ANALYSIS TO REDUCE SETUP TIME IN CELL 1 DRILLING MACHINE FOR TVS/COM/1 TO TVS/HM/4
ELEMENTAL DESCRIPTION
TIME IN SECONDS
Sl.No.
ACTIVITY
CHANGE
BEFORE
PROPOSED
CURRENT
STATUS
32.55
32.55
32.55
30.26
30.26
36.24
22.68
22.68
22.68
77.92
77.92
77.92
8.96
8.96
8.96
55.87
8.11
23.95
23.95
10
18.38
11
17.19
17.19
C
C
C
C
C
C
12
10.04
10.04
13
15.62
15.62
14
7.12
7.12
15
65.63
65.63
16
14.86
14.86
14.86
17
88.52
88.52
88.52
18
Loading of cradle
16.1
16.1
16.1
19
26.24
26.24
26.24
20
12.73
12.73
21
278.25
70
278.25
22
Spindle adjustment
135.57
55
135.57
23
78.47
30
78.47
24
25
26
27
7.25
7.25
7.25
18.83
18.83
18.83
14.4
14.4
14.4
56.17
56.17
C
C
C
C
C
C
C
C
C
C
C
320
40
80
28
29
30
Air line on
31
32
26.74
26.74
26.74
17.99
17.99
17.99
8.03
Trial indexing
15.68
15.68
15.68
25.93
25.93
33
18.83
18.83
34
15.14
15.14
35
8.24
8.24
8.24
36
Inspection
52.05
20
52.05
37
Adjusting adapter
90.49
25
90.49
38
39
Inspection
40
41
Inspection
8.27
8.27
8.27
64.98
20
64.98
9.49
9.49
9.49
49.69
20
49.69
1589.46 670.72
C
C
C
C
C
C
C
C
C
C
C
C
1466.83
BEFORE
PROPOSED
IMPROVEMENT
TARGET DATE
20/07/09
20/07/09
15/07/09
parallel Activity
Offline Setting
STATUS
11/07/09
15/07/09
25/07/09
28/07/09
18/07/09
COMPLETED
16/07/09
18/07/09
19/07/09
15/07/09
20/07/09
19/07/09
15/07/09
16/07/09
NO CHANGE
COMPLETED
PHASE I
12/7/2009
ANALYSIS TO REDUCE SETUP TIME IN CELL 2 U LINE 1 DRILLING MACHINE FROM ALRF 5 TO ALRF 7
ELEMENTAL DESCRIPTION
TIME IN SECONDS
S. No
CHANGE
BEFORE
PROPOSED
39
30
78
50
76
76
31
12
29
29
80
20
TARGET
DATE
IMPROVEMENT
ACTIVITY
28
28
265
109
80
10
109
80
11
135
135
12
35
13
Inspection
72
45
1086
585
40
80
C1`
17/07/09
Ratchet Spanner
16/07/09
Provide
pin
welded chain link
with
20/07/09
20/07/09
18/07/09
Ratchet Spanner
16/07/09
Ratchet Spanner
16/07/09
C
C
To be studied
18/07/09
Off line setting of Drill
bit
15/07/09
C
C
BEFORE
AFTER
Time reduction through Kaizen
No change
Phase 1
Padi.
ANALYSIS TO REDUCE SETUP TIME IN CELL 2 U-LINE 4 DRILLING MACHINE FROM ALRF TO EICHER
ELEMENTAL DESCRIPTION
TIME IN SECONDS
SL. No
ACTIVITY
CHANGE
BEFORE
PROPOSED
70
Walking to trolley
18
40
80
E/I
49
51
15
26
24
10
77
30
41
1
2
3
4
5
6
7
10
C
C
50
Fixing cradle
87
30
16
22
15
17
11
11
18
62
57
31
37
19
17
251
40
18
15
25
rotating spindle.
25
12
26
Spindle adjusting.
12
33
12
13
14
15
16
19
20
21
22
23
24
27
E
E
11
IMPROVEMENT
E
I
E
I
E
C
C
E
I
I
I
I
I
I
I
I
E
I
I
I
I
E
28
Adapter setting.
