16498 Federal Register / Vol. 70, No.

61 / Thursday, March 31, 2005 / Notices

Any comments should be filed within compressor unit at the existing The proposed gas-cooling equipment at
45 days from the issuance date of this launcher-receiver station site located in Compressor Station 17 would be
notice and should be addressed to the Section 17, Township 77 North, Range installed in a previously disturbed area.
Secretary, Federal Energy Regulatory 5 West, Johnson County, Iowa. NBPL indicates that CIPCO plans to
Commission, 888 First Street, NE., 2. Compressor Station No. 17—Install construct a new 1.8-mile long 69-
Room 1–A, Washington, DC 20426. additional gas-cooling equipment and kilovolt transmission line (to provide
Please affix ‘‘Borel Hydroelectric Project replace the compressor wheel and electrical power to Compressor Station
No. 382–026’’ and/or ‘‘Kern Canyon internals on the existing centrifugal 16) ‘‘within state and county road
Hydroelectric Project No. 178–017’’ to compressor unit located in Section 13, easements utilizing aboveground and
all comments. Comments may be filed Township 79 North, Range 4 East, Scott ‘‘narrow profile’’ construction methods
electronically via the internet in lieu of County, Iowa. The proposed to minimize land requirements,
paper. The Commission strongly modification would not result in a potential private landowner concerns,
encourages electronic filings. See 18 change in hp rating. and environmental impacts that may be
CFR 385.2001(a)(1)(iii) and the 3. Compressor Station No. 18— associated with CIPCO’s project. Ground
instructions on the Commission’s Web Replace the compressor wheel and disturbance will generally be limited to
site under the ‘‘e-filing’’ link. For further internals on the existing centrifugal the areas immediately surrounding the
information, contact Emily Carter at compressor unit located in Section 1, base of the power line poles.’’
(202) 502–6512 or emily.carter@ferc.gov. Township 17 North, Range 10 East,
Bureau County, Illinois. The proposed The EA Process
Magalie R. Salas, modification would not result in a The National Environmental Policy
Secretary. change in hp rating. Act (NEPA) requires the Commission to
[FR Doc. E5–1418 Filed 3–30–05; 8:45 am] NBPL indicates that it would also take into account the environmental
BILLING CODE 6717–01–P ‘‘certain install related 2.55(a) auxiliary impacts that could result from an action
facilities.’’ whenever it considers the issuance of a
NBPL indicates that in order to Certificate of Public Convenience and
DEPARTMENT OF ENERGY provide the electric power to operate Necessity. NEPA also requires us to
Compressor Station 16, Central Iowa discover and address concerns the
Federal Energy Regulatory Power Cooperative (CIPCO) would
Commission public may have about proposals. This
construct about 1.8 miles of a 69- process is referred to as ‘‘scoping.’’ The
[Docket No. CP05–88–000] kilovolt transmission line from its main goal of the scoping process is to
existing transmission line north of focus the analysis in the EA on the
Northern Border Pipeline Company; Compressor Station 16. NBPL indicates important environmental issues. By this
Notice of Intent To Prepare an that CIPCO’s planned power line would Notice of Intent, the Commission staff
Environmental Assessment for the be regulated by the Iowa Utilities Board requests public comments on the scope
Proposed Chicago III Expansion and CIPCO would need to file for and of the issues to address in the EA. All
Project and Request for Comments on obtain the necessary permits and comments received are considered
Environmental Issues environmental clearances for its during the preparation of the EA. State
March 24, 2005.
planned power line facilities. and local government representatives
The general location of the project are encouraged to notify their
The staff of the Federal Energy
facilities is shown in Appendix 1.2 constituents of this proposed action and
Regulatory Commission (FERC or
Commission) will prepare an Land Requirements for Construction encourage them to comment on their
environmental assessment (EA) that will Construction of the proposed facilities areas of concern.
discuss the environmental impacts of would occur on previously disturbed In the EA we 3 will discuss impacts
the Chicago III Expansion Project land within each of the three that could occur as a result of the
involving construction and operation of compressor station sites owned by construction and operation of the
facilities by Northern Border Pipeline NBPL. proposed project under these general
Company (NBPL) in Johnson and Scott The 16,000-hp electric driven headings:
Counties, Iowa and Bureau County, compressor would be installed on a • Geology and soils,
Illinois.1 These facilities would consist currently designated 10.3-acre • Land use,
of a new 16,000-horsepower (hp) Compressor Station 16 site which • Cultural resources,
electric compressor station, installation currently contains an existing NBPL • Vegetation and wildlife,
of additional gas cooling equipment, launcher/receiver facility and • Air quality and noise,
and changing internals and wheel of microwave tower. NBPL would also • Endangered and threatened species,
compressors. This EA will be used by construct and maintain a new access • Hazardous waste,
the Commission in its decision-making road to the compressor station. • Water resources and fisheries.
process to determine whether the The proposed modifications for the We will also evaluate possible
project is in the public convenience and compressor wheels and internals at alternatives to the proposed project or
necessity. Compressor Stations 17 and 18 would portions of the project, and make
occur within the compressor buildings. recommendations on how to lessen or
Summary of the Proposed Project avoid impacts on the various resource
NBPL proposes to construct, modify, 2 The appendices referenced in this notice are not areas.
install and operate the following being printed in the Federal Register. Copies of all Our independent analysis of the
facilities: appendices, other than Appendix 1 (maps), are issues will be in the EA. Depending on
1. Compressor Station No. 16—Install available on the Commission’s Web site at the the comments received during the
‘‘eLibrary’’ link or from the Commission’s Public
one new 16,000-hp electric driven Reference Room, 888 First Street, NE., Washington, scoping process, the EA may be
DC 20426, or call (202) 502–8371. For instructions
1 NBPL’s application was filed with the on connecting to eLibrary refer to the last page of 3 ’’We’’, ‘‘us’’, and ‘‘our’’ refer to the

