NTPC

KORBA

Proposal No:
S.NO.
01.
02.
03.
a.

b.

04.

05.
a..
b.
c.
d.
e.
f.
g.

R&M Phase 3

DESCRIPTION
NAME OF THE PACKAGE:
Renovation and Modernisation of Excitation System Stage II with DVR
SPECIFIC AREA OF THE PROBLEM:
Unit# 4, 5 & 6 provided with BHEL Supplied Excitation system. This
system becomes obsolete. No spare supports are available.
BRIEF DESCRIPTION OF THE PROBLEM:
BHEL supplied Thyrism4 excitation system is used. All system viz Field
Breaker control, PSS cards, control cards etc becomes obsolete.
THE EFFECT OF THE PROBLEM ON PLANT OPERATION AND
PERFORMANCE:
In case of failure of any card unit availability will effect and results in loss
of generation.
REFERENCE TO RLA STUDY REPORTS, TECHNICAL AUDIT
REPORTS, TRIP ANALYSIS COMMITTEE REPORTS,
ENERGY AUDIT REPORTS, KNOWLEDGE TEAM STUDY
REPORTS, ROPR / RMC OBSERVATIONS ETC AS MAY BE
APPLICABLE:
Discussed in knowledge Team meet. CC-OS suggested to retrofit
this system with Digital Voltage Regulator with complete system
replacement.
FEASIBLE ENGINEERING SOLUTION:
Renovation of existing system with DVR. BHEL, ABB, Siemens and GE
has developed such DVR which is operating successfully. In our Korba
station we have BHEL supplied DVR in U#2,3 and 7. in Unit#1 we have
ABB supplied DVR.
EXPLANATION OF PROPOSED SYSTEM CORRECTIONS
THROUGH R&M UNDER ONE OR MORE OF THE FOLLOWING
HEADS AS APPLICABLE:
LIFE EXTENSION OF EQUIPMENT / SYSTEM:
N/A
IMPROVEMENT IN AVAILABILITY:
YES
IMPROVEMENT IN OUTPUT:
Yes
IMPROVEMENT IN RELIABILITY:
YES
OVERCOMING OBSOLESCENCE:
No
IMPROVEMENT IN EFFICIENCY OF OPERATION / HEAT RATE
WITH CONSEQUENT REDUCTION IN COST OF GENERATION:
N/A
REDUCTION IN AUXILIARY POWER CONSUMPTION:
N/A

NTPC

KORBA

h.

i.
06.

07.
08.

09.

10.
11.
12.
13.

R&M Phase 3

RESOURCE CONSERVATIONS W.R.T. CONSUMPTIONS OF


MAKE UP WATER, FUEL OIL, LUBE OIL, RAW WATER,
CHEMICALS ETC. AS APPLICABLE:
N/A
IMPROVEMENT WITH RESPECT TO ENVIRONMENT, SAFETY
AND STATUTORY NORMS:
N/A
ESTIMATED TIME REQUIRED FOR THE EXECUTION.
WHETHER PLANT/UNIT SHUTDOWN REQUIRED FOR
IMPLEMENTATION?
20 days required for replacement and commissioning. this job will be
completed during O/H of units.
IF YES PROPOSED SHUTDOWN DURATION:
20- days per unit as per MTP Overhaul plan.
ESTIMATED COST AND BASIS OF ESTIMATION :
Budgetary offer received from M/s ABB Bangalore Ref:
EAPDSK11RB913/R2 dated 5th December 2012
Total cost Rs 2,04,98,000/-.
COST BENEFIT ANALYSIS WITH PAYBACK CALCULATION AS
APPLICABLE:
With this retrofit, availability of the system will increased.
In view of reduced breakdown, improved reliability and safety involved the
proposal is cost effective.
PROPOSED BROAD BILL OF QUANTITY:
Enclosed
PLAN FOR EXECUTION WITH REFERENCE TO THE SIX-YEAR
ROLLING PLAN (SYROP):
AS PER SITE MTP DRAWN OVERHAUL PLAN
PROPOSED FUND PHASING YEARWISE:
As per enclosed Execution program.
LIST OF SUPPORTING DOCUMENTS ENCLOSED WITH THE
PROPOSAL:
I.
SAMPLE B. O. Q.

NTPC
14.

KORBA
EXECUTION PROGRAMME:

Sl No

Unit/offsite

Equipment No.

Year of
execution

01.

Unit-4

MTP Plan

02.

Unit-5

03.

Unit-6

Retrofit of excitation system


with DVR
Retrofit of excitation system
with DVR
Retrofit of excitation system
with DVR

Total In Rs.

Estimated
Cost (in
Rs. )
Rs 68.33
Lakh
Rs 68.33
Lakh
Rs 68.33
Lakh
205 lakh

ESTIMATE and BOQ.


NAME OF THE PROPOSAL:
Renovation and modernization of Excitation system in ST-2 with DVR
services

10

20
30
40

Details

Budget
Reference

Unit rate

Material Supply for DAVR = Rs 1,84,48,000/10.10


Excitation System
Sr. No. 1 of
47,50,000/Material supply
M/s ABB offer
10.20
Excitation System
Sr. No. 2 of
14,00,000/supply of mandatory M/s ABB offer
spares
10.30
Numerical Relay
Sr. No. 4 of
17,98,000/testing Kit
M/s ABB offer
10.40
Supply of Testing
Sr. No. 5 of
Instrument Like
M/s ABB offer
4,50,000/DMM etc.
10.50
Laptop with DAVR
Sr. No. 6 of
5,50,000/Software
M/s ABB offer
PSS Study = Rs 10,00,000/20.10
PSS Study
Sr. No. 7 of
10,00,000/M/s ABB offer
Erection and commissioning = Rs 9,00,000/30.10
Erection and
Sr. No. 3 of
3,00,000/commissioning
M/s ABB offer
Packaging , Forwarding , Freight & insurance = Rs 1,50,000/40.10
P&F-Freight &
Sr. No. 8 of
1,50,000/insurance
M/s ABB offer

Qty
required
for
Korba

Cost for
Korba

3 set

1,42,50,000/-

1 set

14,00,000/-

1 set

17,98,000/-

1 set

4,50,000/-

1 set

5,50,000/-

1 set

10,00,000/-

3 set

9,00,000/-

1 set

1,50,000/-

Total cost Rs 205 Lakh

R&M Phase 3

NTPC

KORBA

The prices are exclusive of Excise duty and Sales tax, which will be applicable
at the rates prevailing at the time of dispatch.
The current rates considered are...
Excise Duty : 12.36 %
CST against Form C: 2%
Service tax: @ 12.36% (if any)

SAY Rs. 205 lakhs.


NOTE :
I.
II.

ALL TRANSPORTATION, HANDLING, PACKING & FORWARDING, STORAGE AT SITE ETC.


SHALL BE INCLUDED IN THE SCOPE OF CONTRACT / SUPPLY.
TAXES & DUTIES SHALL BE EXTRA AS APPLICABLE.

R&M Phase 3