19
15
29
Adapter fixing.
19
15
24
112
63
23
Adjusting cradle
32
24
41
20
19
36
10
10
37
23
40
12
30
31
32
33
34
35
38
17
17
116
20
35
19
13
10
18
44
33
26
45
87
18
46
20
13
16
16
15
15
17
35
22
20
20
15
15
53
14
54
Checking CED
20
33
20
13
16
16
15
15
2097
590
39
40
41
42
43
47
48
49
50
51
52
55
56
57
58
E
I
E
E
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BEFORE
AFTER
34.95
9.833333
No change
Date :12/07/09
IMPROVEMENT
Target Date
15/07/09
17/07/2009
18/07/2009
21/07/2009
18/07/2009
20/07/09
20/07/09
18/07/09
18/07/09
18/07/09
18/07/09
completed
18/07/09
17/07/09
19/07/09
19/07/09
24/07/09
22/07/09
18/07/09
26/07/09
20/07/09
24/07/09
24/07/09
No change
S.No.
ACTIVITY
TIME IN SECONDS
CHAN BEFORE
PROPOSED
GE
50
100
150
200
250
300
50
100
150
200
250
300
32
32
16
60
60
26
59
59
Off-line arrangement
58
58
57
57
15
56
56
55
55
54
54
53
53
52
52
51
51
50
50
49
49
48
48
47
47
46
46
6
7
8
9
29
16
10
30
10
20
20
10
16
11
29
12
13
14
Taking tool
15
10
10
64
40
55
15
45
45
44
44
44
18
12
12
43
43
19
25
10
42
42
20
79
40
41
41
21
10
10
40
40
22
16
39
39
Off-line arrangement
23
23
38
38
Off-line arrangement
24
14
14
37
37
25
25
10
36
36
35
35
34
34
33
33
32
32
31
31
30
30
16
17
26
38
20
27
15
Stopper to be provided
C-Washer to be changed
28
33
33
29
58
30
30
Keeping spacer
10
31
32
47
10
37
37
36
36
35
35
34
34
33
33
32
32
31
31
30
30
29
29
28
28
27
27
26
26
25
25
24
24
33
11
34
32
10
35
90
40
36
28
10
38
66
23
23
68
20
22
22
280
21
21
31
20
20
39
40
41
43
Putting bolts
Checking drill bit free movement in the bush
holder and placing the drill bit(6 Nos)
Adjusting spindle for drill bit position and
insertig the drill bit in to the spindle
103
18
44
86
86
17
17
45
17
17
16
16
46
Adjusting spindle
150
15
15
47
33
33
14
14
48
18
13
13
12
12
11
11
42
74
20
19
19
103
18
49
14
14
50
22
10
26
52
43
53
27
10
54
30
10
24
10
57
1st trial
37
37
58
22
59
2nd trial
15
15
60
17
17
Off-line arrangement
To be done in Offline
Bed height to be standardised for each
product
To be done in Offline
Bed height to be standardised for each
product
Lock nut to be provided for using the 2nd limit
switch
Off-line arrangement
56
Off-line arrangement
It should be standardized instructed to fix
atleast 10 joints in the head
Lever type arrangement for loosening the
bolts instead of hand tools
55
10
10
51
50
100
150
200
250
300
50
100
150
200
250
300
19
19
18
18
17
17
16
16
15
15
14
14
13
13
12
12
11
11
10
10
1
0
61
20
20
2216
833
50
100
150
200
BEFORE
250
300
50
100
150
200
250
300
Proposed
Time reduction through Kaizen
No change
12/7/2009
TARGET DATE
25/07/2009
20/07/09
Completed
30/07/09
Completed
Completed
10/07/09
25/07/2009
20/07/2009
Completed
20/07/09
15/07/2009
20/07/09
20/07/2009
20/07/2009
Completed
Completed
25/07/2009
30/07/2009
25/07/2009
Completed
Completed
Completed
Completed
Completed
20/07/09
20/07/2009
Completed
20/07/09
20/07/2009
20/07/09
20/07/09
20/07/09
25/07/2009
20/07/09
25/07/2009
Completed
25/07/2009
No change