MARKET RATES SYSTEM

(MRS)
BI-ANNUAL PERIOD
(1ST February, 2016 TO 31ST July, 2016)

GOVERNMENT OF THE PUNJAB


FINANCE DEPARTMENT
haroon.aro.fd@gmail.com

S.No.
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

TABLE OF CONTENTS
Chapter
Carriage
Loading, Unloading & Stacking
Earthwork (Excavation & Embankment)
Dismantling (Demolition)
Mortar.
Concrete
Brickwork
Stone Masonry
Roofing
Flooring.
Surface Rendering
Wood Work
Painting & Varnishing.
Lining of Canals
Sheet Piling
Protection & Diversion Work
Outlets
Road & Road Structure
Plumbing, Sanitary Installation & Gas Fittings
Surface Drainage.
Sewerage
Sinking of Wells
Tubewell & Water Supply
Electric Installation
Iron Work
Miscellaneous

Page Nos
3 to 23
24 to 26
27 to 33
34 to 38
39 to 40
41 to 50
51 to 56
57 to 59
60 to 65
66 to 70
71 to 74
75 to 84
85 to 90
91 to 92
93 to 94
95 to 104
105 to 106
107 to 111
112 to 117
118 to 119
120 to 124
125 to 127
128 to 139
140 to 152
153 to 158
159 to 162

1. CARRIAGE
Note:

1 The rates are applicable to carriage of material on pacca roads only.


For kacha roads an allowance of 25% extra shall be allowed for 2nd and subsequent mileage (Km) rates. Rate
upto 1st mile (1st Km) is however common to both kacha and pacca roads.

Note:

2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.

Note:

3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the
rate given in the Composite Schedule of Rates.
ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the
Composite Schedule of Rates.
The length measured shall not be the actual length, but the length of the form of consignment as actually
received.

Note:

4 The term 'mile' (Km) whenever used is to mean statute mile (Km).

Note:

5 The rates include loading and unloading of material from the conveyance and stacking as directed.

Note:

6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.
1

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Carriage of 100 Cft. (2.83 cu.m) of all materials like stone


aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)

Chain
"
"
1000 ft.

129.25
23.80
14.80
145.25

1st Km
2nd Km
3rd Km
4th Km
5th Km
6th Km
7th Km
8th Km
9th Km
10th Km
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms

Chap-1 (Carriage)

30M
30M
30M
300 Metre

129.25
23.80
14.80
145.25

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

172.20
79.45
58.95
39.55
36.30
35.55
32.65
32.25
29.85
27.40
19.65
3.25
2.00

Spec.
No.

Remarks

16.1

Add 20% extra for the item "Recouping


of Reserve Stock of stone for Flood
Protection
Work
in
Irrigation
Department".

Page 3

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.
2

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Carriage of 5 tons of all material like coal, stone lime


(unslaked), etc. B.G. Rail fastenings, points and crossing,
Bridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc.
by truck or any other means owned by the contractor.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
1
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
Carriage of 100 maunds of fuel wood by truck
or any other means owned by the contractor:
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile

Spec.
No.
16.1

Chain
"
"
1000 Ft.

129.25
23.80
14.80
145.25

Mile

277.10

"

63.20

Mile

56.60

"

51.05
46.65
42.95
26.30

30M
30M
30M
300M
Km
Km
Km
Km

129.25
23.80
14.80
145.25
172.20
79.45
58.95
39.55

Km

36.30

Km

35.55

Km

32.65

Km

32.25

Km

29.85

Km

27.40

Km
Km
Km

19.65
3.25
2.00

Remarks

Cement carried in containers other


than bags will be paid according to
this item. The word "pipes" covers
G.I,C.I,R.C.C. and P.C.C.

16.1
Chain
"
"
1000 ft

129.25
23.80
14.80
145.25

Mile

277.10

"

63.20

"

56.60

"

51.05

"

46.65

"

42.95

Chap-1 (Carriage)

30 M
30 M
30 M
300 M
Km
Km
Km
Km

129.25
23.80
14.80
145.25
172.20
79.45
58.95
39.55

Km

36.30

Km

35.55

Km

32.65

Km

32.25

Km

29.85

Page 4

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm)
or 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or
any other means owned by the contractor :1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 100 cft. (2.83 cu.m) of all material like stone,
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or
150 cft. (4.25 cu.m) of timber, by means of material trolly.
1st chain (1st 30 m)
2nd chain to 10th chain (2nd 30 m to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th
Km
1st mile
5th
2ndKm
mile
6th
3rd Km
mile
7th Km
8th Km
9th
6th Km
mile
10th
Km and subsequent miles
7th mile
11th Kms to 200Kms
201 Kms to 250 Kms

"

Labour

129.25
23.80
14.80
145.25

Mile

277.10

"

63.20

"

56.60

"

51.05

"

46.65

"

42.95

"

26.30

Mile

Km

27.40

Km

19.65

Spec.
No.

Remarks

26.30

Chain
"
"
1000 Ft

Chain
"
1000 Ft.

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

129.25
23.80
145.25

30 M
30 M
30 M
300 M
Km
Km
Km
Km

129.25
23.80
14.80
145.25
172.20
79.45
58.95
39.55

Km

36.30

Km

35.55

Km

32.65

Km

32.25

Km

29.85

Km

27.40

Km

19.65

227.25

30 M
30 M
300 M
Km
Km
Km
Km

129.25
23.80
145.25
141.20
105.20
53.45
40.65

75.85

Km

35.35

63.95

Km

33.85

42.95

Km
Km
Km

28.25
27.90
25.80

26.30

Km

23.70

Km
Km

18.65
3.25

Chap-1 (Carriage)

ditto

Reduce the rate by 33% in case of


carriage of 1000 Nos. tiles size
12"x6"x1" (300 x 150 x 30 mm).

16.1

Material trolly to be supplied by the


Government and maintained and run
by the contractor.

Page 5

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

251 Kms & susequent Kms


Carriage of 5 tons of all material like coal, stone lime
(unslaked), etc. B.G. Rail fastening, points and crossing,
Bridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by
means of material trolly.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
5th Km
6th Km
3rd
mile and subsequent miles
7th
4th Km
mile
8th Km
9th Km
10th Km
q
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
Carriage of 100 maunds of fuel wood, by means of
material trolly.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent miles
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm),
by means of material trolly.
1st chain (1st 30 m)
2nd chain (2nd 30 m)

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km

Chain
"
0/00 Ft.

Chain
"
1000 Ft

Mile

129.25
23.80
145.25

Remarks

2.00

63.95

30 M
30 M
300 M
Km
Km
Km
Km
Km
Km

129.25
23.80
145.25
141.20
105.20
53.45
40.65
35.35
33.85

51.05

Km

28.25

Km
Km
Km
Km
Km
Km

27.90
25.80
23.70
18.65
3.25
2.00

129.25
23.8
145.25

Spec.
No.

30 M
30 M
300 M
Km
Km
Km
Km

129.25
23.80
145.25
141.20
105.20
53.45
40.65

Km

35.35

Km

33.85

Km

28.25

Km

27.90

Km

25.80

Km

23.70

Km

18.65

16.1

Material trolly to be supplied by the


Government and maintained and run
by the contractor.

ditto

Material trolly to be supplied


by the Government and
maintained and run by the
contractor.

ditto

Material trolly to be supplied by the


Government and maintained and run
by the contractor.

227.25

"

75.85

"

63.95
51.05
46.65
42.95
26.30

Chain
"

129.25
23.80

Chap-1 (Carriage)

30 M
30 M

129.25
23.80

Page 6

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

1000 to 3000 ft. (300 to 900 m)


1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent miles
7th Km
4th mile
8th.
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
9 Carriage of 1000 No. bricks, 9"x4"x3"
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
10 Carriage of 1000 No. tiles 9"x4"x1"
(225x113x38 mm).
1st chain (1st 30 m)
2nd chain (2nd 30 m)

Rate (British System)


Unit of
M /ment
0/00 Ft.

Labour

Composite

145.25

Mile

227.25

"

75.85

"

63.95

Rate (M etric System)


Unit of
M /ment Labour
Composite
300 M
Km
Km
Km
Km

145.25
141.20
105.20
53.45
40.65

Km

35.35

Km

33.85

Km

28.25

Km

27.90

Km

25.80

Km

23.70

Km

18.65

Spec.
No.

Remarks

16.1

51.05
46.65
42.95
26.30
ditto

Chain
"
"
0/00 Ft.

105.90
22.35
12.15
118.92

Mile

227.15

"

51.80

"

47.90

"

41.85

"

38.20

"

35.20

"

21.60

30 M
30 M
30 M
300 M
Km
Km
Km
Km

105.90
22.35
12.15
118.92
141.15
65.00
48.25
32.65

Km

30.65

Km

29.85

Km

26.75

Km

26.40

Km

24.45

Km

22.45

Km

16.00
16.1

Chain
"

63.91
11.76

Chap-1 (Carriage)

30 M
30 M

63.91
11.76

16.1

Page 7

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

3rd to 10th chain (60 to 300 m)


1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
11 Carriage of 1 Cwt. (50 Kg) cement in bags.

Labour

"
0/00 Ft.

7.26
71.84

Mile

137.10

"

31.30

"

27.80

"

25.25

"

23.05

"

21.25

"

13.00

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
30 M
300 M
Km
Km
Km
Km

7.26
71.84
85.20
39.35
29.20
19.55

Km

17.85

Km

17.50

Km

16.15

Km

15.95

Km

14.75

Km

13.60

Km

9.70

Chain
"
"

2.44
0.29
0.14

30 M
30 M
30 M

2.44
0.29
0.14

1000 to 3000 ft. (300 to 900 m)

0/00 Ft.

1.43

300 M

1.43

Km

2.10

Mile

3.40
Km

1.40

"

1.00
Km

0.60

"

0.50
Km

0.35

1st 1000 (300 m) ft.


1000 to 3000 (300 to 900 m) ft.
1st Km
1st mile
2nd Km
2nd mile to 6th mile
3rd Km
7th mile and subsequent miles
4th Km & subsequent Kms
13 Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash

Remarks

ditto

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)

1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile subsequent miles
4th Km and subsequent kilometers.
12 Carriage of 100 Nos. empty cement bags including
bundling.

Spec.
No.

16.1

0/00 Ft.
"

35.63
4.44

Mile

8.35

Mile

1.95

"

3.20

300 M
300 M

35.63
4.44

Km

5.20

Km

4.55

Km

2.15

Km

1.80
ditto

Chap-1 (Carriage)

Previous lead of collection not

Page 8

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Spec.
No.

or brushwood, by boat or road :-

to be deducted from the next


lead of carriage.

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)

Chain
"
"

52.88
23.80
7.26

30 M
30 M
30 M

52.88
23.80
7.26

1000 to 3000 ft. (300 to 900 m)

0/00 Ft.

59.67

300 M

59.67

Km

79.20

Mile

121.90
Km

39.35

"

88.35
Km

29.20

"

73.55
Km

19.55

"

53.65
Km

17.85

"

44.30
Km

17.50

Km

16.15

Km
Km
Km
Km

15.95
14.75
13.60
9.70

Tonne
300 M
"

431.74
104.61

Km

169.40

Km

77.70

Km

51.30

Km

32.05

Km

30.00

Km

28.75

Km

24.70

Km

24.25

1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent
14 Carriage of light machinery weighing upto 3 tonne
upto 1000 ft. (300 metre)
Exceeding 1000 to 5000 ft (300 to 1500metre)
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km

Remarks

35.20
21.60

Ton
0/00 ft.
1000 ft.

431.74
104.61

Mile

272.60

"

49.95

"

47.00

"

37.60

"

37.95

"

29.20

"

20.55

Chap-1 (Carriage)

ditto

Page 9

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

9th Km
10th Km
11th Km & susequent

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km
Km
Km

Exceeding 1000 to 3000 ft. (300 to 900


metre)
1st Km
1st mile
2nd Km
2nd mile and subsequent miles
3rd Km & subsequent
16 Carriage of consignments job.
i)

ii)

Consignment/Mile
"

35.06
24.04

Consignment/
300 M

42.65

Consignment/ Km

35.06
24.04

26.50
16.25

7.75

"
"

5.15

a) Upto 5 Km
b) Above 5 to 13 Km

Each
Consignment
"

52.80
110.45

Each
Consignmen
"

52.80
110.45

Carriage of consignments odd jobs.


a) Donkey load for distance upto 500 feet.
b) Upto 1000 feet.
c) Upto Mile/ 0.8 Km
d) Upto one Mile/ 1.6 Km
e) Upto three Miles/ 4.8 Km
f) Exceeding 3 Miles/ 16 km

Each
Consignment
"
"
"
"
"

10.85
16.45
20.80
26.00
45.95
82.25

Each
Consignmen
"
"
"
"
"

10.85
16.45
20.80
26.00
45.95
82.25

Each
Consignment
"
"

89.85
163.55

Each
Consignment
"
"

89.85
163.55

"
"

66.45
100.75

"
"

66.45
100.75

a) upto 4 Miles/ 6.4 Km


b) Exceeding 4 Miles(6.4 Km) to10 Miles(16 Km)
Camel load for a distance:a) upto 4 Miles/ 6.4 Km.)
b) exceeding 4 to 12 mills (6.4 Km to 19.2 Km)
17 Hire charges of:i)

For consignment weighing 5 to 10


maunds, rate be increased by 25%;
and for consignments weighing 10
to 20 maunds, rate be increased by
100%.

Cooly load for distance:-

iii) Cart load for a distance :-

iv)

16.1

Consigment/
1000 ft.
1000 ft.

Remarks

23.50
18.40
14.80

15 Carriage of small consignments weighing upto 5 maunds


(job rates) :

Upto 1000 ft. (300 metre)

Spec.
No.

truck (10 Ton Capacity)

Per

3000.00

Chap-1 (Carriage)

Per

3000.00

1. This item will be allowed with


prior concurrence of Superintending
Engineer.

Page 10

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

ii)

tractor with trolly

iii) tractor without trolly

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

day
"

4392.00

day
"

1000.00

"

4392.00

"

800.00

18 Carriage of bitumen, tar or other lubricants, in drums:


1st Km
1st mile
2nd Km
2nd mile
3rd & subsequent Km
3rd mile
19 Carriage of Asbestos cement pipes BSS Class 'B" with
comet joint and rubber ring, including loading, unloading
and stacking (rate per 100 Rft. (30 m pipes):i)

3" (75 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km

Remarks

2. The rate includes pay of driver


and cleaner only. The repairs shall
be the responsibility of the owner
and the cost of lubrication, fuel,
loading and unloading shall be paid
by the borrower.
16.1

Per
Ton
"
"

45.45

Per
Tonne
"

28.25
18.90

"

7.30

30 M
30 M
30 M
300 M
Km
Km
Km

5.10
0.95
0.60
5.75
6.80
3.10
2.30

Km

1.55

Km

1.40

Km

1.35

Km

1.25

Km

1.20

Km

1.15

Km

1.05

Km

1.00

30 M

6.70

7.35
11.75

Chain
"
"
0/00 Ft.

5.10
0.95
0.60
5.75

Mile

10.95

"

2.50

"

2.25

"

2.00

"

1.85

"

1.70

"

1.05

11th Km & Susequent


ii)

Spec.
No.

4" (100 mm) i/d pipes:1st chain (1st 30 m)

Chain

6.70

Chap-1 (Carriage)

Page 11

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

2nd chain (2nd 30 m)


3rd to 10th chain (60 to 300 m)

"
"

1.25
0.75

30 M
30 M

1.25
0.75

1000 to 9000 ft. (300 to 900 m)

0/00 Ft.

7.50

300 M

7.50

Km

8.90

Mile

14.35
Km

4.05

"

3.25
Km

3.00

"

2.95
Km

2.00

"

2.65
Km

1.85

"

2.40
Km

1.75

"

2.20
Km

1.65

"

1.35
Km
Km
Km
Km

1.60
1.50
1.35
1.30

30 M
30 M
30 M
300 M
Km
Km
Km

10.05
1.85
1.15
11.25
13.35
6.15
4.55

Km

3.05

Km

2.80

Km

2.75

Km

2.50

Km

2.40

Km

2.30

Km
Km

2.10
1.75

1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent Km

Spec.
No.

Remarks

iii) 6" (150 mm) i/d pipes:-

iv)

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 9000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Km
8" (200 mm) i/d pipes:

Chain
"
"
0/00 Ft.

10.05
1.85
1.15
11.25

Mile

21.50

"

4.90

"

4.40

"

3.95

"

3.60

"

3.35

"

2.05

Chap-1 (Carriage)

Page 12

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Km
v)

vi)

10" (250 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

Labour

Chain
"
"
0/00 Ft.

16.95
3.10
1.95
19.05

Mile

36.35

"

8.30

"

7.45

"

6.70

"

6.10

"

5.65

"

3.45

Chain
"
"
0/00 Ft.

22.8
4.20
2.60
25.60

Mile

48.85

"

11.15

"

10.00

Mile

9.00

"

8.25

"

7.55

"

4.65

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
30 M
30 M
30 M
300 M
Km
Km
Km

16.95
3.10
1.95
19.05
22.60
10.65
7.85

Km

5.25

Km

4.80

Km

4.70

Km

4.30

Km

4.15

Km

3.75

Km
Km

2.45
1.70

30 M
30 M
30 M
300 M
Km
Km
Km

22.8
4.20
2.60
25.60
30.35
13.90
10.30

Km

6.85

Km

6.30

Km

6.15

Km

5.90

Km

5.80

Km

5.40

Km
Km

4.95
3.50

Spec.
No.

Remarks

12" (300 mm) i/d pipes:

Chap-1 (Carriage)

Page 13

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th Km & subsequent Kms
vii) 16" (400 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
viii) 18" (450 mm) i/d pipes:-

Labour

Chain
"
"
0/00 Ft.

29.65
5.45
3.40
33.30

Mile

63.55

"

14.50

"

13.00

"

11.70

"

10.70

"

9.85

"

6.05

Chain
"
"
0/00 Ft.

48.60
8.95
5.55
54.60

Mile

104.15

"

23.75

"

21.30

"

19.20

"

17.55

"

16.15

"

9.90

Composite

Chap-1 (Carriage)

Rate (M etric System)


Unit of
M /ment Labour
Composite
30 M
30 M
30 M
300 M
Km
Km
Km
Km

29.65
5.45
3.40
33.30
39.50
19.10
13.75
8.95

Km

8.20

Km

8.00

Km

7.35

Km

7.25

Km

6.70

Km

6.15

Km

4.50

30 M
30 M
30 M
300 M
Km
Km
Km

48.60
8.95
5.55
54.60
64.70
30.10
22.10

Km

14.85

Km

13.65

Km

13.35

Km

12.25

Km

12.10

Km

11.20

Km
Km

10.30
7.40

Spec.
No.

Remarks

Page 14

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
ix)

20" (500 mm) i/d pipes:-

x)

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
24" (600 mm) i/d pipes:-

Labour

Chain
"
"
0/00 Ft.

62.45
11.50
7.15
70.20

Mile

133.85

"

30.50

"

27.35

"

24.65

"

22.55

"

20.75

"

12.70

Chain
"
"
0/00 Ft.

66.30
12.20
7.60
74.50

Mile

142.10

"

32.40

"

29.05

"

26.15

"

23.95

"

22.00

"

13.50

Composite

Chap-1 (Carriage)

Rate (M etric System)


Unit of
M /ment Labour
Composite
30 M
30 M
30 M
300 M
Km
Km
Km

62.45
11.50
7.15
70.20
83.20
38.40
28.45

Km

19.10

Km

17.55

Km

17.20

Km

15.80

Km

15.60

Km

14.45

Km
Km

13.25
9.45

30 M
30 M
30 M
300 M
Km
Km
Km

66.30
12.20
7.60
74.50
88.30
40.75
30.20

Km

20.30

Km

18.60

Km

18.25

Km

16.75

Km

16.50

Km

15.30

Km
Km

14.05
10.20

Spec.
No.

Remarks

Page 15

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 5000 ft. (300 to 1500 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
20 Carriage of PVC pipes B.S.S. Class 'B' including loading,
unloading and stacking (Rate per 1000 ft.) (300 metre) :i)

Labour

Chain
"
"
0/00 Ft.

73.45
13.50
8.40
82.55

Mile

157.45

"

35.90

"

32.15

Mile

29.00

"

26.50

"

24.40

"

14.95

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
30 M
30 M
30 M
300 M
Km
Km
Km

73.45
13.50
8.40
82.55
97.85
45.10
33.45

Km

22.95

Km

20.55

Km

20.15

Km

18.50

Km

18.25

Km

16.90

Km
Km

15.55
11.10

30 M
30 M
30 M
300 M
Km
Km
Km

10.00
1.85
1.15
11.25
13.35
6.15
4.55

Km

3.05

Km

2.80

Km.

2.75

Km

2.50

Km

2.45

Km

2.25

Spec.
No.

Remarks

3" (75 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles

Chain
"
"
0/00 Ft.

10.00
1.85
1.15
11.25

Mile

21.45

"

4.90

"

4.40

"

3.95

Mile

3.60

"

3.30

"

2.05

Chap-1 (Carriage)

Page 16

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

ii)

Labour

Composite

10th Km
11th Km & subsequent Kms
4" (100 mm) i/d pipes:-

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
iii) 5" (125 mm) i/d pipes:-

Chain
"
"
0/00 Ft.

15.40
2.85
1.75
17.30

Mile

33.05

"

7.55

"

6.75

"

6.10

"

5.55

"

5.10

"

3.15

1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km

Chain
"
"
0/00 Ft.

21.05
3.85
2.40
23.65

Mile

45.05

"

10.30

"

9.20

Mile

8.30

"

7.60

"

7.00

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km
Km

2.10
1.70

30 M
30 M
30 M
300 M
Km
Km
Km

15.40
2.85
1.75
17.30
20.55
9.65
7.05

Km

4.65

Km

4.25

Km

4.15

Km

3.80

Km

3.75

Km

3.45

Km
Km

3.20
2.70

30 M
"
"
300 M
Km
"
"

21.05
3.85
2.40
23.65
28.00
13.05
9.75

"

6.60

Km.

5.85

"

5.70

"

5.25

Spec.
No.

Remarks

5.20
4.80

Chap-1 (Carriage)

Page 17

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

7th mile and subsequent miles


10th Km
11th Km & subsequent Kms
iv)

Labour

Composite

Spec.
No.

Remarks

4.30
4.40
3.20

6" (150 mm) i/d pipes:


1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 300 m)
1st Km.
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

v)

"

Rate (M etric System)


Unit of
M /ment Labour
Composite

Chain
"
"
0/00 Ft.

29.00
5.35
3.30
32.55

Mile

62.15

"

14.15

"

12.70

"

11.45

"

10.45

"

9.65

"

5.90

30 M
30 M
30 M
300 M
Km.
Km.
Km.

29.00
5.35
3.30
32.55
38.60
17.80
13.20

Km.

8.85

Km.

8.15

Km.

8.00

Km.

7.35

Km.

7.25

Km.

6.70

Km.
Km.

6.15
4.40

30 M
30 M
30 M
300 M
Km
Km
Km

50.85
9.35
5.80
57.10
67.70
31.25
23.20

Km

15.55

Km

14.30

Km

14.00

Km

12.85

Km

12.65

8" (200 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile

Chain
"
"
0/00 Ft.

50.85
9.35
5.80
57.10

Mile

108.95

"

24.85

Mile

22.25

"

20.05

"

18.35

"

16.90

Chap-1 (Carriage)

Page 18

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

vi)

9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
10" (250 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

"

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km

11.75

Km
Km

10.75
7.70

30 M
30 M
30 M
300 M
Km
Km
Km

78.80
14.50
9.00
88.60
105.00
48.45
35.95

Km

24.15

Km

22.10

Km

21.65

Km

19.90

Km

19.65

Km

18.20

Km
Km

16.70
12.05

30 M
30 M
30 M
300 M
Km
Km
Km

110.95
20.45
12.70
124.70
147.80
68.20
50.60

Km

33.95

Km

31.15

Km

30.55

Km

28.05

Km

27.65

Spec.
No.

Remarks

10.35

Chain
"
"
0/00 Ft.

78.80
14.50
9.00
88.60

Mile

168.95

"

38.55

"

34.50

"

31.10

"

28.45

"

26.20

"

16.05

vii) 12" (300 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile

Chain
"
"
0/00 Ft.

110.95
20.45
12.70
124.70

Mile

237.85

Mile

54.25

"

48.60

"

43.80

"

40.05

"

36.85

Chap-1 (Carriage)

Page 19

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

"

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km

25.65

Km
Km

23.50
16.90

30 M
30 M
30 M
300 M
Km
Km
Km

144.45
26.60
16.55
162.30
192.40
88.75
65.85

Km

44.20

Km

40.55

Km

39.70

Km

36.45

Km

36.00

Km

33.35

Km
Km

30.65
22.10

30 M
30 M
30 M
300 M
Km
Km
Km

7.30
1.35
0.85
8.20
9.75
4.50
3.35

Km

2.25

Km

2.05

Km

2.00

Km

1.85

Spec.
No.

Remarks

22.60

viii) 14" (350 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

Chain
"
"
0/00 Ft.

144.45
26.60
16.55
162.30

Mile

309.60

"

70.60

"

63.25

Mile

57.00

"

52.15

"

48.00

"

29.40

21 Carriage of PVC pipes B.S.S. Class 'D' including loading,


unloading and stacking (Rates per 1000 ft.):i)

2" (50 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km

Chain
"
"
0/00 Ft.

7.30
1.35
0.85
8.20

Mile

15.70

"

3.60

"

3.20

"

2.90

Chap-1 (Carriage)

Page 20

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10Km
11th Km & subsequent Kms
ii)

Labour

"

2.65

"

2.45

"

1.50

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite
Km

1.80

Km

1.70

Km
Km

1.55
1.15

30 M
30 M
30 M
300 M
Km
Km
Km

11.40
2.10
1.30
12.80
15.15
7.05
5.20

Km

3.50

Km

3.25

Km

3.20

Km

2.90

Km

2.70

Km

2.55

Km
Km

2.35
1.75

30 M
30 M
30 M
300 M
Km
Km
Km

15.75
2.90
1.80
17.70
21.00
9.70
7.20

Km

4.85

Km

4.45

Km

4.35

Km

4.00

Spec.
No.

Remarks

2" (63 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10Km
11th Km & subsequent Kms

Chain
"
"
0/00 Ft.

11.40
2.10
1.30
12.80

Mile

24.40

"

5.55

"

5.00

"

4.50

"

4.10

"

3.80

"

2.30

iii) 3" (75 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile

Chain
"
"
0/00 Ft.

15.75
2.90
1.80
17.70

Mile

33.80

"

7.70

"

6.90

"

6.25

Mile

5.70

Chap-1 (Carriage)

Page 21

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
iv)

"

5.25

"

3.20

Composite

Km

3.95

Km

3.55

Km
Km

3.25
2.45

30 M
30 M
30 M
300 M
Km
Km
Km

26.10
4.80
3.00
29.35
34.75
16.05
11.90

Km

8.00

Km

7.35

Km

7.20

Km

6.65

Km

6.45

Km

6.00

Km
Km

5.45
4.05

30 M
30 M
30 M
300 M
Km
Km
Km

39.00
7.20
4.45
43.85
51.95
24.00
17.75

Km

11.95

Km

10.95

Km

10.75

Km

9.85

Spec.
No.

