduled Resource Utilization Weighted


Time / Capacity Time
Time a resource has been assigned to work
on a project. An assignment can be
provisional or confirmed

Resource Utilization Weighted


Time/Capacity Time
Actual Time weighted by the different
classifications of work (work types) with the
set of weights for the resource level

Metric Reference Guide 2-111

Project Analytics

No

Metric Name

Description

10.66
10.67

Total Resources
Training Time

Total count of resources


Time assigned to training activities

10.68
10.69

Training Time %
Unassigned Time

Training Time/ Capacity Time


Capacity time - (Confirmed time +
Provisional time) It is 0 if Confirmed +
Provisional > Capacity

10.70

Unassigned Time %

10.71

Variance to Scheduled Organization Utilization


%

Unassigned time as a percent of Capacity


Time
Organization Utilization % - Scheduled
Organization Utilization %

10.72

Variance to Scheduled Resource Utilization %

10.73

Actual Time - ITD

10.74

Confirmed Billable Time - ITD

Confirmed billable time scheduled since


inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

10.75

Confirmed Nonbillable Time - ITD

Confirmed non billable time scheduled since


inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

10.76

Confirmed Time - ITD

Confirmed time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

10.77

Provisional Billable Time - ITD

Provisional billable time scheduled since


inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

10.78

Provisional Nonbillable Time - ITD

Provisional non billable time scheduled


since project inception

Resource Utilization % - Scheduled


Resource Utilization %
Time reported as utilized since inception,
satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

Metric Reference Guide 2-112

Project Analytics

No

Metric Name

Description

10.79

Provisional Time - ITD

Provisional time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

10.80

Schedule Billable Time - ITD

Billable time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

10.81

Schedule Nonbillable Time - ITD

Non billable time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

10.82

Scheduled Time - ITD

Time scheduled since inception, satisfying


the filter of the report. For example, if
filtering by project, then data is since project
inception

10.83
10.84

Actual Time - MTD


Billable Organization Utilization % - MTD

10.85

Billable Resource Utilization % - MTD

Month to date actual time


Month to date organization billable utilization
%
Month to date resource billable utilization %

10.86
10.87

Capacity Time - MTD


Change in Available Resources % - MTD

Month to date capacity time


Month-to-date Available Resources % Prior Month-to-date Available Resources %

10.88

Change in Missing Hours - MTD

Month to date Missing Time - Prior Month to


date Missing Times

10.89

Change in Organization Utilization % - MTD

Month-to-Date Organization Utilization % Prior Month-to-Date Organization Utilization


%

10.90

Change in Resource Utilization % - MTD

Month-to-Date Resource Utilization % - Prior


Month-to-Date Resource Utilization %

10.91
10.92

Missing Time - MTD


Organization Utilization % - MTD

Month to date missing time


Month to date organization utilization %

10.93

Resource Utilization % - MTD

Month to date resource utilization %

10.94
10.95
10.96

Scheduled Time - MTD


Unassigned Time - MTD
Actual Time - QTD

Month to date scheduled time


Month to data unassigned time
Quarter to date actual time

Metric Reference Guide 2-113

Project Analytics

No

Metric Name

Description

10.97

Billable Organization Utilization % - QTD

10.98

Billable Resource Utilization % - QTD

10.99
10.100

Capacity Time - QTD


Change in Available Resources % - QTD

10.101

Change in Missing Hours - QTD

10.102

Change in Organization Utilization % - QTD

10.103

Change in Resource Utilization % - QTD

Quarter-to-Date Resource Utilization % Prior Quarter-to-Date Resource Utilization %

10.104
10.105

Missing Time - QTD


Organization Utilization % - QTD

Quarter to date missing time


Quarter to date organization utilization %

10.106

Resource Utilization % - QTD

Quarter to date resource utilization %

10.107
10.108
10.109

Scheduled Time - QTD


Unassigned Time - QTD
Billable Organization Utilization % - YAGO

Quarter to date scheduled time


Quarter to data unassigned time
Billable Organization Utilization % for same
period in the previous year

10.110

Billable Resource Utilization % - YAGO

10.111

Organization Utilization % - YAGO

10.112

Resource Utilization % - YAGO

10.113
10.114

Actual Time - YTD


Billable Organization Utilization % - YTD

10.115

Billable Resource Utilization % - YTD

Billable Resource Utilization % for same


period in the previous year
Organization Utilization % in the year
previous to that selected
Resource Utilization % in the year previous
to that selected
Year to date actual time
Year to date organization billable utilization
%
Year to date resource billable utilization %

