1.
1.01
1.02
1.03
1.05
1.06
2.
2.01
3.
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.
4.01
5.
5.01
5.02
5.03
5.04
5.05
5.06
5.07
5.08
5.09
5.10
5.11
5.12
5.13
5.14
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.23
5.24
5.25
5.26
6.
6.01
6.02
6.03
7.
7.01
7.02
8.00
8.01
8.02
8.03
8.04
8.05
8.06
8.07
9.00
9.01
9.03
9.04
9.05
9.05
10.00
10.01
10.02
10.04
10.05
10.05
10.06
10.07
10.08
10.10
10.11
10.12
10.13
10.14
11.00
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
13.
Concepto
Carpinteros
Arquitecto
Fabiola (maestra obra)
Muebles
Gastos obra
Pisos
Total
OBRA CIVIL
AMOBLAMIENTO
CAPITULO
MAMPOSTERIA Y MUROS EN DRY - WALL
Muros dobles con aislante acustico en drywall
Muros sencillos en drywall
Refuerzo en madera para muros
Drywall terminado
Muros en superboard
PAETES
Filos y Dilataciones de muros contra drywall
ACABADOS PISOS, MUROS Y MESONES
Piso de granito caravelas antidado igual a la muestra
Alfombra de piso modular importada suministro e instalacion ref Jean color 720
Tapete ref Mobe Pearl color 536 similar a muestra de Brazil
Piso porcelanatto importado similar a la muestra para cocina y data center
Mano de obra instalacion de alfombra
Mesa lounge ejecutivos en madera segun diseo suministrado por daddo castello
Mueble sala de juntas mediana diseo Brazil
Mueble archivo con puertas de corredera piso techo con entrepaos internos acceso cocina diseo Brazil
Mueble archivo con puertas de corredera piso techo con entrepaos internos para workspace Brazil
Mueble sala de reuniones segn diseo Brazil
Mueble en L de 0.75 de altura por 3.55 y por el otro lado de 3.40 con profundadida de 0.60 con entrepao interno
Puerta bao, documentos, salas de juntas, data center, sala de reuniones segn diseo enviado
Cocina con mueble bajo y alto para hornos cajonera y entrepaos internos diseo enviado
Meson en marmol cocina segun muestras enviadas de Brazil
Butacos para isla
Poltronas en tela blanco con apoya brazos diseo suministrado por Dado Castello
Escritorio director
Punto electrico para electroiman, punto para huellero, punto para tarjetero
Puntos de camaras de tv, sensores para alarma y puntos para aire acondicionado
Ducteria para conexiones en salas de juntas
Tomas electricas reguladas suminstro e instalacion
Tomas corrientes doble suministro e instalacion
ILUMINACION
Instalacion de interruptores dobles. Red electrica y alambrado centelsa no. 12
Armada de tacos y tableros
Extractores Cata
Microondas
PRESUPUESTO INICIAL
Costo Total
104,253,667
36,585,336
97,054,600
16,824,420
19,826,000
54,724,000
329,268,022.88
97,054,600
PRESUPUESTO INICIAL
UN
CANT.
V/R UNIT.
M2
ML
ML
ML
249.00
38.00
48.00
38.00
105,000
40,000
7,200
32,000
M2
15.00
120,000
ML
102.00
9,500
M2
M2
M2
M2
M2
ML
34.00
135.00
8.00
18.00
135.00
240.00
800,000
126,000
228,000
95,000
12,000
18,000
ML
16.00
65,000
UN
UN
UN
UN
UN
UN
1.00
1.00
1.00
1.00
1.00
6.00