Remarks

4" (100 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms

v)

Labour

Rate (M etric System)


Unit of
M /ment Labour
Composite

Chain
"
"
0/00 Ft.

26.10
4.80
3.00
29.35

Mile

55.95

"

12.75

"

11.45

"

10.30

"

9.40

"

8.65

"

5.30

5" (125 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km

Chain
"
"
0/00 Ft.

39.00
7.20
4.45
43.85

Mile

83.60

"

19.05

"

17.10

"

15.40

Chap-1 (Carriage)

Page 22

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
vi)

"

Labour

Composite

Spec.
No.

Remarks

14.10
12.95
7.95

Km

9.75

Km

9.00

Km
Km

8.15
6.05
56.20
10.35
6.45
63.15
74.90
34.55
25.60

6" (150 mm) i/d pipes:1st chain (1st 30 m)


2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd mile
Km
1st

Chain
"
"
0/00 Ft.

56.20
10.35
6.45
63.15

Mile

120.50

30 M
30 M
30 M
300 M
Km
Km
Km

27.45

Km

17.20

24.60

Km

15.75

22.20

Km

15.45

20.30

Km

14.20

18.65

Km

14.00

11.45

Km

13.00

Km
Km

11.90
8.65

Each
No
"
"
Each
No/Km

158.20
286.40
386.70
460.15

Each
No.
"
"
Each
No/Km

91.80
152.05
200.55
240.70

4th
2ndKm
mile
5th
Km
3rd mile
6th
4th Km
mile
7th
5th Km
mile
8th
6th Km
mile
9th mile
Km and subsequent miles
7th
10th Km
11th Km & subsequent Kms
22 Hand shunting loaded Railway wagons or
trucks:a)
b)
c)
d)
e)

Rate (M etric System)


Unit of
M /ment Labour
Composite

upto mile / Km
upto mile / Km
upto mile / Km
upto 1 (1.6 Km) mile
2nd mile and subsequent miles/
2nd and subsequent kilometres

Each
No
"
"
Each
No/Mile

253.15
458.25
618.70
736.20
422.15

263.85

23 Hand shunting empty Railway wagons or trucks.


a)
b)
c)
d)
e)

upto mile / Km
upto mile / Km
upto mile / Km
upto 1 mile / 1 Km
2nd mile and subsequent miles/
2nd and subsequent kilometres

Each
No.
"
"
Each
No/Mile

146.85
243.30
320.85
385.10
207.25

Chap-1 (Carriage)

129.55

Page 23

2. LOADING, UNLOADING & STACKING


1

The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Loading or unloading into or from Railway wagons, lead

Labour

Rate (Metric System)

Composite

Unit

Labour

100 Cft.

496.30

cu.m

175.30

1000 Nos.

620.40

1000 Nos.

620.40

ditto

496.30

ditto

496.30

Spec.
No.

Remarks

Composite

within one chain, (30m) shingle, sand, ballast, surkhi, ashes,

kankar, brick bats, coal, lime or 1,000 Nos. tiles size


12"x6"x2" (300x150x50 mm) or 9"x4"x1"
(225x113x37mm) properly laid & stacked.

Loading or unloading bricks into or from Railway wagons


laid and stacked, lead within one chain:a)

Bricks 10" (250 mm) size.

b)

Bricks 9" (225 mm) or smaller size.

Loading or unloading into or from Railway wagons cement


in bags (from inside or outside the godown) and stacking
within one chain (30 m)

100 Bags

620.40

100 Bags

620.40

Loading or unloading into or from Railway wagons empty


cement bags (from inside or outside the godown) and
stacking.

100 Nos.

59.55

100 Nos.

59.55

Loading or unloading into or from Railway wagons (from


inside or outside the godown) and stacking, white lime in
bags.

100 Mds.

372.25

100 Kg

9.95

Loading or unloading into or from Railway wagons


Structural Steel, R.S. joists, broad, narrow or meter gauge
rail and rail fastenings, etc.

Per
Tonne

297.80

Per
Tonne

293.10

Loading or unloading 45 gallon (204.57 Litres) drums full


into or from Railway wagons, lead upto one chain.

Each

37.20

Each

37.20

Loading or unloading packages of all sorts, upto one Cwt


(50 Kg).
Loading or unloading sleepers other than wooden,
including stacking lead within one chain:-

Each

18.60

Each

18.60

a)

Broad gauge sleepers

100 Nos.

1240.80

100 Nos.

1240.80

b)

Metre gauge and narrow gauge sleepers.

ditto

620.40

ditto

620.40

10 Loading or unloading timber logs or timber for shuttering,

Per

155.1

Per

152.65

Chap-2 (Loading/Unloading)

Except cement in jute or


paper bags.

Page 24

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

into or from Railway wagons of any gauge, including


stacking lead within one chain (30 m)

Labour

Rate (Metric System)

Composite

Unit

Ton

Labour

Spec.
No.

Remarks

Composite

Tonne

11 Loading or unloading bhoosa in Railway wagons lead upto


150 ft. (45 m)

100 Mds.

1488.95

100 Kg

39.9

12 Loading or unloading timber scrap or wooden plugs, into or


from Railway wagons, and stacking within one chain lead.

Per
Ton

248.15

Per
Tonne

244.25

13 Loading or unloading pitching stone or spawl from Railway


wagons of any gauge (including clearing 5 ft. (1500 mm)
away from the rail).

100 Cft.

183.65

cu.m

64.85

14 Loading or unloading building stone (including clearing 5 ft.


(1.5 m) away from rails).

100 Cft.

238.25

cu.m

84.15

15 Unloading oil, bitumen tar, etc.


a)

Crude oil (to be pumped from tank wagon into tank).

1000
Gallon

620.40

100
litres

13.65

b)

Crude oil (drained by gravity).

1000
Gallon

620.40

100
litres

13.65

c)

Crude oil materials from railway wagons.

100 Cft.

79.40

cu.m

28.05

d)

Fuel oil from tank into empty drums, including


stacking within one chain (30 m).

Per
Ton

220.60

Per
Tonne

217.10

e)

Petrol (2 gallon tin)

100 Nos.

312.70

100 Nos.

312.70

100 Nos.

620.40

100 Nos.

620.40

100 Cft.

248.15

cu.m

87.65

f)
Kerosene oil (4 gallon tin)
16 Removing and stacking within one chain
(30 m) lead:
a)

Stone, spawl, brick bats, shingle, sand, lime,


surkhi, ashes, kankar and coat, etc.

b)

Bricks.

1000 Nos.

661.75

1000 Nos.

661.75

c)

Broad gauge wooden sleepers.

100 Nos.

397.05

100 Nos.

397.05

d)

Metre gauge or narrow gauge wooden sleepers.

100 Nos.

236.35

100 Nos.

236.35

e)

Rails girders, pipes, cement etc.

Per
Ton

110.30

Per
Tonne

108.55

Chap-2 (Loading/Unloading)

The rate includes checking


and weighing the tins.

Page 25

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

f)

Bridge and crossing timbers, etc.

Labour

Rate (Metric System)

Composite

Unit

Labour

100 No.

1323.50

100 No.

1323.50

17 Loading into wagons girders, rails, permanent way


material (except wooden sleepers) iron work, M.S. bars,
pipes, etc. including lead one chain (30 M) and stacking
inside wagons.

Per
Ton

248.15

Per
Tonne

244.25

18 Unloading from wagons girders, rails, permanent way


material (except wooden sleepers) iron work, M.S. bars,
pipes, etc. lead upto one chain (30 m) but excluding
stacking.

Per
Ton

141.80

Per
Tonne

139.55

19 Loading into wagons wooden broad gauge sleepers,


including one chain (30 m) lead and stacking,.

100 Nos.

992.65

100 Nos.

992.65

20 Unloading wooden broad gauge sleepers from wagons,


including one chain (30 m) lead and stacking.

100 Nos.

472.70

100 Nos.

472.70

21 Loading metre gauge or narrow gauge wooden sleepers,


including one chain (30 m) lead and stacking inside
wagons.

100 Nos.

496.30

100 Nos.

496.30

22 Unloading metre gauge or narrow gauge wooden sleepers,


including one chain (30 m) lead but excluding stacking.

100 Nos.

261.20

100 Nos.

261.20

23 Loading bridge and crossing timbers, including one chain


(30 m) lead and stacking.
24 Unloading bridge and crossing timbers, including one
chain (30 m) lead but excluding stacking.

100 Nos.

1985.30

100 Nos.

1985.30

100 Nos.

992.65

100 Nos.

992.65

Per
Ton

148.90

Per
Tonne

146.55

25 Loading or unloading bitumen, asphalt or tar in drums, into


or from railway wagons, lead upto one chain (30 m).

Chap-2 (Loading/Unloading)

Spec.
No.

Remarks

Composite

Page 26

3. EARTHWORK (EXCAVATION & EMBANKMENT)


1

Special allowances for the hardness, wetness and slush:The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of such
allowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and of
which dry bulk density is not less than 1.5, will be treated as hard.

Deduction for shrinkage from bank measurements:The following allowances should be provided for material which is not rammed, or equally consolidated:a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%
b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%
Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Earthwork excavation undressed lead upto a single throw


of Kassi, phaorah or shovel:a)
b)

In ashes, sand, soft soil or silt clearance.


In ordinary soil.

1000 Cft.
1000 Cft.

1,861.20
2,233.45

---

cu.m
cu.m

65.75
78.90

---

1000 Cft.

2,729.75

--

cu.m

96.40

--

Earthwork excavation in ashes, sand and soft soil or silt


clearance, undressed lead upto 50 ft (15 metre).

Bed clearance and dressing slopes of drains to required


sections including the removal of weeds, roots, etc.
disposal of excavated materials within 50 ft. (15 metre) lead.
a) Excavated material undressed.
b) Excavated material dressed in the specified manner.

1000 Cft.
1000 Cft.

3,474.25
3,750.10

---

cu.m
cu.m

122.70
132.45

---

Borrowpit excavation undressed lead upto 100 ft (30 metre).


a) Ordinary soil
b) Hard soil

1000 Cft.
1000 Cft.

3,474.25
4,268.35

---

cu.m
cu.m

122.70
150.75

---

6
7

Earthowrk in ordinary soil for embankments lead upto 100


ft. (30 m), including ploughing and mixing with blade grade
or disc harrow or other suitable equipment, and
compaction by mechanical means at optimum moisture
content and dressing to designed section, complete in all
respects:i)
95% to 100% maximum modified AASHO dry density.
ii) 90% maximum modified AASHO dry density.
iii) 85% maximum modified AASHO dry density.
Regular excavation dressed.

Remarks

171 to 17.5

Spec.
No.

ditto

ditto

* 411-1 to
411-13 and
301-1 &
202-3

1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.

3,784.60
3,784.60
3,784.60
2,552.05

4,376.85
4,285.55
4,194.25
--

Earthwork excavation in open cutting upto 5'-0" (1.5 m)


depth for storm water channels, drains, sullage drains in
open areas, roads, streets, lanes, including under pinning of
walls and shoring to protect existing works, shuttering and
timbering the trenches, dressed to designed level and
dimensions, trimming, removal of surface water from

cu.m
cu.m
cu.m
cu.m

133.65
133.65
133.65
90.15

The rate is applicable where the earth


of the bed to be removed is of the
type of ordinary soil. When it is silt or
1 or 2 above, whichever is applicable.
the drains of each category.

The rate includes hire charges of


machinery, cost of fuel, lubricants, pay

of driver and cleaner. The rate also


includes clearing and grubbing
where necessary.

154.60
151.35
148.15
--

* 411-2
17.1 to
17.5

Chap-3 (Earthwork)

Page 27

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

trenches, back filling and surplus excavated material


disposed of and dressed within 50 ft. (15 m) lead:i)
ordinary
ii) hard
iii) very hard
iv) gravel & shingle
8

Rate (British System)


Unit of
M /ment

Earthwork excavation in open cutting 5.01 ft. (1.5 m) to


10.0 ft. (3.0 mm) depth for storm water channels, drains,
sullage drains in open areas, roads, streets, lanes, including
under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed
level and dimensions, trimming, removal of surface water
from trenches, back filling and surplus excavated material
disposed of and dressed within 100 ft. (30 m) lead:i)
ordinary
ii) hard
iii) very hard
iv) gravel & shingle
Excavation in shingle or gravel formation and rock, not
requiring blasting, undressed lead upto 100 ft (30 m).
i)
Dry
ii) Wet
iii) In flowing water

1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.

Labour

4,337.00
5,131.10
5,974.85
10,049.95

Composite

4,414.25
5,208.40
6,052.15
10,127.25

Rate (M etric System)


Unit of
M /ment Labour
Composite

cu.m
cu.m
cu.m
cu.m

153.20
181.25
211.05
354.95

12 a)

ditto

1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.

4,720.30
5,514.45
6,358.20
10,929.60

4,874.05
5,668.15
6,511.90
11,083.30

cu.m
cu.m
cu.m
cu.m

166.70
194.75
224.55
386.05

172.15
200.20
230.00
391.45
17.1 to 17.5

1000 Cft.
1000 Cft.
1000 Cft.

9,430.10
10,919.05
13,896.95

----

cu.m
cu.m
cu.m

333.05
385.65
490.85

----

ditto

1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.

3,975.85
4,769.95
5,613.70
9,936.95

-----

cu.m
cu.m
cu.m
cu.m

140.45
168.50
198.30
350.95

----17.1 to 17.5 Tools and plants shall be the liability


of the contractor.

1000 Cft.

9,456.50

1000 Cft.

15,039.60

-15,630.00

cu.m

334.00

cu.m

531.20

-552.05

Excavation in hard rock requiring blasting and disposal


of excavated material (blasted material) upto 50 ft. (15
m) lead, (including dressing and leveling to designed
section,e tc. complete).
i) Grade I
ii) Grade II
iii) Grade III
iv) Grade IV

Remarks

155.90
183.95
213.75
357.70

10 Earthwork excavation in irrigation channels, drains, etc. to


designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:i)
ordinary
ii) hard
iii) very hard
iv) gravel & shingle
11 Excavation in rock dressed to designed section, grades and
profiles, excavated material disposed off within 100 ft. (30 m)
and lift upto 5'-0" (1.5 m).
a) Soft rock, slate, shale, schist laterite work, with pick and
crow bar.
b) Medium hard rock, requiring occasional blasting.

Spec.
No.

17.1 to 17.5 1) Tools and plants required shall be


the liability of the Contractor

1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.

9,028.80
9,775.90
11,680.70
12,963.70

9,619.20
10,759.90
12,861.50
14,341.30

Chap-3 (Earthwork)

cu.m
cu.m
cu.m
cu.m

318.90
345.30
412.55
457.90

339.75
380.05
454.25
506.55

2) Reduce the rate by 8% if the


excavated section is not dressed or
levelled to designed section.

Page 28

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

v) Grade V
vi) Grade VI
b)

1000 Cft.
1000 Cft.

Labour
14,337.85
15,372.70

Composite
15,912.25
17,143.90

Rate (M etric System)


Unit of
M /ment Labour
Composite
cu.m
cu.m

506.40
542.95

Remarks

562.00
605.50

Excavation in hard rock requiring blasting, but blasting


prohibited, and disposal of excavated material within 50
ft. (15 m) lead (including dressing and levelling to
designed section, etc. complete):i) Grade I
ii) Grade II
iii) Grade III
iv) Grade IV
v) Grade V
vi) Grade VI

Spec.
No.

17.1 to 17.5 1) Tools and plants required shall be


the liability of the contractor.

1000
1000
1000
1000
1000
1000

Cft.
Cft.
Cft.
Cft.
Cft.
Cft.

18,057.60
19,551.85
23,361.35
25,927.45
28,675.70
30,745.45

1000 Cft.
1000 Cft.

1,240.80
1,737.10

1000 Cft.

4,963.20

19,238.40
21,519.85
25,722.95
28,682.65
31,824.50
34,287.85

2) Reduce the rate by 8% if the


excavated section is not dressed or
levelled to designed section.

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

637.80
690.55
825.10
915.75
1012.85
1085.95

679.50
760.10
908.55
1013.05
1124.05
1211.05

---

cu.m
cu.m

43.85
61.35

---

ditto

--

cu.m

175.30

--

17.1 to 17.5

13 Rehandling of earthwork:
a)
b)

Lead upto a single throw of Kassi, phaorah or shovel


Upto a lead of 50 ft. (15 m).

14 Rehandling of gravel work or excavated rock,


lead upto 50 ft.( 15 m)

ditto

15 Filling, watering and ramming earth under floors:i)


ii)

with surplus earth from foundation, etc.


with new earth excavated from outside,
lead upto one chain (30 m).
16 Extra for every 50 ft. (15 m) additional lead or part thereof :i)
ii)

for earhtwork soft, ordinary, hard and very hard.


for gravel, shingle or rock.

17 Transportation of earth all types when the total distance,


including the lead covered in the item of work, is more than
1000 ft. (300 m)
a) upto mile (400 m).
b) for every 330 ft. (100 m) additional lead or part thereof,
beyond mile (400 m) upto one mile. (1.6 Km.)
c) for every mile (400 m) additional lead or part thereof,
beyond one mile (1.6 Km.) upto 5 mile (8 Km).
d) for every mile (800 m) additional lead
or part thereof, beyond 5 miles (8 Km).
18 Dressing and levelling of earhtwork to designed section, etc.
complete:a) Ashes, sand, silt or soft soil.
b) Ordinary or hard soil.
c) Gravel work or soft rock not requiring
blasting.

1000 Cft.
1000 Cft.

1000 Cft.
1000 Cft.

2,489.50
4,783.80

45.25
53.30

---

---

cu.m
cu.m

cu.m
cu.m

87.95
168.95

1.60
1.90

--This rate shall be applicable upto


1000 ft. total distance, including the
lead covered in the item of earthwork

---

1000 Cft.

2,003.00

--

cu.m

70.75

--

1000 Cft.

64.00

--

cu.m

2.25

--

1000 Cft.

158.00

--

cu.m

5.60

--

1000 Cft.

139.95

--

cu.m

4.95

--

This rate will be paid inaddition to the


rate of earthwork, without deducting
the lead covered in the item of
earthwork

17.10 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.

159.90
310.35
749.75

----

Chap-3 (Earthwork)

cu.m
cu.m
cu.m

5.65
10.95
26.50

---Page 29

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Spec.
No.

Remarks

19 Dowel dressing.

Per
Chain

145.85

--

Metre

4.80

--

ditto

This rate is in addition to payment for


dressed earhtwork.

20 a)

Dressing slopes of banks or ground surface.

100Sft.

65.05

--

sq.m

7.00

--

ditto

To be paid only when exclusively


dressing is done and no earthwork is
carried out in embankment or cutting.

Dressing of earthwork (done by machinery or otherwise


and left undressed) to designed section.

100Sft.

116.75

--

sq.m

12.55

--

b)

i) The surface area dressed is to be


taken for measurement.
ii) The item is applicable where the
dressing is done by the contractor
other than the one who executed the
work.

21 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and ramming lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
a) in sand, ashes or loose soil
b) in ordinary soil.
c) in hard soil or soft murum.
22 Cutting hard rock such as granite, ballast, hard lime stone or
sand stone, etc. with chisels and hammers, for small
foundations.

17.1 to 17.5

Cft.
Cft.
Cft.
Cft.

4,472.15
5,219.30
5,841.00
37,292.65

---41,328.70

cu.m
cu.m
cu.m
cu.m

157.95
184.35
206.30
1317.20

1000 Cft.

637.55

896.30

cu.m

22.50

1000 Cft.

586.25

--

cu.m

20.70

--

i) soft or sandy soil

1000 Cft.

744.50

--

cu.m

26.30

--

ii) ordinary soil

1000 Cft.

868.55

--

cu.m

30.70

--

iii) hard soil

1000 Cft.

992.65

--

cu.m

35.05

--

iv) admixture of shingle

1000 Cft.

1,116.70

--

cu.m

39.45

--

c)

Ramming earthwork (all types of soil).

1000 Cft.

744.50

--

cu.m

26.30

--

d)

Ramming earhtwork behind retaining walls.

1000 Cft.

992.65

--

cu.m

35.05

--

23 Extra for excavation requiring shoring.

1000
1000
1000
1000

---1459.75 17.1 to 17.5 Tools and plants required shall be the


liability of the contractor.

31.65 17.1 to 17.5 Composite rate includes materials,


i.e. plank, etc.
ditto

24 Compaction of earthwork (soft, ordinary or hard soil) :a)

Mixing, moistening earth to optimum moisture content


in layers for compaction, etc. complete.

b)

Compaction by rolling with animal driven


roller/hand rammed:

25 Compaction of earthwork with power road roller, including


ploughing, mixing, moistening earth to optimum moisture

1) The rate does not include hire


charges of the roller.
2) Roller to be 'supplied by
Government

17.1 (a)
* 411-5 and The rate also includes hire charges of
Chap-3 (Earthwork)

Page 30

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

content in layers, etc. complete:

Spec.
No.

202-3

i)

95% to 100% maximum modified AASHO dry density.

1000 Cft.

--

592.25

cu.m

20.90

ii)

90% maximum modified AASHO dry density.

1000 Cft.

--

500.95

cu.m

17.70

iiii) 85% maximum modified AASHO dry density.

1000 Cft.

--

409.65

cu.m

14.45

Remarks

machinery, cost of fuel, lubricant, pay


of driver and cleaner, etc.

26 Extra for wet earthwork.

1000 Cft.

1,737.10

--

cu.m

61.35

17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering.

1000 Cft.

3,970.55

--

cu.m

140.25

17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling.

1000 Cft.

3,109.90

--

cu.m

109.85

ditto

471.50

--

Metre

15.45

ditto

1000 Cft.

4,466.90

--

cu.m

157.75

--

17.1 to 17.5

31 Dag bailing 3" (75 mm) deep.

Per mile

1,853.90

--

Per
Km

1152.20

--

ditto

32 Turfing slopes of banks or lawns with grass sods including


ploughing, laying, setting and watering (Turf got from within a
distance of 5 miles (8 Km.) and maintenance for 15 days).

100Sft.

827.20

--

sq.m

89.00

--

ditto

29 Earthwork on small rain water drains, along canal banks,


roads and plantation drains, dressed, etc. complete.
30 Filling and compacting soil, earth and boulders behind
retaining walls (including excavation of soil and lead upto 50
ft.( 15 m).

100 Rft.

17.1 to 17.5

33 Berm cutting:a)
b)

lead upto a single throw of Kassi, phaora or shovel


(without dressing).
upto 50 ft(15 m)lead (including dressing).

1000 Cft.

2,233.45

--

cu.m

78.90

--

1000 Cft.

3,975.85

--

cu.m

140.45

--

34 Berm trimming both sides of channels:a)


b)
c)

upto 3 ft. (1.06 m) depth.


exceeding 3 ft. to 5 ft. (1.06 to 1.5 m) depth.
exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth

17.1 to 17.5
Per Mile
Per Mile
Per Mile

5,799.20
8,087.20
12,641.20

----

Per Km.
Per Km.
Per Km.

3624.50
5054.50
7900.75

----

35 Ploughing and levelling borrowpits.


i)
ii)

upto 3 ft. (0.9 m) depth.


above 3 ft. (0.9 m) depth.

ditto
Per Acre
Per Acre

1,240.80
2,481.60

---

36 Making boundary or service roads, including dag-belling,


leveling and dressing:
i)

Dag bailing for layout of borrow pit, to


be done by contractors at their own
cost.

Per Hect.
Per Hect.

3066.10
6132.15

Area ploughed to be measured.

--ditto

in unploughed land:

Chap-3 (Earthwork)

Page 31

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.


b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.
ii)

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

Per Chain
Per Chain

622.60
831.60

---

Metre
Metre

20.40
27.30

---

Per Chain
Per Chain

642.15
851.15

---

Metre
Metre

21.05
27.90

---

Spec.
No.

Remarks

in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.

37 Earthwork by boats, including hire of boats:i)


Digging and loading into boats, upto 50 ft. (15 m) lead.
ii) Carriage by boats upto 10 chains (300 m).
iii) Extra for every additional one chain (30 m) or part
thereof beyond 10 chains (300 m).
iv) Unloading earth from boats.

17.1 to 17.5 For ordinary soil.


1000 Cft.
1000 Cft.
1000 Cft.

3,722.40
965.05
99.25

----

cu.m
cu.m
cu.m

131.50
34.10
3.50

----

1000 Cft.

1,737.10

--

cu.m

61.35

--

38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m)


from rail.

1000 Cft.

1,488.95

--

cu.m

52.60

--

17.1 to 17.5

39 Earthwork by tramway, digging and loading in trucks, upto 50


ft. (15 m) lead.

1000 Cft.

3,474.25

--

cu.m

122.70

--

17.1 to 17.5

40 Unloading earth from B.G. trucks and spreading upto


15 ft. (4.5 m) from rail.

1000 Cft.

2,791.80

--

cu.m

98.60

--

ditto

cu.m

167.15

41 Supplying clean and screened river or pit sand within 5


chains (150 m).

100Cft.

473.30

496.30

175.30

42 Earthwork excavation in open cutting for sewers and


manholes as shown in drawings including shuttering and
timbering, dressing to correct section and dimensions
according to templates and levels, and removing surface
water, in all types of soil except shingle, gravel and rock:i)
0 ft. to 7.0 ft. (0 to 2.10 m) depth
ii) 7-01 ft. to 15.0 ft. (2.15 to 4.5 m) depth
iii) above 15.0 ft. (4.5 m) depth

The rate incudes:i) removal of top crust of earth


over burden
ii) royalty to the government or cost
to the private owner.

17.1 to 17.5 The rate does not include back filling


* * 13.1 &13.4 after laying of sewer, which is payable
separately.

1000 Cft.
1000 Cft.
1000 Cft.

4,033.90
6,850.65
8,835.95

4,417.10
7,419.15
9,404.40

cu.m
cu.m
cu.m

142.50
241.95
312.10

If the timbering and shuttering is not


actually done at site, the composite
rate may be reduced by Rs. 368.20,
579.60 and 579.60 respectively.

156.00
262.05
332.15

17.1 to 17.5 The rate does not include back filling


**13.3 &
after laying of sewer, which is payable

43 Earthwork excavation of trenches in open cutting for sewers


and manhole chambers, etc. below sub-soil water level to
correct section and dimensions according to templates and
levels, including shoring, timbering and shuttering of M.S.
sheets on both sides of the trenches:
i)
0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL.
ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL.
iii) Exceeding 8 ft. (2.4 m) depth below SSWL.

ditto

13.5

1000 Cft.
1000 Cft.
1000 Cft.

5,534.10
6,918.50
10,377.75

8,043.80
10,024.75
13,668.55

Chap-3 (Earthwork)

cu.m
cu.m
cu.m

195.45
244.35
366.55

separately.

284.10
354.05
482.75
Page 32

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit of
M /ment

44 Excavation of trenches in all kinds of soil, except cutting


rock, for watersupply pipelines upto 5 ft. (1.5 m) depth
from ground level, including trimming, dressing sides,
leveling the beds of trenches to correct grade and cutting
pits for joints, etc. complete in all respects.

