You are on page 1of 29

CH03_Hickey 11/15/01 2:42 PM Page 3.

24

3.24 Section Three

3.6.9 NEC Section 240.12, System


Coordination or Selectivity

3.6.9

(continued)
CH03_Hickey 11/15/01 2:42 PM Page 3.25

Overcurrent Protection 3.25

3.6.9 (Continued)

3.6.10 NEC Section 240.13, Ground-Fault Protection


of Equipment on Buildings or Remote Structures

3.6.10

3.6.11 NEC Section 240.21, Location Requirements


for Overcurrent Devices and Tap Conductors

3.6.11

(continued)
CH03_Hickey 11/15/01 2:42 PM Page 3.26

3.26 Section Three

3.6.11 (Continued)

(continued)
CH03_Hickey 11/15/01 2:42 PM Page 3.27

Overcurrent Protection 3.27

3.6.11 (Continued)

3.6.12 NEC Section 240.40, Disconnecting


Means for Fuses

3.6.12
CH03_Hickey 11/15/01 2:42 PM Page 3.28

3.28 Section Three

3.6.13 NEC Section 240.50, Plug


Fuses, Fuseholders, and Adapters

3.6.13

3.6.14 NEC Section 240.51, Edison-Base Fuses

3.6.14

3.6.15 NEC Section 240.53, Type S Fuses

3.6.15
CH03_Hickey 11/15/01 2:42 PM Page 3.29

Overcurrent Protection 3.29

3.6.16 NEC Section 240.54, Type S Fuses,


Adapters, and Fuseholders

3.6.16

3.6.17 NEC Section 240.60, Cartridge


Fuses and Fuseholders

3.6.17

3.6.18 NEC Section 240.61, Classification


of Fuses and Fuseholders

3.6.18
CH03_Hickey 11/15/01 2:42 PM Page 3.30

3.30 Section Three

3.6.19 NEC Section 240.86, Series Ratings

3.6.19

3.6.20 NEC Section 240.90, Supervised Industrial


Installations

3.6.20
CH03_Hickey 11/15/01 2:42 PM Page 3.31

Overcurrent Protection 3.31

3.6.21 NEC Section 240.92(B), Transformer


Secondary Conductors of Separately Derived
Systems (Supervised Industrial Installations Only)

3.6.21

3.6.22 NEC Section 240.92(B)(1), Short-Circuit


and Ground-Fault Protection (Supervised
Industrial Installations Only)

3.6.22

3.6.23 NEC Section 240.92(B)(2), Overload


Protection (Supervised Industrial Installations Only)

3.6.23

3.6.24 NEC Section 240.92(C), Outside Feeder


Taps (Supervised Industrial Installations Only)

