You are on page 1of 19
Alexandria University Faculty of Engincering Structural Engineering Dept. June, 2015 Metallic Bridges 4" Year Civil pee tt Time allowed: Three Hrs. SE oh PARE () 0 marks} The shown Figure represents the clevation and the cross-scetion of a roadway trass bridge. The truss girders have a span of 30.0 m, ‘The cross girders have & span of 12.0 ns and spaced at 5.0 m. Two portal frames are provided at A and B to transmit the reactions of the horizontal upper bracing to the bearings. own I3s0 Bridge Cross-Section st and B Dead Load Weight of sted! = 300 kgm? Weight of pavement ~ 200 kg /ar? R.C slab thickness ~20.em Live load For Floor Beuins (stringers und cross girders: 1.4, shssild be considered according tw the Egyptian Cade. For Main Girders (russes): TL. should be considered as an eculvalent uniform: load = 1.2 t/ non the roadway and 0.3 ¢/ m? on the sidewalks, Page 1of3 Alexandria University Faculty of Engineering Structural Engineering Dept. June 2015 Metallic Structures 4 Year Civil Time allowed: Three Hrs. PART (A) fa) ‘The shown Figures represent the section elevation, plan and side view of stee! structure covers an area of 18x25.0m, ‘The main structures are frames 18 m span and 5.0 m spacing. 6.0 ml 12x 1.5= 18.0 m Section Elevations fee 5.0m N du Joint (1) fy 180m Plan of Horizontal Bracing Joint gy] ] | \ || 6.0m NO || Ai va ;2on som 50m J __s0m_{__s0m Section Side View (Page 1/3) Given: Total load (DL +LL) = 0.15 vm? ‘The horizontal reaction at (A) Xq=3.0 ton Wind load should be considered according to the Egyptian Code requirements. St (37) should be used Fy = 2.4 t/em? Bolt diameter +20 mm, grade (10.9) Gusset Plate thickness = 10 mm. Required 1 Check the safety of the column AB for the following cross section; 2 Flange Plates 250 x10 mm and Web Plate 600x8 mm. 2- Find the force in the horizontal bracing members D1&D2. 3- Find the force in the vertical bracing members V1&V2 4- Cheek the safety of the vertical bracing members V1&V2 as 2L 100x100x10, 5- Design and draw to scafe 1:10 the joint (1) & joint (2). Consider the horizontal bracing members are single angle L 80X80x8 and the roof purlins are UPN 120. 6- Design and draw to scale 1:10 the joint (3) & joint (4). Part B: 40% 1) Calculate the allowable axial compression capacity of a Concrete-Encased stee! column having the following properties: steel section : HEA 360 concrete section : 55x S0.cm _ longitudinal rft.: 12 16 Sm Ly=5.0m F,= 3.6t/cm® (for both steel section and R&t) E,=2100t/em? Feu = 300 kg/cm? 2) Check the safety of a concrete-filled tubular stee! column subjected to an axial compression load of 750 ton. The column has the following properties: Steel section : circular tube 10 mm thickness and 600 mm outer diameter Buckling length = 5.00 m Fy= 3.6t/em? Fey = 400 kg / em? 3) (a) Calculate the maximum allowable axial compression capacity of a hollow steel pipe 400 mm diameter and 6 mm thickness made of mild steel 37 for max buckling length of 6 m. (b) Calculate the maximum allowable bending capacity of the pipe given