1,900,000
6,400,000
1,600,000
4,200,000
2,550,000
1,956,360
UN
1.00
2,871,787
M2
UN
1.00
2,175,000
UN
1.00
1,006,880
UN
6.00
590,000
UN
UN
6.00
1.00
896,000
1,580,000
UN
2.00
900,000
UN
UN
1.00
1.00
950,000
2,400,000
UN
UN
UN
UN
UN
UN
UN
UN
1.00
1.00
1.00
1.00
7.00
1.00
1.00
2.00
4,400,000
4,600,000
1,800,000
6,500,000
800,000
4,300,000
6,700,000
150,000
UN
2.00
1,860,000
UN
1.00
4,725,840
UN
4.00
2,880,000
M2
33.00
460,000
GL
1.00
1,600,000
M2
180.00
46,000
GL
GL
UN
1.00
1.00
4.00
680,000
4,900,000
68,000
UN
UN
UN
3.00
13.00
2.00
68,000
68,000
140,000
UN
10.00
68,000
UN
26.00
68,000
UN
GL
15.00
1.00
87,000
380,000
UN
UN
UN
UN
UN
UN
28.00
14.00
45.00
2.00
9.00
12.00
110,000
684,400
69,600
1,218,000
34,800
440,800
UN
8.00
411,200
UN
12.00
127,000
UN
7.00
140,000
UN
7.00
8,000
UN
1.00
139,200
UN
1.00
522,000
UN
2.00
120,000
UN
1.00
570,000
UN
1.00
300,000
UN
1.00
336,400
UN
1.00
189,000
UN
1.00
417,600
M2
75.00
148,000
UN
1.00
74,220
UN
1.00
1,900,000
VJ
UN
VJ
RLL
MES
GBL
GBL
1.00
70.00
5.00
1.00
2.00
1.00
1.00
140,000
300
20,000
115,000
250,000
300,000
300,000
GBL
1.00
100,000
GBL
1.00
250,000
GBL
1.00
18,000,000
GBL
1.00
36,585,336
ACABADOS ESCOGIDOS P
HUGO
FABIOLA
149204600.4
%
60%
40%
40%
80%
50%
70%
54%
Costo Total
121,847,842
41,267,408
218,902,442 97,054,600
19,964,820
19,826,000
71,446,000
371,406,670
PUESTO INICIAL
V/R. PARCIAL
TOTAL
CANT.
V/R UNIT.
V/R. PARCIAL
26,145,000
1,520,000
345,600
1,216,000
249
38
48
38
105,000
40,000
7,200
32,000
26,145,000
1,520,000
345,600
1,216,000
1,800,000
15
120,000
1,800,000
102
9,500
969,000
0
34
135
8
18
135
240
800,000
126,000
228,000
95,000
12,000
18,000
0
27,200,000
17,010,000
1,824,000
1,710,000
1,620,000
4,320,000
16
65,000
1,040,000
16,722,000.00
16,722,000
1,900,000
6,400,000
1,600,000
4,200,000
2,550,000
11,738,160
1
1
1
1
1
1
1,900,000.00
6,400,000.00
1,600,000.00
4,200,000.00
2,550,000.00
11,738,160.00
1,900,000
6,400,000
1,600,000
4,200,000
2,550,000
11,738,160
2,871,787
5,137,930.00
5,137,930
31,026,600
969,000
969,000
27,200,000
17,010,000
1,824,000
1,710,000
1,620,000
4,320,000
1,040,000
54,724,000
0
2,175,000
3,147,799.00
3,147,799
1,006,880
1,579,920.00
1,579,920
3,540,000
3,540,000.00
3,540,000
5,376,000
1,580,000
1
1
5,376,000.00
1,580,000.00
5,376,000
1,580,000
1,800,000
2,586,800.00
5,173,600
950,000
2,400,000
1
1
1,364,999.00
2,400,000.00
1,364,999
2,400,000
4,400,000
4,600,000
1,800,000
6,500,000
5,600,000
4,300,000
6,700,000
300,000
1
1
1
1
1
1
1
1
4,400,000.00
4,600,000.00
1,800,000.00
6,500,000.00
5,600,000.00
4,300,000.00
6,700,000.00
300,000.00
4,400,000
4,600,000
1,800,000
6,500,000
5,600,000
4,300,000
6,700,000
300,000
3,720,000
4,571,999.00
9,143,998
4,725,840
4,725,840.00
4,725,840
11,520,000
4,022,399.00
16,089,596
33
460,000.00
15,180,000
104,253,667
15,180,000
0
1,600,000
16,780,000
8,280,000
1
180
1,600,000.00
1,600,000
46,000.00
8,280,000