Labour

Composite

Rate (M etric System)


Unit of
M /ment Labour
Composite

1000 Cft.

3,725.05

--

cu.m

131.55

--

Each
Each

726.35
1,417.35

---

Each
Each

726.35
1417.35

Each

930.60

--

Each

930.60

1000 Sft.
1000 Sft.

124.10
248.15

---

sq.m
sq.m

1.35
2.65

---

100Sft.

59.55

--

sq.m

6.40

--

Per
Acre

504.10

--

Per Hect.

1245.60

--

50 Leveling, dressing and making lawns.

100Sft.

248.15

--

sq.m

26.70

--

51 Turfing lawns (excluding cost of turf).

100Sft.

209.00

--

sq.m

22.50

--

cu.m

--

Spec.
No.

Remarks

17.1 to 17.5 The rate does not include back filling


* * 8.1
after laying of pipe line, which is
payable separately.

45 Cutting and removing trees within a distance of 100 ft. (30 m)


a)
b)

upto 2 ft. (760 mm) girth.


above 2 ft. to 6 ft. (760 to 1800 mm) girth.

46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft.
to 6 ft. (600 to 1800 mm) girth.
47 Jungle clearance and removing within 100 ft. (30 m).
a)
b)

light
thick

48 Uprooting Sarkanda growth and disposal within 100 ft. (30 m)


49 Ploughing 3 times.

52 Earthwork in excavation of drains, irrigation channels through


excavator / drag lines in all kind of soil and conditions(dry,wet
slush,daldal and under water) including its disposal and
preparation of working pad for operation of machinery.
(Rates includes 100 ft lead)
*
**

1000 Cft.

--

1573.00

55.55

Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".
Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).

Chap-3 (Earthwork)

Page 33

4. DISMANTLING (DEMOLITION)
1

Rates for all finished works include the removal of surplus debris, unused material and byproducts.

The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roof
supports such as beams and trusses.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Composite

Rate (M etric System)


Unit

Labour

Spec.
No.

Remarks

Composite

Stone Work
1

Dismantling dry stone masonry.

100Cft.

421.85

cu.m

149.00

18.1

Dismantling stone masonry in mud mortar.

100Cft.

620.40

cu.m

219.15

ditto

Dismantling stone masonry in lime or cement mortar.

100Cft.

1,488.95

cu.m

525.90

ditto

a)

Dismantling dry stone or spawl pitching.

100Cft.

744.50

cu.m

262.95

ditto

b)

Dismantling stone or spawl pitching (mud grouted).

100Cft.

943.00

cu.m

333.05

ditto

Dismantling stone or spawl pitching and apron in silted


condition.

100Cft.

1,240.80

cu.m

438.25

ditto

Dismantling stone pitching, cement or lime grouted.

100Cft.

1,985.30

cu.m

701.20

ditto

Dismantling stone in crates:


100Cft.

992.65

cu.m

350.60

1,240.80

ditto

438.25

694.85

cu.m

245.40

a)

wooden crates

b)

wire crates

ditto

Dismantling stone ware drain including base concrete.

100Cft.

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively.

ditto

Brick Work
9 Dismantling mud/pise walling.

100Cft.

248.15

cu.m

87.65

18.1

10 Dismantling sun dried brick masonry.

100Cft.

620.4

cu.m

219.15

ditto

11 Dismantling dry brick masonry.

100Cft.

421.85

cu.m

149

ditto

12 Dismantling brick work in mud mortar.

100Cft.

868.55

cu.m

306.75

13 Dismantling brick work in lime or cement mortar.

100Cft.

2109.35

cu.m

745

14 Dismantling cement block masonry.

100Cft.

1,861.20
Chap-4 (Dismantling)

cu.m

657.40

18.1 Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
ditto and subsequent floors respectively
against item No. 12, 13, 14 & 15.
ditto
Page 34

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

15 Dismantling Dhajji walling.

Labour

Composite

Rate (M etric System)


Unit

Labour

Spec.
No.

Remarks

Composite

100Cft.

496.30

cu.m

175.30

ditto

16 Dismantling mud concrete.

100Cft.

992.65

cu.m

350.60

ditto

17 Dismantling lime concrete.

100Cft.

1,364.90

cu.m

482.10

18 Dismantling lime or cement concrete, under water.

100Cft.

5,211.35

cu.m

1840.65

19 a)

100Cft.

2,729.75

cu.m

964.15

ditto

4,466.90

ditto

1577.70

ditto

5,459.50

ditto

1928.30

ditto

1,488.95

ditto

525.90

ditto

744.50

ditto

262.95

100Cft.

8,933.75

cu.m

3155.40

ditto

21 Dismantling sirki sarkanda or thatched


roofing, supported on battens or bellies.

100Sft.

297.80

sq.m

32.05

18.1

22 a)

Dismantling 1st class tile roofing.

100Sft.

744.50

sq.m

80.10

Dismantling 2nd class tile roofing.

100Sft.

620.40

sq.m

66.75

ditto

23 Dismantling from any height, asbestos sheets and ridge


coping.

100Sft.

389.40

sq.m

41.90

18.1

24 a)

Dismantling roof of wooden planks and battens, from


any height.

100Sft.

sq.m

33.5

ditto

b)

Dismantling wooden ceiling above 20' (6.0 m) height


in difficult position, including lifting with care and
special scaffolding along live electric wires and with
machines underneath.

100Sft.

sq.m

132.60

ditto

Concrete

b)
c)
d)
e)

Dismantling cement concrete plain


1:4:8.
Dismantling cement concrete plain
1:3:6.
Dismantling cement concrete 1:2:4
plain.
Dismantling cement concrete with brick
aggregate.
Dismantling D.P.C. of cement concrete
1" thick (40 mm) and clearing the site.

20 Dismantling cement concrete reinforced,


separating reinforcement from concrete,
cleaning and straightening the same.

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
against item No. 17, 19 & 20.
ditto

Roofing

b)

311.5

1,232.35

Chap-4 (Dismantling)

Add extra 13%, 32 and 51% on


labour rate only for 2nd, 3rd, 4th
and subsequent floors respectively
against items No. 22, 25, 26 and 28.

Page 35

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Composite

Rate (M etric System)


Unit

Labour

Spec.
No.

Composite

25 Dismantling jack arch roofing, including removal of joists.

100Sft.

992.65

sq.m

106.80

ditto

26 Dismantling R.B. roof complete with mud and plaster,


including separating reinforcement, cleaning and
straightening the same.

100Sft.

1,240.80

sq.m

133.50

ditto

27 a)

100Sft.

620.40

sq.m

66.75

Stripping and stacking slate or tiles from the truss


roofing.

b)

Stripping and stacking C.I. sheet roof.

ditto

564.10

ditto

60.70

c)

Extra for dismantling C.I. sheet roof above 20 ft. (6m)


in difficult position, including lifting with special
scaffolding along live electric wire with machine
underneath.

ditto

689.05

ditto

74.15

100Sft.

992.65

sq.m

106.80

18.1

29 Dismantling brick or flagged flooring without


concrete foundation.

100Sft.

421.85

sq.m

45.40

18.1

30 Dismantling plank or wooden block flooring,


etc.

100Sft.

620.40

sq.m

66.75

ditto

28 Dismantling slates or tiles including battens, purlins and


planking.

Remarks

Flooring

31 Disjoining R.C.C. pipes inside the trench and dismantling


and removing the pipes from the trench and stacking them
outside:a)
b)
c)
d)

i) The rate does not include the


cost of excavation and refilling of
trench, or the demolition of any
masonry or brick work.
Per Lft
Per Lft
ditto
ditto

15.60
25.50
29.80
42.50

Metre
Metre
ditto
ditto

51.15
83.65
97.75
139.40

Per
No.
ditto

199.00

199.00

153.85

Per
No.
ditto

153.85

33 Removing ventilators and wooden sunshade, etc.

Per No.

80.45

Per No.

80.45

ditto

34 a)

Per No.

155.10

Per No.

155.10

ditto

32 a)
b)

6" to 12" (150 to 300 mm) diameter


13" to 24" (325 to 600 mm) diameter
25" to 36" (625 to 900 mm) diameter
Above 36" (Above 900 mm) diameter

WOOD WORK
Removing door with chowkat.
Removing windows and sky lights with chowkat.

Dismantling wooden beams upto 12' (3.65m)


length.

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
against items No. 29 and 30.

Chap-4 (Dismantling)

ii) Bends, elbows, sluice valves,


etc. should not be paid for extra if
fixed in the length of pipe line that
is being dismantled.

18.1

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
against items No. 32, 33, 34, 35 &
36.

Page 36

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

b)

Composite

Unit

Labour

Spec.
No.

248.15

ditto

248.15

Dismantling wooden partition Jaffry work etc.

100Sft.

278.15

sq.m

29.95

Dismantling wooden trusses.

100Kg

872.10

%Kg

872.10

Per Lft.

22.10

Metre

72.50

ditto

37 Dismantling iron work of trusses, sheds, water tanks, etc.


excluding cutting of rivets.

100Kg

842.30

%Kg

842.30

18.1

38 Dismantling rolled steel beams or iron rails, etc.

100Kg

407.30

%Kg

407.30

ditto

39 Dismantling iron latrine.

Per Unit/
2 Seats

902.90

Per Unit/
2 Seats

902.90

ditto

40 Dismantling tees, bends or sluice valves upto 12"


(300 mm) bore.

Each per
inch bore

18.45

Each per
cm bore

7.40

ditto

b)

36 Dismantling wooden palisade fencing.

Remarks

Composite

ditto

35 a)

Dismantling wooden beams from 12.1' to 23'


(3.65 to 7.0 m) length.

Labour

Rate (M etric System)

ditto

I ron work

41 a)

Dismantling B.G. water column.

Each

6,022.50

Each

6022.50

ditto

Dismantling M.G. or N.G. water column.

Each

3,984.75

Each

3984.75

ditto

100Lft.

421.85

Metre

13.85

18.1

43 Dismantling wire netting of tennis courts and frame work.

100Sft.

198.55

sq.m

21.35

18.1

44 Dismantling cloth ceiling and supporting timber.

100Sft.

372.25

sq.m

40.05

ditto

45 Dismantling and removing road metalling.

100Cft.

992.65

cu.m

350.60

ditto

46 Dismantling and removing road pavement, etc., including


screening and stacking of byproducts upto one chain lead
(30 metre).

100Cft.

1,325.15

cu.m

468.05

ditto

47 Removing mud plaster from walls.

100Sft.

103.40

sq.m

11.15

ditto

48 Removing cement or lime plaster.

100Sft.

206.80

sq.m

22.25

ditto

b)

42 Dismantling all type of wire fencing, including rolling wire


into bundles and collecting material.

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors respectively
against items No. 37 and 38.

M iscellaneous

Chap-4 (Dismantling)

Add extra 13%, 32% and 51% on


labour rates only for 2nd, 3rd, 4th
and subsequent floors against item
No. 47, 48, 49, & 50 respectively

Page 37

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

49 Scraping:-

18.1

a)

White wash or colour wash.

b)

Ordinary distemper, oil bound distemper,


or paint of wall.

100Sft.

124.10

sq.m

13.35

ditto

372.25

ditto

40.05

50 Dismantling glazed or encaustic tiles, etc.

100Sft.

1,061.30

sq.m

114.20

18.1

51 Scraping boulders.

100Cft.

1,737.10

cu.m

613.55

18.1

52 Cleaning lime or cement mortar of old stones


to be used in masonry.

100Cft.

868.55

cu.m

306.75

18.1

53 Dismantling light, fan and call bell point


including casing and capping/strip open type,
and making good damaged surface (building
portion).

Per
point

33.90

34.30

Per
point

33.90

34.30

54 Dismantling plug point and making good


damaged surface (building portion).

Per
point

29.05

29.40

Per
point

29.05

29.40

Per foot
Per foot

6.20
13.50

6.30
13.60

P.Mtr
P.Mtr

20.35
44.30

20.65
44.60

Electric Wiring

55 Dismantling G.I./M.S. conduit/G.I. flexible/PVC pipes or


conduit wiring, etc. of all sizes including making good
damaged surface (building portion):i)
ii)

on surface
recessed in wall

Chap-4 (Dismantling)

Page 38

5. MORTAR
MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Dry Material Required for
100 Cft. Wet (Ready) Mortar

S. No.

Ratio of Mortar

1
1

Lime
Putty
Cft.
4

Sand
Cft.
5

Cement
(50 Kg.)
Bag.
6

82
85
90
90
100
100
100

11.83
8.16
6.49
5.19
4.81
4.12
3.61

15.0
13.1
11.5
10.44
9.4
22.5
20.0
18.8
15.66
23.0
20.1
17.7
7.0

90
92
92
94
94
90
90
94
94
92
94
94
85

4.33
3.78
3.32
3.00
2.71
3.25
2.88
2.71
2.26
2.21
1.93
1.70
8.16

43
31

86
93

Lime
Putty
Cum
7

Sand
Cum.
8

Cement : Sand
1
1
1
1
1
1
1

Cement
(50 Kg)
Bag
3

Dry Material Required for


One Cum Wet (Ready) Mortar

:
:
:
:
:
:
:

2
3
4
5
6
7
8

Cement : Lime : Sand


1 : 1 : 6
1 : 1 : 7
1 : 1 : 8
1 : 1 : 9
1 : 1 : 10
1 : 2 : 8
1 : 2 : 9
1 : 2 : 10
1 : 2 : 12
1 : 3 : 12
1 : 3 : 14
1 : 3 : 16
1 : : 3

33.48
23.11
18.37
14.70
13.61
11.68
10.21

12.25
10.70
9.39
8.52
7.67
9.19
8.16
7.67
6.39
6.26
5.47
4.82
23.11

0.82
0.85
0.90
0.90
1.00
1.00
1.00

0.15
0.13
0.12
0.10
0.09
0.23
0.20
0.19
0.16
0.23
0.20
0.18
0.07

0.90
0.92
0.92
0.94
0.94
0.90
0.90
0.94
0.94
0.92
0.94
0.94
0.85

0.43
0.31

0.86
0.93

Lime : Sand
1 : 2
1 : 3

Chap-5 (Mortar)

Page 39

5. MORTAR
MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
S.
No.

Ratio of Mortar

Clay

Cft.
3

1
4

Mud

Lime : Surkhi

Lime : Sand : Surkhi


1 : 1 : 1

M3
3

49.00
40.75
30.30

73.5
81.5
91.0

0.49
0.41
0.30

0.74
0.82
0.91

40.50

40.5

40.5

0.41

0.41

0.41

0.57

57.0

57.0

M3
7

35.00
25.00
25.00
25.00

Cft
Cft
Cft
Cft

0.35
0.25
0.25
0.25

M3
M3
M3
M3

Stone M asonry :
a) Random rubble, uncoursed
i) Foundation and Plinth
ii) Superstructure
iii) Coursed

45.00 Cft
40.00 Cft
35.00 Cft

0.45
0.40
0.35

M3
M3
M3

30.00 Cft
20.00 Cft

0.30
0.20

M3
M3

Ashlar Block in course or Scabled masonry


Ashlar fine masonry

(1) Cement
(2) Unslaked lime
(3) Slaked lime

1 Cft.
1.7 Cft.
2.5 Cft.

(4) Quick lime

40 Kg

0.57

Wet material required for 1M (35.32 Cft)


masonry ( including wastage) :

Brick M asonry :
a) Mud Mortar
b) Cement, Sand
c) Cement, Lime (Putty) Sand
d) Lime (Putty) Sand

b)
c)

Notes :

Cft.
7

Cinder

1.35

Wet material required for 100 Cft.


masonry (including wastage):

Clay

Dry Material Required for


one M 3 Wet (Ready) Mortar
Lime
Sand
Surkhi
(Putty)
M3
M3
M3
4
5
6

Lime : Cinder
1 : 1

Cinder

135

2 : 3
1 : 2
1 : 3
6

Dry Material Required for 100 Cft.


Wet (Ready) Mortar
Lime
Sand
Surkhi
(Putty)
Cft.
Cft.
Cft.
6
4
5

= 40.8233 Kg
= 37.3242 Kg
= 37.3242 Kg
Will yield 2.6 Cft. lime putty.
Chap-5 (Mortar)

Page 40

6. CONCRETE
1. Rates for all finished works include the removal of surplus debris, unused material and by products.
2. If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.
3. Subsequent carriage of crushed stone aggregate / bajri will be paid according to the following:
a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.
b) It shall be payable from the nearest approved quarry.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Mud concrete in foundation including watering and ramming,

100Cft

Labour

2730.15

Rate (M etric System)

Composite

4869.15

Unit

cu.m

Labour

964.30

Spec.
No.

Remarks

Composite

1719.80

The stone ballast, crushed bajri,

using brick or stone ballast 1" (40 mm) gauge.

round shingle from nallah, or brick


ballast may be used according to

Dry rammed brick or stone ballast, 1" to 2"( 40 mm to 50

100Cft

1861.20

3841.20

cu.m

657.40

1356.70

their comparative cheaper rates in

mm) gauge.

various areas of the Province.

Cement concrete brick or stone ballast 1 " to 2" (40 mm to

20.1

-do-

50 mm) gauge, in foundation and plinth:-

(a) Ratio 1: 3: 6

100Cft

3592.05

13603.65

cu.m

1268.70

4804.80

(b) Ratio 1: 4: 8

ditto

3592.05

11650.30

"

1268.70

4114.90

(c) Ratio 1:5:10

ditto

3592.05

10613.35

"

1268.70

3748.65

(d) Ratio 1: 6:12

ditto

3592.05

9830.25

"

1268.70

3472.05

(e) Ratio 1: 6: 18

ditto

3592.05

9041.85

"

1268.70

3193.60

(f) Ratio 1: 7:20

ditto

3592.05

8661.50

"

1268.70

3059.25

Extra on item No. 3 above, for sedimentation tank or filter


beds of Public Health Engineering Works:

The stone ballast, crushed bajri,


round shingle from nallah, or brick

(a) in bed

100Cft

1106.80

cu.m

390.90

ballast may be used according to

ditto

1637.45

"

578.35

various areas of the Province.

their comparative cheaper rates in


(b) on slope
5

Cement concrete plain including placing,

20.1

compacting, finishing and curing


complete (including screening and
washing of stone aggregate):
Chap-6 (Concrete)

Page 41

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

(a) Ratio 1: 1:2

100Cft

Labour

4804.80

Rate (M etric System)

Composite

26565.00

Unit

cu.m

Labour

1697.05

Spec.
No.

Remarks

Composite

9382.75

(b) Ratio 1: 1: 1

ditto

4804.80

26181.60

"

1697.05

9247.35

(c) Ratio 1: 1: 3

ditto

4804.80

21357.60

"

1697.05

7543.50

(d) Ratio 1: 2: 3

ditto

4804.80

20388.00

"

1697.05

7201.05

(e) Ratio 1: 3: 3

ditto

4804.80

18139.45

"

1697.05

6406.85

(f) Ratio 1: 2: 4

100Cft

4804.80

18548.65

cu.m

1697.05

6551.40

(g) Ratio 1: 2: 6

ditto

4804.80

16505.30

"

1697.05

5829.65

(h) Ratio 1: 3: 6

ditto

4804.80

15920.40

"

1697.05

5623.10

(i) Ratio 1: 4: 8

ditto

4804.80

14015.05

"

1697.05

4950.10

Providing and laying reinforced cement concrete (including

20.4

1) The rate includes rendering floor

prestressed concrete), using coarse sand and screened

surface smooth, and the plastering

graded and washed aggregate, in required shape and design,

done for making up all surfaces

including forms, moulds, shuttering, lifting, compacting,

after removing centring.

curing, rendering and finishing exposed surface, complete


(but excluding the cost of steel reinforcement, its fabrication

2) Plastering done under soffit of

and placing in position, etc.):-

R.C.C. roof slab meant for human


habitation buildings shall be paid

(a) (i) Reinforced cement concrete in roof slab, beams,

extra.

columns lintels, girders and other structural members laid in


situ or precast laid in position, or prestressed members cast

3) This item shall not be applicable

in situ, complete in all respects:-

to factory made units.

(1) Type A (nominal mix 1:1:2)

Per Cft

111.70

376.10

cu.m

3945.25

13283.85

(2) Type B (nominal mix 1: 1: 3)

ditto

111.70

324.15

"

3945.25

11449.00

(3) (c) Type C (nominal mix 1: 2: 4)

ditto

111.70

296.15

"

3945.25

10460.00

Per Cft

64.70

296.80

cu.m

2285.20

10483.00

4) Composite rate shall be reduced by Rs: 5/50P.Cft & Rs:12/- P.Cft if chenab sand and local
sand respectively is used.

(a)(ii) Reinforced cement concrete in slab of rafts / strip


foundation, base slab of column and retaining walls; etc and
other structural members other than those mentioned in
5(a) (i) above not requiring form work (i.e. horizental
shuttering) complete in all respects:(1) Type A (nominal mix 1: 1: 2)
(2) Type B (nominal mix 1: 1: 3)

ditto

64.70

239.95

"

2285.20

8475.05

(3) Type C (nominal mix 1: 2: 4)

ditto

64.70

211.85

"

2285.20

7482.55

Chap-6 (Concrete)

Page 42

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

(b) Precast reinforced cement concrete and prestressed


reinforced cement concrete in columns, beams, lintels, stair
cases, shelves, etc.
(1) Type A (nominal mix 1: 1: 2)

Per Cft

84.15

336.25

cu.m

2972.20

11876.35

(2) Type B (nominal mix 1:1: 3)

ditto

84.15

283.90

"

2972.20

10027.35

(3) Type C (nominal mix 1: 2: 4)

ditto

84.15

256.25

"

2972.20

9050.75

Per Cft

38.10

48.30

cu.m

1345.70

1705.95

Per Cft

18.60

cu.m

656.95

(c) Erecting and fixing in position, precast cement concrete


or stone slab in roofs or lintels, etc. lift unto 20 ft., (6m)
including all charges.
(d) Add extra labour for R.C. concrete in

--

2nd and subsequent storeys.


7

Providing and casting in situ bored reinforced concrete piles

*851-1

with type C concrete (nominal mix 1: 2: 4 ) , using 10% extra

to

Rs: 5/50 P.Cft & Rs:12/- P.Cft if chenab

Composite rate shall be reduced by

cement in dry mix, and course sand, including all labour and

851-10

sand and local sand respectively is used.

*851-5

The rate includes wastage, overlaps,

material (except the cost of steel reinforcement and its


labour for bending and laying in position, etc. which will be
paid separately, including, screening & washing of shingle
and curing:-

i) 18 " (450 mm) dia pile

Per Rft

740.85

1017.65

Metre

2430.00

3337.90

ii) 20" (500 mm) dia pile

Per Rft

853.95

1195.45

Metre

2800.95

3921.10

iii) 22" (550 mm) dia pile

Per Rft

1026.55

1428.3

Metre

3367.1

4684.8

iv) 24" (600 mm) dia pile

Per Rft

1252.70

1744.70

Metre

4108.85

5722.65

Fabrication of mild steel reinforcement bar cage for R.C.C.


bored piles, including cutting, bending, laying in position,

etc. but does not apply to the laps and

welding and fastening, including cost of binding wire and

spiral reinforcement which are specifically

labour charges for binding of steel reinforcement (also

shown in the structural / working drawings

includes removal of rust from the bars):-

of piles as per lapping requirements


of design.

(a) plain bars


(b) deformed bars
9

Per Cwt.

1283.70

4765.30

100 kg

2526.95

9380.50

ditto

1283.70

6017.30

"

2526.95

11845.10

Fabrication of mild steel reinforcement for cement concrete,

*851.5

including cutting, bending, laying in position, making joints

The rate includes wastage, overlaps


and chairs, etc.

Chap-6 (Concrete)

Page 43

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

and fastenings, including cost of binding wire and labour


charges for binding of steel reinforcement (also includes
removal of rust from bars):(a) Plain bars

Per Cwt.

331.65

3993.50

100 kg

652.85

7861.20

(b) Deformed bars (Grade-40)

ditto

331.65

5346.50

ditto

652.85

10524.60

('c) Deformed bars (Grade-60)

ditto

331.65

5630.30

ditto

652.85

11083.30

Per Cft

42.55

182.55

cu.m

1502.85

6447.65

20.2

Per Cft

94.35

186.50

cu.m

3332.45

6587.20

20.2

Per Sft

26.55

50.20

sq.m

285.70

540.15

20.1 to

10 Precast cement concrete solid or face blocks (1:2:4),


including cost of templates.
11 Precast cement concrete hollow blocks (1: 2: 4) , including
cost of templates and constructing walls thereof.
12 Providing and fixing ornamental cement jali 2" (50 mm) thick
(1: 2: 4), without steel.

20.4

13 Extra labour for laying concrete plain or reinforced:


(a) above 20' (6 m) upto 40'(12 m) height

100Cft

1985.30

cu.m

701.20

(b) for every additional 10'(3 m) height.

100Cft

1240.80

cu.m

438.25

100Cft

496.30

cu.m

175.30

Each

331.65

Each

331.65

472.90

20.4

Per hole

795.95

Each

795.95

20.1

100Cft

2952.40

cu.m

1042.80

20.1

100Sft

282.50

sq.m

30.40

ditto

93.20

"

10.05

14 Extra labour for work of weirs, rail or road bridges, syphons, and
concreting in superstructure
15 Making reinforced cement concrete spout, including fixing in

472.90

position (2' x 6" x5") (760 mmx150 mm x 125 mm)


16 Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement
concrete or stone masonry walls and repairing.
17 Extra labour for skipping concrete in wells.
18 Nicking concrete surface:
(a) Cement concrete surface
(b) Lime concrete surface

Chap-6 (Concrete)

Page 44

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

19 Preparing, watering and ramming surface for laying concrete


(for Headworks only):(a) Horizontal floor

100Sft

282.25

sq.m

30.35

(b) Glacis and crest

ditto

406.55

"

43.75

(c) Inverted filters

ditto

132.65

"

14.25

100 Kg.

4134.15

20 Fabrication of high tensile steel prestressing cables for

29690.05 100 Kg.

4134.15

29690.05

prestressed (post tensioned) concrete, including assembling by

*811-1
to

drawing the H.T. wire through metal spacer plate, inserting in helix

811-11

The rate includes wastage in


cutting and breakage in stressing,
etc.

core and taping or tying, sheathing in longitudinally welded metal


corrugated sheath, positioning , anchorage with male and female
set of anchorage cone, forming ducts for transverse cable,
stressing cables with jack at both ends as per stressing schedule,
maintaining stressing record and supply the same in the approved
proforma to the Engineer-in-charge, making loop at blind end,
including all materials required for it, grouting the cable ducts with
cement, cutting projected ends and making good recesses, etc.,
complete in all respects.
21 Fabrication of High Tensile steel reinforcement for prestressed

100kg

2481.60

26957.60

%kg

2481.60

26957.60

1) The rate includes wastage in

(pretension) concrete work, including inserting wire in moulds,

cutting and breakage in stressing,etc.

providing M.S. shear bars, spacers and lift hooks, male and
female anchorage, tie down, struts, stressing cables, maintaining

2) Quantity of H. T. wire will form

stress record and supply the same in approved proforma to the

basis of payment.