10.116
10.117

Capacity Time - YTD


Change in Available Resources % - YTD

Year to date capacity time


Year-to-date Available Resources % - Prior
Year-to-date Available Resources %

10.118

Change in Missing Hours - YTD

10.119

Change in Organization Utilization % - YTD

Year to date Missing Time - Prior Year to


date Missing Times
Year-to-Date Resource Utilization % - Prior
Year-to-Date Resource Utilization %

Quarter to date organization billable


utilization %
Quarter to date resource billable utilization
%
Quarter to date capacity time
Quarter-to-date Available Resources % Prior Quarter-to-date Available Resources
%
Quarter to date Missing Time - Prior Year to
date Missing Times
Quarter-to-Date Organization Utilization % Prior Quarter-to-Date Organization
Utilization %

Metric Reference Guide 2-114

Project Analytics

No

Metric Name

Description

10.120

Change in Resource Utilization % - YTD

Year-to-Date Resource Utilization % - Prior


Year-to-Date Resource Utilization %

10.121
10.122

Missing Time - YTD


Organization Utilization % - YTD

Year to date missing time


Year to date organization utilization %

10.123

Resource Utilization % - YTD

Year to date resource utilization %

10.124
10.125

Scheduled Time - YTD


Unassigned Time - YTD

Year to date scheduled time


Year to data unassigned time

2.11 Project Revenue


No
11.1
11.2
11.3
11.4

Metric Name
Bill Amount MAGO
Bill Amount QAGO
Bill Amount YAGO
Realized Gains Amount MAGO

11.5

Realized Gains Amount QAGO

11.6

Realized Gains Amount YAGO

11.7

Realized Losses Amount QAGO

11.8

Realized Losses Amount MAGO

11.9

Realized Losses Amount YAGO

11.10

Revenue Amount MAGO

Description
Bill amount - Month Ago
Bill Amount - Quarter Ago
Bill Amount - Year Ago
The amount realized gains debit by the
draft revenue - Month Ago
The amount realized gains debit by the
draft revenue - Quarter Ago
The amount realized gains debit by the
draft revenue - Year Ago
The amount realized gains debit by the
draft revenue - Quarter Ago
The amount realized gains debit by the
draft revenue - Month Ago
The amount realized gains debit by the
draft revenue - Year Ago
Amounts recognized as income or
expected billing to be received for work on
a project during the previous period

Metric Reference Guide 2-115

Project Analytics

No
11.11

Metric Name
Revenue Amount QAGO

Description
Amounts recognized as income or
expected billing to be received for work on
a project during the previous quarter

11.12

Revenue Amount YAGO

Amounts recognized as income or


expected billing to be received for work on
a project during the previous year

11.13

Revenue Monthly Change

Difference between the Revenue from the


last quarter and the Revenue from the
current quarter

11.14

Revenue Quarterly Change

Difference between the Revenue from the


last quarter and the Revenue from the
current quarter

11.15

Revenue Write-Off Amount MAGO

A decrease in revenues a month ago


when payment for a receivable cannot be
collected.

11.16

Revenue Write-Off Amount QAGO

A decrease in revenues a quarter ago


when payment for a receivable cannot be
collected.

11.17

Revenue Write-Off Amount YAGO

A decrease in revenues year ago when


payment for a receivable cannot be
collected.

11.18

Revenue Yearly Change

Difference between the Revenue from the


last year and the Revenue from the
current year

11.19

# of Projects

11.20

# of Revenue Lines Not Transferred

Number of distinct Projects with a


Revenue Distribution Line
Count of revenue lines with transfer status
equal to not transferred

11.21

# of Tasks

11.22

Active Contracts Revenue Amount

11.23
11.24

Bill Amount
Realized Gains Amount

Number of distinct tasks that have been


included on invoices.
Revenue of contract lines with status
"Active"
Total amount of all invoices.
The amount realized gains debit by the
draft revenue

Metric Reference Guide 2-116

Project Analytics

No
11.25

Metric Name
Realized Losses Amount

Description
The amount realized losses credited by
the draft revenue
Amounts recognized as income or
expected billing to be received for work on
a project

11.26

Revenue Amount

11.27

Revenue Amount - Revenue Lines Not


Transferred

Amount value of revenue lines with


transfer status equal to not transferred

11.28

Revenue Quantity

Number of Units (of Material or Hours)


used for this Revenue Distribution Line

11.29

Revenue Write-Off Amount

Revenue write-off is a decrease in


revenues when payment for a receivable
cannot be collected.