in (a) above. (©) Explain how to check the safety of the given pipe if subjected to combined action of axial compression and bending, (Page 2/3) Page (3/3) Alexandria University Faculty of Engineering Sanitary Engineering Dept. Fourth Year (Civil Engineering) Wastewater Engineering (Elective Course) WASTEWATER ENGINEERING Time allowed:3 Hours ce-413 Question 1: a- Define: Yield coefficient(Y), Decay coefficient (Kd). - Parameter (a), Parameter (b) 4G, RO>, i. F/M, 8. b- Draw a conventional activated sludge process and indicate definition of symbols used for steady-state analysis ¢- Develop material balance equation (around aeration tank), to determine return sludge (Xw= zero), d- What is importance of process control? Explain the methods of controlling return activated sludge. Question An activated sludge plant is being considered for treatment of domestic wastewater a 95% of BOD reduction is desired the following values of biokinetic parameters were obtained in laboratory units at 20 °C. 2 = 350 mg/l, S+= 300 mg/l ,Xve=10 mg/l, V= 56000m3, Y=0.5, Kd =0.06d", a= 0.718 , b= 0.085 d?, F/M=0.3, X= 12000 mg/!, SRT= 10d, RT=0.35d Calculate: 1-Xva 2- Weight of BOD removed and oxygen consumed per day 3g 4- Net sludge yield 5- Quy Question 3: Calculate sludge volume for activated sludge pliant with F/M = 0.3, BOD in raw wastewater = 257 mg/l, volume of aeration tanks = 12000 m3, Qr = 5000 m?/day. And SS in raw wastewater = 250 mg/l Question 4: a- Draw conventional trickling filter b- Explain disadvantages of trickling filters, c- Wastewater treatment plant consist of 10 trickling filters , m3/day Check the design criteria (safe or not safe) if BOD in raw wastewater = 300 mg/l and primary sedimentation tanks remove 40% of BOD. If the wastewater plant effluent discharged into drain , according to the Egyptian code the BOD in the effluent must be less than 30 mg/I, is the plant safe according to the code or not?? 0 m d=3m Q= 28000 Question 5: ~ draw sludge digestor. - explain the 3 stages of sludge treatment. -Wastewater treatment plant consist of 4 primary sedimentation tanks with diameter 32 m, depth 3.75 m O.F.R = 32 m'/m*/d , design the modified trickling filter and final sedimentation tanks , if BOD in raw wastewater = 250 gm /m? Hf SS concentration in raw waste water = 300 gm /m* design sludge diges d drying beds. a pation | eee ee ee hy ssh Borne ly Sly 2g ee ey cet mention ¢ 2 ssa Bi ie) ia Uns ois comes Bee aly Days ess Spl see typ) old AAS Sy a MEE ge ig al Se cha ae Hy hgh Vell Sata asa g ah wots 2580 pS cy Le Aa Cay RES NSE Oy!) dik JS cals 1g! (Case) eT pal Ley {BOOT "Sigg! shel Gi jaae (OSH) Be TALL TY BOOT <2 si cle 9 pan Saat) al el ih ga S19 BOOTS ga ls 2 ally shal Ga jl ¥ pal 4631-5) Soph let a oho g yl gy Siete unbalancing "158i a3" 5 AUB define de —*-! "gaps gl Vial Ye lancing "ol me" ( GiB pS Gog Selle SLs ple LAR o set uk T gal 634) Lee Easy penal disatl Yb 5 AER! contra BiB be Sy ctr 4 un: Spat Ayshh ious aby EL Use A LSS BOOT Sige pls A ee PPP 3) P3 as al Sg gh Sy a gH 1) ge 9 BOO S gal ast seit pal on