Engineer-in-charge, cutting wires and projecting ends and making

3) This item shall not be applicable

good recesses, etc., complete in all respects.

to factory made units.

22 Lifting, transporting and placing precast prestressed concrete

*811-1

B eam, Girder and other members (excluding battens) etc. in

to

Position on the bridge to correct alignment and level, etc.

811-11

complete
i)

Beam upto 50 ft. (15 m) length

100Cft

1588.95

cu.m

ii)

561.20

Beam above 50 ft. (15m) upto 75 ft. (22.5m) length

100Cft

2270.17

cu.m

801.80

iii) Beam above 75ft. (22.5m) upto 100ft. (30m) length

100Cft

3026.40

cu.m

1068.95

iv)

Beam above 100ft. (30m) upto 150ft.(45m) length

100Cft

3916.30

cu.m

1383.25

v)

Beam above 150ft. (45m) length

100Cft

4816.95

cu.m

1701.35

Chap-6 (Concrete)

Page 45

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

23 Providing and laying foam concrete 3 inch (75 mm) thick,

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per Sft.

26.10

61.90

sq.m.

280.85

666.05

i) aluminium sheet 1/16 in(1.5 mm) thick

Per Rft.

12.90

89.80

Metre

42.30

294.55

ii) G.I. sheet, 18 SWG

Per Rft.

13.20

73.35

Metre

43.30

240.60

using cement sand in the ratio of 1:2 and aluminium powder


at the rate of 0.2% of the cement, sand mix,
24 Providing and fixing 6 in(150 mm). wide curved sheet of
required shape fixed on face of the construction joint with G.I.
screw,1.5 in (40 mm) long to cover construction joints
vertically:-

25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium
strip on horizontal and vertical expansion joints in walls, columns,
ceilings and floors etc., including cost of clips/screws etc.,
complete in all respects:a) On interior surface (without mastic strip)
b) On exterior surface (with mastic strip)
26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on

Per Rft.

11.75

88.70

Metre

38.55

290.95

ditto

11.75

92.30

"

38.55

302.75

Per Sft.

13.25

101.00

Sq.m

142.55

1086.75

Per Rft.

4.35

60.60

Metre

14.25

198.75

Per Rft.

17.65

65.65

Metre

57.90

215.30

10.15

53.45

expansion joints complete in all respects.


27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG.
stopper to expansion joint.
28 Providing embeding 10" (250 mm) wide " (6 mm) thick
rubber water stopper in expansion joints of R.C.C. roof
slab complete in all respects.
29 Filling expansion joints with bitumen. sand & saw dust in
ratio 1:2:2.

Per Rft
per inch

P.Metre/
3.10

16.30 Per 25 mm

width
30 Filling expansion joints with bitumen.

Per Rft.

Width
45.90

Chap-6 (Concrete)

Metre

150.55

Page 46

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

31 Laying asphaltic mixture in expansion joints.

Labour

Rate (M etric System)

Composite

Unit

Labour

Metre

142.50

Spec.
No.

Remarks

Composite

Per Rft.

43.45

Material to be paid on actuals.

Per Sft.

5.30

10.80

Sq.m

57.05

116.20

ditto

5.30

14.70

"

57.05

158.15

32 Providing and fixing theremopore (foamed polythene)


sheet in horizontal and vertical expansion joints:
a)

1" (25 mm) thick thermopore sheet

b)

1" (40 mm) thick thermopore sheet

33 Providing and laying damp proof course of cement concrete


1:2: 4(using cement, sand and shingle), including bitumen
coating :(a) with one coat bitumen and one coat polythene sheet
500gauge
i) 1" thick (40 mm)

100Sft

1237.70

4136.15

sq.m

133.20

445.05

ii) 2" thick (50 mm)

100Sft

1237.70

4662.55

sq.m

133.20

501.70

iii) 3" thick (75 mm)

100Sft

1284.80

5859.10

sq.m

138.25

630.45

i) 1" thick (40 mm)

100Sft

1237.70

4423.90

sq.m

133.20

476.00

ii) 2" thick (50 mm)

100Sft

1237.70

4949.75

sq.m

133.20

532.60

iii) 3" thick (75 mm)

100Sft

1284.80

6146.30

sq.m

138.25

661.35

a) " thick (13 mm)

100Sft

1167.10

2653.45

sq.m

125.60

285.50

b) " thick (20 mm)

100Sft

1167.10

2921.80

sq.m

125.60

314.40

(b) with 2 coats of bitumen:

34 Providing and laying damp proof course with cement sand


plaster and bitumen coating:(a) with one coat of bitumen and one coat of polythene sheet
500 gauge :i) Ratio 1: 4

Chap-6 (Concrete)

Page 47

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

ii) Ratio 1:3


a) " thick (13 mm)

100Sft

1167.10

2741.25

sq.m

125.60

294.95

b) " thick (20mm)

100Sft

1167.10

3025.65

sq.m

125.60

325.55

a) " thick (13 mm)

100Sft

1167.10

2872.80

sq.m

125.60

309.10

b) " thick (20 mm)

100Sft

1167.10

3276.40

sq.m

125.60

352.55

a) " thick (13 mm)

100Sft

1167.10

2811.10

sq.m

125.60

302.45

b) " thick (20 mm)

100Sft

1167.10

3079.60

sq.m

125.60

331.35

a) " thick (13 mm)

100Sft

1167.10

2899.85

sq.m

125.60

312.00

b) " thick (20 mm)

100Sft

1167.10

3184.30

sq.m

125.60

342.65

a) " thick (13 mm)

100Sft

1167.10

3118.20

sq.m

125.60

335.50

b) " thick (20 mm)

100Sft

1167.10

3544.60

sq.m

125.60

381.40

a) " thick (13 mm)

100Sft

1167.10

2566.30

sq.m

125.60

276.15

b) " thick (20 mm)

100Sft

1167.10

2835.05

sq.m

125.60

305.05

a) " thick (13 mm)

100Sft

1167.10

2654.50

sq.m

125.60

285.60

b) " thick (20 mm)

100Sft

1167.10

2938.90

sq.m

125.60

316.25

iii) Ratio 1:2

(b) with 2 coats of bitumen:i) Ratio 1: 4

ii) Ratio 1:3

iii) Ratio 1:2

35 Providing and laying vertical damp proof course with cement


sand plaster and bitumen coating:(a) with one coat of bitumen and one coat of polythene sheet
500 gauge:
i) Ratio 1: 4

ii) Ratio 1:3

Chap-6 (Concrete)

Page 48

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

iii) Ratio 1:2


a) " thick (13 mm)

100Sft

1167.10

2872.80

sq.m

125.60

309.10

b) " thick (20 mm)

100Sft

1167.10

3299.20

sq.m

125.60

355.00

a) " thick (13 mm)

100Sft

1167.10

2810.95

sq.m

125.60

302.45

b) " thick (20 mm)

100Sft

1167.10

3079.60

sq.m

125.60

331.35

a) " thick (13 mm)

100Sft

1167.10

2899.05

sq.m

125.60

311.95

b) " thick (20 mm)

100Sft

1167.10

3183.50

sq.m

125.60

342.55

a) " thick (13 mm)

100Sft

1167.10

3117.50

sq.m

125.60

335.45

b) " thick (20 mm)

100Sft

1167.10

3543.75

sq.m

125.60

381.30

100Cft

5494.50

cu.m.

1940.65

37 Chiesel dressing concrete surface on sides of grooves.

100Sft

155.35

sq.m

16.70

38 Laying and ramming dry ballast or kankar.

100Cft

2016.30

cu.m

712.15

39 Hoisting and placing in position R.C.C. shelves.

per No.

60.85

per No.

60.85

100Cft.

1551.00

cu.m

547.80

(b) with 2 coats of bitumen:i) Ratio 1: 4

ii) Ratio 1:3

iii) Ratio 1:2

36 Grouting concrete between, the grooves of gates, including


shuttering.

40 Breaking brick ballast, screening and stacking:(a) 2"(50 mm) ring


(b) 1 "(40 mm) ring

ditto

1737.10

"

613.55

(c) 1" (25 mm) ring

ditto

2016.30

"

712.15

(d) Jhama ballast "(20 mm) ring

ditto

2326.50

"

821.70

metre

157.10

41 Supplying and fixing broken glasses on court yard walls,

Per Rft

47.90

87.50

287.00

including 1:3: 6 cement concrete coping.

Chap-6 (Concrete)

Page 49

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

42 Crushing stone ballast by machine.

100Cft

Labour
1551.00

Rate (M etric System)

Composite

Unit

cu.m.

Labour
547.80

Spec.
No.

Remarks

Composite
-

This does not include the charges


for working of crushers, but includes
manual labour for carriageof stone to
crusher within three chains (90 m)
and also stacking the product after
crushing within three chains (90 m).

43 Breaking stone ballast screened and stacked:(a) 2" ring (50 mm)

100Cft.

1737.10

cu.m.

613.55

(b) 1 " ring (40 mm)

ditto

2016.30

"

712.15

(c) 1" ring (25 mm)

ditto

2326.50

"

821.70

d) " ring (13 mm)

ditto

3102.00

"

1095.65

(e)1/8" to " ring (3 mm to 6 mm)

ditto

5273.40

"

1862.55

44 Screening and stacking stone ballast shingle or bajri, etc.

100Cft.

496.30

cu.m.

175.30

45 Washing ballast, bajri or shingle.

100Cft.

496.30

cu.m.

175.30

Each

269.15

Each

269.15

46 Erecting and carting sun shades of precast R.C. concrete


upto 5' x 2' (1.50 m x 0.76 m)

Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"

Chap-6 (Concrete)

Page 50

7. BRICK WORK
1
2

Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.
The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Pacca brick work in mud mortar in buildings:


i)
ii)

in foundation and plinth


in ground floor

100Cft.
ditto

2403.35
3182.15

15600.65
16379.45

cu.m
ditto

848.85
1123.95

Remarks

5510.15
5785.20

21.1
to
21.4

Masonry of boundary wall to be


considered as masonry other than
building.
The composite rate is to be
reduced by 7% and 14%, if 2nd or
3rd class bricks are used.

Add extra labour on item No. 1 for brick work in:i)


ii)
iii)
iv)

100Cft.
ditto
ditto
ditto

637.55
1416.35
2195.15
3504.60

-----

cu.m
ditto
ditto
ditto

225.20
500.25
775.35
1237.85

Pacca brick work in mud mortar other than building:i)


ii)

first floor
second floor
third floor
fourth & subsequent floors

upto 20 ft. (6.1 m) height


extra labour for every 5 ft. (1.5 m)
additional height, or part thereof.

100Cft.
ditto

3280.75
637.55

16478.05
--

cu.m
ditto

1158.75
225.20

ditto

Same remarks as against


item No. 1 above.

21.1

The rate of lime mortar also


includes grinding of mortar.

Cement, sand mortar:Ratio


Ratio
Ratio
Ratio
Ratio
Ratio
Ratio

ii)

Same remarks as against


item No. 1 above

5820.05
-

Pacca brick work in foundation and plinth in:i)

21.1 to
21.4

1:2
1:3
1:4
1:5
1:6
1:7
1:8

100Cft.
ditto
ditto
ditto
ditto
ditto
ditto

3158.85
3158.85
3158.85
3158.85
3158.85
3158.85
3158.85

21166.05
19989.75
19284.00
18813.45
18460.00
18228.15
18025.30

cu.m
ditto
ditto
ditto
ditto
ditto
ditto

1115.65
1115.65
1115.65
1115.65
1115.65
1115.65
1115.65

7475.85
7060.40
6811.10
6644.90
6520.05
6438.20
6366.55

lime, cement sand mortar:Ratio 1:1:6


Ratio 1:1:7
Ratio 1:1:8
Ratio 1:1:9
Ratio 1:1:10

100Cft.
ditto
ditto
ditto
ditto

3158.85
3158.85
3158.85
3158.85
3158.85

18750.15
18499.80
18296.85
18126.85
17999.50

chapter-7(Brickwork)

cu.m
ditto
ditto
ditto
ditto

1115.65
1115.65
1115.65
1115.65
1115.65

6622.55
6534.15
6462.45
6402.40
6357.40
Page 51

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iii) lime, sand mortar 1:2


5

100Cft.

17639.8

Unit
cu.m

Labour

ii)

Spec.
No.

Remarks

ditto

ditto

Composite

1115.65

6230.4

ditto

cement, sand mortar:Ratio


Ratio
Ratio
Ratio
Ratio
Ratio
Ratio

1:2
1:3
1:4
1:5
1:6
1:7
1:8

100Cft.
ditto
ditto
ditto
ditto
ditto
ditto

4185.85
4185.85
4185.85
4185.85
4185.85
4185.85
4185.85

22193.05
21016.75
20310.95
19840.45
19486.95
19255.15
19051.10

cu.m
ditto
ditto
ditto
ditto
ditto
ditto

1478.45
1478.45
1478.45
1478.45
1478.45
1478.45
1478.45

7838.60
7423.10
7173.85
7007.65
6882.80
6800.90
6728.85

lime, cement, sand mortar:-

i) The composite rate is to


be reduced by 7% and 14%,
if 2nd or 3rd class bricks are
used.
ii) Masonry of boundary wall
to be considered as masonry
other than building.

The rate of lime mortar also


includes grinding of mortar.
Ratio 1:1:6
Ratio 1:1:7
Ratio 1:1:8
Ratio 1:1:9
Ratio 1:1:10

iii) lime, sand mortar 1:2

100Cft.
ditto
ditto
ditto
ditto

4185.85
4185.85
4185.85
4185.85
4185.85

19777.10
19529.40
19323.85
19153.85
19026.90

cu.m
ditto
ditto
ditto
ditto

1478.45
1478.45
1478.45
1478.45
1478.45

6985.25
6897.80
6825.20
6765.15
6720.30

100Cft.

4185.85

18666.75

cu.m

1478.45

6593.10

100Cft.
ditto
ditto
ditto

637.55
1416.35
2195.15
3504.60

-----

cu.m
ditto
ditto
ditto

225.20
500.25
775.35
1237.85

The rate of lime mortar also


includes grinding of mortar.

Add extra labour on item No. 5 for brickwork


in:i)
ii)
iii)
iv)

3158.85

Composite

Pacca brick work in ground floor:i)

Labour

Rate (M etric System)

first floor
second floor
third floor
fourth & subsequent floors

Pacca brick work other than building upto 10ft. (3 m)


height.
i)

i) The composite rate is to be


reduced by 7% and 14%, if 2nd or
3rd class bricks are used.

cement, sand mortar:Ratio


Ratio
Ratio
Ratio
Ratio
Ratio
Ratio

ii)

21.1
to
21.5

1:2
1:3
1:4
1:5
1:6
1:7
1:8

100Cft.
ditto
ditto
ditto
ditto
ditto
ditto

3648.50
3648.50
3648.50
3648.50
3648.50
3648.50
3648.50

21655.70
20479.40
19773.60
19303.10
18949.60
18717.80
18514.90

lime, cement, sand mortar:-

cu.m
ditto
ditto
ditto
ditto
ditto
ditto

1288.65
1288.65
1288.65
1288.65
1288.65
1288.65
1288.65

7648.80
7233.30
6984.05
6817.85
6693.00
6611.15
6539.45

ii) Workshops, godowns,, bins,


house type godowns, reservoirs,
filter beds, storage tanks, wells,
screening chambers, collecting
tanks, manholes etc. are to be
treated as masonry other than
buildings.

The rate of lime mortar also


includes grinding of mortar.
chapter-7(Brickwork)

Page 52

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Ratio 1:1:6
Ratio 1:1:7
Ratio 1:1:8
Ratio 1:1:9
Ratio 1:1:10

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

100Cft.
ditto
ditto
ditto
ditto

3648.50
3648.50
3648.50
3648.50
3648.50

19239.75
18989.40
18786.50
18616.40
18489.10

cu.m
ditto
ditto
ditto
ditto

1288.65
1288.65
1288.65
1288.65
1288.65

6795.50
6707.05
6635.40
6575.30
6530.35

iii) lime, sand mortar 1:2

100Cft.

3648.50

18129.40

cu.m

1288.65

6403.30

Add extra labour on item No. 7, for every 10ft.(3 m)


additional height, or part thereof.

100Cft.

637.55

--

cu.m

225.20

Extra labour for arch work in brick masonry, including


labour for centring and decentring.

100Cft.

1095.60

--

cu.m

386.95

10 Extra for pacca brick work in steining of wells or any other


circular masonry.

100Cft.

706.20

cu.m

249.45

11 Extra labour for profile and flared walls.

100Cft.

242.95

--

cu.m

85.80

100Cft.
100Cft.

315.95
637.55

---

cu.m
cu.m

111.60
225.20

1493.40

Remarks

ditto

21.5

527.45

21.1
to
21.4

The composite rate is to be


reduced by 7% and 14%, if 2nd or
3rd class bricks are used.

12 Extra labour for pacca brick work in piers and abutment:i)


ii)

from 10ft. to 20ft. (3 m to 6 m) height


above 20 ft. (6 m) height.

13 Extra for face work (half brick thick) using special bricks
instead of first class bricks.

100Cft.

14 Reinforced brick work in lintel of openings, laid in 1:3


cement mortar, including all labour, material, forms,
moulds, lifting & shuttering, etc, (but excluding cost and
labour of steel reinforcement which shall be paid for
separately).

Per Cft.

104.00

100 Nos.
ditto

1863.65
931.80

2466.45

cu.m

871.15

272.90

cu.m

3672.75

9638.85

% Nos.
ditto

1863.65
931.80

This item is to be executed only


under the written permission of
Superintending Engineer.

15 Extra for dressing or chamfering bricks for:a)


b)

special architectural bricks


all other purposes

16 Perforated pacca brick walling half brick thick, in ground


floors:i)

mud mortar

ii)

cement, sand mortar:-

21.1
to
21.4
100 Sft.

1588.60

4892.70

chapter-7(Brickwork)

Sqm.

170.95

The composite rate is to be


reduced by 7% and 14%, if 2nd or
3rd class bricks are used.

526.45

Page 53

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio

1:2
1:3
1:4
1:5
1:6
1:7
1:8

100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto

Labour
2097.90
2097.90
2097.90
2097.90
2097.90
2097.90
2097.90

Rate (M etric System)

Composite
6604.50
6310.15
6134.00
6016.35
5933.75
5869.50
5822.35

Unit
sq.m.
ditto
ditto
ditto
ditto
ditto
ditto

Labour

Spec.
No.

Composite

225.75
225.75
225.75
225.75
225.75
225.75
225.75

710.65
678.95
660.00
647.35
638.45
631.55
626.50

iii) lime, cement sand mortar

The rate of lime mortar also


includes grinding of mortar.
Ratio 1:1:6
Ratio 1:1:7
Ratio 1:1:8
Ratio 1:1:9
Ratio 1:1:10

iv)

Remarks

lime, sand mortar 1:2

100Sft.
100Sft.
100Sft.
100Sft.
100Sft.

2097.90
2097.90
2097.90
2097.90
2097.90

6000.50
5937.05
5889.90
5844.10
5816.95

sq.m
sq.m
sq.m
sq.m
sq.m

225.75
225.75
225.75
225.75
225.75

645.65
638.85
633.75
628.85
625.90

100Sft.

2097.90

5720.75

sq.m

225.75

615.55

100Sft.
ditto
ditto
ditto

321.60
705.35
1100.40
1684.95

sq.m
ditto
ditto
ditto

34.60
75.90
118.40
181.30

ditto

17 Add extra labour on item No. 16 for pacca brick work in:i)
ii)
iii)
iv)

first floor
second floor
third floor
fourth & subsequent floors

18 Perforated pacca brick walling one brick thick, in ground


floor:
i)

mud mortar

ii)

cement, sand mortar:Ratio


Ratio
Ratio
Ratio
Ratio
Ratio
Ratio

1:2
1:3
1:4
1:5
1:6
1:7
1:8

21.1
to
21.4
100Sft.

2246.65

8845.30

sq.m

241.75

951.75

100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto

3150.95
3150.95
3150.95
3150.95
3150.95
3150.95
3150.95

12154.55
11566.40
11213.50
10978.25
10813.00
10684.25
10584.20

sq.m
ditto
ditto
ditto
ditto
ditto
ditto

339.05
339.05
339.05
339.05
339.05
339.05
339.05

1307.85
1244.55
1206.55
1181.25
1163.50
1149.65
1138.85

100Sft.
ditto
ditto
ditto
ditto

3150.95
3150.95
3150.95
3150.95
3150.95

10946.60
10818.40
10720.00
10634.95
10572.65

sq.m
ditto
ditto
ditto
ditto

339.05
339.05
339.05
339.05
339.05

1177.85
1164.05
1153.45
1144.30
1137.60

100Sft.

3150.95

10390.15

sq.m

339.05

1118.00

iii) lime, cement, sand mortar:Ratio 1:1:6


Ratio 1:1:7
Ratio 1:1:8
Ratio 1:1:9
Ratio 1:1:10
iv)

lime, sand mortar 1:2

chapter-7(Brickwork)

The composite rate is to be


reduced by 7% and 14%, if 2nd or
3rd class bricks are used.

The rate of lime mortar also


includes grinding of mortar

ditto
Page 54

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

-----

sq.m
ditto
ditto
ditto

Labour

Spec.
No.

Remarks

Composite

19 Add extra labour on item No. 18 for perforated pacca brick


work in:i)
ii)
iii)
iv)

first floor
second floor
third floor
fourth & subsequent floors

100Sft.
ditto
ditto
ditto

478.15
1062.25
1646.35
2628.45

168.90
375.20
581.50
928.40

20 Fire brick masonry in fireclay mortar:i)

upto 20 ft. (6.10 m) height including all charges.

Per Cft.

39.30

ii)

Extra for every 5 ft. (1.5 m) additional height, or part


thereof.

100Cft.

637.55

633.55
--

cu.m

1388.40

ditto

225.20

22377.80
-

A& C No.I dated 2.9.1998

21 First class brick walling laid in 1:3 cement sand mortar,


reinforced with 1" (25 mm) wide 18 gauge hoop iron:i)

4" (113 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
ii) 4" (113 mm) thick walling with hoop iron, bonding
12" (300 mm) apart.
iii) 3" (75 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
iv) 3" (75 mm) thick walling with hoop iron, bonding 12"
(300 mm) apart.

21.1
to
21.2

21.19
100Sft.

1744.40

9238.95

sq.m

187.70

994.10

100Sft.

1553.95

8595.20

sq.m

167.20

924.85

ditto

1381.40

6806.00

ditto

148.65

732.35

ditto

1105.10

6026.25

ditto

118.90

648.45

22 Ghilafi work (1 brick thick wall)

100Cft.

3202.20

10587.75

cu.m

1131.00

3739.60

21.18

23 Dry brick pitching

100Cft.

1947.00

14907.00

cu.m

687.70

5265.15

21.1

24 Sun dried bricks in mud mortar

100Cft.

2709.95

4283.75

cu.m

957.15

1513.00

21.16

25 Pise wall (mud walling)

100Cft.

1560.25

cu.m

551.10

21.17

--

26 Eave brick moulded, weathered and throated with back


brick or drip course cornice, in 1:3 cement mortar:i)
3" (75 mm) thick drip course cornice
ii) 4" (113 mm) thick drip course cornice.
iii) 4" (113 mm) thick eave brick with back brick.

21.1 to 21.2

Rft.
ditto
ditto

19.85
22.50
15.55

51.25
106.80
126.60

Metre
ditto
ditto

65.10
73.80
51.00

168.10
350.30
415.25

27 Laying dressed or moulded brick cornices in 1:6 cement


mortar, plastering or painting complete:i)
ii)

1 brick
2 bricks

correction vide A& C No.I


dated 2.9.98

21.1 to 21.2

Rft.
ditto

22.50
33.10

38.55
82.05

chapter-7(Brickwork)

Metre
ditto

73.80
108.55

126.45
269.10
Page 55

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iii) 3 bricks
iv) 4 bricks

Labour

ditto
ditto

44.15
55.55

28 Cleaning bricks dismantled from kacha pacca masonry

1,000
Nos

868.55

29 Scraping bricks dismantled from pacca masonry

1,000
Nos

1637.85

100Cft.

206.80

Rft.

82.90

30 Supplying and filling sand under floor; or plugging in wells.


31 Providing and laying 2" (50 mm) thick and 15" (375 mm)
projected tile band, laid in 1:2 cement sand mortar, with
hoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"
apart.

Rate (M etric System)

Composite
125.10
175.70

Unit

Labour

Spec.
No.

Composite

ditto
ditto

144.80
182.20

410.35
576.30

--

1,000
Nos

868.55

--

1,000
Nos

1637.85

1346.80

cu.m

73.05

475.70

141.45

Metre

271.90

463.95

32 First class brick tiles clad by laying tiles in stretcher


course in cement sand mortar reinforced with 18 SWG
hoop iron strips bonding placed at 2.0' (600 mm) apart
horizontally, and at 1.0' (300 mm) interval vertically.
i)
ii)

1:3
1:4

This item is to be executed only


under the written permission of the
Superintending Engineer.

100Sft.
ditto

1553.95
1553.95

Per Sft.

44.20

34 Replacing kallar eaten bricks

Each No.

33.90

35 Repairing corners of bridges and other hydraulic masonry


works

Each No.

221.10

36 Extra labour for drains of bath rooms, etc.

Per Lft.

17.65

37 Maroo corners

Each
Corner

113.00

33 Chamfering sides of head regulators and masonry walls to


increase width.

Remarks

9135.90
8853.60

sq.m
ditto

167.20
167.20

sq.m

475.60

41.95

Each

33.90

41.95

298.35

Each

221.10

298.35

--

Metre

57.90

--

Each
Corner

113.00

--

chapter-7(Brickwork)

983.00
952.65
-

Payable in addition to brick work

Page 56

8. STONE MASONRY
1

The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of
transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.

The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of the
stone or spawl carried.

Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl is
supplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)
shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall form
the basis of laying.

Rates for all finished work include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i)
ii)
iii)
iv)

Unit

Labour

dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8

i)
ii)
iii)
iv)

dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8

22.10,
22.11
100 Cft.
100 Cft.
100 Cft.

3273.60
4093.65
6240.30

4077.60
5202.75
8999.10

cu.m
cu.m
cu.m

1156.25
1445.90
2204.05

1440.20
1837.60
3178.50

100 Cft.
100 Cft.
100 Cft.
100 Cft.

6240.30
6240.30
6240.30
6240.30

12850.65
11792.00
10580.35
9909.90

cu.m
cu.m
cu.m
cu.m

2204.05
2204.05
2204.05
2204.05

4538.85
4164.95
3737.00
3500.20
22.8

100 Cft.
100 Cft.
100 Cft.

3979.80
5619.90
6926.70

4783.80
6729.00
9467.55

cu.m
cu.m
cu.m

1405.65
1984.95
2446.50

1689.65
2376.70
3343.95

100 Cft.
100 Cft.
100 Cft.
100 Cft.

6926.70
6926.70
6926.70
6926.70

13179.90
12238.85
11161.55
10569.10

cu.m
cu.m
cu.m
cu.m

2446.50
2446.50
2446.50
2446.50

4655.15
4322.75
3942.25
3733.00

Random rubble masonry (uncoursed) in


ground floor or 20 ft.(6 m) height, building/other
than building.
a)
b)

dry masonry
in mud mortar

Remarks

Composite

Coursed rubble masonry hammer dressed, in foundation


and plinth:
a)
b)
c)
d)

Composite

Spec.
No.