11.30

Unbilled Receivable

Identifies the potential revenue amount of


the expenditure item to be charged to the
GL account, in chart of account/ group/
global currency of the organization against
which a transaction is carried out, which is
attributable to the revenue generated as
a...

11.31

Unearned Revenue

Value of revenue recognized for which the


work has not been performed yet.

11.32

# of Projects - ITD

Number of distinct projects with a revenue


distribution line since the project inception

11.33

# of Tasks - ITD

Number of distinct tasks with an Invoice


Distribution Line since the Project
inception

11.34

Active Contracts Revenue Amount - ITD

11.35

Bill Amount - ITD

Revenue since project inception of


contract lines with status "Active"
Inception to date total invoice amount.

11.36

Realized Gains Amount - ITD

11.37

Realized Losses Amount - ITD

11.38

Revenue Amount - ITD

11.39

Revenue Write-Off Amount - ITD

The amount realized gains debit by the


draft revenue ITD
The amount realized gains debit by the
draft revenue - ITD
Amounts recognized as income or
expected billing to be received for work on
a project since project inception until the
current date
Inception to date write-off amount for
revenue

Metric Reference Guide 2-117

Project Analytics

No
11.40

Metric Name
Unbilled Receivable - ITD

Description
Revenue amount accrued since project
inception by the selected items of the
WBS

11.41

Unearned Revenue - ITD

Inception to Date value of revenue


recognized for which the work has not
been performed yet.

11.42

Active Contracts Revenue Amount - MTD

11.43

Bill Amount - MTD

Month to date revenue of contract lines


with status "Active"
Month to date total invoice amount.

11.44

Realized Gains Amount - MTD

11.45

Realized Losses Amount - MTD

11.46

Revenue Amount - MTD

11.47

Revenue Write-Off Amount - MTD

Month to date write-off amount for revenue

11.48

Unbilled Receivable - MTD

Period to Date value for the revenue


amount of the expenditure item or event

11.49

Unearned Revenue - MTD

Month to Date value of revenue


recognized for which the work has not
been performed yet.

11.50

Active Contracts Revenue Amount - QTD

11.51

Bill Amount - QTD

Quarter to date revenue of contract lines


with status "Active"
Quarter to Date total invoice amount.

11.52

Realized Gains Amount - QTD

11.53

Realized Losses Amount - QTD

11.54

Revenue Amount - QTD

11.55

Revenue Write-Off Amount - QTD

11.56

Unbilled Receivable - QTD

The amount realized gains debit by the


draft revenue MTD
The amount realized gains debit by the
draft revenue - MTD
Amounts recognized as income or
expected billing to be received for work on
a project during the selected period until
the current date

The amount realized gains debit by the


draft revenue QTD
The amount realized gains debit by the
draft revenue - QTD
Amounts recognized as income or
expected billing to be received for work on
a project during the selected quarter until
the current date
Quarter to date write-off amount for
revenue
Quarter to Date value for the revenue
amount of the expenditure item or event

Metric Reference Guide 2-118

Project Analytics

No
11.57

Metric Name
Unearned Revenue - QTD

Description
Quarter to Date value of revenue
recognized for which the work has not
been performed yet.

11.58

Equipment Actual Bill Rate

Revenue due to equipment / Quantity units


used for the equipment revenue
distribution line

11.59

Labor Actual Bill Rate

Revenue due to labor / Quantity units used


for the labor revenue distribution line

11.60

Active Contracts Revenue Amount - YTD

11.61
11.62

Bill Amount - YTD


Realized Gains Amount - YTD

11.63

Realized Losses Amount - YTD

11.64

Revenue Amount - YTD

Year to date revenue of contract lines with


status "Active"
Year to Date total invoice amount.
The amount realized gains debit by the
draft revenue YTD
The amount realized gains debit by the
draft revenue - YTD
Amounts recognized as income or
expected billing to be received for work on
a project during the selected year until the
current date

11.65

Revenue Write-Off Amount - YTD

Year to date write-off amount for revenue

11.66

Unbilled Receivable - YTD

Year to Date for the revenue amount of


the expenditure item or event

11.67

Unearned Revenue - YTD

Year to Date value of revenue recognized


for which the work has not been performed
yet.

