Professional Documents
Culture Documents
Modified Proposal 45 EM-Excitation System ST-2
Modified Proposal 45 EM-Excitation System ST-2
KORBA
Proposal No:
S.NO.
01.
02.
03.
a.
b.
04.
05.
a..
b.
c.
d.
e.
f.
g.
R&M Phase 3
DESCRIPTION
NAME OF THE PACKAGE:
Renovation and Modernisation of Excitation System Stage II with DVR
SPECIFIC AREA OF THE PROBLEM:
Unit# 4, 5 & 6 provided with BHEL Supplied Excitation system. This
system becomes obsolete. No spare supports are available.
BRIEF DESCRIPTION OF THE PROBLEM:
BHEL supplied Thyrism4 excitation system is used. All system viz Field
Breaker control, PSS cards, control cards etc becomes obsolete.
THE EFFECT OF THE PROBLEM ON PLANT OPERATION AND
PERFORMANCE:
In case of failure of any card unit availability will effect and results in loss
of generation.
REFERENCE TO RLA STUDY REPORTS, TECHNICAL AUDIT
REPORTS, TRIP ANALYSIS COMMITTEE REPORTS,
ENERGY AUDIT REPORTS, KNOWLEDGE TEAM STUDY
REPORTS, ROPR / RMC OBSERVATIONS ETC AS MAY BE
APPLICABLE:
Discussed in knowledge Team meet. CC-OS suggested to retrofit
this system with Digital Voltage Regulator with complete system
replacement.
FEASIBLE ENGINEERING SOLUTION:
Renovation of existing system with DVR. BHEL, ABB, Siemens and GE
has developed such DVR which is operating successfully. In our Korba
station we have BHEL supplied DVR in U#2,3 and 7. in Unit#1 we have
ABB supplied DVR.
EXPLANATION OF PROPOSED SYSTEM CORRECTIONS
THROUGH R&M UNDER ONE OR MORE OF THE FOLLOWING
HEADS AS APPLICABLE:
LIFE EXTENSION OF EQUIPMENT / SYSTEM:
N/A
IMPROVEMENT IN AVAILABILITY:
YES
IMPROVEMENT IN OUTPUT:
Yes
IMPROVEMENT IN RELIABILITY:
YES
OVERCOMING OBSOLESCENCE:
No
IMPROVEMENT IN EFFICIENCY OF OPERATION / HEAT RATE
WITH CONSEQUENT REDUCTION IN COST OF GENERATION:
N/A
REDUCTION IN AUXILIARY POWER CONSUMPTION:
N/A
NTPC
KORBA
h.
i.
06.
07.
08.
09.
10.
11.
12.
13.
R&M Phase 3
NTPC
14.
KORBA
EXECUTION PROGRAMME:
Sl No
Unit/offsite
Equipment No.
Year of
execution
01.
Unit-4
MTP Plan
02.
Unit-5
03.
Unit-6
Total In Rs.
Estimated
Cost (in
Rs. )
Rs 68.33
Lakh
Rs 68.33
Lakh
Rs 68.33
Lakh
205 lakh
10
20
30
40
Details
Budget
Reference
Unit rate
Qty
required
for
Korba
Cost for
Korba
3 set
1,42,50,000/-
1 set
14,00,000/-
1 set
17,98,000/-
1 set
4,50,000/-
1 set
5,50,000/-
1 set
10,00,000/-
3 set
9,00,000/-
1 set
1,50,000/-
R&M Phase 3
NTPC
KORBA
The prices are exclusive of Excise duty and Sales tax, which will be applicable
at the rates prevailing at the time of dispatch.
The current rates considered are...
Excise Duty : 12.36 %
CST against Form C: 2%
Service tax: @ 12.36% (if any)
R&M Phase 3