Commission under section 7 of the Natural Gas Act this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects
and part 157 of the Commission(s regulations. all those receiving this notice in the mail. (OEP).

VerDate jul<14>2003 15:30 Mar 30, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\31MRN1.SGM 31MRN1
Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices 16499

published and mailed to federal, state, Becoming an Intervenor Commission, such as orders, notices,
and local agencies, public interest In addition to involvement in the EA and rulemakings.
groups, interested individuals, affected scoping process, you may want to In addition, the Commission now
landowners, newspapers, libraries, and become an official party to the offers a free service called eSubscription
the Commission(s official service list for proceeding known as an ‘‘intervenor.’’ which allows you to keep track of all
this proceeding. A comment period will Intervenors play a more formal role in formal issuances and submittals in
be allotted for review if the EA is the process. Among other things, specific dockets. This can reduce the
published. We will consider all intervenors have the right to receive amount of time you spend researching
comments on the EA before we make copies of case-related Commission proceedings by automatically providing
our recommendations to the documents and filings by other you with notification of these filings,
Commission. intervenors. Likewise, each intervenor document summaries and direct links to
To ensure your comments are must send one electronic copy (using the documents. Go to http://
considered, please carefully follow the the Commission’s eFiling system) or 14 www.ferc.gov/esubscribenow.htm.
instructions in the public participation paper copies of its filings to the Finally, public meetings or site visits
section below. Secretary of the Commission and must will be posted on the Commission’s
send a copy of its filings to all other calendar located at http://www.ferc.gov/
Public Participation EventCalendar/EventsList.aspx along
parties on the Commission’s service list
You can make a difference by for this proceeding. If you want to with other related information.
providing us with your specific become an intervenor you must file a Magalie R. Salas,
comments or concerns about the project. motion to intervene according to Rule Secretary.
By becoming a commentor, your 214 of the Commission’s Rules of
concerns will be addressed in the EA [FR Doc. E5–1424 Filed 3–30–05; 8:45 am]
Practice and Procedure (18 CFR
and considered by the Commission. You BILLING CODE 6717–01–P
385.214) (see Appendix 2).4 Only
should focus on the potential intervenors have the right to seek
environmental effects of the proposal, rehearing of the Commission’s decision. DEPARTMENT OF ENERGY
alternatives to the proposal, and Affected landowners and parties with
measures to avoid or lessen environmental concerns may be granted Federal Energy Regulatory
environmental impact. The more intervenor status upon showing good Commission
specific your comments, the more useful cause by stating that they have a clear
they will be. Please carefully follow and direct interest in this proceeding Notice of Application for Non-Project
these instructions to ensure that your which would not be adequately Use of Project Lands and Waters and
comments are received in time and represented by any other parties. You do Soliciting Comments, Motions To
properly recorded: not need intervenor status to have your Intervene, and Protests
• Send an original and two copies of environmental comments considered.