680,000.00
4,900,000.00
68,000.00
680,000
4,900,000
272,000
8,280,000
680,000
4,900,000
272,000
1
1
4
204,000
884,000
280,000
3
13
2
68,000.00
68,000.00
140,000.00
204,000
884,000
280,000
680,000
10
68,000.00
680,000
26
68,000.00
1,768,000
1,305,000
380,000
0
15
1
87,000.00
380,000.00
1,305,000
380,000
3,080,000
9,581,600
3,132,000
2,436,000
313,200
5,289,600
28
14
45
2
9
12
110,000.00
684,400.00
69,600.00
1,218,000.00
34,800.00
440,800.00
3,080,000
9,581,600
3,132,000
2,436,000
313,200
5,289,600
3,289,600
411,200.00
3,289,600
12
127,000.00
1,524,000
980,000
140,000.00
980,000
56,000
80,000.00
56,000
139,200
3,999,800.00
3,999,800
1,768,000
1,524,000
9,668,000
30,331,000
522,000
522,000.00
522,000
240,000
120,000.00
240,000
570,000
570,000.00
570,000
300,000
300,000.00
300,000
336,400
1,147,000.00
1,147,000
189,000
189,000.00
189,000
417,600
786,800.00
786,800
11,100,000
11,100,000.00
11,100,000
74,220
74,220.00
74,220
1,900,000
16,824,420
140,000
21,000
100,000
115,000
500,000
300,000
300,000
1.00
70.00
5.00
1.00
2.00
1.00
1.00
140,000.00
300.00
20,000.00
115,000.00
250,000.00
300,000.00
300,000.00
140,000
21,000
100,000
115,000
500,000
300,000
300,000
100,000
1.00
100,000.00
100,000
1.00
250,000.00
250,000
1.00
18,000,000.00
18,000,000
1.00
41,267,407.75
41,267,408
250,000
1,826,000
274,682,687
18,000,000
18,000,000
292,682,687
36,585,336
329,268,023
Anticipos
requeridos para
inciar obra
73,108,705
16,506,963
38,821,840
15,971,856
9,913,000
50,012,200
204,334,564
114,939,842
0
%
60%
40%
40%
80%
50%
70%
55%
31,026,600
969,000
54,724,000
16,722,000
121,847,842
16,780,000
8,280,000
9,668,000
30,331,000
19,964,820
1,826,000
312,139,262
18,000,000
330,139,262
371,406,670
147,030,600
91,410,820
OC
OC
OC
OC
OC
OC
OC
IT
OC
OC
OC
IT/OC
IT
IT/OC
IT
IT
OC
CAR
CAR
CAR
CAR
IT/MOB
IT/MOB
MOB
CAR/MOB
CAR
OC
MOB
OC
CAR
OC
MOB
MOB
MOB
OC
IT
OC
OC
IT
MOB
CAR
IT
IT
OC
OC
OC
OC
IT
OC
IT
OC
OC
IT/OC
IT
OC
OC
OC
IT
IT
OC
CAR
CAR
CAR
CAR
IT/MOB
IT/MOB
MOB
CAR/MOB
IT
IT
CAR
OC
MOB
OC
CAR
OC
MOB
MOB
MOB
OC
IT
OC
CRONOGRAMA ORIGINAL
ACTIVIDAD
CIMBRADA DE MUROS
ADECUACION DE NIVELES PARA TUBERIAS, ACOMETIDAS ELECTRICAS, Y DESAGUES
ESCTRUCTURA Y REFUERZOS DE MUROS Y CIELO RASOS DE DRYWALL
TAPAS DE MUROS
MUROS SUPERBOARD
ENCHAPE DE PISOS HALL DE ACCESO, BAOS, COCINA Y CUARTO TECNICO
ENPASTADA DE MUROS
MONTAJE DE LAMPARAS E INSTALACIONES ELECTRICAS
DILATACIONES DE CIELORASOS
PINTURA PRIMERAS MANOS
MONTAJE DE VIDRIOS Y PUERTA ACCESO
MONTAJE DE ILUMINACION Y REDES DE VOZ Y DATOS
MONTAJE DE APARATOS ELECTRICOS
ARMADA DE TACOS Y TABLEROS
ARMADA DE RACKS ,CUARTO DE SISTEMAS
MONTAJE DE AIRE ACONDICIONADO Y SISTEMA DE VENTILACON
MONTAJE DE LAVAMANOS SANITARIO Y GRIFERIA DE LAVAMANOS Y COCINA
MONTAJE DE COCINA Y CLOSSET DE ASEO BAO
MONTAJE DE CLOSSET DE ARCHIVO
MONTAJE DE PUERTAS
ENCHAPE DE PUERTA DE ACCESO EN MADERA
INSTALACION DE MUEBLES GERENTE Y SALAS DE JUNTAS
