Weather Condition:.____________Sunny____________
Site Condition:.____Wetland______
PersonalObservation: The storage area of the construction materials needs to be
protected to moisture and water, it should be elevated or at least the community
provide appropriate measure such as a shed to protect it from rain.
Work Activities Performed:
7:00 8:00 Travel time to Sitio Pulo Navotas
8:00 12:00 Purchase and Canvass of the construction materials for the
reinforced concrete bamboo bridge
These are the list of materials purchased:
- Rebars 16 mm, diameter 8 pcs
- Rebars 10 mm, diameter 16 pcs
- Concrete cement box
a. ordinary plywood
b. 2x24 good lumber
________________________
(Signature above printed name)
Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 2,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ABD SITIO PULO and SUB URBAN
Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM
Weather Condition:.____________Sunny_____________
Site Condition:.________________
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
________________________
(Signature above printed name)
Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 3,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ABD SITIO PULO and SUB URBAN
Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal and Navotas
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM
Weather Condition:.____________Sunny_____________
Site Condition:.____Wetland______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
8:00 12:00 PM
Create the 3d model and cad file of the foundations
of the bamboo bridge in sitio pulo navotas
12:00 1:00 PM
BREAKT TIME
1:00 3:00 PM
Continue the working drawings of the suburban
multipurpose center together with additional revisions and additional
________________________
(Signature above printed name)
Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May7,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: ADB SITIO PULO NAVOTAS
Project Description:
Housing: Community
Participatory Project
Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
7:30 9:00
________________________
(Signature above printed name)
Attachment 5
Project Description:
Housing: Community
Participatory Project
Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
Work Activities Performed:
8:00 12:00 PM
Revised the working drawings of the Multipurpose
Center due to the given columnation of the engineer consultants for the
structural design of the building
12:00 1:00 PM
BREAK TIME
1:00 5:00PM
Continue the working drawings of the multipurpose
center and evacuation area.
________________________
(Signature above printed name)
Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 9,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SUB URBAN and ADB NAVOTAS Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM
Weather Condition:.____________Sunny_____________
Site Condition:.__Mountainous______
PersonalObservation:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
________________________________________________
BREAK TIME
1:00 5:00PM
associate with fellow engineering trainees in
preparing the structural design of the infrastructure projects and continue
the working drawings of the multipurpose center in rodriguez rizal
________________________
(Signature above printed name)
Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: May 10,2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy.
Central DilimanQ.C
Project Title: SUB URBAN and ADB NAVOTAS Project Description:
Housing: Community
Participatory Project
Project Location: Sub-urban Ph. 1 B San Jose Rodriguez Rizal
Assigned Work Task:
Office
Field
Others, pls, specify
Time in: 8:00 AM
Time out: 5:00 PM
spent: 8
Weather Condition:.____________Sunny_____________Site
Condition:.__Wetland______
PersonalObservation:
Due to weather conditions, especially the proximity of the area to the
manila bay high tide prevented our transportation to the island. The good thing is
the curing of the foundations are conducted on the nearer area.
Due to the high tide, the cured footings are get wet by the sea water, which
could affect the composition and strength of it. Engr. Harold instructed them to
remove the foundations, and there will be another mixture of concrete to be
poured on the footing so that it will strengthen its strength. And
Work Activities Performed:
7:00 12:00 PM
Monitoring visit on the curing of foundation
footings to be used in the bamboo bridge and clarifications on the design
of the multi-purpose center.
12:00 1:00 PM
1:00 4:00 PM
center
These are the monitoring and construction updates of the field activity:
- Due to weather conditions, the TAO and YP TEAM cannot accessible the
sitio pulo proper
- The curing of the foundations failed because the amount of water used in
the mixture is too much for the concrete to achieve its normal strengths.
Signs of too much water is seen on the foundation
- More cans should be bought for the continuation of the bridge, 120
foundations are cured which achieve the equivalent number of
foundations, with targeted length of 150 meters but the cured footings
should be reinforced by another concrete mixture
- Mr Bong Villanueva was instructed by the engineer consulant and archt
Verona to water the foundations to prevent it from cracking. He was also
informed about the process of putting dams in laying the cured
foundations on the wet lands. Target period to finish the bridge is on last
week of may
- the continuation of the precast column should be on right time and low
tide condition so that it is easier to lay over the precast columns
- The layout of the multipurpose center is already approved by the client,
he wants to add additional cubicle toilet inside the center and orientation
of doors should be inside
- The client also sponsor counterparts the Norwegian foundation in the
continuation of the bamboo bridge, the drawings are given to him
________________________
(Signature above printed name)
Attachment 5
Project Description:
Housing: Community
Participatory Project
Others, pls, specify
Weather Condition:.____________Sunny_____________Site
Condition:.__Preparation of rebar reinforcement.
PersonalObservation:
The SAPSPA is an association which is a common client of TAO Pilipinas
5 residences are sponsored by tao pilipinas and given each a budget of 100,000
pesos in each benefactor families in the program of disaster resiliency of the TAO
PILIPINAS.
Revisions arises are made by the master carpenter, they were informed
that they should follow the as-built plan but in the way of construction, revisions
are made.
Set backs are not followed by the clients because they want to expand and
add additional space on the house.
Reports of corruption particularly in building permit are reported by the
client
________________________
(Signature above printed name)