cMar GS! ON Eat A caipthall gh gil gud Je AC tals, cpa gg) th lla GS Ja yy Rea AS ha a! oe Fe! nl Ge i if ugh Tall 338 Gulls... nat ce gk Gls! igh quid Leal chy dw Gadi eal gee LE ue gad Pet | ; nda A Coal Ge tly FAS eS Nd Aa ca Kgs CAS yk tly Ag) ABN Ca py gS) tga Ane BLY ale Bg pts CHD 5 HA anne Abel 18 spot ate eceiaue yaar BHU) gal AGE Y pie gos Cana 9 cagia Ua old £ yet ‘hee poh ab culy Tike gat eth Jat aad Ly JEG cola ETC SER ope Saale AT Geely PTB Sy, esi oa aie Ut asl gly ach (nin goeaoueaepan eyreerscari 2a GSE Ga oh ald Lagi La gi do 1) a Se isi) Way! Bal boot asl asic lb cairns Canes gag at r ENG 9) Clan Byam ght as Gal sige A baile Fat Se Sekt disputes Se JU Gai! Silay Maal 63h tr sip) Sle ad) Puchitration ASS Cijuee t asi 53. ya duct GE psSat properties uaied ¢ asi 1S. AC bi. let gigi CE Aaa he Maal pais Jill Sa oad 8 [Type text] Task ~ [relate | deg gin Bay pall le ga LV Cigale pug poke pS Sa SS AT (Sled Sey Sica egy Lalit Sy pal Neal age FE Cots Ja) atl ad 98 La veya GY gli opie pL Se yee Gb pa YT sell Jil oes ses at uta Jleael ogy he Ga Gite cu GaGa gkt 1 ATs Soa 9 ML cay Aah ag Chelan spelt 8 (als JG BY ab!) Seas ot ABah pas /otbGay! sgh pa ial g und ob gas DLS g} laa Ggae Slain! ppeectll Sy lanay & g ytly Lea eS Spats NL J sah agg Cle aed UU By pal 9-1 GSA ass a ‘ 2 as) ap ata ALN Sob 999 lage ny Seana GaSe fall Maga Le JIS GRBEDE CASE gH Guadind Oy eats Gabba Leagan MEA i Sach Spe AL LS Os Cand) aye aS St UR ts ee ab yg Repel Jl Yo Fabeny tpnipS 19 Seed Gosek yee ts LE jis de lob J han JAS ES an a 1 A js S55 hap ty Sata 9B gall 9 Oa gf gual a il ea lhl sly Aes | ses pa Rat ep pd piston ela shal hag E lg au gh gee gtd ae - tall GL SN set BAG Oe Gael ya agg ll eth gall 9 cba [83h (eh tah ae) ghd Sill CHL aI yt 361 p gy ll gah hae) a ge ll Sh = ate BA Si) Ma SN Gao Libel, Laud git aad peal ee (Saget gee gt) — Leatil CS) po seal J wth a3 Oe gta 9B Saal sla gy a i a GUEST Sh sf igllnal 5 Annan AY 5 Cag Fant Coe Sally Bagh LY (BARE! 9 al pats 5 CMDS) LB ad Aa tacall At At Jue) aS pes 1 PEE yee GEES SEGRE aA Lah alse | SMD 9 oh ast Ll ype text] yor | } J rv \ LpSI galas Gaeta Gass payed) \ at oY yh oh Jae nigy yer eld GLa) [Lz wer yigy Wer Wer | gcytedt plat! T obi pet ISA $ ones pet ISA Boned 4" Year Civil Engineering — 2" Term June , 2015 Alexandria University Faculty of Engineering Structural Engineering Dep. Construction Project Management Final Exam Lime allowed 3 hours Answer the following questions :( No fables are allowed} Question 1 The PERT network data for a small engineering design proj each activity’s expected duration te and variance V. Aetivity | Evenistia) [fe (weeks)| vi | | t Determine the critioul path(s), mean duration, and standard deviation of the project If the owner accepts your schedule for part (a) for the project and will pay you a bonus of $3000 for each week you finish ahead of schedule, what is your estimated chance of clearing @ bonus of $6000? ‘What are the optimistic and pessimistic durations of the project based on $ and 95% percentiles? Given that the pessimistic