Random, rubble masonry (uncoursed), in foundation and


plinth:
a)
b)
c)
d)

Labour

Rate (M etric System)

22.10

100 Cft.
100 Cft.

3626.70
4913.70

4430.70
6022.80

chapter-8(Stone masonary)

cu.m
cu.m

1280.95
1735.50

1564.90
2127.25
Page 57

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)
d)
i)
ii)
iii)
iv)
4

i)
ii)
iii)
iv)

dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8

in lime, sand mortar 1:2


in cement, sand mortar:
i) ratio 1:3
ii) ratio 1:4
iii) ratio 1:6

in lime, sand mortar 1:2


in cement, sand mortar:
i) ratio 1:3
ii) ratio 1:4
iii) ratio 1:6

Remarks

Composite

100 Cft.

6750.15

9508.95

cu.m

2384.15

3358.55

100 Cft.
100 Cft.
100 Cft.
100 Cft.

6750.15
6750.15
6750.15
6750.15

13360.50
12301.85
11090.20
10419.75

cu.m
cu.m
cu.m
cu.m

2384.15
2384.15
2384.15
2384.15

4718.95
4345.00
3917.05
3680.25
22.8

100 Cft.
100 Cft.
100 Cft.

4643.10
6946.50
7766.55

5447.10
8042.05
10307.40

cu.m
cu.m
cu.m

1639.95
2453.50
2743.15

1923.90
2840.45
3640.55

100 Cft.
100 Cft.
100 Cft.
100 Cft.

7766.55
7766.55
7766.55
7766.55

14019.75
13078.70
12001.40
11408.95

cu.m
cu.m
cu.m
cu.m

2743.15
2743.15
2743.15
2743.15

4951.80
4619.40
4238.90
4029.65
22.5
&
22.6

100 Cft.

20163.00

22617.80

cu.m

7121.55

7988.60

100 Cft.
100 Cft.
100 Cft.

20163.00
20163.00
20163.00

25185.75
24479.95
23680.05

cu.m
cu.m
cu.m

7121.55
7121.55
7121.55

8895.60
8646.30
8363.80

100 Cft.

35828.10

38075.45

cu.m

12654.50

13448.25

100 Cft.
100 Cft.
100 Cft.

35828.10
35828.10
35828.10

39359.40
39006.05
38613.85

cu.m
cu.m
cu.m

12654.50
12654.50
12654.50

13901.75
13776.95
13638.40

100 Cft.
100 Cft.
100 Cft.
100 Cft.

896.05
1968.40
3065.55
4813.25

cu.m
cu.m
cu.m
cu.m

316.50
695.25
1082.75
1700.05

100 Cft.

778.80

cu.m

275.05

22.3
(A) to
(C) &
22.4

Extra labour on items 3, 4, 5 & 6 above for work in:i)


ii)
iii)
iv)

Labour

Ashlar fine masonry (including dressing, etc.) in ground


floor or 20 ft. 6 m) height, building/other than building.
a)
b)

Unit

Ashlar block in course or scabbled masonry (including


dressing, etc.,) in ground floor or 20 ft. (6 m) height,
building/other than building.
a)
b)

Composite

Spec.
No.

Coursed rubble masonry hammer dressed, in ground floor


or 20 ft. (6 m) height, building/other than building.
a)
b)
c)
d)

in lime, sand mortar 1:2


in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8

Labour

Rate (M etric System)

first floor
second floor
third floor
fourth floor

Extra labour on items 3,4,5 & 6 above for every 5 ft.(1.5 m)


additional height, other than building, or part thereof.

chapter-8(Stone masonary)

Page 58

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Extra labour for arch work in stone masonry, including


centering and decentring, etc.

100 Cft.

Labour
2205.75

Rate (M etric System)

Composite

Unit

cu.m

Labour
779.05

Spec.
No.

Composite
-

10 Extra labour for:a)


b)

coping and caps, etc.


cornice & string course

hammer dressed
rough tooled dressed
chisel dressed
fine dressed

22.12

22.7
100 Cft.
100 Rft.

10169.30
10169.30

cu.m
Rm.

3591.80
333.55

11 Dressing stones:a)
b)
c)
d)

Remarks

22.2
100 Sft.
100 Sft.
100 Sft.
100 Sft.

4065.60
7634.90
9261.10
18865.45

12 Dhajji walling 5"x5" (125 mmx125 mm) thick deodar


framing with stone laid in 1:6 cement sand mortar, and 1:4
cement sand plaster on both sides.

100 Sft.

13 Providing and fixing stone blocks from 2 Cft.


(0.6 cu.m) to 6 Cft (0.17 cu.m). each
including lift upto 20 ft. (6 m)
14 Providing and fixing stone blocks, under 2
Cft. (06 cu.m) each including lift upto 20 ft.
(6 m)

i) This rate of dressing shall be paid


only when the supply of undressed
stone is made.
ii) In case of masonry, dressing is
already included and this rate shall
not be added thereto.
iii) Only dressed surface of stone
shall be measured.

sq.m
sq.m
sq.m
sq.m

437.45
821.50
996.50
2029.90

8065.25

13775.50

sq.m

867.80

1482.25

Per Cft.

375.50

404.75

cu.m

13262.65

14295.75

Per Cft.

211.60

243.80

cu.m

7473.70

8611.00

chapter-8(Stone masonary)

22.13

Page 59

9. ROOFING
Rates for all finished works include the removal of surplus debris unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

First class tile roofing, consisting of 4" (100 mm) earth


and 1" (25 mm) mud plaster with Gobri leeping over " (13
mm) thick cement plaster 1:6 with 34 lbs. per %Sft or
1.72 Kg/sq.m hot bitumen coating sand blinded, provided
over 2 layers of tiles 12"x6"x1" (300x150x30 mm) laid in
1:6 cement mortar with " (13 mm) thick sand wiched
layer of 1:6 cement mortar, including 1:2 cement pointing
underside of tiles, complete, including curing, etc.

100Sft.

5667.00

11093.60

sq.m

609.75

1193.65

23.1

Second class tile roofing consisting of 4" (100 mm) earth


and 1" (25 mm) mud plaster with Gobri leeping over " (13
mm) thick cement plaster 1:6 with 34 lbs. per %Sft or
1.72 Kg/sq.m of hot bitumen coating sand blinded,
provided over one layer of 12"x6"x2" (300x150x50 mm)
tiles laid in 1:6 cement mortar, including 1:2 cement
pointing underneath of tiles complete including curing, etc.

100Sft.

4395.60

8270.65

sq.m

472.95

889.90

23.2

Covering mud roof with coal tar, and fine sand.

100Sft.

239.85

912.50

sq.m

25.80

Filling spaces in between:100Sft.


roof area
-ditto-ditto-

442.20

2439.75

sq.m

47.60

262.50

841.50
230.60

1186.80
791.60

90.55
24.80

127.70
85.20

100Sft.

1376.55

5981.45

148.10

643.60

a)
b)
c)

Wooden battens over beams, filled with


deodar wood pieces (spacers).
RCC battens, filled with CC block 1:3:6.
Spaces filled with bricks.

Single layer of tiles 9"x4"x1" (225x113x40 mm) laid


over 4"(100 mm) earth and 1" (25 mm) mud plaster without
Bhoosa, grouted with cement sand 1:3 on top of RCC roof
slab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.m
bitumen coating sand blinded.

Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with 3" (75 mm)
earth and 1" (25 mm) plaster, soffits of arches cement
plaster 1:6 and " (13 mm) thick. The rate also includes
bitumen coating, centring, laying skew bricks in cement
mortar (1:3), and encasing exposed flanges of the joints
with fine cement concrete 1:2:4 using stone aggregate:-

sq.m

Remarks

98.20 23.1 to 23.2

Add extra 13%, 32% & 51% on


labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively.

ditto

ditto

Add extra 13%, 32% & 51% on


labour rates only or 6%, 15% &
23% on composite rates for 2nd,
3rd, 4th & sub- sequent floors,
respectively.
23.1

23.3 to
23.5

ditto

For steel part and its erection etc.


items 10 & 14 under Chapter IRON
WORK be referred.
Add extra 13%, 32% & 51% on
labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively.

chapter-9(Roofing)

Page 60

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

a)
b)
7

cement concrete in haunches 1:6:12.


cement concrete in haunches 1:3:6.

100Sft.
ditto

Labour
6235.70
6235.70

Rate (M etric System)

Composite
16601.85
17827.65

Unit
sq.m
ditto

Labour
670.95
670.95

Spec.
No.

Composite
1786.35
1918.25

Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with " (13 mm)
cement plaster 1:6 on top (except earth filling mud plaster
and gobri) soffit of arches cement plastered. The rate also
includes bitumen coating, centring, laying skew bricks in
cement sand mortar (1:3), and encasing exposed flanges
of the joints with fine cement concrete 1:2:4 using stone
aggregate:a)
b)

cement concrete in haunches 1:6:12.


cement concrete in haunches 1:3:6.

23.3
to
23.5

100Sft.
ditto

5067.50
5067.50

Extra for vaulted jack arch roofing.

100Sft.

1129.90

Jack arch roofing of shingle and cement concrete 1:3:6,


4" (113 mm) thick at crown, with " (13 mm) cement
plaster including cost of supplying, erecting and
dismantling centring.

100Sft.

7269.90

16072.15
16369.85

14627.05

sq.m
ditto

545.25
545.25

1729.35
1761.40

sq.m

121.60

sq.m

782.25

1573.85

ditto

10 Earth filling over roof including watering, ramming with 1"


(25 mm) mud plaster finished, with gobri leeping:

23.3
to
23.5

23.1
to
23.3

a)

3" (75 mm) thick earth filling and 1" (25 mm) mud
plaster

100Sft.

624.30

957.70

sq.m

67.20

103.05

b)

4" (100 mm) thick earth filling and 1" (25mm)


mud plaster

100Sft.

818.00

1219.20

sq.m

88.00

131.20

11 1/8" (3 mm) thick gobri leeping on roofs or floors.

100Sft.

81.60

96.40

sq.m

8.80

10.35

ditto

12 Two coats of bitumen laid hot using 34 lbs. per %Sft, or


1.72 Kg per square metre over roof and blinded with sand
at one Cft. per %Sft. (0.003 cu.m per sq.m)

100Sft.

496.30

1788.85

sq.m

53.40

192.50

23.1

13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts,
nuts, limpet and bitumen washers, wind ties, complete in
all respects without valleys and ridges:20 BWG
22 BWG
24 BWG

14 Khassi parnalas in cement, sand mortar 1:2, 12" (300

For steel part and its erection etc.


items 10 & 14 under Chapter IRON
WORK be referred.
Add extra 13%, 32% & 51% on
labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively.

a)
b)
c)

Remarks

23.7

100Sft.
100Sft.
100Sft.

884.4
884.4
884.4

13241.75
11348
9219.05

sq.m
sq.m
sq.m

95.15
95.15
95.15

1424.8
1221.05
991.95

Rft.

63.00

83.95

Metre

206.65

275.35

chapter-9(Roofing)

ditto

Add extra 13%, 32% & 51% on


labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively.

ditto

Add extra 13%, 32% & 51% on


labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively,
on items 13 to 18.

23.10
Page 61

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

mm) outside width finished smooth with a floating coat of


neat cement.
15 Khuras on roof 2'x2'x6" (600 x 600 x 150 mm)

Each

237.35

401.60

Each

Each

401.60

23.10

16 Bottom Khuras of brick masonry in cement mortar 1:6,


4'x2'x4" (1200x600x113 mm) over 3" (75 mm) cement
concrete 1:4:8.

Each

237.35

791.20

Each

237.35

791.20

23.10

Per Rft.
Per Rft.

48.80
48.80

148.05
169.00

Metre
Metre

160.05
160.05

485.60
554.30

18 Plain galvanized iron sheet flashing, 22 gauge.

Per Sft.

48.80

121.15

sq.m

525.10

1303.55

19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over
roof expansion joint complete in all respects.

Per Sft.

14.10

80.55

Sq.m

151.70

866.70

17 Plain galvanized iron sheets 22 SWG rain water down pipe


including clamp and fixing in position.

a)
b)

4" (100 mm) diameter down pipe


5" (125 mm) diameter down pipe

23.11

20 Cast iron rain water downpipe fixed in position, excluding


heads and shoes, but including painting and clamps, etc:a)
b)

4" dia (100 mm) cast iron down pipe.


3" (75 mm) cast iron down pipe.

Add extra 13%, 32% & 51% on


labour rates only or 6%, 15% & 23%
on composite rates for 2nd, 3rd, 4th
& sub- sequent floors, respectively,
on items 19 to 24

Per Rft.
Per Rft.

44.20
44.20

206.15
182.45

Metre
Metre

145.00
145.00

676.15
598.45

21 Rain water down pipe cast iron head fixed in place,


including cost of clamp holdfast and painting.

Each

182.95

487.50

Each

182.95

487.50

22 Shoes, bends or offsets for cast iron rain water down pipe,
including fixing and painting.

Each

66.35

308.65

Each

66.35

308.65

23 Plain GI sheet iron spouts fixed in position, including


painting.

Each

203.30

315.80

Each

203.30

315.80

23.10

100Sft.

4686.00

20080.30

sq.m

504.20

2160.65

26.1

100Sft.
100Sft.

2830.75
2830.75

14564.25
13138.40

sq.m
sq.m

304.60
304.60

1567.10
1413.70

23.60

100Sft.

1947.00

5853.60

sq.m

209.50

629.85

23.8

24 Laying " (13 mm) thick deodar ceiling complete,


including sawing, planing and fixing.
25 Flat sheet roof with galvanized iron plain sheets, including
battens, rolls, screws, clips etc. (Planking to be paid for
separately):a)
b)

22 BWG sheets roofing


24 BWG sheets roofing

26 Asbestos cement corrugated sheet roofing including


necessary overlaps, and GI hook bolts, nuts, screws,
washers and bitumen washers, etc. (excluding valleys and

chapter-9(Roofing)

Page 62

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

--

sq.m

25.30

Metre

75.45

Spec.
No.

Remarks

Composite

ridges, etc).
27 Extra labour for erection of GI sheets, flat sheet or
asbestos sheet roofing, above 20' (6.10 m) height in
difficult position, including lifting with care and special
scaffolding along live electric wires.

100Sft.

235.05

28 Fixing asbestos cement sheet ridges and valleys "


(6 mm) thick.

Per Rft.

23.00

72.45

23.6

237.65

29 Plain galvanized iron sheet ridging, including fixture,


timber for ridge roll and ridge sheeting:a)

23.6

Per Rft.

61.00

398.75 Per Metre

200.10

1307.90

Per Rft.

79.60

392.05 Per Metre

261.10

1285.90

Per Rft.

79.60

452.55 Per Metre

261.10

1484.35

30 Plain 22 gauge G.I sheet gutter semi circular


8" (200 mm) dia meter.

Per Rft.

39.80

152.75 Per Metre

130.55

501.00

31 Making masonry ventilators in cement, sand


mortar 1:4

Each

884.40

Each

884.40

1476.85

32 Fixing water spouts or parnalas.

Each

265.30

Each

265.30

33 Making drip course 2"x" (50x13 mm) under RCC slab edges
in outer opening, in cement, sand mortar 1:2.

Per Rft.

11.35

12.60

Metre

37.25

41.35

34 Supplying and laying of twin G.I sheet 20 SWG duly


painted with bitumen, with polythene film in between 300
gauge, to provide a sliding joint under the bearing of the
beams, including 3" (75 mm) long, 3/8" (10 mm) dia bar to
act as holdfast on wall and beam.

Per Sft.

33.35

290.70

sq.m

358.85

3127.95

100Sft.
100Sft.
100Sft.

2126.85
2126.85
2130.40

6832.15
6958.15
7087.70

sq.m
sq.m
sq.m

228.85
228.85
229.25

735.15
748.70
762.65

13.25

232.20

Metre

43.45

761.60

b)
c)

6" (150 mm) lap and 18" (450 mm)


overall, of 22 gauge G.I sheet ridging.
9" (225 mm) lap and 24" (600 mm)
overall, of 24 gauge G.I sheet ridging.
12" (300 mm) lap and 30" (750 mm)
overall, of 22 gauge G.I sheet ridging.

23.8

1476.85

--

23.11

23.10

35 Providing and laying roof insulation, comprising of single


layer of tiles 9"x4"x1" (225x113x40 mm) grouted with
cement sand mortar 1:3 laid over 2" (50 mm) thick earth
(including mud plaster) over thermopore sheet, over
polythene sheet 300 gauge over a layer of bitumen,
complete in all respects:i) Thermopore sheet " (13 mm) thick
ii) Thermopore sheet " (20 mm) thick
iii) Thermopore sheet 1" (25 mm) thick
36 Providing and fixing AC rain water down pipe 4" (100 mm)

Rft.

chapter-9(Roofing)

Page 63

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

dia, with shoe, T-bend, clamp, etc.


37 Making jharries in existing brick masonry for providing
recesses for bearing of RCC roof slab, including repairing
the damaged face:i)
ii)

for slabs upto 6" (150 mm) thick


for slabs exceeding 6" to 12" (150 to 300 mm) thick.

Rate will be increased by 1.5 time


for stone masonry or plain; concrete;
and 2 times for reinforced cement
concrete.
Rft.
Rft.

14.10
24.30

15.95
27.65

Metre
Metre

46.25
79.70

52.30
90.70

38 Making recess in existing brick masonry for bearing of


beam, girder, R.S. Joist, etc. including repairing damaged
face:-

Rates will be increased by 1.5 times


for stone masonry and plain
cement concrete and two times
for reinforced cement concrete.

i)

upto 1.0' (300 mm) height of girder or beam.

Each

58.85

64.95

Each

58.85

64.95

ii)

for every 6" (150 mm) additional height or part thereof.

Each

28.25

31.20

Each

28.25

31.20

39 Hoisting RS. Beams and wooden beams and placing in


position.

Each

256.75

Each

256.75

40 Hoisting and placing in position sahl ballies, over roof.

Each

37.90

Each

37.90

Each
Each
Each
Each
Each

36.70
51.35
64.20
85.60
102.70

Each
Each
Each
Each
Each

36.70
51.35
64.20
85.60
102.70

41 Hoisting precast R.C.C/prestressed concrete


battens and placing in position.
a)
b)
c)
d)
e)

5' to 6' (1.50 to 1.83 m) long


6' to 7' (1.83 to 2.13 m) long
7' to 8' (2.13 to 2.44 m) long
8' to 9' (2.44 to 2.74 m) long
above 9' (2.74 m) length

42 Hoisting and placing in position R.C. trough:


a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)

upto 10' (3 m) in length


10' to 11' (3 to 3.36 m) in length
11' to 12' (3.36 to 3.66 m) in length
12' to 13' (3.66 to 3.96 m) in length
13' to 14' (3.96 to 4.26 m) in length
14' to 15' (4.26 to 4.57 m) in length
15' to 16' (4.57 to 4.88 m) in length
16' to 17' (4.88 to 5.19 m) in length
17' to 18' (5.19 to 5.49 m) in length
18' to 19' (5.49 to 5.80 m) in length
19' to 20' (5.80 to 6.10 m) in length

Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

102.70
128.35
171.15
197.50
213.95
233.40
256.75
285.25
366.75
395.00
427.90

Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

102.70
128.35
171.15
197.50
213.95
233.40
256.75
285.25
366.75
395.00
427.90

Each
ditto
ditto

79.70
177.10
212.50

Each
ditto
ditto

79.70
177.10
212.50

Applicable only to roof trough


(inverted tees & trough) for height of
1st storey only.

43 Hoisting and placing in position R.C. inverted battens:i) upto 10' (3.05 m) span
ii) from 10' to 12' (3.05 to 3.66 m) span
iii) from 12' to 13' (3.66 to 3.96 m) span

chapter-9(Roofing)

Page 64

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iv)
v)
vi)
vii)
viii)

from 13' to 14' (3.96 to 4.26 m) span


from 14' to 15' (4.26 to 4.57 m) span
from 15' to 16' (4.57 to 4.88 m) span
from 16' to 18' (4.88 to 5.49 m) span
from 18' to 20' (5.49 to 6.10 m) span

44 Reinforced cement concrete spout, including fixing in


position, with top and bottom Khurras.

Labour

ditto
ditto
ditto
ditto
ditto

265.65
289.80
318.80
398.50
637.55

Each

353.75

Rate (M etric System)

Composite

Unit

ditto
ditto
ditto
ditto
ditto

265.65
289.80
318.80
398.50
637.55

Each

353.75

594.60

594.60

chapter-9(Roofing)

Labour

Spec.
No.

Remarks

Composite

Page 65

10. FLOORING
Rates for all finished works include the removal of surplus debris, unused material and byproducts

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Laying Murum flooring, consisting of 1"(25 mm) layer of


fine powdery or flakey variety of Murum, laid over 6"(150
mm) good hard layer of Murum spreaded over 9"(225 mm)
thick sub-base comprising of hand packed rubble or
broken bricks properly watered and rammed, provided over
well rammed earth.

100 Sft.

2527.80

3797.15

sq.m

272.00

408.55

Earth flooring, consisting of 6"(150 mm) thick consolidated


layer of moistened earth, including ramming.

100 Sft.

865.45

1204.45

sq.m

93.10

129.60

Providing, laying, watering and ramming brick ballast 1"


to 2"(40 mm to 50 mm) gauge mixed with 25% sand, for
floor foundation, complete in all respects.

100 Cft.

1985.95

4070.95

cum.

701.45

1437.85

Mud flooring, consisting of 6"(150 mm) thick consolidated


layer of moistened earth and finished off with 1"(25 mm)
mud plaster and gobri leeping.

100 Sft.

1574.10

2082.15

sq.m

169.35

224.05

24.2

Dry brick paving laid flat, sand grouted, including


preparation of bed by watering, ramming and bringing the
same to proper camber, by "(13 mm) thick mud plaster.

100 Sft.

803.90

4261.55

sq.m

86.50

458.55

24.12

Dry brick on edge paving, sand grouted, including


preparation of bed by watering, ramming & bringing the
same to proper camber, by "(13 mm) thick mud plaster.

100 Sft.

1453.90

6603.00

sq.m

156.45

710.50

24.12

Grouting 4"(113 mm) dry brick work with cement mortar


ratio 1: 5

100 Sft.

781.45

1254.40

sq.m

84.10

134.95

Flat brick flooring laid in 1:6 cement mortar, over a bed of


3/4" (20 mm) thick cement mortar, 1:6.

100 Sft.

1419.00

5676.10

sq.m

152.70

610.75

24.4

Brick on edge flooring, laid in 1:6 cement mortar, over a


bed of " (20 mm) thick cement mortar 1:6.

100 Sft.

1,808.40

8,038.75

sq.m

194.60

864.95

24.4

10

Brick tiles (12"x6"x2") (300x150x50mm) laid in 1:6


cement mortar, over a bed of " (20 mm) thick cement
mortar 1:6.
Brick ties (9"x4"x1")(225 mm x 113 mm x 40 mm) laid
flat in 1:3 cement mortar, over a bed of 3/4"(20 mm) thick
cement mortar 1:6.

100 Sft.

1,773.75

3,938.80

sq.m

190.85

423.80

ditto

100 Sft.

1,950.30

5,450.45

sq.m

209.85

586.45

24.4

Cement tiles (8"x8"x")(200 x 200 x 20 mm) laid flat in


1:2 cement mortar, over 3/4" (20 mm) thick bed of cement

100 Sft.

1,168.35

6,092.45

sq.m

125.70

655.55

24.7

11

12

chapter-10(Flooring)

Remarks

24.1

Page 66

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

mortar 1:2.
13

Cement concrete tiles laid in 1:2 cement mortar, over


3/4" (20 mm) thick bed of cement mortar 1:2:(a) 12"x12"x1" (300 x 300 x 25 mm)
(b) 9"x9"x" (225 x 225 x 20 mm)
(c) 6"x6"x"(150 x 150 x 20 mm)

14

Coloured cement tiles (8"x8"x")(200 x 200 x 20 mm) of


approved dark shade laid flat in 1:2 cement mortar, over
" (20 mm) bedding mortar of 1:2.

15

Providing and laying topping of cement concrete 1:2:4,


including surface finishing and dividing in panels:(a) 1"(25 mm) thick
(b) 1"(30 mm) thick
(c) 1"(40 mm) thick
(d) 1"(45 mm) thick
(e) 2"(50 mm) thick
(f) 2"(56 mm) thick
(g) 2"(62 mm) thick
(h)2"(70 mm) thick
(i) 3"(75 mm) thick

16

24.8

100 Sft.
ditto
ditto

1,168.35
1,168.35
1,168.35

4,226.05
5,466.85
7,910.95

sq.m
ditto
ditto

125.70
125.70
125.70

454.70
588.25
851.20

100 Sft.

1,168.35

6,121.95

sq.m

125.70

658.70

100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

1,255.65
1,255.65
1,597.20
1,597.20
1,938.75
2,000.80
2,280.30
2,280.30
2,280.30

2,446.65
2,709.85
3,314.60
3,590.95
4,258.30
4,566.55
5,041.55
5,384.60
5,691.20

sq.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

135.10
135.10
171.85
171.85
208.60
215.30
245.35
245.35
245.35

100 Sft.
ditto
ditto

1,861.85
1,861.85
2,379.95

3,522.80
3,698.60
4,483.70

sq.m
ditto
ditto

200.35
200.35
256.10

379.05
397.95
482.45

946.00

sq.m

47.60

101.80

sq.m

40.05

17

Add extra in cement concrete floor topping, if finished with


pigment and polishing.

100 Sft.

442.20

18

Extra labour for each storey above ground, for mosaic,


conglomerate, tiles, stone and wooden floor.

100 Sft

372.25

19

Flag stone flooring in lime mortar 1:2, over "(20 mm)


bedding mortar, in platforms and floors, etc.
(a) 2"(50 mm) thick
(b) 3"(75 mm) thick

24.9

If glass or marble strips are used


for panelling, it will be paid extra as
per item No. 41 or 42.

24.10

If glass or marble strips are used


for panelling, it will be paid extra as
per item No. 41 or 42.

263.25
291.60
356.65
386.40
458.20
491.35
542.45
579.40
612.35

Providing and laying conglomerate flooring (two coat work)


with top layer of "(13mm) thick wearing surface,
consisting of one part of cement and 2 parts of stone
chips passing 3/16"(6 mm) sieve, over bottom layer of
cement concrete 1:3:6, including surface finishing and
dividing in panels:(a) 1"(40 mm) thick
(b) 1"(45 mm) thick
(c) 2"(50 mm) thick

24.7

On items 19-25 & 29-34

24.5

100 Sft.
ditto

3,834.60
3,834.60

5,488.85
5,755.20

chapter-10(Flooring)

sq.m
ditto

412.60
412.60

590.60
619.25

Page 67

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

20

Unit

Labour

24.10

100 Sft.
ditto
ditto

1,593.90
1,248.40
917.00

13,012.80
7,085.10
3,937.15

sq.m
ditto
ditto

171.50
134.35
98.65

1400.20
762.35
423.65

If glass or marble strips are used


for panelling, it will be paid extra as
per item No. 41 or 42.