2.12 Project - Revenue GL Reconciliation


No

12.1

Metric Name

# of Amount Mismatch

Description

Count of journals lines with transaction


amounts that do not match the total amount
of their matching revenue distributions lines

Metric Reference Guide 2-119

Project Analytics

12.2

# of Manual Journal Lines

Count of journal lines that do not have


matching revenue distribution lines

12.3

# of Revenue Line Transfer Exceptions

Count revenue lines transferred out of


Projects but not found at their destination.
For EBS R12 users this is those lines not
found in Sub Ledger Accounting. For EBS
11.5.10 this is those lines not found in
General Ledger. For People Soft customers
with Single Feed, this is those lines not
found in the Accounting Lines table. This
metric does not apply for People Soft users
with dual feed.

12.4

# of Revenue Lines not in GL

Count of transferred revenue distribution


lines that have no corresponding journal
lines created in General Ledger. For EBS
R12 users this is exceptions in the transfer
from Sub Ledger Accounting to General
Ledger. For People Soft Customers, this is
exceptions in the transfer from Accounting
Lines to General Ledger. This metric does
not apply for EBS 11.5.10 users or People
Soft customers with Dual Feed.

12.5

# of Revenue Lines with Unposted Journals

Count of transferred revenue distribution


lines, with journal lines created but not
posted to the General Ledger

12.6

Amount - Revenue Line Transfer Exceptions

Debit amount of revenue distribution lines


transferred out of Projects but not found at
their destination. For EBS R12 users this is
those lines not found in Sub Ledger
Accounting. For EBS 11.5.10 this is those
lines not found in General Ledger. For
People Soft customers with Single Feed, this
is those lines not found in the Accounting
Lines table. This metric does not apply for
People Soft users with Dual Feed.

12.7

Amount - Revenue Lines Not in GL

Debit amount of transferred revenue


distribution lines that have no corresponding
journal lines created in General Ledger. For
EBS R12 users this is exceptions in the
transfer from Sub Ledger Accounting to
General Ledger. For People Soft Customers,
this is exceptions in the transfer from
Accounting Lines to General Ledger. This
metric does not apply for EBS 11.5.10 users
or People Soft customers with Dual Feed.

Metric Reference Guide 2-120

Project Analytics

12.8

Amount - Revenue Lines with Unposted


Journals

Amount of transferred revenue distribution


lines, with journal lines created but not
posted to the General Ledger

12.9

Credit Amount - Manual Journal Lines

Transaction amount of credit journal lines


that do not have matching revenue
distribution lines

12.10

Debit Amount - Manual Journal Lines

Transaction amount of debit journal lines


that do not have matching revenue
distribution lines

12.11

Journal Lines - Credit Amount

Credit amount value of journal lines

12.12

Journal Lines - Debit Amount

Debit amount value of journal lines

12.13

Revenue Lines - Credit Amount

Amount of credit entries for a revenue line

12.14

Revenue Lines - Debit Amount

Amount of debit entries for a revenue line

12.15

Transaction Amount

Amount of revenue transactions

2.13 Project Earned Value Management


No
13.1

13.2
13.3

13.4
13.5
13.6
13.7
13.8
13.9

Metric Name
% Complete

Budget at Completion - Progress


Cost - ITD

Earned Value
Planned Value
Cost Variance
Cost Variance %
Cost Performance Index
Schedule Variance

Description
Percentage completed (Work performed) of
a task or project measured since inception.
Data at lowest level is read from the base
application. Figures are rolled up to parent
tasks and project.
Inception to date cost amount in the current
version of the budget
Inception to date cost amount. This is the
actual cost of work performed since
inception.
Budgeted cost of work performed since
inception
Budgeted cost of work scheduled since
inception
Difference between Earned Value and Cost,
since inception
Cost Variance / Earned Value, since inception

Earned Value / Cost, since inception


Difference between Earned Value and Plan
Metric Reference Guide 2-121

Project Analytics

Value, since inception


13.10

Schedule Variance %

Schedule Variance / Planned Value, since


inception

13.10

Schedule Performance Index

Earned Value /Planned Value, since


inception

13.12

Cost/Schedule Index

Product of Cost Performance Index and


Schedule Performance Index, since
inception

13.13

To Complete Cost Performance Indicator

(Budget at Completion - Progress Earned


Value) / (Budget at Completion Actual
Cost), since project inception.

