-------What's New?
Upgrade Installations and Running Workstation Setup
Windows NT and 2000 Setups
Backward Compatibility and Resource/Cost Loading Reports
Backward Compatibility and Project Codes
Database Server Version
InfoMaker Version and Using Expedition with P3
Using Pervasive.SQL 2000 Server Engine
Viewing the Online Documentation
Installing the InfoMaker Dynatext Reader
Btrieve Project Conversion
Miscellaneous
Known Issues, including Upgrades on NT
Contacting Primavera Customer Support
-----------------------------------------------------------------* WHAT'S NEW?
Version 3.1:
Edit Period Performance Data: Change resources' actual and earned quantity
and cost values that are saved when you run Store Period Performance. You
can view the new values in reports, graphics, Resources window, and
Resource/Cost Profile or Table.
All previous P3 3.0 service packs (SP1-SP3) have been incorporated into this rel
ease.
Version 3.0:
Period Performance Data: Store periodic actuals and earned value
per resource assignment to facilitate accurate reporting and
display a resource assignment's true actual cost and quantity spread
and earned value from the start of the resource assignment to the
data date or actual finish.
Automatic Scheduling and Leveling: Have P3 automatically schedule
or level projects whenever you change data that affects calculated
schedule or level dates.
Progress Spotlight and Update Progress: Visually identify which
activities were scheduled in the current update period and
automatically status their progress if they are on schedule.
Customizable Header and Footer: Select the information to include
in the header and footer, including project dates, the bar chart
legend, project titles, and multiple revision boxes and logos.
You can also specify the size, position, and font of each header
and footer section.
Project Codes: Define project codes in the project group and assign
them to member projects so you can organize and filter projects
by project code.
Resource Assignments: Assign the same resource to multiple
activities in one step.
Bar Chart Customization: Customize the appearance of the data
date line, display the new target progress line, and format
individual bars in the Bar chart to get more information at a
glance.
Activity Columns: Display multiple predecessors, successors, cost
accounts, or resources in one column cell. Group data items into
one band for each combination of values.
PERT: Use the new timescaled PERT to arrange activities by
early start or actual start. You can also expand PERT by
inserting rows and columns.
InfoMaker: Use P3's new custom report writer to modify and format
existing P3 reports, or create new reports using your project data
from P3. See "Creating P3 Reports with InfoMaker" in the P3
Reference manual for more details.
Primavera Post Office: Display an Expected Finish constraint
column on the Status Sheet so team members can see when work
is expected to finish. Use the Print command to print the
Status Sheet.
Saving Layouts as Web Pages: To facilitate communicating project
data within a company with offices local or worldwide, you can
create layouts in P3 and save them in HTML format using the
Primavera Web Publishing Wizard and then place them on a central
server--your office network or the Internet.
-----------------------------------------------------------------* UPGRADE INSTALLATIONS AND RUNNING WORKSTATION SETUP
Workstation setup should be run on all the clients after the network
install is upgraded to P3 3.1 to prevent potential registration errors
or Btrieve configuration errors.
-----------------------------------------------------------------* WINDOWS NT & 2000 SETUPS
To install P3 under a Windows NT or 2000 Operating System, a local
Administrator account is required with Change permissions (NTFS drives)
to the default WINNT folder. This allows P3 Setup to write to the Registry
and WINNT folder.
To Run, P3 requires Change permissions to the default WINNT folder and
the P3WORK, PROJECTS and P3OUT folders. P3 also requires Full Control
permissions to the HKEY_LOCAL_MACHINE\SOFTWARE\Btrieve Technologies Key
in the Registry (REGEDT32).
Windows NT, 2000 users should be members of the Power User or Standard User
group with the above permissions. If you attempt to open P3 and you do not
have sufficient permissions, an error message will generate, and P3 will not ope
n.
------------------------------------------------------------------