3.6.24
CH03_Hickey 11/15/01 2:42 PM Page 3.32

3.32 Section Three

3.6.25 NEC Section 240.100, Feeder and Branch-


Circuit Protection over 600 V Nominal

3.6.25

3.6.26 NEC Section 240.100(C),


Conductor Protection

3.6.26

3.7.1 NEC Section 250.2(D), Performance


of Fault-Current Path

3.7.1

3.7.2 NEC Section 250.90, Bonding Requirements


and Short-Circuit Current Rating

3.7.2

3.7.3 NEC Section 250.96(A), Bonding Other


Enclosures and Short-Circuit Current Requirements

3.7.3
CH03_Hickey 11/15/01 2:43 PM Page 3.33

Overcurrent Protection 3.33

3.7.4 NEC Section 250.122, Sizing of


Equipment Grounding Conductors

3.7.4
CH03_Hickey 11/15/01 2:43 PM Page 3.34

3.34 Section Three

3.8.1 NEC Section 310.10, Temperature


Limitation of Conductors

3.8.1

3.9.1 NEC Section 364.11, Protection


at a Busway Reduction

3.9.1

3.10.1 NEC Section 384.16, Panelboard


Overcurrent Protection

3.10.1
CH03_Hickey 11/15/01 2:43 PM Page 3.35

Overcurrent Protection 3.35

3.11.1 NEC Section 430.1, Scope of Motor Article

3.11.1

3.11.2 NEC Section 430.6, Ampacity of Conductors


for Motor Branch Circuits and Feeders

3.11.2

3.11.3 NEC Section 430.8, Marking on Controllers

3.11.3
CH03_Hickey 11/15/01 2:43 PM Page 3.36

3.36 Section Three

3.11.4 NEC Section 430.32, Motor


Overload Protection

3.11.4

3.11.5 NEC Section 430.36, Fuses Used to Provide


Overload and Single-Phasing Protection

3.11.5
CH03_Hickey 11/15/01 2:43 PM Page 3.37

Overcurrent Protection 3.37

3.11.6 NEC Section 430.52, Sizing of Various


Overcurrent Devices for Motor Branch-Circuit
Protection

3.11.6
CH03_Hickey 11/15/01 2:43 PM Page 3.38

3.38 Section Three

3.11.7 NEC Section 430.53, Connecting Several


Motors or Loads on One Branch Circuit

3.11.7

3.11.8 NEC Section 430.71, Motor


Control-Circuit Protection

3.11.8
CH03_Hickey 11/15/01 2:43 PM Page 3.39

Overcurrent Protection 3.39

3.11.9 NEC Section 430.72(A), Motor


Control-Circuit Overcurrent Protection

3.11.9

3.11.10 NEC Section 430.72(B), Motor


Control-Circuit Conductor Protection

3.11.10

(continued)
CH03_Hickey 11/15/01 2:43 PM Page 3.40

3.40 Section Three

3.11.10 (Continued)
CH03_Hickey 11/15/01 2:43 PM Page 3.41

Overcurrent Protection 3.41

3.11.11 NEC Section 430.72(C), Motor


Control-Circuit Transformer Protection

3.11.11
CH03_Hickey 11/15/01 2:43 PM Page 3.42

3.42 Section Three

3.11.12 NEC Section 430.94, Motor


Control-Center Protection

3.11.12

3.11.13 NEC Section 430.109(A)(6), Manual


Motor Controller as a Motor Disconnect

3.11.13

3.12.1 NEC Section 440.5, Marking


Requirements on HVAC Controllers

3.12.1
CH03_Hickey 11/15/01 2:43 PM Page 3.43

Overcurrent Protection 3.43

3.12.2 NEC Section 440.22, Application and


Selection of the Branch-Circuit Protection for
HVAC Equipment

3.12.2

3.13.1 NEC Section 450.3, Protection


Requirements for Transformers

3.13.1

(continued)
CH03_Hickey 11/15/01 2:43 PM Page 3.44

3.44 Section Three

3.13.1 (Continued)
CH03_Hickey 11/15/01 2:43 PM Page 3.45

Overcurrent Protection 3.45

3.13.2 NEC Section 450.3(A), Protection


Requirements for Transformers over 600 V

3.13.2

3.13.3 NEC Section 450.3(B), Protection


Requirements for Transformers 600 V or Less

3.13.3

3.13.4 NEC Section 450.6(A)(3), Tie-Circuit Protection

3.13.4
CH03_Hickey 11/15/01 2:43 PM Page 3.46

3.46 Section Three

3.14.1 NEC Section 455.7, Overcurrent Protection


Requirements for Phase Converters

3.14.1

3.15.1 NEC Section 460.8(B), Overcurrent


Protection of Capacitors

3.15.1

3.16.1 NEC Section 501.6(B), Fuses


for Class 1, Division 2 Locations

3.16.1
CH03_Hickey 11/15/01 2:43 PM Page 3.47

Overcurrent Protection 3.47

3.17.1 NEC Section 517.17, Requirements for


Ground-Fault Protection and Coordination in
Health Care Facilities

3.17.1

3.18.1 NEC Section 520.53(F)(2), Protection


of Portable Switchboards on Stage

3.18.1
CH03_Hickey 11/15/01 2:43 PM Page 3.48

3.48 Section Three

3.19.1 NEC Section 550.6(B), Overcurrent Protection


Requirements for Mobile Homes and Parks

3.19.1

3.20.1 NEC Section 610.14(C), Conductor


Sizes and Protection for Cranes and Hoists

3.20.1

3.21.1 NEC Section 620.62, Selective Coordination


of Overcurrent Protective Devices for Elevators

3.21.1

(continued)
CH03_Hickey 11/15/01 2:43 PM Page 3.49

Overcurrent Protection 3.49

3.21.1 (Continued)

3.22.1 NEC Section 670.3, Industrial Machinery

3.22.1
CH03_Hickey 11/15/01 2:43 PM Page 3.50

3.50 Section Three

3.23.1 NEC Section 700.5, Emergency


Systems: Their Capacity and Rating

3.23.1

3.23.2 NEC Section 700.16, Emergency Illumination

3.23.2
CH03_Hickey 11/15/01 2:43 PM Page 3.51

Overcurrent Protection 3.51

3.23.3 NEC Section 700.25, Emergency System


Overcurrent Protection Requirements (FPN)

3.23.3

3.24.1 NEC Section 705.16, Interconnected


Electric Power Production Sources: Interrupting
and Short-Circuit Current Rating

3.24.1
CH03_Hickey 11/15/01 2:43 PM Page 3.52

3.52 Section Three

3.25.1 NEC Section 725.23, Overcurrent


Protection for Class 1 Circuits

3.25.1

3.26.1 NEC Section 760.23, Requirements for


Non-Power-Limited Fire Alarm Signaling Circuits

3.26.1