13.14

To Complete Schedule Performance Indicator

(Budget at Completion Earned Value) /


(Budget at Completion Planned Value),
since project inception.

13.15

Estimate at Completion

Inception to date estimate at completion


cost amount in the current forecast version.

13.16

Estimate to Complete

Estimate to complete cost amount in the


current forecast version

13.17

Variance at Completion

Difference between the Budget at


Completion and the inception to date
Estimate at Completion

13.18

Variance at Completion %

Variance at Completion / Budget at


Completion

13.19

% Complete Cost

100*(Cost - ITD + Estimate to Complete)

13.20

% Spent Cost

100* (Cost - ITD / Budget at Completion)

13.21

Budgeted Quantity of Work Scheduled

Budget effort scheduled since inception

13.22

Actual Quantity of Work Performed

Actual effort booked since inception. This is


effort attributed to work performed.

13.23

Budgeted Actual Quantity

Total budgeted effort

13.24

Budgeted Quantity of Work Performed

Budget Actual Quantity * % Completion

13.25

Time Based Metrics - % Complete

Percentage completion of a task or project


in the selected period of time

13.26

Time Based Metrics - Cost

13.27

Time Based Metrics - Earned Value

13.28

Time Based Metrics - Planned Value

Cost amount for the selected period. This is


the actual cost of work performed for the
selected period of time
Budgeted cost of the work performed for
the selected period of time
Budgeted cost of the work scheduled for
the selected period of time
Metric Reference Guide 2-122

Project Analytics

13.29

Time Based Metrics -Cost Variance

Difference between Earned Value and Cost


for the selected period of time

13.30

Time Based Metrics - Cost Variance %

Cost Variance / Earned Value, for the selected


period of time

13.31

Time Based Metrics - Cost Performance Index

Earned Value / Cost, for the selected period


of time

13.32

Time Based Metrics - Schedule Variance

Difference between Earned Value and Plan


Value, for the selected period of time

13.33

Time Based Metrics - Schedule Variance %

Schedule Variance / Planned Value, for the


selected period of time

13.34

Time Based Metrics - Schedule Performance


Index

Earned Value /Planned Value for the


selected period of time

2.14 Project Construction in Progress


No
14.1
14.2
14.3

14.4
14.5
14.6
14.7

Metric Name
Total Cost Capital Project
Capitalizable Cost
Expensed Cost

Capitalizable Cost not associated to a Asset


Total Cost Capital Project - ITD
Capitalizable Cost - ITD
Expensed Cost - ITD

14.8

Capitalizable Cost not associated to a Asset ITD

14.9

Total Cost Capital Project - YTD

14.10

Capitalizable Cost - YTD

Description
For Capital projects, this is the total of the
capitalizable and expensed cost
For Capital projects, CIP Cost plus
Interfaced CIP cost
For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents project costs that are not to be
capitalized and hence will not be
summarized in the Asset lines.
For Capital projects, CIP Cost plus
Interfaced CIP cost but not associated to a
Asset
For Capital projects, this is the total of the
capitalizable and expensed cost ITD
For Capital projects, CIP Cost plus
Interfaced CIP cost ITD
For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents ITD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
For Capital projects, CIP Cost plus
Interfaced CIP cost but not associated to a
Asset ITD
For Capital projects, this is the total of the
capitalizable and expensed cost ITD
For Capital projects, CIP Cost plus
Interfaced CIP cost YTD
Metric Reference Guide 2-123

