ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 4, 2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ABD SITIO PULO
Project Location: Navotas
Assigned Work Task:
Office
Time in: 8:00 AM
Time out: 5:00 PM

Project Description: Housing:


Community Participatory Project
Field

Others, pls, specify

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny____________
Site Condition:.____Wetland______
PersonalObservation: The storage area of the construction materials needs to be
protected to moisture and water, it should be elevated or at least the community
provide appropriate measure such as a shed to protect it from rain.
Work Activities Performed:
7:00 8:00 Travel time to Sitio Pulo Navotas
8:00 12:00 Purchase and Canvass of the construction materials for the
reinforced concrete bamboo bridge
These are the list of materials purchased:
- Rebars 16 mm, diameter 8 pcs
- Rebars 10 mm, diameter 16 pcs
- Concrete cement box
a. ordinary plywood
b. 2x24 good lumber

c. 2x28 good lumber


- common wire
- 1 kl of 3d common nail
- kl of 1d common nail
- 8 bags of Portland cement
- elf of gravel 1 cubic meter
- elf of sand 1 cubic meter
12:00 3:00 Assess the delivered materials and the storage area of the purchased
materials and conduct meeting with SAMASAISIP leader to commence the initial
stage of construction of the foundation
- Start the initial construction of the foundation of the bamboo bridge.
3:00 5:00 pm Travel Time to office and submission of field report

New Knowledge and Experience you have gained:


- Value of proper coordination with suppliers and contractors
- Value of handling money and decision making
- Value of Assessment in proper handling of material
- Concrete mix of sand, gravel and cement
- fabrication on site of foundations and concrete mixing box

Report/ Drawings Submitted, if any:


- Field report
- Liquidation of the purchased materialss

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 2,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ABD SITIO PULO and SUB URBAN
Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny_____________
Site Condition:.________________
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________

Work Activities Performed:


8:00 12:00 Continue the drawings of bamboo bridge, Revisions on the
structural design of the footing and columns are made especially from the design
of column from a rectangular grid column, the length of the dowels and concrete
cover of the footing
12:00 1:00 BREAKTIME
1:00 5:00

Continue the working drawings of the Sub Urban Project

New Knowledge and Experience you have gained:

Report/ Drawings Submitted, if any:


- Revised plan of the bamboo bridge
- Working drawings of Multipurpose Center

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 3,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ABD SITIO PULO and SUB URBAN
Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal and Navotas
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny_____________
Site Condition:.____Wetland______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
8:00 12:00 PM
Create the 3d model and cad file of the foundations
of the bamboo bridge in sitio pulo navotas
12:00 1:00 PM
BREAKT TIME
1:00 3:00 PM
Continue the working drawings of the suburban
multipurpose center together with additional revisions and additional

working details to be done


3:00 5:00 PM
Create Estimate of materials to be used in the
bamboo bridge in sitio pulo

New Knowledge and Experience you have gained:


- Estimate quantities and get familiarize on construction materials and
language of construction

Report/ Drawings Submitted, if any:


- Estimates of material
- Working drawings of the multipurpose center

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May7,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ADB SITIO PULO NAVOTAS

Project Description:
Housing: Community
Participatory Project

Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal


Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
7:30 9:00

Transportation time from office to sitio pulo

9:00 11:00 Preparation of the metal reinforcement and dowel bars of


the footing
11:00 12:00 Fabrication of the cement mixing box

12:00 1:00 BREAK TIME


1:00 5:00 Preparation of the concrete mixture and pouring of the
concrete mixture to the formwork of the footing

New Knowledge and Experience you have gained:


- Precast concrete column
- Fabrication of concrete mixing box
- Proportion of Mix of Concrete, Cement , Water and Gravel
- Tie of Metal Dowel Bars
- Coordination with co-workers and construction workers

Report/ Drawings Submitted, if any:


- Field Report

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5

Republic of the Philippines


College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May8 ,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SUB URBAN

Project Description:
Housing: Community
Participatory Project

Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal


Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
8:00 12:00 PM
Revised the working drawings of the Multipurpose
Center due to the given columnation of the engineer consultants for the
structural design of the building
12:00 1:00 PM

BREAK TIME

1:00 5:00PM
Continue the working drawings of the multipurpose
center and evacuation area.