INSTALACION DE PUESTOS DE TRABAJO DE WORKSPACE
INSTALACION DE SALAS DE JUNTAS, SALA DE REUNIONES Y PUESTO GERENTE
INSTALACION RECEPCION
INSTALACION DE PAREDES ENCHAPADAS EN MADERA HALL DE RECEPCION
INSTALACION DE ALFOMBRA
ENTREGA DE MOBILIARIO DE SALA DE ESPERA
INSTALACION DE AVISO DE RECEPCION
INSTALACION GUARDAESCOBAS
INSTALACION DE MESON DE MARMOL COCINA
INSTALACION PAPEL DE COLGADURA SALA DE JUNTAS
INSTALACION DE PAPEL DE COLGADURA BAO
INSTALACION DE ELECTRODOMESTICOS PEQUEOS
INSTALACION DE TELEVISORES
INSTALACION DE CONMUTADOR, INTERNET Y LINEAS TELEFONICAS
ASEO FINO
OBRA CIVIL
INTERNET/TELECOMUNICACIONES
MOBILIARIO
CARPINTERIA
CRONOGRAMA ACTUALIZADO
ACTIVIDAD
INSTALACIN DE CANALIZACIN DE RED ELCTRICA Y DE DATOS
CABLEADO PARA ILUMINACIN Y PARA RED EN TECHO
CIMBRADA DE MUROS
ADECUACION DE NIVELES PARA TUBERIAS, ACOMETIDAS ELECTRICAS, Y DESAGUES
ESCTRUCTURA Y REFUERZOS DE MUROS Y CIELO RASOS DE DRYWALL
TAPAS DE MUROS
INSTALACIN DE BAJANTES Y SUBIDAS A MUROS Y CABLEADO ELCTRICO POR PISO
MUROS SUPERBOARD
CABLEADO DE DATOS
ENCHAPE DE PISOS HALL DE ACCESO, BAOS, COCINA Y CUARTO TECNICO
ENPASTADA DE MUROS
INSTALACIN DE ACOMETIDA PRINCIPAL
APERTURA EN CIELO PASOS PARA ILUMINACION
MONTAJE DE LAMPARAS
DILATACIONES DE CIELORASOS
PINTURA PRIMERAS MANOS
MONTAJE DE VIDRIOS Y PUERTA ACCESO
PEINADO DE TABLERO ELCTRICO Y MONTAJE DE RACK
MONTAJE DE AIRE ACONDICIONADO Y SISTEMA DE VENTILACON
MONTAJE DE LAVAMANOS SANITARIO Y GRIFERIA DE LAVAMANOS Y COCINA
MONTAJE DE COCINA Y CLOSSET DE ASEO BAO
MONTAJE DE CLOSSET DE ARCHIVO
MONTAJE DE PUERTAS
ENCHAPE DE PUERTA DE ACCESO EN MADERA
INSTALACION DE MUEBLES GERENTE Y SALAS DE JUNTAS
INSTALACION DE PUESTOS DE TRABAJO DE WORKSPACE
INSTALACION DE SALAS DE JUNTAS, SALA DE REUNIONES Y PUESTO GERENTE
INSTALACION RECEPCION
MONTAJE DE SALIDAS ELCTRICAS Y DE DATOS
PEINADO DE RACK Y CERTIFICACIN DE PUNTOS
INSTALACION DE PAREDES ENCHAPADAS EN MADERA HALL DE RECEPCION
INSTALACION DE ALFOMBRA
ENTREGA DE MOBILIARIO DE SALA DE ESPERA
INSTALACION DE AVISO DE RECEPCION
INSTALACION GUARDAESCOBAS
INSTALACION DE MESON DE MARMOL COCINA
INSTALACION PAPEL DE COLGADURA SALA DE JUNTAS
INSTALACION DE PAPEL DE COLGADURA BAO
INSTALACION DE ELECTRODOMESTICOS PEQUEOS
INSTALACION DE TELEVISORES
INSTALACION DE CONMUTADOR, INTERNET Y LINEAS TELEFONICAS
ASEO FINO
Da
1
2
X
X
3
X
4
X
5
X
6
X
X
7
X
X
8
X
X
X
9
X
X
X
10
11
12
13
14
15
X
X
X
X
X
X
X
X
X
X
X
X
Da
JULIO
10
11
12
13
14
X
X
X
X
X
X
X
X
X
X
X
X
15
16
17
18
X
X
X
X
X
X
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
33
34
X
X
32
X
X
35
36
37
38
X
X
39
40
X
X
41
X
X
42
43
44
45
48
49
50
51
52
53
X
X
47
X
X
X
46
35
X
X
36
37
38
39
40
41
42
43
44
45
X
X
48
49
50
51
52
53
X
X
X
47
X
X
X
46
X
X
X
X
X
X
X
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
X
X
X
X
X
X
X
X
X
X
54
55
X
X
X
X
X
56
57
58
59
60
61
62
63
64
65
66
67
X
X
X
X
68
69
70
X
X