duration of activity E is 10 weeks, compute its most likely duration. Assuming that the contract calls for completing the project in 25 weeks, what are the probability of meeting this scheduled date and the probability that the projeet will be late? Question 2 ‘You are a planner and of 100 steel frames. The mai ou are responsible for developing a time schedule for a project consists ctivities are shown in the following table. Aeiivity [Barat ad Foundation re framing by Wdays Framing after finishing the fou days | Cladding Starts after staring framing by 8 days i __{ Finishes after finishing the framing by 9days | Decking Starts after st is i ___| Finishes after finishing cladding by | a. Draw the bar chart b. Draw the AON showing all calculations. c. Draw the AOA showing all the calculations, Page 1of 4 Prof, Dr. Hesham Abdelkhalek Question 3 a. Caleulate the actual quantity in eubie meter for the excavation for the following retaining wall, ifthe required soil slope for exeavation is 1:1. Cross section i. oz ml = om i b. For the project betaw, calculate the unit price for activities A, B and amount of activity C afier completing the Recap Sheet. consider 10% sales tax . 10% payroll tax, 1% insurance , 0.5% risk . 8000 EGP site overhead , 5% general Overhead. 15% profit and interest due 10 __bond 2000 EGP, | Activity | Unit | Quantity quipment | Sub-contractor wi | 60 w00 i Fo eee s00@ eae anna SeeeE B M2 | 200 | 1 000 [is pT =a tion 4 You are a manager of a desigivbuild project; some key data on the major sections of work are tabulated below. Assume the activity cost is spread evenly across activity duration, a Seer | Major section of work | Estimated evs ee | G60 EGP) Duration BS | (seeks) (weeks) St Building Mechanieui Electrical 1000 “Architectural 3000 Page 2 of 4 Prof. Or, Hesham Abdelkhalek sore At the end of week 15 the situation is as follows: ~on | vesomplete Cost to date Major section of work | (Quantity) (1000 EGP) Siusural ‘I : A Building Mechanical Electrical hitectural a. Draw the project $-curve (time versus Cumulative curve) for every 5 weeks, the period used for cost status reporting b. Summarize the performance status to date in a table showing the ACWP, BCWP and BCWP, variances and status. ¢. Assuming the present rate of continues, what will be the estimated cost to complete the project? Question 5 1+ Construct the Activity On Node AON network (RDM) for the following activities 2+ Perform a resource allocation to produce the project schedule, if maximum available laborers (Resource 1) in any given period are 8 laborers und maximum availsble equipment (Resource 2) is 3. (Solve for resource | first and find the corresponding resource 2, then solve for resouree 2 first and find the corresponding resource 1}. 