100 Sft.
ditto

5,673.35
5,673.35

8,254.15
8,533.95

sq.m
ditto

610.45
610.45

888.15
918.25

1"(40 mm) thick mosaic flooring, consisting of "(13


mm) mosaic topping of one part of cement and marble
powder in the ratio of 3:1 and two parts of marble chips,
laid over 1"(25 mm) thick floor of 1:2:4 cement concrete,
including rubbing and polishing complete with finishing :(a) using grey cement
(b) using white cement

Remarks

Composite

1 /8"(35 mm) thick mosaic flooring, consisting of 3/8"(10


mm) mosaic topping of one part of cement and marble
powder in the ratio of 3:1 and two parts of marble chips,
laid over 1"(25 mm) thick flooring of 1:2:4 cement concrete
including rubbing and polishing complete :(a) using grey cement
(b) using white cement

22

Composite

Spec.
No.

Asphalt flooring , including preparation of proper base


remelting, setting out, and finishing complete:(a) 1"(25 mm) thick topping
(b) "(13 mm) thick topping
(c) "(6 mm) thick topping

21

Labour

Rate (M etric System)

If glass or marble strips are used


for panelling, it will be paid extra as
per item No. 41 or 42.

100 Sft.
ditto

5,673.35
5,673.35

8,437.45
9,074.35

sq.m
ditto

610.45
610.45

907.85
976.40

23

Providing and laying floor of mosaic marble chips tiles


1"(25 mm) thick of approved quality and shade, laid in
white cement and pigment, over "(20 mm) thick bedding
of cement sand mortar 1:2, including finishing and
polishing, complete.

100 Sft.

3,249.70

7,327.65

sq.m

349.65

788.45

24.8

24

Laying floor of approved white glazed tile " (6 mm) thick


in white cement 1:2 over " (20mm) thick cement mortar
1:2, complete.

100 Sft.

4,207.50

10,697.95

sq.m

452.75

1151.10

24.7

25

Laying floor of approved coloured glazed tiles "(6 mm)


thick, laid in white cement and pigment on a bed of "
(20 mm) thick cement mortar 1:2.

100 Sft.

4,207.50

11,246.25

sq.m

452.75

1210.10

ditto

26

Rubbing and polishing old grit/ mosaic floor, including


repairing voids, uneven surface, complete in all respects.

100 Sft.

1,186.70

1,320.40

sq.m

127.70

142.10

The composite rate will be reduced


by Rs. 150.00 per % Sft or Rs.13.95 per
Sq. metre respectively, if no
polishing is done.

27

Rubbing and polishing grit floor, including repairing voids,


uneven surface, complete in all respects

100 Sft.

1,261.90

1,398.35

sq.m

135.80

150.45

The composite rate will be reduced


by Rs. 150.00 per % Sft or Rs.13.95 per
Sq. metre respectively, if no
polishing is done.

chapter-10(Flooring)

Page 68

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

28

Cleaning and washing mosaic or marble floor with caustic


soda mixture.

100 Sft.

167.85

213.40

sq.m

18.05

22.95

24.6

29

Shisham wood boarding or strip flooring 3/4" (20mm) thick


(sawn to required size) tongued and grooved or splayed
rebated fixed with brass screws on deodar wood battens
1 "x2"(40 x 50 mm),size placed at 12"(300 mm) centre
to centre, including two coats of bitumen laid hot on the
base.

100 Sft.

3,531.00

37,053.25

sq.m

379.95

3986.95

24.13

30

Deodar wood boarding or strip flooring 3/4" (20 mm) thick


(sawn to required size) tongued and grooved or splayed
rebated fixed with brass screws on deodar wood battens
1"x2"(40 x 50 mm) size , placed at 12"(300 mm) centre,
to centre including two coats of bitumen laid hot on the
base.

100 Sft.

3,979.80

45,482.25

sq.m

428.25

4893.90

ditto

31

Teak wood boarding or strip flooring " (13 mm) "thick


(sawn to required size) to tongued and grooved screwed
on deodar wood battens 1 " x2"(40 x 50 mm) size,
placed at 12"(300 mm) centre to centre, including 2 coats
of bitumen laid hot on base.

100 Sft.

3,388.00

48,275.65

sq.m

364.55

5194.45

ditto

32

Shisham wood block flooring 1"(25 mm) thick cut to


required size, fixed on a layer of asphalt bitumen laid on
base.

100 Sft.

3,669.60

41,088.90

sq.m

394.85

4421.15

24.13

33

Teak wood block 1"(25 mm) thick cut to required size,


fixed on a layer of asphalt bitumen laid on base.

100 Sft.

3,388.00

79,523.35

sq.m

364.55

8556.70

ditto

34

Laying wooden paving of hard wood on edge in coal tar


and asphalt:-

234.85
234.85

2744.25
1520.65

(a) Shisham wood


(b) Kikar wood
35

ditto
100 Sft.
Per Inch
thickness
ditto

2,182.40
2,182.40

25,504.00
14,132.50

sq.m
per cm
thickness
ditto

100 Sft.
ditto

1,910.55
3,120.15

7,243.15
10,378.95

sq.m
ditto

205.60
335.75

779.35
1116.80

100 Sft.

2,327.40

2,934.25

sq.m

250.45

315.75

Tile skirting laid in 1:2 cement mortar, over "(20 mm)


thick cement mortar, 1:2 including cement washing and
filling joints complete:(a) cement tiles
(b) mosaic tiles

36

Remarks

Providing grey cement skirting or dado 3/8"(10 mm) thick


including rounding of corner and straight ening of top edge
and finishing to smooth surface afterplastering :(a) 1:2 cement, sand mortar

chapter-10(Flooring)

Page 69

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

(b) 1:3 cement, sand mortar


(c) Extra if skirting or dado is finished
with pigment of any colour.

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

ditto
ditto

2,327.40
155.10

2,754.10
422.75

ditto
ditto

250.45
16.70

296.35
45.50

37

White glazed tile (6"x6"x") (6 mm) thick dado jointed in white


cement and laid over 1:2 cement sand mortar 3/4" (20mm)
thick, including finishing.

100 Sft.

5,181.00

11,671.45

sq.m

557.50

1255.85

24.7

38

Coloured glazed tile dado (6"x6"") (6mm) thick in pigment over


1:2 cement, sand mortar 3/4"(20mm) thick, including finishing.

100 Sft.

5,181.00

12,202.70

sq.m

557.50

1313.00

ditto

39

Mosaic dado or skirting with one part of cement and


marble powder in the ratio of 3:1 and two parts of marble
chips, laid over "(13 mm) thick cement plaster 1:3,
including rubbing and polishing, complete with finishing:

100 Sft.
ditto

6,811.20
6,811.20

8,180.45
9,000.00

sq.m
ditto

732.90
732.90

880.20
968.40

100 Sft.
ditto

6,811.20
6,811.20

9,066.20
9,377.95

sq.m
ditto

732.90
732.90

975.50
1009.05

16.35

79.25

sq.m

175.95

852.75

(a) using grey cement:


i) 3/8"(10 mm) thick
ii) "(13 mm) thick

Remarks

(b) using white cement :


'i) 3/8"(10 mm) thick
ii) "(13 mm) thick
40

Rubber flooring, consisting of 12"x12"x1/8"


(300x300x3mm) rubber tiles, laid on firm foundation.

Per Sft.

41

Providing and fixing glass strip 5mm thick and 1"


(40 mm) wide, for dividing the mosaic flooring into panels.

Per Rft.

4.20

Metre

13.80

42

Providing and fixing marble strip of any shade for dividing


the mosaic flooring into panels
Per Rft.
ditto

6.60
4.60

Metre
ditto

21.65
15.10

a) sSize 1" x /8" (40 x 10 mm)


b) sSize 1" x " (40 x 6 mm)

chapter-10(Flooring)

24.14

The cost of base for rubber flooring


is not included in the rate and is
payable separately.
Labour for fixing already included in
items No. 15, 16, 21and 22 of this
Chapter.

Page 70

11. SURFACE RENDERING


1
2

PLASTERING, POINTING, WHITE WASHING, COLOUR WASHING AND DISTEMPERING, ETC.


Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Unit

Labour

" (13 mm) thick


1" (25 mm) thick

25.7

100 Sft.
ditto

369.30
520.35

454.95
691.70

sq.m
ditto

39.75
56.00

48.95
74.45
ditto

a)

" (13 mm) thick

100 Sft.

333.15

418.85

sq.m

35.85

45.05

b)

1" (25 mm) thick

ditto

333.15

504.55

ditto

35.85

54.30

Cement lime plaster 1:7:12 (cement, lime and sand) upto


20' (6.00 m) height.
" (6 mm) thick

100 Sft.

1045.45

1213.10

sq.m

112.50

130.55

b)

" (13 mm) thick

ditto

1045.45

1380.60

ditto

112.50

148.55

Cement Neru plaster 1:2 (cement and sand) upto 20'


(6.00 m) height:-

2" (50 mm) stucco cement plaster 1:2:4 (cement, sand


and shingle) upto 20' (6.00 m) height.

Providing and laying machine sprayed plaster " (13 mm)


thick, using cement and chips zero gauge, over the
existing plastered and roughened surface, upto 20' (6.00
m) height:i)
ratio 1:1
ii) ratio 1:1
iii) ratio 1:2

ditto

100 Sft.
ditto

1045.45
1045.45

1480.25
1742.45

sq.m
ditto

112.50
112.50

159.30
187.50

100 Sft.

2700.70

5364.95

sq.m

290.60

577.25

3/8" (10 mm) thick


" (13 mm) thick
" (20 mm) thick

ditto

ditto

100 Sft.
ditto
ditto

888.90
888.90
888.90

2538.40
2435.55
2376.30

sq.m
ditto
ditto

95.65
95.65
95.65

273.15
262.05
255.70

Cement plaster 1:2 upto 20' (6.00 m) height:a)


b)
c)

Add extra 13%, 32% and 51% above


the labour rates only or 6%, 15% &
23% on the composite rates for 2nd,
3rd, 4th and subsequenct floors,
respectively.

25.1 to 25.6

a)

" (6 mm) thick


" (13 mm) thick

Remarks

Composite

Mud plaster on floor or roof (excluding Gobri leeping):-

a)
b)

Composite

Spec.
No.

Mud plaster on walls (excluding Gobri leeping) upto 20'


(6.00 m) height:a)
b)

Labour

Rate (M etric System)

100 Sft.
ditto
ditto

1045.45
1045.45
1310.75

1652.25
1832.65
2524.35

sq.m
ditto
ditto

chapter-11(Surface Rendering)

112.50
112.50
141.05

177.80
197.20
271.60

25.1
to
25.6

Page 71

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

3/8" (10 mm) thick


" (13 mm) thick
" (20 mm) thick

3/8" (10 mm) thick


" (13 mm) thick
" (20 mm) thick

1:2
1:3
1:4

3/8" (10 mm) thick


" (13 mm) thick
" (20 mm) thick

ditto
100 Sft.
ditto
ditto

1045.45
1045.45
1310.75

1472.10
1614.30
2164.05

sq.m
ditto
ditto

112.50
112.50
141.05

158.40
173.70
232.85
ditto

100 Sft.
ditto
ditto

1045.45
1045.45
1310.75

1423.00
1526.25
2060.20

sq.m
ditto
ditto

112.50
112.50
141.05

153.10
164.25
221.70
ditto

100 Sft.
ditto
ditto

1186.70
1186.70
1186.70

1914.55
1733.80
1684.75

sq.m
ditto
ditto

127.70
127.70
127.70

206.00
186.55
181.30

100 Sft.
ditto
ditto

1045.45
1045.45
1310.75

1380.85
1452.50
1981.55

sq.m
ditto
ditto

112.50
112.50
141.05

148.60
156.30
213.20

100 Sft.
ditto
ditto

1045.45
1045.45
1310.75

1320.60
1410.30
1861.10

sq.m
ditto
ditto

112.50
112.50
141.05

13

Applying floating coat of cement 1/32" (0.8 mm) thick.

100 Sft.

597.95

838.90

sq.m

64.35

90.25 25.4 to 25.6

14

Lime pointing flush upto 20' (6.00 m) height including


raking joints, in lime, sand mortar 1:2.

100 Sft.

780.10

897.40

sq.m

83.95

96.55

25.8

15

Lime pointing struck joints on walls, upto 20' (6.00 m)


height, including raking joints in lime sand mortar 1:2.

100 Sft.

1186.70

1303.95

sq.m

127.70

140.30

ditto

16

Cement pointing flush upto 20' (6.00 m) heihgt:ratio 1:2


ratio 1:3

i) This item shall be applicable to


buildings meant for human
habitation only, such as buildings
like residences, offices,
educational institutions and
hospitals, etc. It shall not be
admissible on godowns; bins;
agriculture, poultry and animal
sheds; cycle stands; garrages; etc.
ii) The thickness of the plaster will
not be more than 3/8" (10 mm)
thick.

25.1 to 25.6

Cement plaster 1:6 upto 20' (6.00 mm)


height:a) 3/8" (10 mm) thick
b) " (13 mm) thick
c) " (20 mm) thick

a)
b)

Remarks

Composite

Cement plaster 1:5 upto 20' (6.00 mm) height:a)


b)
c)

12

Labour

Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.


roof slabs only, upto 20' height.

a)
b)
c)

11

Unit

Cement plaster 1:4 upto 20' (6.00 m) height:a)


b)
c)

10

Composite

Spec.
No.

Cement plaster 1:3 upto 20' (6.00 m) height:a)


b)
c)

Labour

Rate (M etric System)

ditto
142.10
151.75
200.25

ditto
100 Sft.
ditto

1045.45
1045.45

1499.70
1393.55

sq.m
ditto

chapter-11(Surface Rendering)

112.50
112.50

161.35
149.95
Page 72

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

17

Cement pointing 1:2 flush on floor.

18

Cement pointing struck joints, on walls, upto


20' (6.00 m) hiehgt:a)
b)

19

ratio 1:2
ratio 1:3

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

100 Sft.

780.10

1234.35

sq.m

83.95

132.80

100 Sft.
ditto

1186.70
1186.70

1640.95
1534.80

sq.m
ditto

127.70
127.70

176.55
165.15

Pointing flush on stone work, upto 20' (6.00 m) height.


a)
b)
c)

in lime mortar 1:2 (lime, sand)


in cement mortar 1:3
on stone work raised:i) in lime mortar 1:2
ii) in cement mortar 1:3

ditto

25.8
100 Sft.
ditto

938.50
938.50

1095.65
1286.60

sq.m
ditto

101.00
101.00

117.90
138.45

100 Sft.
ditto

1751.65
1751.65

1908.80
2099.75

sq.m
ditto

188.50
188.50

205.40
225.95

20

Raking and washing joints of stone masonry


(old work).

100 Sft.

564.95

sq.m

60.80

ditto

21

Raking and washing joints of brick masonry (old work).

100 Sft.

282.50

sq.m

30.40

ditto

22

Priming coat of chalk under distemper.

100 Sft.

106.15

113.75

sq.m

11.40

23

Distempering:a)

b)

24

b)

25

12.25

new surface:i) one coat


ii) two coats
iii) three coats

100 Sft.
ditto
ditto

113.10
167.35
221.55

194.30
273.10
351.95

sq.m
ditto
ditto

12.15
18.00
23.85

20.90
29.40
37.85

old surface:i) one coat


ii) two coats

100 Sft.
ditto

103.70
167.35

160.30
223.90

sq.m
ditto

11.15
18.00

17.25
24.10
25.10

new surface:i) one coat


ii) two coats

100 Sft.
ditto

97.55
146.35

126.25
188.25

sq.m
ditto

10.50
15.75

13.60
20.25

old surface:i) one coat


ii) two coats

100 Sft.
ditto

97.55
146.35

115.30
175.45

sq.m
ditto

10.50
15.75

12.40
18.90

White washing:a)

new surface:i) one coat


ii) two coats

25.11
ditto

Colour washing:a)

Remarks

25.9

100 Sft.
ditto

97.55
146.35

121.00
181.45

sq.m
ditto

chapter-11(Surface Rendering)

10.50
15.75

13.00
19.50
Page 73

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iii)
b)

26

three coats

old surface:i)
one coat
ii)
two coats

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

ditto

189.50

236.20

ditto

20.40

25.40

100 Sft.
ditto

97.55
146.35

115.15
175.55

sq.m
ditto

10.50
15.75

12.40
18.90

Gobri leeping:a)
b)

on walls
over roofs

25.7
100 Sft.
ditto

114.85
97.90

119.15
102.20

sq.m
ditto

12.35
10.55

12.80
11.00

27

Striking joints of burnt bricks in lime or cement mortar.

100 Sft.

141.25

sq.m

15.20

28

Extra for lime, mud or cement plaster and pointing from


20' (6.00 m) and above for each additional 10' (3.00 m)
height or part thereof.

100 Sft.

191.90

sq.m

20.65

29

Caulking joints of sleeper wall, with sand and coaltar.

100 Sft.

530.65

920.65

sq.m

57.10

99.05

30

Caulking joints of sleepers, withmud and chopped straw.

100 Sft.

530.65

563.15

sq.m

57.10

60.60

31

Extra cost of labour and material for red oxide pigment in


cement pointing to match with the colour of bricks.

100 Sft.

176.55

277.05

sq.m

19.00

29.80

32

Providing grooved cement sand plaster 1:3 over existing


plastered and roughened surface upto 20' (6.00 m) height.
100 Sft.
ditto

1186.70
1186.70

1613.35
1755.55

sq.m
ditto

127.70
127.70

173.60
188.90

Rft.

8.40

38.00

Metre

27.55

124.65

Each
Each

185.70
371.45

235.80
471.65

Each
Each

185.70
371.45

235.80
471.65

i)
ii)

3/8" (10 mm) thick


" (13 mm) thick

33

Providing and fitting expanded metal edge bead for


corners, with nails on both sides of edges.

34

Petty repairs to fire place.


i)
ii)

Single
Double

Remarks

25.8

Payable with fresh masonry, when


the face of the work is not to be
plastered/pointed.

Area above 100 Sft (10.76 sq.m)


35

Petty repair to main rooms.

Each

387.50

521.10

Each

387.50

521.10

36

Petty repair to small rooms.

Each

193.75

260.50

Each

193.75

260.50

37

Petty repair to verandah.

Each

387.50

494.30

Each

387.50

494.30

38

Extra labour for white washing, colour washing, priming coat


and distempering, etc. from 20' (6.00 m) height and above,
requiring scaffolding, for every additional 10' (3.00m) height
or part thereof.

100 Sft.
Per
coat

16.25

sq.m
Per
coat

1.75

Area upto 100 Sft (10.76 sq.m)

chapter-11(Surface Rendering)

The height will be taken from the


floor, roof or ground uderneath as
the case may be on the side
towards which the work is to be
done.
Page 74

12. WOOD WORK


1
2

No extra rate is to be paid for sawing as the rates are inclusive of these.
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Deodar wood
Shisham wood

Deodar wood
Shisham wood

Labour

26.1

Per Cft.
ditto

621.45
706.20

4101.20
3082.45

cu.m
ditto

21949.60
24943.00

144854.40
108872.15
26.1

Per Cft.
ditto

402.55
402.55

3923.55
2848.40

cu.m
ditto

14218.05
14218.05

138579.80
100605.50
26.1
to
26.3
&
26.7

Per Sft.
ditto
ditto

107.20
107.20
107.20

1457.20
1360.15
1265.35

sq.m
ditto
ditto

1153.45
1153.45
1153.45

15679.45
14635.20
13615.15

First class teak wood wrought joinery in wire gauze doors


and windows with frames 22 SWG galvanized iron wire
2
gauze 12x12 meshes to square inch, (5x5 meshes in cm )
including brass fittings, sash bars, etc. complete:a)

ii) with springs or spring hinges.


b)

26.8
to
26.10

teak wood framing 1" (45 mm) thick with wire gauze
fixed in position:i) without springs or spring hinges.

teak wood framing 1" (40 mm) thick, with wire


gauze fixed in position:i) without springs or spring hinges.
ii) with springs or spring hinges.

Remarks

Composite

First class teak wood wrought joinery in doors and


windows, etc. panelled, panelled and glazed or fully
glazed and fixed in position, including chowkat, holdfast,
tower bolt, chocks, rubber stop, cleats/G.I. clamps,
chords with hooks, nails, screws, etc. complete
(excluding sliding bolt and lock):i)
2" (50 mm) thick
ii) 1" ( 45 mm) thick
iii) 1" (40 mm) thick

Unit

Plain wood work for regulation karries or needles, etc.


including sawing, planning, wroughting wood and providing
and fixing steel parts of karries i.e. end strip and rods, etc.
a)
b)

Composite

Spec.
No.

Plain wood work sawn, wrought, planed and fixed


inposition, including cost of nails and screws etc.
a)
b)

Labour

Rate (M etric System)

Per Sft.

19.60

595.70

sq.m

210.90

6409.75

ditto

19.60

599.40

ditto

210.90

6449.55

Per Sft.
ditto

19.60
19.60

549.50
553.65

sq.m
ditto

210.90
210.90

5912.60
5957.25

chapter-12(Wood Work)

i) This also includes the cost of


wood required for extra thickness of
chowkat.
ii) If 24 SWG wire gauge is used,
the composite rate shall be
reduced by Rs.4.70 per sft. and
Rs.50.60 per sq.m.

Page 75

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

c)

G.I. wire gauze 22 SWG, 12x12 meshes per square


2
inch, (5x5 meshes per cm ) fixed to chowkat with "
(20 mm) teak wood strips and screws.

Per Sft.

35.3

184.05

sq.m

379.85

1980.4

d)

G.I. wire gauze 22 SWG, 12x12 meshes per square


2
inch (5x5 meshes per cm ) fixed with " (13 mm) strip
on separate frame of teak wood 2"x2" (50x50 mm),
for windows, etc.

Per Sft.

33.10

573.75

sq.m

356.15

6173.55

P/F expanded metal " to " (13 to 20 mm) mesh, 16


Guage, fixed to chowkat with 1" (25 mm) teak wood cover
strips and screw etc., complete.

Per Sft.

44.15

293.10

sq.m

475.05

3153.75

Providing and fixing expanded metal " (13 mm) to "


20 mm), 16 gauge, fixed to chowkat with 1" (25 mm)cover
moulding and screws, including teak wood frame 2"x2"
(50 mm x 50 mm)

Per Sft.

44.15

431.30

sq.m

475.05

4640.80

First class deodar wood wrought joinery in doors and


windows, etc. panelled, or panelled or glazed, or fully
glazed, fixed in position, including chowkat, holdfast,
hinges, tower bolts, chocks, rubber stop, cleats/G.I.
clamps, handles and chord with hooks, etc. complete
(excluding sliding bolt or lock):a)
b)
c)

26.1 to
26.3 & 26.7

Per Sft.
ditto
ditto

104.60
104.60
104.60

1095.95
1025.25
976.15

sq.m
ditto
ditto

1125.50
1125.50
1125.50

11792.40
11031.80
10503.35

Deodar wood framed, braced and battened doors and


windows, complete with iron fittings and fixed in position,
including chowkats:a)
b)

2" thick (50 mm)


1" thick (45 mm)
1" thick (40 mm)

2" (56 mm) thick, with 1" (30 mm)


battens and 1" (25 mm) planks.
1" (40 mm) thick with 1" (25 mm)
battens and " (20 mm) planks.

1" (25 mm) thick battneded doors and windows fitted in


position, complete with iron fittings, without chowkats.

10 Deodar battened ledged and braced doors and windows


2" (56 mm) thick (1" (30 mm) thick ledge braces and
1" (25 mm) thick battens complete with iron fittings,
chowkats and fixed in position.
11 a)

Remarks

26.1, 26.2
& 26.4

Per Sft.

117.70

746.65

sq.m

1266.45

8033.95

ditto

108.65

645.10

ditto

1169.05

6941.30

Per Sft.

134.20

423.15

sq.m

1444.00

4553.10

1363.85

26.1, 26.2
26.4 to
7837.60
26.6

Per Sft.

126.75

728.40

Deodar wood framed with braces and 22 SWG G.I.


sheet facing, including holdfast, wooden beadings,
hinges, and locking arrangements as directed by the

sq.m

26.1, 26.2 If 24 gauge G.I. sheet is used, the


& 26.4 composite rate will be reduced by
Re.4.70 per Sft. (Rs. Per 50.60
chapter-12(Wood Work)

Page 76

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Engineer incharge:i)
ii)

G.I. sheet facing on one side.


G.I. sheet facing on both sides.

b)

Partal wood framed with braces and 22 SWG G.I.


sheet facing, including holdfast, wooden beadings,
hinges and locking arrangements, as directed by the
Engineer-in-charge:-

i)
ii)

G.I. sheet facing on one side.


G.I. sheet facing on both sides.

Per Sft.
ditto

55.15
60.70

568.25
598.15

sq.m
ditto

593.40
653.15

b)

c)

-ditto-

Per Sft.
ditto

55.15
60.70

246.70
276.60

sq.m
ditto

593.40
653.15

2654.50
2976.20
26.8 to
26.10

i) This also includes the cost of


wood required for extra thickness
of chowkat.
ii) If 24 SWG wire gauze is used
the composite rate shall be
reduced by Rs.4.70 per sft or
Rs.50.60 per sq.m.

deodar wood framing 1" (45 mm) thick with wire


gauze fixed in position:i) without springs or spring hinges.
ii) with springs or spring hinges.

Per Sft.
ditto

58.85
58.85

474.95
479.10

sq.m
ditto

633.25
633.25

5110.45
5155.10

deodar wood framing 1" (40 mm) thick, with wire


gauze fixed in position:i) without springs or spring hinges
ii) with springs or spring hinges

Per Sft.
ditto

58.85
58.85

442.05
444.60

sq.m
ditto

633.25
633.25

4756.45
4783.90

Per Sft.

44.15

160.50

sq.m

475.05

1727.00

Per Sft.

66.20

410.90

sq.m

712.30

4421.30

Per Sft.

98.10

494.45

sq.m

1055.55

5320.30

Per Sft.

23.50

139.25

sq.m

252.85

1498.35

G.I. wire gauze 22 SWG, 12x12 meshes per square


2

inch, (5x5 in cm ) fixed to chowkat, with "


('20 mm) thick deodar wood strip and screws.
d)

Sq.m) for G.I. facing on one side


and Rs.9.40 per Sft. (Rs.101.20
per Sq.m) for G.I. sheet facing on
both sides.

6114.35
6436.10

12 First class deodar wood wrought joinery work in wire


gauze doors and windows, with 22 SWG G.I. wire gauze,
2
12x12 meshes per square inches (5x5 per cm ) including
iron fittings etc. complete:a)

Remarks

G.I. wire gauze 22 SWG 12x12 meshes per square


2

inch, (5x5 meshes in cm ) fixed to chowkat, with "


(13 mm) strip on separate frame of deodar wood 2" x
2" (50 mm x 50 mm).
13 Making and fixing trellis doors and windows of deodar
wood, complete.