Project Analytics

14.11

Expensed Cost - YTD

14.12

Capitalizable Cost not associated to a Asset YTD

14.13

Total Cost Capital Project - QTD

14.14
14.15

Capitalizable Cost - QTD


Expensed Cost - QTD

14.16

Capitalizable Cost not associated to a Asset QTD

14.17

Total Cost Capital Project - MTD

14.18
14.19

14.20
14.21
14.22
14.23

14.24

14.25
14.26
14.27

Capitalizable Cost - MTD


Expensed Cost - MTD

Capitalizable Cost not associated to a Asset MTD


# of Projects
Interfaced CIP Cost
Original Asset Cost

CIP Cost

# of Projects - ITD
Interfaced CIP Cost - ITD
Original Asset Cost - ITD

For Capital projects, difference of Total


project Cost and the capitalizable cost. This
represents YTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
For Capital projects, CIP Cost plus
Interfaced CIP cost but not associated to a
Asset YTD
For Capital projects, this is the total of the
capitalizable and expensed cost QTD
For Capital projects, CIP Cost plus
Interfaced CIP cost QTD
For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents QTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
For Capital projects, CIP Cost plus
Interfaced CIP cost but not associated to a
Asset QTD
For Capital projects, this is the total of the
capitalizable and expensed cost MTD
For Capital projects, CIP Cost plus
Interfaced CIP cost MTD
For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents MTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
For Capital projects, CIP Cost plus
Interfaced CIP cost but not associated to a
Asset MTD
Count of Capital projects
Total of asset lines that have been already
sent from Projects to Fixed Assets
In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the total value of the asset
lines that had been interfaced to Fixed
Assets before the split.
Cost associated with building a
construction-in-progress asset. This can be
raw or burdened cost, according to how the
project has been set up.
Count of Capital projects ITD
Total of asset lines that have been already
sent from Projects to Fixed Assets ITD
In cases where a fixed asset is split into
Metric Reference Guide 2-124

Project Analytics

14.28

14.29
14.30
14.31

14.32

14.33
14.34
14.35

14.36

14.37
14.38
14.39

14.40

14.41

CIP Cost - ITD

# of Projects - YTD
Interfaced CIP Cost - YTD
Original Asset Cost - YTD

CIP Cost - YTD

# of Projects - QTD
Interfaced CIP Cost - QTD
Original Asset Cost - QTD

CIP Cost - QTD

# of Projects - MTD
Interfaced CIP Cost - MTD
Original Asset Cost - MTD

CIP Cost - MTD

Interfaced CIP Cost

more than one asset after some CIP cost


has been already interfaced to fixed assets,
this represents the ITD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
Cost associated with building a
construction-in-progress asset ITD. This can
be raw or burdened cost, according to how
the project has been set up.
Count of Capital projects YTD
Total of asset lines that have been already
sent from Projects to Fixed Assets YTD
In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the YTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
Cost associated with building a
construction-in-progress asset YTD. This
can be raw or burdened cost, according to
how the project has been set up.
Count of Capital projects QTD
Total of asset lines that have been already
sent from Projects to Fixed Assets QTD
In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the QTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
Cost associated with building a
construction-in-progress asset QTD. This
can be raw or burdened cost, according to
how the project has been set up.
Count of Capital projects MTD
Total of asset lines that have been already
sent from Projects to Fixed Assets MTD
In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the MTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
Cost associated with building a
construction-in-progress asset MTD. This
can be raw or burdened cost, according to
how the project has been set up.
Total of asset lines that have been already
sent from Projects to Fixed Assets.
Metric Reference Guide 2-125

Project Analytics

14.42

14.43
14.44

14.45
14.46

14.47
14.48

14.49
14.50

CIP Cost

Interfaced CIP Cost - ITD


CIP Cost - ITD

Interfaced CIP Cost - YTD


CIP Cost - YTD

Interfaced CIP Cost - QTD


CIP Cost - QTD

Interfaced CIP Cost - MTD


CIP Cost - MTD

Cost associated with building a


construction-in-progress asset. This can be
raw or burdened cost, according to how the
project has been set up.
Total of asset lines that have been already
sent from Projects to Fixed Assets ITD.
Cost associated with building a
construction-in-progress asset ITD. This can
be raw or burdened cost, according to how
the project has been set up.
Total of asset lines that have been already
sent from Projects to Fixed Assets YTD.
Cost associated with building a
construction-in-progress asset YTD. This
can be raw or burdened cost, according to
how the project has been set up.
Total of asset lines that have been already
sent from Projects to Fixed Assets QTD.
Cost associated with building a
construction-in-progress asset QTD. This
can be raw or burdened cost, according to
how the project has been set up.
Total of asset lines that have been already
sent from Projects to Fixed Assets MTD.
Cost associated with building a
construction-in-progress asset MTD. This
can be raw or burdened cost, according to
how the project has been set up.

Metric Reference Guide 2-126

Project Analytics

Metric Reference Guide 2-127