New Knowledge and Experience you have gained:


- Develop communication skills to engineer consultants

Report/ Drawings Submitted, if any:


- Architectural Working Drawings of the project

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 9,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SUB URBAN and ADB NAVOTAS Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM

Total no. of hour.s spent: 8

Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________

Work Activities Performed:


8:00 12:00 PM
Meeting with engineer consultant Mr. Harold
Aquino regarding the structural design of the infrastructure project in ADB
Sitio Pulo Navotas, he discuss regarding the preparation and computation
of load for able to design the structurabilty of the said - Computation of
footings, loads and beam
- The application of mathematical engineering in design, and distributary
computation of load
buildings
12:00 1:00 PM

BREAK TIME

1:00 5:00PM
associate with fellow engineering trainees in
preparing the structural design of the infrastructure projects and continue
the working drawings of the multipurpose center in rodriguez rizal

New Knowledge and Experience you have gained:

Report/ Drawings Submitted, if any:


- Architectural Working Drawings of the project

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 10,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SUB URBAN and ADB NAVOTAS Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM
spent: 8

Total no. of hour.s

Weather Condition:.____________Sunny_____________Site
Condition:.__Wetland______
PersonalObservation:
Due to weather conditions, especially the proximity of the area to the
manila bay high tide prevented our transportation to the island. The good thing is
the curing of the foundations are conducted on the nearer area.
Due to the high tide, the cured footings are get wet by the sea water, which
could affect the composition and strength of it. Engr. Harold instructed them to
remove the foundations, and there will be another mixture of concrete to be
poured on the footing so that it will strengthen its strength. And
Work Activities Performed:

7:00 12:00 PM
Monitoring visit on the curing of foundation
footings to be used in the bamboo bridge and clarifications on the design
of the multi-purpose center.
12:00 1:00 PM
1:00 4:00 PM
center

Returen to TAO Office


Continue the working drawings of the multi purpose

These are the monitoring and construction updates of the field activity:
- Due to weather conditions, the TAO and YP TEAM cannot accessible the
sitio pulo proper
- The curing of the foundations failed because the amount of water used in
the mixture is too much for the concrete to achieve its normal strengths.
Signs of too much water is seen on the foundation
- More cans should be bought for the continuation of the bridge, 120
foundations are cured which achieve the equivalent number of
foundations, with targeted length of 150 meters but the cured footings
should be reinforced by another concrete mixture
- Mr Bong Villanueva was instructed by the engineer consulant and archt
Verona to water the foundations to prevent it from cracking. He was also
informed about the process of putting dams in laying the cured
foundations on the wet lands. Target period to finish the bridge is on last
week of may
- the continuation of the precast column should be on right time and low
tide condition so that it is easier to lay over the precast columns
- The layout of the multipurpose center is already approved by the client,
he wants to add additional cubicle toilet inside the center and orientation
of doors should be inside
- The client also sponsor counterparts the Norwegian foundation in the
continuation of the bamboo bridge, the drawings are given to him

New Knowledge and Experience you have gained:

- Effect of sea water to bamboo and concrete


- Dam with the use drums
- Sewage in wetlands in natural way

Report/ Drawings Submitted, if any:


- Drawings of the bamboo bridge
- and working drawings of the multi purpose center

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)

Attachment 5

Republic of the Philippines


College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 11,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SAPSPA HOUSING PROJECT

Project Location: TONDO MANILA


Assigned Work Task:
Office
Field
Time in: 7:00AM
Time out: 5:00 PM
spent: 8

Project Description:
Housing: Community
Participatory Project
Others, pls, specify

Total no. of hour.s

Weather Condition:.____________Sunny_____________Site
Condition:.__Preparation of rebar reinforcement.
PersonalObservation:
The SAPSPA is an association which is a common client of TAO Pilipinas
5 residences are sponsored by tao pilipinas and given each a budget of 100,000
pesos in each benefactor families in the program of disaster resiliency of the TAO
PILIPINAS.
Revisions arises are made by the master carpenter, they were informed
that they should follow the as-built plan but in the way of construction, revisions
are made.
Set backs are not followed by the clients because they want to expand and
add additional space on the house.
Reports of corruption particularly in building permit are reported by the
client

Work Activities Performed:


12:00 5:00 Monitoring of the construction of the ROMANO Residence,
and discussion about the concentration of the budget given by TAO Pilipinas to
them,. Together with meeting with the master carpenter about the construction of
the house
These are the monitoring and construction updates of the field activity:
- The budget 100,000 pesos are concentrated in the ground floor of the
building, the client will find additional counterparts and sponsor to the
continuation of the rest of the house.
- The budget for the grade filling or backfilling of the house will be on the
client, also with the second floor of the house
- The master carpenter did structural revision of the orientation of the
beam due to retrofication of the existing beams of the house. Instead of a
horizontal beam in center it was oriented paralleled to the front of the house and
ideal for the span of the columns
- The orientation of the stairs also changed because the client want to have
bigger space for the living room, also the T&B was pushed to the perimeter of the
setback. The setbacks on the rear are used by the clients.. with this revisions the
orientation of spaces in the second floor also change together with the orientation
of windows and doors

New Knowledge and Experience you have gained:


- Retrofication of existing structural members of the house
- Corruption on the manila city hall regarding building permit
- relation with master carpenter and client

Report/ Drawings Submitted, if any:


- Monitoring report and field report

Pictures Taken if any:


- kindly see the weekly log for pictures

Certified True and Corrected by:


_______________________
(Signature above printed name)

________________________
(Signature above printed name)