26.1
26.2

14 Providing and fixing mild steel chowkat of doors, windows,


C.window, etc. including holdfast, making and threading
holes for hinges, etc. complete:a)

M.S. angle iron 1"x 1"x " (40x40x6 mm) welded


with M.S. flat 2"x " (50 mm x 6 mm)

chapter-12(Wood Work)

Page 77

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

b)

M.S. tee iron 1"x 1"x " (40x40x6 mm) welded


with M.S. flat 2"x " (50 mm x 6 mm)

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per Sft.

23.50

106.40

sq.m

252.85

1144.85

Per Sft.
ditto

36.30
42.60

116.85
134.80

sq.m
ditto

390.60
458.40

1257.30
1450.45

16 Extra for providing and fixing iron double spring hinges,


with brass fittings (it shall include brass finger plate, 6"
(150 mm) tower bolt).

Per Sft.
door area

3.35

31.45

sq.m
door area

36.05

338.40

17 Providing and fixing brass spring hinges to wire gauzed


doors.

Each

70.60

223.00

Each

70.60

223.00

Each
ditto
ditto
ditto

66.20
66.20
66.20
66.20

128.60
170.60
169.40
326.60

Each
ditto
ditto
ditto

66.20
66.20
66.20
66.20

128.60
170.60
169.40
326.60

Per Sft.

2.00

12.30

sq.m

21.50

132.35

ditto

2.00

9.85

ditto

21.50

106.00

20 Extra for providing and fixing approved quality rim lock


adjustable over the style surface.

Each

211.85

423.05

Each

211.85

423.05

21 Providing and fixing, approved quality mortice lock.

Each

294.25

485.05

Each

294.25

485.05

Per Sft.

44.15

242.30

sq.m

475.05

2607.15

ditto

44.15

340.00

ditto

475.05

3658.40

15 Providing and fixing M.S. sheet hollow pressed frame of


doors, windows, C. windows, etc. (chowkat only) of 20
SWG welded with M.S. flat 6"x 1" x 1/8" (150
mmx30mmx3mm) M.S. holdfast 9"x1"x1/8"
(225mmx25mmx3mm) welded/screwed 4" (100 mm) long
iron hinges, including filling chowkat with cement sand
mortar 1:8 and embedding holdfast in cement concrete
1:2:4, complete in all respects:
a)
b)

single rebate
double rebate

26.2

18 Providing and fixing sliding bolt to doors:i)


ii)
iii)
iv)

iron sliding bolt, 10" (250 mm) long


iron sliding bolt, 12" (300 mm) long
brass sliding bolt, 10" (250 mm) long
brass sliding bolt, 12" (300 mm) long

19 Extra for brass fittings to doors and windows, except for


hinges, which shall be of iron:i)
ii)

deodar wood panelled or panelled and


glazed or fully glazed.
deodar wood wire gauzed shutters.

22 Providing and fixing, expended metal " to " (13 mm to


20 mm) mesh 16 gauge.
a)
b)

fixed to chowkat with 1" (25 mm) thick deodar wood


strip and screws, etc.
fixed with 1" (25 mm) cover moulding and screws,
including deodar wood frame 2"x2" (50 x 50 mm)

chapter-12(Wood Work)

Page 78

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

23 a)

b)

Providing and fixing deodar wood almirah 9" to 12"


(225 mm to 300 mm) depth, including boxing with
back, shelves, shutter and brass fittings, etc.
complete.

Providing and fixing deodar wood almirah 9" to 12"


(225 mm to 300 mm)depth with shelves, shutters,
brass fittings, etc., without boxing and back,
complete.

24 Providing and fixng class room almirah consiting of 1" (25


mm) thick solid flush shutter with deodar wood lipping " (6 mm)
thick all around (Approved Factory Manufactured) fixed in deodar
wood frame 3"x1" (75mm x 25mm) including full hinges
C.P. fittings with RCC (1:1:3) shelves 1" (40 mm) thick
including 3 coats of painting.

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Per Sft.

141.25

1563.15

sq.m

1519.75

16819.45

Per Sft.

105.95

564.35

sq.m

1139.80

6072.20

Per Sft.

84.25

371.90

Sq.m

906.30

4001.85

25 Providing and fixing wooden box type wardrobe 22" (550


mm) deep including " (20 mm) thick boxing and shelves,
hanger rods, hard board back drawers, brass fittings,
locking arrangements, handles, internal bolts, shoe rods,
etc. including three coats of enamel paint:i)

ii)

Partal wood boxing and deodar wood


shelves and leaves, etc.
Deodar wood boxing, and deodar wood
shelves and leaves, etc.

26 Providing and fixing wardrobe 22" (550 mm) deep


consisting of RCC shelves 1" (40 mm) thick including "
thick vinboard boxing and back (one side ply) vinboard
shutter " (20 mm) thick including deodar wood lipping "
(6 mm) on all edges, fixes including deodar wood frame
3"x1" (75mm x 25mm) with hanger rod in centre position
drawers at bottom and openable shutter on upper portion
including full hinges C.P. fitting and painting 3 coats
complete.

Remarks

Per Sft.

162.95

739.90

sq.m

1753.55

7961.40

ditto

159.70

955.05

ditto

1718.60

10276.50

Per Sft.

63.20

614.60

Sq.m

680.25

6612.85

Per Sft.
ditto

31.40
19.60

498.15
361.25

Sq.m
ditto

337.70
211.10

5360.00
3887.15

For hollow frame shutter with


commercial ply on one side, the
composite rate shall be reduced by
Rs.54.00 per Sft;or Rs.580.00
per Sqm and for hollow frame
shutter with commercial ply on
both sides, the composite rate
shall be reduced by Rs.22.80 per
Sft. or Rs.245.00 per Sq. metre.

If hollow flush door leaves 1" thick


(25 mm) with commercial ply
3 ply) on both sides of deodar
wood frame and partal wood
bracing and deodar wood lipping is
used, the composite rate will be
reduced by Rs.13.00 per Sft. or
Rs.140.00 per Sq. metre.

27 Providing and fixing chowkat for doors, windows and C.


windows, including holdfast, etc.
a)
b)

Teak wood
Deodar wood

chapter-12(Wood Work)

Page 79

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)

Shisham wood

ditto

Labour

Rate (M etric System)

Composite

23.55

182.75

Unit
ditto

Labour
253.30

Spec.
No.

Composite
1966.25

28 Making and fixing deodar wood planking in eave boards,


etc. planed on both sides, rebated and fixed including
nails and screws, bolts and brackets:a)
b)
c)

1" (25 mm) thick


" (20 mm) thick
" (13 mm) thick

26.1
26.2

Sft.
ditto
ditto

35.30
35.30
35.30

320.60
249.20
178.10

sq.m
ditto
ditto

379.95
379.95
379.95

3449.90
2681.65
1916.60

29 Making and fixing deodar wood shelves, including


brackets:i)
1" (25 mm) thick
ii) 1" (40 mm) thick
iii) 2" (50 mm) thick

ditto
Sft.
ditto
ditto

35.30
35.30
35.30

320.60
463.10
605.60

sq.m
ditto
ditto

379.95
379.95
379.95

3449.90
4983.20
6516.50

Making and fixing cleats for doors and windows,


including hinges and screws.

Each

42.35

126.60

Each

42.35

126.60

b)

Making and fixing cleats with brass hooks for roof


ventilators.

Each

56.50

99.30

Each

56.50

99.30

c)

Providing and fixing door stops of 1" (40 mm) dia


rubber block.

Each

5.90

59.00

Each

5.90

59.00

d)

Providing and fixing G.I. hook with clamps for doors.

Each

1.90

10.80

Each

1.90

10.80

30 a)

31 Hard wood railing of any shape and design, including


bends and corners, fixed in position, including polishing
complete as directed.
a)
b)

Shisham wood
Teak wood

32 Deodar wood dado or picture rail 3"x1" (75x40 mm) as


per approved design including moulding and fixed in place,
cost of screws, nails, plugs, and painting complete.

Remarks

26.1 and
26.2

ditto

Per Rft.
ditto

158.80
118.60

316.95
686.40

Metre
ditto

520.90
389.05

1039.65
2251.35

Per Rft.

59.30

243.10

Metre

194.50

797.35

100Sft.
ditto

706.20
941.60

sq.m
ditto

76.00
101.30

100Sft.
ditto

416.66
626.15

sq.m
ditto

44.85
67.35

26.1
26.2

33 Sawing wood by hand:a)


b)

Soft wood (deodar, kail or chir).


Hard wood (shisham, kikar, teak or
sahl).

34 Sawing wood by machine:


a)
b)

Soft wood
Hard wood

chapter-12(Wood Work)

Page 80

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

35 Making and fixing sun-shade of deodar wood including


fixing brackets.

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Per Sft.

49.45

390.80

sq.m

531.90

4205.10

Per Sft.

58.85

130.70

sq.m

633.25

1406.35

37 Making deodar punkha pole 10'x6"x6"


(3.0 m x 150 mm x 150 mm)

Each

211.85

7764.65

Each

211.85

7764.65

38 Dismantling and refixing eave boards.

Per Rft.

15.15

Metre

49.65

39 Making wooden stair-cases complete 2' to 3' (600 to 900


mm) wide frame 1" (40 mm) thick planks of deodar
wood, including hand rails.

Per Rft.

232.75

2440.70

Metre

763.45

8005.50

100Sft.
ditto
ditto

1103.45
1103.45
1103.45

13068.95
14580.95
14832.95

sq.m
ditto
ditto

118.75
118.75
118.75

1406.20
1568.90
1596.00

100Sft.
ditto
ditto

1324.15
1324.15
1324.15

14705.80
25047.20
18233.80

sq.m
ditto
ditto

142.50
142.50
142.50

1582.35
2695.10
1961.95

100Sft.
ditto
ditto
ditto

2162.20
2162.20
2162.20
2162.20

9744.60
12384.60
12264.60
11664.60

sq.m
ditto
ditto
ditto

232.65
232.65
232.65
232.65

1048.50
1332.60
1319.65
1255.10

36 Making and fixing 1" (25 mm) thick kail or chir wooden
notice board with frame.

Remarks

26.1

ditto

--

ditto

-26.1

40 Providing and fixing partition, including frame work:a)

Sheets on one side of framework:i) Hard board


ii) Ply wood " (6 mm) thick
iii) Masonite

b)

Sheets on both sides of frame work:i) Hard board


ii) Ply wood " (6 mm) thick
iii) Masonite

41 Providing and fixing ceiling, including frame work:i)


ii)
iii)
iv)

Hard board
Chip board
Ply wood " (6 mm) thick
Masonite

42 Providing and fixing thermopore false ceiling, including


wooden frame panelling, cost of M.S. clamps, making
holes in walls and repairing damaged surface, complete in
all respects:a)

Deodar wood frame panelling:


i) " (20 mm) thick
ii) 1" (25 mm) thick

b)

In case of acoustic
Thermopore sheet, the
composite rate will be
increased by Rs.9.00 per Sft.

100Sft.
ditto

2422.30
2422.30

9921.65
9999.50

sq.m
ditto

260.65
260.65

1067.55
1075.95

Partal wood frame panelling:

chapter-12(Wood Work)

Page 81

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i) " (20 mm) thick


ii) 1" (25 mm) thick

100Sft.
ditto

Labour
2422.30
2422.30

Rate (M etric System)

Composite

Unit

6734.15
6860.15

sq.m
ditto

Labour

Spec.
No.

Composite

260.65
260.65

724.60
738.15

43 a)

Fixing door, including chowkats.

Each

331.65

Each

331.65

b)
44 a)

Fixing windows, including chowkats.


Glazing with panes (16 oz. to 18 oz.,)
including cost of putty.

ditto
Per Sft.

165.85
25.20

165.85
271.40

59.35

ditto
sq.m

b)

Glazing with panes (16 oz. to 18 oz.)


using deodar wooden fillets and putty.

Per Sft.

31.80

91.45

sq.m

341.95

983.85

45 Glazing with panes (24 oz. to 26 oz.), using


putty and deodar wooden fillets.

Per Sft.

47.30

105.70

sq.m

508.70

1137.10

46 a)

Cutting to required size and fixing glass


panes with putty

Per Sft.

17.65

18.75

sq.m

189.95

201.95

Cutting to required size and fixing glass panes with


wooden fillets and putty.

Per Sft.

26.50

46.20

sq.m

284.95

497.20

b)

Remarks

638.45

26.12

26.12

47 Glazing with plate glass 1/4" (6 mm) thick including the cost
of deodar wood fillets and putty:a)

Glazing upto 8 sft (0.75 sq.m)

Per Sft.

40.60

107.50

sq.m

436.95

1156.75

b)

Glazing exceeding 8 Sft (0.75 sq.m) but not exceeding 24 sft


(2.25 sq.m).

Per Sft.

40.60

107.70

sq.m

436.95

1158.85

Per Sft.

150.90

696.55

sq.m

1623.85

7495.05

Per Sft.

150.90

652.15

sq.m

1623.85

7017.35

48 Providing and fixing 1" (40 mm) thick deodar wood


panelled or panelled and glazed, doors and windows, with
mild steel chowkat (frame), etc. complete in all respects
(excluding sliding bolt or lock) with:i)
i)
ii)

M.S. angle iron 1"x1"x", welded


(40 mmx 40 mmx 6mm) with M.S. flat
2"x" (50 mm x 6 mm)
M.S. tee iron 1"x1"x", welded
(40 mmx40 mmx 6mm) with M.S. flat
"x" (13 mm x 6 mm)

49 Providing and fixing 1" (40 mm) thick hollow flush doors
and windows with commercial ply (3 ply) on both faces of
deodar wood shutter frame 1" (30 mm) thick and partal
wood braces at about 3" (75 mm) apart and deodar wood
lipping 1"x3/8" (40 mmx10 mm) fixed with M.S. chowkat
(frame) including chromium plated fittings, etc. complete
in all respects (without sliding bolt or lock):i)

M.S. angle iron 1"x1"x", welded


(40 mmx40 mmx 6mm) with M.S. flat
2"x" (50 mm x 6 mm)

Teak ply would be used under the


written permission of the
superintending Engineer, and the
composite rate of using teak ply
will be increased by Rs.20.00 per
Sft. ( 216.00 per Sq.m)

Per Sft.

104.60

568.65

chapter-12(Wood Work)

sq.m

1125.75

6118.90

Page 82

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

ii)

M.S. tee iron 1"x1"x", welded


(40 mmx40 mmx 6mm) with M.S. flat
"x" (13 mm x 6 mm)

50 Providing and fixing 1" (40mm) thick solid flush door shutter
(Approved Factory Manufactured) with commercial ply (5 mm thick)
on both sides double pressed and deodar wood lipping
1"x3/8" (40mm x 10mm) around shutter including
chromium plated fitting, iron hinges with aluminium kick
plate 22 SWG on both sides & finger plate complete in all
respect.

Per Sft.

Labour
104.60

Rate (M etric System)

Composite
535.80

Unit
sq.m

Labour
1125.75

Spec.
No.

Remarks

Composite
5765.05

Per Sft.

57.65

350.20

sq.m

620.30

3767.95

51 Providing and fixing panelled door of M.S. sheet, with


forged door leaves of M.S. sheet 22 SWG fitted in hollow
frame chowkat 3"x4" (75 mmx113 mm) made of M.S.
sheet 18 SWG filled with plain cement concrete 1:3:6 etc.
complete with all fittings and hammer painting, including
carriage to site and fixing in position.

Per Sft.

98.60

318.95

sq.m

1060.80

3432.05

52 Providing and laying 24 SWG aluminum kick plate 4" (100


mm) high, fixed with screws 4" (100 mm) centre to centre,
on bottom rail of flush doors only of commercial ply.

Per Rft.

21.20

34.95

Metre

69.50

114.65

53 Providing and fitting curtain railing to doors and windows,


comprising of TOSO-elite Japan made superior type of
railing or equivalent, fixed over 4"x" (100mmx20mm)
deodar wood strip, including painting.

Per Rft.

8.85

131.10

Metre

28.95

430.05

54 Providing and fixing M.S. flat "x1/8" (13mm x 3mm) grill


including " x 1/8" (20 mmx3 mm) M.S. flat frame, in
windows of approved design, including painting three
coats, complete in all respects.

Per Sft.

51.20

180.75

sq.m

550.75

1944.70

55 Providing and fixing G.I. wire gauze 22 SWG, 12x12

Per Sft.

18.00

61.95

sq.m

193.40

666.65

meshes per square inch, (5x5 meshes in cm ) fixed to


steel window, complete with flat iron patti "x 1/8" (13
mmx3 mm) and machine made screws.

It C.P. Finger plate and kick plate


are not provided/fixed the
composite rate will be reduced by
Rs.15.20 per Sft.
Reduce composite rate by Rs.20.00
per. Sq/ft or Rs.215 per sq.meter if
3-mm commmercial ply is used

It 24 SWG wire gauze is used, the


composite rate shall be reduced by
Rs.4.70 per Sft. or Rs.50.60 P.SQM

56 Providing and fixing wooden moulding stopper 2"x5/8"


(63 x 16 mm) on door frame fitted with ply of approved
quality complete in all respects.
a)
b)

Teak wood moulding


Deodar wood moulding

Per Sft.
ditto

22.05
22.05

110.65
66.70

57 Providing and fixing deodar wood dolly frame having


1"x1" (40 x 40 mm) vertical and horizontal double post
with 1"x1" (40 x 40 mm) full width of james braces at
12" (300 mm) including filling of the spaces in between

sq.m
ditto

237.45
237.45

1190.65
717.50
Rate shall be paid as per surface
area of dolly frame
e-g 0.75' x (3.5' + (2 x 7))

chapter-12(Wood Work)

Page 83

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

braces with 1:3:6 PCC fixing ply of approved quality


including holdfasts complete in all respects.
a)
b)

Teak wood ply


With commercial ply

Per Sft.
ditto

54.30
54.30

335.65
329.50

sq.m
ditto

584.50
584.50

3611.45
3545.20

Per Sft.
ditto

9.90
9.90

69.15
39.35

sq.m
ditto

106.60
106.60

743.80
423.35

Per Sft
Per Sft
Per Sft
Per Sft

114.70
114.70
114.70
114.70

542.45
594.05
592.80
644.40

sq.m
sq.m
sq.m
sq.m

1233.90
1233.90
1233.90
1233.90

5836.95
6392.15
6378.30
6933.50

58 Providing and fixing ornamental wooden architrave 3" x


(1" tapered to ") all along the door frame complete in all
respect.
a)
b)

Teak wood architrave


Deodar wood architrave

59 Providing and fixing Vin board cabinet 3/4" thick with


drawers 3"deep in 'Kitchen including termite proofing and
polishing with synthetic enamel as specified, with handles
hinges,screws etc., complete in all respects.
i) 1-1/2' deep,without back
ii) 1-1/2' deep,with back
iii) 2' deep,without back
iv) 2' deep,with back

chapter-12(Wood Work)

Page 84

13. PAINTING AND VARNISHING


1

The rates include charges for scaffolding and other arrangements.

The rates for all finished works include the removal of surplus debris, unused material and by products

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

a)

Cleaning painted wood work with oil and water.

100 Sft.

124.10

158.45

sq.m

13.35

17.05

b)

Oiling woodwork with boiled linseed oil.

100 Sft.

82.70

130.60

sq.m

8.90

14.05

27.7

Brushing and scraping blisters of old paints from


woodwork.

100 Sft.

248.15

--

sq.m

26.70

27.3

Scraping, brushing and removing old paint from metal


surface.

100 Sft.

992.65

--

sq.m

106.80

27.9

Painting old surfaces:a)

b)

e)

Painting guard bars, gates of iron bars, gratings,


railing (including standards, braces etc.) and similar
open work:i) first coat
ii) each subsequent coat
Painting fillets, framings, skirtings, pipes, gutters and
similar linear work not exceeding 6" in girth:i) first coat
ii) each subsequent coat

f)

291.85
221.10

469.60
311.85

sq.m
ditto

31.40
23.80

50.55
33.55

100 Sft.
ditto

176.90
150.35

271.35
227.45

sq.m
ditto

19.05
16.20

29.20
24.45

100 Sft.
ditto

291.85
221.10

473.35
359.10

sq.m
ditto

31.40
23.80

50.95
38.65

100 Sft.
ditto

176.90
150.35

271.35
227.45

sq.m
ditto

19.05
16.20

29.20
24.45

100 Lft.
ditto

150.35
106.15

244.85
183.20

Metre
ditto

4.95
3.50

8.05
6.00

Painting doors and windows, any type:


i) first coat
ii) each subsequent coat

d)

100 Sft.
ditto

Painting sashes, fanlights, glazed or gauzed doors


and windows:i) first coat
ii) each subsequent coat

c)

27.1
27.3 &
27.9

Painting corrugated surfaces, patent roofing, etc. with


oil paint.
i) first coat
ii) each subsequent coat

Remarks

Painting small detached articles, not exceeding one


square foot (Sq.m) of painted surface:-

chapter-13(Painting & Var)

Page 85

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i) first coat
ii) each subsequent coat
g)

Composite

Unit

Labour

Spec.
No.

Composite

100 Nos.
ditto

430.65
391.30

608.40
485.75

100 Nos.
ditto

430.65
391.30

608.40
485.75

100 Nos
ditto

984.35
580.80

1513.85
845.55

100 Nos
ditto

984.35
580.80

1513.85
845.55

Painting new surface:a)

100 Sft.
ditto

427.55
150.80

658.25
372.05

sq.m
ditto

46.00
16.25

70.85
40.05

100 Sft.
ditto

180.95
127.35

340.70
252.90

sq.m
ditto

19.45
13.70

36.65
27.20

i) priming coat.
ii) each subsequent coat of paint.

100 Sft.
ditto

427.55
150.80

654.50
372.05

sq.m
ditto

46.00
16.25

70.40
40.05

Preparing surface and painting guard bars, gates of


iron bars, gratings, railing (including standards,
braces, etc.) and in similar open work:i) priming coat.
ii) each subsequent coat of paint.

100 Sft.
ditto

282.00
127.35

419.70
252.90

sq.m
ditto

30.35
13.70

45.15
27.20

100 Lft.
ditto

225.50
84.90

329.75
188.10

Metre
ditto

7.40
2.80

10.80
6.15

100 Nos.
ditto

663.3
324.80

1214.55
763.55

100 Nos.
ditto

663.3
324.80

1214.55
763.55

Preparing surface and painting sashes, fan light,


glazed or gauzed doors and windows etc. any type
(including edges):i) priming coat.
ii) each subsequent coat of paint.

c)

d)

e)

Preparing surface and painting of doors and windows


any type (including edges):-

Preparing surface and painting of fillets, framing,


skirtings, pipes, gutters, and similar linear work not
exceeding 6" (150 mm) girth:i) priming coat.
ii) each subsequent coat of paint.

f)

27.1
27.2 &
27.9

Preparing surface and painting corrugated surface,


patent roofing, etc.
i) priming coat.
ii) each subsequent coat of paint.

b)

Remarks

Painting small detached articles, exceeding one


square foot (Sq.m) but not exceeding three square
feet (Sq.m) of painted surface:i) first coat
ii) each subsequent coat

Labour

Rate (M etric System)

Preparing surface and painting of small detached


articles, not exceeding one sq. ft. (Sq.m) of painted
surface:i) priming coat.
ii) each subsequent coat of paint.

chapter-13(Painting & Var)

Page 86

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

g)

h)

Composite

Unit

Labour

Spec.
No.

Preparing surface and painting of small detached


articles, exceeding one Sft. but not exceeding 3 Sft.
(Sq.m) of painted surface:i) priming coat.
ii) each subsequent coat of paint.

100 Nos.
ditto

1856.25
559.90

2756.55
1346.65

Extra for knotting and stopping to


priming coat on new surface of wood.

100 Sft.

28.25

43.90

100 Nos.
ditto
sq.m

1856.25
559.90

2756.55
1346.65

3.05

4.75

first coat
second coat

27.10

100 Sft.
ditto

221.10
178.75

422.15
307.65

sq.m
ditto

23.80
19.25

45.40
33.10

French polishing complete:a)


b)

2170.45
1161.60

2238.65
1198.15

sq.m
ditto

233.55
125.00

240.90
128.90

100 Sft.
ditto
ditto

176.90
66.35
66.35

310.35
167.50
146.50

sq.m
ditto
ditto

19.05
7.15
7.15

33.40
18.00
15.75

100 Sft.
ditto
ditto

206.80
198.55
163.80

979.50
593.80
559.05

sq.m
ditto
ditto

22.25
21.35
17.60

105.40
63.90
60.15

10 Writing letters or figures, per letter, per inch (25 mm)


height.

Per No.

8.85

9.50

Per No.

8.85

9.50

27.1

11 Writing letters or figures at any surface with reflective paint


of approved quality and colour per letter per inch height.

Per Letter

8.85

9.20

Per Letter

8.85

9.20

27.1

10.15

11.05

ditto

Varnishing wood work, including cleaning and preparing


surface.
a)
b)
c)

on new work
on old work

27.6
100 Sft.
ditto

Remarks

Composite

Applying Khanki Mixture hot to barrage


gates:i)
ii)

Labour

Rate (M etric System)

first coat
second coat
third coat

Bitumen coating to plastered or cement concrete surface:i)


20 lbs. per 100 Sft. (9.07 Kg per Sq.m)
ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m)
iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m)

12 Writing letters of figures on any surface with reflective tape


of approved quality and colour per letter per inch (25 mm)
height.

per inch

per 25 mm

height

height

ditto

10.15

11.05

ditto

13 Coaltar painting:
a)
b)

first coat, laid hot


second coat, laid hot

100 Sft.
ditto

186.45
113.00

790.20
497.15

chapter-13(Painting & Var)

sq.m
ditto

20.05
12.15

85.05
53.50

27.8
to
27.11

Page 87

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

14 Solignum painting:a)
b)

one coat, applied hot


two coats, applied hot

27.8
100 Sft.
ditto

155.35
235.40

182.55
278.85

sq.m
ditto

16.70
25.35

19.65
30.00

15 Creosote painting:a)
b)

one coat, applied hot


two coats, applied hot

ditto
100 Sft.
ditto

186.45
282.50

304.35
480.15

sq.m
ditto

20.05
30.40

32.75
51.65

16 Burning off or rubbing down with pumice stone, old paint


from wood work.

100 Sft.

689.05

704.65

sq.m

74.15

75.80

27.3

17 Removing with caustic soda, old paint from wood work.

100 Sft.

248.15

255.90

sq.m

26.70

27.55

ditto

Each

44.20

51.15

Each

44.20

51.15

27.1

19 Painting two feet wide gauges, reading to 10th of a foot


(metre).

Per Rft.

88.45

101.80 per Metre

290.10

333.85

ditto

20 Painting sounding rods and other gauges, reading to 10th


of a foot (metre)

Per Lft.

44.20

48.35 per Metre

145.05

158.65

27.1

21 Painting leveling staves.

Per Lft.

135.50

142.20 per Metre

444.50

466.40

18 Painting distance marks for white ground and black


lettering on both sides.