3+ Draw the resources profiles for RI and R2 4- Draw the cumulative Cash-out for the project Question 6 Explain briefly o- WBS be Pessimistic, optimistic and most likely times c- Equation for calculating the Standard deviation in two different cases. d+ Central limited theory in PERT analysis fe Project Life cycle & PMP, PMI, AACE Different relationships in AON he Cash flow Page 30f 4 Prof. Dr. Hesharn Abcielkhalek Question 7 Given below are the network data and the time-cost trade-off data for a small maintenance project Predecessor -- ‘Assume the indirect costs are as follow: Page 4 of 4 Prof. Dr. Hesham Abdelkhalek Bost Wishes ( Riajea Durston | ireet Costs ($) 620 Alexandria University Faculty of Engineering Structural Eng, Departnent June 2015 By Sey daly 7 Ae ig NS ye Tele gigs Reinforced Concrete Structures,CE475 4™ Civil ‘Time allowed: Three hours. VLR yg hsy lle pita day : Meat al al lel 20: Gat L Question (1): (35 Marks) Figure (1) shows the ma Sou =25 Nine’, for main steel, f= 360 N/mm and for stirrups, f,= 240 N/mnt? » dimensions of a two-bay north light saw-tooth of frame type. The spacing between frames is 6.0 m, It is required to: = Design the main structural elements of Rafters, Posts, Ties and Columns. ~ Draw using suitable scale a longitudinal section and cross sections of an intermediate saw tooth frame showing the details of the reinforcement of the designed structural elements. (Assume any missing data) Figure (1) Question (2 j: (50 Marks Figure (2) shows a rectangular clevated water tank supported by a system of columns and tie beams, The internal dimensions of the tank are 8.0 x 8.0 x 3.0 meters, and the tank is subjected to wind pressure = 1.2 KN fm? It is required to design and give full detailed drawings (plan and sections using suitable seale) of the tank walls, floor, columns and tie heams (draw only the top 5.00 meters of the supporting structure), Design of wall as a deep beam is not required), pos 200 a Figure (2) - > of a TeV Yt cabal plalh TS 0 gsigy VA Gapadll DV EPS Glan oe cole 1003! : Go peal Jat) g3 cata Seo te snail Spat feta V+) sds pt a gsi pad = tal) LY! a LY) Ga dS SS ge Lah COU tally apes Le Gn Sl sei 3h $e ca uae SH Bailly ek gs tal adh Sah pas lea aly gag ll AY Le apn Cail le a US Goal aye gb Cal aga ge 9S ee all BS pu ghd CAs lg Lh ak tl Sle a aed pee BE sree SY lal GN pub Lal jo slat ll ga Le Hubei) LAA lly jualin gal quays ge UR gy Lad Go US ys alll Cashin iadl IN lb Ls oie oy geal a a SS Ssh UN ait ae La gL! 95 ll Ss spy Ge polish Cgile Asahi MLlay Cebu! CUBY gine cli) - clygatl LaiAY Aleka Liss (5 jlad cline oti Fyeline Lynes jp ps VO Kaus le phen Lt) weSigiMiliiy gid Gli of LLG el 5 ua ji Deal Eye doles Usihag yll Gal Tass dy sal Saad gies ot) Ha SY 9 Se Goll + CUT eae Gedy 5 tod J pay Ashe cl yl de pone oli) eal phate @ lle GAs a ll SF Gaal aka LS (eta A) 228 Sut Seely Bt a peal oye plait Sake y dail GOV! ga Le 451 juan Sh ph Lg Spek I haa old ape phy aga ya Le alla fell G pues eet ISSt yall cage gt LS Ch lee de ane lp lds Gg Sat sa! asst Bil dash tad gle Jpaall aed cena 8) spell pal le Ale aay Spall a DS Quy Cn hinge de gate Oe GSS lp Hiaie Gage «LES aye slay o5 US) iy GUN a he pone oLEL YI dl Bs hy Aad yh Cla aah ga Aalisall ¢ 5 pall Lae Ai file pias sie CLAY) Leleia yy ad Gl bile Yb Aa alae! -1 Ao ay patil ya gle Upuaally £ scl Xyanls dial! (1S FB) abn