your letter to: Magalie R. Salas, March 22, 2005.
Environmental Mailing List Take notice that the following
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room An effort is being made to send this application has been filed with the
1A, Washington, DC 20426. notice to all individuals, organizations, Commission and is available for public
• Label one copy of the comments for and government entities interested in inspection:
the attention of Gas Branch 2. and/or potentially affected by the a. Application Type: Non-Project Use
• Reference Docket No. CP05–88– proposed project. This includes all Of Project Lands And Waters.
000. landowners whose property may be b. Project No.: 2503–086.
used temporarily for project purposes, c. Date Filed: March 3, 2005.
• Mail your comments so that they d. Applicant: Duke Power, a division
will be received in Washington, DC on or who own homes within distances
defined in the Commission’s regulations of Duke Energy Corporation.
or before April 25, 2005. e. Name of Project: Keowee-Toxaway.
Please note that we are continuing to of certain aboveground facilities.
f. Location: The project is located on
experience delays in mail deliveries Additional Information Lake Keowee in Oconee County, South
from the U.S. Postal Service. As a result, Carolina. The project does not utilize
Additional information about the
we will include all comments that we federal or tribal lands.
project is available from the
receive within a reasonable time frame g. Filed Pursuant to: Federal Power
Commission’s Office of External Affairs,
in our environmental analysis of this Act, 16 U.S.C. 791(a), 825(r) and 799
at 1–866–208–FERC or on the FERC
project. However, the Commission and 801.
Internet Web site (http://www.ferc.gov)
strongly encourages electronic filing of h. Applicant Contact: Mr. Joe Hall,
using the eLibrary link. Click on the
any comments or interventions or Lake Management Representative, Duke
eLibrary link, click on ‘‘General Search’’
protests to this proceeding. See 18 CFR Energy Corporation, P.O. Box 1006,
and enter the docket number excluding
385.2001(a)(1)(iii) and the instructions Charlotte, NC 28201–1006, 704–382–
the last three digits in the Docket
on the Commission’s Web site at 8576.
Number field. Be sure you have selected
http://www.ferc.gov under the ‘‘e- i. FERC Contact: Any questions on
an appropriate date range. For
Filing’’ link and the link to the User’s this notice should be addressed to Kate
assistance, please contact FERC Online
Guide. Before you can file comments DeBragga at (202) 502–8961, or by e-
Support at FercOnlineSupport@ferc.gov
you will need to create a free account mail: Kate.DeBragga@ferc.gov.
or toll free at 1–866–208–3676, or for
which can be created online. j. Deadline for filing comments and or
TTY, contact (202) 502–8659. The
We may mail the EA for comment. If motions: April 22, 2005.
eLibrary link also provides access to the
you are interested in receiving it, please All documents (original and eight
texts of formal documents issued by the
return the Information Request copies) should be filed with: Ms.
(Appendix 3). If you do not return the 4 Interventions may also be filed electronically via Magalie R. Salas, Secretary, Federal
Information Request, you will be taken the Internet in lieu of paper. See the previous Energy Regulatory Commission, 888
off the mailing list. discussion on filing comments electronically. First Street, NE., Washington DC 20426.

VerDate jul<14>2003 15:30 Mar 30, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\31MRN1.SGM 31MRN1

You might also like