AS 1 [chase V) small SN peatt OS GIS U8 8 TY Mile le Ghat al Saal! golea gas ob Syl dap Fyne by (1) Ay SSE CHa y Chiat yay egal 6 ji Gye GIS (STO GLa le TAS Veet gale Ca USL! dana hi) Gp a US Sazaal § phil) yh Wl yey he WV Ge ada US Ola V Lae gg I cha ciiglnue V4 Gal Aig yh 6 yh ly 9 by Ral ah ha obs ha NV y Gye a VV sks Geet ke Sate 5 pal an Wb Ve ayer y CHa Ge 9S sph el abd 2 94S ase giel! jal clans Wipeala glel fin 10,4 5 phil EE Gs pie penal 35 ha AO ll jie 110 Ga 73) 5 Up ele 5 ne Aan le VAG ll LN Hal FISH GLYN AIS a pa Ap le YOY Ca Sah YN ge Abe aS ca gilad GLY CLL 6 yo 8 Bosse galan Qg5 JoUSE yi Maal Yl gy Lage ats) A ALAN pet! AR aa =) LMA LE lal gna bagged SE gy ple ape gle Snel lly Gy pad Ie Ge Aad Go yal WV Sansa do geek pL LEM & y pay la Ayu Gayle jh amas ga THY Gd atts) aa ally ss ad ly Sigal ol we coe ale Kamal gh pd iy lS Maly — Kgl As eel 3 AN) Oj oe ta, aa 2015 SL olaist Ayanall Auvaight 1 20) gaa 20 g slay Aaya) AN cia pall Ou 1S 386 GE gat ole Agta Abaae Ay pial gy ul Gala! puna Selly Guy ll Gl gal aa gaily CUE a) Chal detest o Ceipall GRAD LAP pulpal Au I puedo gas Lab Chalecall Quan MIS y Clad) Qa he! Line Stall gh Lely Leth ato ele 3 — 2 pe tll Ga — pf? ha? ie 180 - 120 Nana) ee pall Jats (Bibs 0 - 20 us 05 — a5 721 32 40 -20 parbaual) Geant Jane — ast sagt nie JAG ALE pail age dis 8 ppl Lie oa Ga alle Vise age Guat od Ula US Oy (AN AG Bh yh Guat Ga Gal aug yw Mab Sasty pbs Lani (GY Ste )10000 osef CIS Goo sae paddle! ASHE Ud Bypule Jhb al ae T3100 Seal) a patiy he 30 BA yt (A béLally 2 B50 Syguldl Sjgedlal) Sold AISA) Galeay Quill Gb yc paue DELS Gi ce BAN OY |b boLal STE 2 ASA Sly ppl) BB Lal 8 Joe Ob 460,013 OSD pb heal GU Ny Maal) At Gal GN GS BY Meal GB) call Alaa 5 st tas BF S35 dsb AS 4 sles Lael a5 shal USS huey Jat Le PUI Ay glial) ChaLall gig 83 $591 ipa (p98 15) ct! Baal gel pt US CAG Cans Gand Sy (yas Ht lead) Gadd 500000 Wehaei ud Time (hours) 0h-2h) 2h-th | 4h-8h | 6h-8h an-toh ont ah 46h] 16h 18h|18h-20h}20h-22H] 22h.24h lconsumptionratio! 2] 3 | 8 | to | 12 | 18 | ws } 2] 6 8 OS ype Jane oh RELL 2 hae gle St Janay olla QB etl Jats: atl Gye IYI Gg) Dipiaad Jans age CIS Gala Ga JA pray Ula JS ob gia vans adage Cloke asl 2 150 bul (as 12) io Syed BSA TATORAAT sly yb lel yes Ualgal T G4 O96 ae pe Mains Hae Sia Hla py Legal cal yal pe JA T8 Gee y Ba PN Sh Shs) eS Call £ wtb ape Gal aly Aylin Ata ‘0% - D.T = (6-12) hr — O.F.R = 20-40 m*/m*/day ~ D.T = (2-4) hr- O.F.W 0 m/m/day) Syst weasel ELS eda as QB Cth = Ha) AS ge y Cpa Lage Sau Gileay LE QUBIT YE A pee Mane e+ Aglaatl Aaygitl Gal ga Jala) BOD F559 pte Vee yb anal 1 lg ce 5D ah gal g A ged Sy gh Gal al “0% - D.T = (12-36) hr — O.F.R = 20-40 m3/m2/day — D.T = (2-4) hr- O.F.W. 50 m3/m/day) Rigel A gee 5 jpn Landay Ban Clay Jae BE Cdl =! Mena V2 BOD 555 9 sds fees pease Gna Agiias Maa Jihad Gail IS) pe pA is slp ahead AEN ce tl algal + Bio-filter.¢ si) G+ Anslyul! Bg chads 5 woh cael algal = (O.F.R = 20-40 m*/m'/day — D.T = (2-4) hr- O.F.W =450 m’/miday- O.L.R = 400 — 1100 gm BOD/m’/day - H.L.R = 10-25 m*/m’/day)

You might also like