22 a)

Painting and lettering mile/Km stones,


on both sides:
i) one coat
ii) two coats

b)

c)

ditto

Each
ditto

94.75
165.85

142.60
242.65

Each
ditto

94.75
165.85

142.60
242.65

Painting and lettering Furlong/ Km


stones, on both sides:i) one coat
ii) two coats

27.1

Each
ditto

12.65
22.10

18.30
32.05

Each
ditto

12.65
22.10

18.30
32.05

Each
ditto

106.15
175.10

137.20
228.00

Each
ditto

106.15
175.10

137.20
228.00

100 Sft.

496.30

sq.m

53.40

Painting and lettering Sign posts:i) one coat


ii) two coats

23 Removing paint or varnish from wall.

24 Scraping from hydraulic gates:a)


b)

Remarks

Khanki paint
Aluminium paint

27.12
27.1

100 Sft.
ditto

992.65
992.65

chapter-13(Painting & Var)

sq.m
ditto

106.80
106.80

Page 88

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

25 Painting letters with shade.

per letter
per inch
height

14.15

26 Scraping rust from old rail or girders.

100 Sft.

744.50

786.50

27 Chiselling old paint from brick work.

100 Sft.

992.65

28 Cleaning glasses with chalk and spirit, etc.

100 Sft.

29 Cleaning and oiling rafter or rolled steel


beams.
30 Cleaning and painting punkha poles, including fixing
hooks.

Unit

14.15 per letter


per 25 mm
height

Labour

Spec.
No.

Composite

14.15

14.15

27.1

sq.m

80.10

84.65

27.9
27.10

1025.05

sq.m

106.80

110.30

27.12

827.20

842.60

sq.m

89.00

90.65

100 Sft.

248.15

269.85

sq.m

26.70

29.05

27.9

Each

176.55

184.65

Each

176.55

184.65

27.3

31 Preparing surface and painting with emulsion paint:a)


b)

first coat
2nd and each subsequent coat

27.12
100 Sft.
ditto

216.20
166.05

403.45
313.35

sq.m
ditto

23.25
17.85

43.40
33.70

32 Preparing surface and painting with water proof coloured


cement finish, like duracem, buxcem or other finishes with
similar specifications, on walls, etc.
a)

27.12

new surface:
i) 1st coat
ii) 2nd and subsequent coat

b)

Remarks

100 Sft.
ditto

216.20
166.05

304.70
243.40

sq.m
ditto

23.25
17.85

32.80
26.20

100 Sft.
ditto

216.20
166.05

253.25
202.45

sq.m
ditto

23.25
17.85

27.25
21.80

i) 1st coat
ii) 2nd coat

%sft
%sft

778.80
424.70

1253.80
631.75

sq.m
sq.m

83.80
45.70

134.90
68.00

old surface:

%sft

424.70

631.75

sq.m

45.70

68.00

1.35

2.25

Metre

4.35

7.30

old surface:
i) 1st coat
ii) 2nd and subsequent coat

32A Providing and applying weather shield paint of approved


quality on external surface of building including preparation of
surface, application of primer complete in all respect:
a)

b)

new surface:

33 Painting traffic lane 5" (125 mm) wide, with road marking
enamel.

Per Rft.

chapter-13(Painting & Var)

Page 89

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

34 Painting traffic lane 5" (125 mm) wide with reflective


clorinated rubber (CR) paint including glass beads comlpete
in all respect.
35 Repainting of ceiling fan (all sizes and types), including
painting of blades, canopy, suspension rod and regulator,
with suitable enamel paint.

Per Rft.

1.60

9.85

Metre

5.25

32.30

Per Job

50.45

84.05

Job

50.45

84.05

36 Repainting of iron poles with cross arms, with bitumen or


other approved paint.

Per Job

117.70

238.30

Job

117.70

238.30

Per Rft.
ditto
ditto

1.10
2.15
3.60

3.55
4.15
6.60

Metre
ditto
ditto

3.55
7.05
11.75

7.35
13.60
21.60

38 Repainting main switches and branch distribution boards


of all sizes and types, with approved paint (complete set).

Per Job

23.30

71.55

Job

23.30

71.55

39 Extra labour for painting, varnishing, etc. from 20' (6.10 m)


height and above, for every additional 10' (3.05 m) height,
or part thereof, requiring scaffolding.

100 Sft.
per coat

79.40

sq.m

8.55

AASHTO
M248-91
(2000)

Rates shall be reduced by Rs.0.50


P.Rft or Rs.1.65 P.Mtr.
If glass beads are not used.

37 Repainting of pipes and specials of G.I., M.S. or conduit,


etc., fixed for on surface electric wiring, with approved
paint:
i)
upto 40 mm (1") dia
ii) above 40 mm (1") to 50 mm (2") dia
iii) above 50 mm (2") to 100 mm (4") dia

chapter-13(Painting & Var)

The height will be taken from the


floor, roof or ground underneath, as
the case may be on the side
towards which the work is to be
done.

Page 90

14. LINING OF CANALS


1
2
3

Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates also include curing for specified period wherever necessary.
Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description
Unit

in bed
on slope

Stabilized layer of cement, sand ratio 1:30, 2" (50 mm)


thick on slope.

Cement plaster " (13 mm) thick ratio 1:10.


a)
b)

Labour

in bed
on slope

in bed
on slope

in bed
on slope

in bed
on slope

28.1 to 28.3
100Sft.
ditto

547.70
747.10

100Sft.

1277.75

sq.m
ditto

58.95
80.40

1784.15

sq.m

137.50

192.00

in bed

b)

on slope

100Sft.
ditto

933.55
1153.70

1186.25
1406.40

sq.m
ditto

100.45
124.15

127.65
151.35
ditto

100Sft.
ditto

933.55
1153.70

1383.75
1603.85

sq.m
ditto

100.45
124.15

148.90
172.60
ditto

100Sft.
ditto

1153.70
1419.00

2226.80
2492.10

sq.m
ditto

124.15
152.70

239.60
268.15

100Cft.
ditto

5337.75
6134.70

15767.00
16563.95

cu.m
ditto

1885.30
2166.80

5568.90
5850.40

100Cft.

5337.75

17272.65

cu.m

1885.30

6100.70

ditto

6134.70

18069.60

ditto

2166.80

6382.20

Brick lining 9"x4"x3" (225x113x75 mm) in 1:6 cement,


sand mortar:a)
b)

in bed
on slope

ditto

ditto

Tile lining 12"x6"x2" (300x150x50 mm) in


1:3 cement, sand mortar:a)

Remarks

Composite

Tile lining 12"x6"x2" (300x 150x50 mm) in 1:6 cement,


sand mortar:a)
b)

Unit

Cement plaster 1" (40 mm) thick ratio 1:6.


a)
b)

Composite

Cement plaster 3/8" (10 mm) thick ratio 1:3.


a)
b)

Labour

Spec.
No.

Formation, dressing and preparing sub-grade:a)


b)

Rate (M etric System)

Rate (British System)

28.2 to 28.3 The rates are only for laying tiles


over 1/8" (3 mm) thick layer of 1:6
mortar. Items 1 to 5 above are
payable separately.

28.2 to 28.3 The rates are only for laying tiles


over 1/8" (3 mm) thick layer of 1:3
mortar. Items 1 to 5 above are
payable separately.

28.2

100Cft.
ditto

5337.75
6134.70

20663.00
21459.95

cu.m
ditto

chapter-14(Lining of canal)

1885.30
2166.80

7298.15
7579.65

The rates are only for laying bricks


over 1/8" (3 mm) thick layer of 1:6
mortar. Items 1 to 5 above are
payable separately.

Page 91

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Composite

Unit

Labour

Spec.
No.

in bed
on slope

ditto

100Cft.
ditto

5337.75
6134.70

22168.65
22965.60

cu.m
ditto

1885.30
2166.80

7829.95
8111.45

Cement concrete lining, using washed screened and


graded stone aggregate:a)

The rates are only for laying


bricks over 1/8" (3 mm) thick
layer of 1:3 mortar. Items 1 to
5 above are payable
separately.

20.1, 28.1
& 28.3

in bed:i) ratio 1:2:4


ii) ratio 1:3:6
iii) ratio 1:4:8

b)

Remarks

Composite

Brick lining 9"x4"x3" (225x113x75 mm), in 1:3 cement,


sand mortar:a)
b)

10

Labour

Rate (M etric System)

100Cft.
ditto
ditto

4804.80
4804.80
4804.80

18548.65
15920.40
14015.05

cu.m
ditto
ditto

1697.05
1697.05
1697.05

6551.40
5623.10
4950.10

100Cft.
ditto
ditto

5539.05
5539.05
5539.05

19282.90
16654.65
14749.30

cu.m
ditto
ditto

1956.40
1956.40
1956.40

6810.70
5882.40
5209.45

on slope:i) ratio 1:2:4


ii) ratio 1:3:6
iii) ratio 1:4:8

chapter-14(Lining of canal)

Page 92

15. SHEET PILING


Rates for all finished works include the removal of surplus debris, unused material and by products.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Cutting Ransome and Larson piles.

2
3

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per
cut

141.25

Per
cut

141.25

29.129.3

Cutting universal piles.

Per cut

209.05

Per cut

209.05

ditto

Driving steel piles, 25' to 30'. (7.5 to 9.0 m)

100Sft.

3393.70

sq.m

365.15

ditto

1) The rate includes laying and


removing of track and also carriage
of piles to machine, average
distance of 3 chains (90 metre).
2) The rates are for the tackle
gangs only supplied by the
contractor, Mechanical staff
on-machines will be supplied by
Government.
3) T-piles and adjustable junction
piles will be counted as two piles.

Driving steel piles,more than 15' (4.6 m) and less than 25'
(7.5 m).

100Sft.

3252.50

sq.m

349.95

ditto

ditto

Driving steel piles, 15' (4.5 m) and under.

100Sft.

2405.05

sq.m

258.80

ditto

ditto

Dolleying piles.

Each

212.25

Each

212.25

ditto

Drilling holes in piles by hand.

Each

19.40

Each

19.40

ditto

Raising and lowering machine.

Per Ft.

3181.20

Metre

10434.35

ditto

Turning Machine, 90

o.

Per
Job

4741.45

Per
Job

4741.45

29.1 to
29.3

10

Turning Machine, 135 .

Per
Job

5871.35

Per
Job

5871.35

ditto

11

Turning Machine, 180 .

Per
Job

7993.90

Per
Job

7993.90

29.1 to
29.3

12

Travelling machine (light).

Per
Chain

9444.60

30 M.

9444.60

ditto

chapter-15(Sheet piling)

Upto 5' (1.5 m) dolleying.

Page 93

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

13

Loading and unloading piles.

Ton

183.65

Tonne

14

Dismantling piling machine.

Each

19531.60

15

Erecting piling machine.

Each

22536.45

16

Carriage of piling machine under different conditions.

per
chain

3838.55

Labour

Spec.
No.

Composite

180.75

ditto

Each

19531.60

ditto

Each

22536.45

ditto

30 M

3838.55

ditto

chapter-15(Sheet piling)

Remarks

To be done by hand carts or


ramps, including cost of ropes.

Page 94

16. PROTECTION & DIVERSION WORKS


1
2

3
4

Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage
of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport is
adopted. The supply and carriage to site of work of all other material required in the item, is included in the
composite rates.
The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reduction
factor) of the stone, boulders, shingle or spawl carried.
Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only;
or where such stone product is supplied, carried or handled by the contractor in which no laying is required,
the actual stack measurement (without any reduction factor) shall from the basis of payment of supply or
carriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form the
basis of laying.
In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. within
one mile (1.6 Km.)
i)

the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafter
from the point of supply.

ii)

if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collected
and measured at site of work and no extra carriage would be admissible in such cases.

iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the point
of supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges would
be arrived at, most economically. Extra carriage will be admissible from the place of supply of the
material which will be considered its starting point. The demarcation of the place of supply will be
pre-determined before calling the tenders.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Cutting pilchi frash or sarkanda inlcuidng carriage within


one mile.

100Cft.

943.00

cu.m

333.00

Weaving matresses.

100Cft.

1786.75

cu.m

631.00

a)

Supplying and filling jute bags 1.25 (o.o35 cum) Cft.,


capacity, with sand or earth, sewing and stacking, in
dry.

Per
Bag

27.90

42.80

Per Baq

27.90

42.8

b)

Supply and filling jute bags 1.25 (0.35 ccum) Cft.


capacity, with sand or earth, sewing and laying in
position, under water.

ditto

43.45

58.30

Per Baq

43.45

58.3

Supplying and filling jute bags 4 to 5 cft


(0.11 to 0.14 cum) capacity, with sand or earth,
sewing and stacking, in dry.

Per
Bag

66.80

120.25

Per
Bag

66.80

120.25

Supply and filling new jute bags 4 to 5 cft (0.11 to

ditto

95.45

148.90

ditto

95.45

148.90

4.00 a)

b)

chapter-16(Protec & Div)

Remarks

The rate does not include supply of


sand or earth for filling bags, which
will be paid extra.
-ditto-

The rate does not include supply of


sand or earth for filling bags, which
will be paid extra.
-dittoPage 95

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

0.14 cu.m) capacity, with sand or earth, sewing and


laying in position, under water.
5

Carriage of jute bags 1.25 Cft. (0.035 cu m) capacity, filled


with sand or earth:a)

1st chain (30 m)

100 Nos

248.15

b)

2nd to 4th chain (30 m to 120 m)

Per chain
per 100
Nos

89.35

ditto

34.75

100 Nos

992.65

% Nos

992.65

per chain
per 100Nos

347.40

Per 30 m
per %Nos

347.40

ditto

134.00

ditto

134.00

c)

5th and subsequent chains


(150 m and subsequent every 30 m)

% Nos

248.15

Per 30 m

89.35

Per 100 Nos/

ditto

34.75

Carriage of new jute bags 4 to 5 Cft.(0.11 to 0.14 cu.m)


capacity, filled with sand or earth:-

a)

1st chain (Ist 30 metre)

b)

2nd to 4th chain (60 m to 120 m)

c)

5th and subsequent chains (150 m and


subsequent every 30 m)

Rolling matresses to river edge and floating,


after unroling:a)

area of matress upto 2,000 Sft.


( 186 sq.m)

100Sft.

558.35

sq.m

60.10

b)

area of matress 2,000 to 2,500 Sft.


(186 sq.m to 232 sq.m)

100Sft.

930.60

sq.m

100.15

c)

area of matress over 2,500 Sft.


(232 sq.m)

ditto

1085.70

ditto

116.80

Sewing empty cement bags in sheets.

100 Nos

868.55

904.40

% Nos

868.55

904.4

Making compact round pilchi, frash or sarkanda round


bundles of specified size for the work.

100Cft.

1209.80

1313.00

cu.m

427.30

463.75

chapter-16(Protec & Div)

Measured in the shape of compact


round bundles and of size specified
for the work, before filling at site.
Page 96

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

10 Launching the above and placing in position.

Labour

Rate (M etric System)

Composite

Unit

Labour

100Cft.

595.60

cu.m

210.35

100Cft.

1796.70

cu.m

634.50

Spec.
No.

Remarks

Composite

11 Supply within 5 chains (150 m):a)

Boulders 9" (225 mm) and above

b)

Over size shingle 3" to 9"(75 to 225 mm)

ditto

1201.10

ditto

424.15

c)

Mixed graded shingle

ditto

1424.45

ditto

503.05

Each

77.55

122.45

Each

77.55

122.45

100Sft.
ditto
ditto

928.60
994.95
994.95

1261.25
2074.95
2688.40

sq.m
ditto
ditto

99.90
107.05
107.05

135.70
223.25
289.25

100Sft.
ditto
ditto

1193.95
1326.60
1326.60

1694.00
2943.35
3861.35

sq.m
ditto
ditto

128.45
142.75
142.75

182.25
316.70
415.50

100Cft.

620.40

950.40

cu.m

219.10

335.65

100Cft.
ditto
ditto

1085.70
1085.70
837.55

1547.70
1415.70
1893.55

cu.m
ditto
ditto

383.40
383.40
295.80

546.55
499.95
668.80

12 Supplying Munj or Patha Trungers 6" (150 mm) mesh to hold


3 Cft. (0.085 cu.m)
13 Providing and weaving G.I. wire netting for wire crates, with
G.I. wire of approved size (including siding and partition to
make crate):a)

6" (150 mm) mesh


i) 15 SWG wire
ii) 10 SWG wire
iii) 8 SWG wire

b)

4" (100 mm) mesh


i) 15 SWG wire
ii) 10 SWG wire
iii) 8 SWG wire

14 Providing and laying shingle on top of bund, including


handling of materials within three chains.
15 Supply and dumping at site, without boat, including
handling of materials within three chains (90 m)
a)
b)
c)

stone or boulder
shingle or spawl
brick bats

16 Supply and dumping by boat, including loading into boat


within three chains (90 m) lead, and hire charges of boat and
boatman.
a)
b)
c)

stone or boulder
shingle or spawl
brick bats

The rate includes supply of brick


bats to site of work.
The rate includes supply of brick
bats to site of work.

100Cft.
ditto
ditto

2098.80
2098.80
1850.65

2560.80
2428.80
2906.65

cu.m
ditto
ditto

741.30
741.30
653.65

904.5
857.85
1026.65

17 Providing and filling brick bats in crates


(excluding cost of crates).

100Cft.

1512.70

2568.70

cu.m

534.30

907.25

The rate includes supply of brick


bats to site of work.

18 Supplying and filling bricks in crates and hand packing

100Cft.

1822.90

16222.90

cu.m

643.85

5729.95

The rate includes supply of bricks

chapter-16(Protec & Div)

Page 97

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

(excluding cost of crates).

to site of work.

19 Supply and filling in wire crates, including sewing crates


(excluding cost of crates):i)
ii)

stone or boulder
shingle or spawl

100Cft.
ditto

2071.10
2071.10

2533.10
2401.10

cu.m
ditto

731.50
731.50

20 Extra for anchoring boat, for dumping by boats or tipping


crates.

100Cft.

21 Extra for tipping crates (in addition to anchoring boats).

218.40

cu.m

77.15

100Cft.

1091.90

cu.m

385.65

22 Pilchi reventment, including carriage upto one mile


(1.6 km.)

100Sft.

620.40

1130.40

sq.m

66.75

121.65

30.1

23 Surface protection with pilchi matresses, carriage upto


one mile (1.6 Km).

100Sft.

1551.00

1602.00

sq.m

166.90

172.40

ditto

100Sft.

3719.90

4829.45

sq.m

400.25

519.65

25 Constructing Groynes upto 5' (1.5 m) height, with single


row of wooden vertical stakes 7" to 12" (175 to 300 mm)
dia, 1' (300 mm) apart, average lead one mile (1.6 km.)

100Sft.

1220.65

1323.85

sq.m

131.35

26 Construction Groynes upto 10' (3.0 m) height, with double


row of wooden vertical stakes 7" to 12" (175 to 300 mm)
dia, 2' (600 mm) apart, average lead one mile (1.6 Km).

100Sft.

2088.25

2210.65

sq.m

224.70

237.85

27 Providing and laying stone pitching/filling, dry hand


packed, as filling behind retaining walls or in pitching and
aprons.

100Cft.

1326.60

2055.60

cu.m

468.55

726.05

28 Providing and laying stone pitching with hammer dressed


stones on surface, laid in courses.

100Cft.

3450.15

4098.15

cu.m

1218.60

1447.45

100Cft.
ditto

2920.50
2610.30

3568.50
3258.30

cu.m
ditto

1031.50
921.95

1260.4
1150.85

24 Pilchi, sarkanda or frash pitching on slopes, including


supply of pilchi, sarkanda or frash within one mile, (1.6 km)
also supply and driving of pegs 1' (460 mm) long
sharpened at one end and, tying with wire or Munj Ban
(excluding cost of placing earth between rolls).

894.70
848.05

142.45

The cost of placing earth between


rolls shall be paid separately, as
earthwork.

Measurement to be made of the


area of elevation on one face only.

29 Providing and laying stone pitching, for top layer only:a)


b)

one slope
on level

30 Providing and laying stone or spawl filling:-

chapter-16(Protec & Div)

Page 98

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

a)

on level

100Cft.

796.95

1096.95

cu.m

281.50

387.45

b)

on slope

ditto

959.40

1259.40

ditto

338.85

444.8

100Cft.
ditto
ditto

3803.70
3493.50
2045.35

6379.15
6068.95
4701.80

cu.m
ditto
ditto

1343.45
1233.90
722.40

2253.10
2143.55
1660.65

cement, sand mortar 1:3


cement, sand mortar 1:8

100Sft.
ditto

1341.20
1130.25

5209.80
3057.70

sq.m
ditto

144.30
121.60

560.6
329.00

33 Sand grouting in stone apron, with high


pressure hose.

100Sft.

451.45

1021.45

sq.m

48.60

109.90

34 Grouting stone filling or pitching, with bajri.

100Cft.

775.50

1675.50

cu.m

273.90

591.8

35 Removing stone and repitching hand packed, on slopes or


level after making good damaged slope/portion.

100Cft.

2758.25

cu.m

974.20

36 Collecting and stacking boulders from nullah beds or loose


shale, or from any other site, within 3 chains (90 m) lead.

100Cft.

992.65

cu.m

350.60

37 Levelling and dressing stone filling under blocks and


grouting with shingle.

100Cft.

796.95

1696.95

cu.m

281.50

599.35

38 Grouting jharies between blocks with bajri.

100Cft.

796.95

1396.95

cu.m

281.50

493.40

39 Breaking stone into spawls and stacking

100Cft.

744.50

cu.m

262.95

31 Providing and laying stone pitching, hand packed, with


surface levelled off to the correct section and voids filled in
1:8 cement, sand mortar, in floors of bridges along banks
and in appons etc.
i)
top layer on slope
ii) top layer on level
iii) stone pitching/filling on slope or on level
(other than top layer).
32 Grouting stone pitching or apron, etc. in:a)
b)

Canal and Roads


40 Fixing floating spurs, with material from canal plantation
within one mile (1.6 Km) lead:a)

upto 2.0' (600 mm) F.S. depth

Each

25.25

Each

25.25

b)

above 2.0' to 3.0' (600 to 900 mm) F.S. depth

ditto

28.40

ditto

28.40

c)

above 3.0' to 4.0' F.S. (900 mm to 1200mm) depth

Each

37.90

ditto

37.90

d)

above 4.0' (1200 mm) F.S. depth

ditto

94.70

ditto

94.70

chapter-16(Protec & Div)

Page 99

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

41 Staking and bushing from canal plantation, royalty to be


paid to Forest Department or cost to private owner, if and
when required:a)

b)

i) Cutting and supply unsharpened pegs 3.5' (1.07


m) long, 3" to 6" (75 to 150 mm) dia, within one mile
(1.6 Km) lead.

100 Nos

1240.80

ii) Sharpening one end of 3.5' (1.07 m) long pegs, 3"


to 6" (75 to 150 mm) dia.

100 Nos

530.65

iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).

100 Nos

790.95

iv) Tying pegs with Munj, Patha ban (one line,


incuding tying around the pegs).

Per Chain
of One
Row

62.05

93.25

v) Cutting and supplying brush wood from canal


plantation or private owners, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).

ditto

892.30

i) Cutting and supplying unsharpened pegs 4.0'


(1.20 m) long, 3" to 6" (75 to 150 mm) dia, from canal
plantation, lead within one mile (1.6 Km).

100 Nos

86.85

ii) Sharpening one end of 4' (1.20 M) long pegs, 3"


to 6" (75 to 150 mm) dia.

100 Nos

530.65

iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).

100 Nos

927.25

iv) Tying pegs with Munj, Patha ban (one line,


incuding tying around the pegs).

Per
Chain of
one row

62.05

v) Cutting and supplying brush wood from canal


plantation or private source, lead within one mile
(1.6 Km). and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
c)

i) Cutting and supplying unsharpened pegs 5.0' (1.5

ditto

2257.20

100 Nos

108.60

1273.35

% Nos

1240.80

100 Nos

530.65

100 Nos

790.95

Per 30
Metre
of one
row

62.05

93.25

1067.15

ditto

892.30

1067.15

123.85

100 Nos

86.85

123.85

100 Nos

530.65

100 Nos

927.25

Per
30 M of
one row

62.05

154.95

chapter-16(Protec & Div)

ditto

2257.20

100 Nos

108.60

1273.35

154.95
Page 100

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

m) long, 3" to 6" (75 to 150 mm) dia, from canal


plantation, lead within one mile (1.6 Km).
ii) Sharpening one end of 5' (1.5 m) long pegs, 3" to
6" (75 to 150 mm) dia.

100 Nos

558.90

100 Nos

558.90

iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.5' (450 mm) below the available bed
or ground (average).

100 Nos

1061.30

100 Nos

1061.30

iv) Tying pegs with Munj, Patha ban (one line,


incuding tying around the pegs).

Per
Chain of
one row

62.05

93.25

Per chain
of one row

1059.30

1303.90

i) Cutting and supplying unsharpened


pegs 6.0' (1.8 m) long, 3" to 6" (75 to
150 mm) dia, from canal plantation, lead
within one mile (1.6 Km).

100 Nos

2481.60

ii) Sharpening one end of 6' (1.8 m) long pegs, 3" to


6" (75 to 150 mm) dia.

100 Nos

iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.75' (530 mm) below the available
bed or ground (average).
iv) Tying pegs with Munj, Patha ban (one line,
incuding tying around the pegs).

v) Cutting and supplying brush wood from canal


plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
d)

v) Cutting and supplying brush wood from canal


plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).
e)

i) Cutting and supplying unsharpened pegs 6'-1" to


8.0' long (1.85 to 2.45 m), 4" to 8" (100 to 200 mm)
dia, from canal plantation, lead within one mile
(1.6 Km).

Per
30 M
of one
row

62.05

93.25

Per 30 M
of one row

1059.30

1303.90

2537.20

100 Nos

2481.60

2537.2

665.00

100 Nos

665.00

100 Nos

1273.55

100 Nos

1273.55

Per
Chain of
one row

62.05

Per Chain
93.25 of one row

62.05

93.25

ditto

2567.40

2864.45

ditto

2567.40

2864.45

100 Nos

1861.20

1976.50

100 Nos

1861.20

1976.50

chapter-16(Protec & Div)

Page 101

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

ii) Sharpening one end of 6'-1" to 8.0' (1.85 to 2.45m)


long pegs, 4" to 8" (100 to 200 mm) dia.

100 Nos

849.00

100 Nos

849.00

iii) Driving pegs 6'-1" to 8.0' (1.85 to 2.45 m) long, 3"


to 6" (75 to 150 mm) dia driven 2' (600 mm) below
the available bed or ground (average).

100 Nos

1404.50

100 Nos

1404.50

iv) Tying pegs with Munj, Patha ban (one line,


incuding tying around the pegs).
v) Cutting and supplying brush wood from canal
plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).

Per chain
of one row

62.05

79.35 Per 30 M
of one row

Remarks

62.05

79.35

Per 30 M
of one row

2920.50

3269.95

Per
Chain of
one row

2920.50

3269.95

i) Supplying Bamboos 8'-1" to 10.0' (2.46 to 3.05 m)


long, 2" to 5" (63 m to 125 mm) dia.

100 Nos

7200.00

100 Nos

7200.00

ii) Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5


m) long Bomboos, 2" to 5" (63 to 125 mm) dia.

100 Nos

742.90

100 Nos

742.90

iii) Driving Bamboos 8'-1" to 10.0' (2.46 to 3.05 m)


long 2" to 5" (63 to 125 mm) dia, driven 2.5' (750
mm) below the available bed or ground (average).

100 Nos

1538.85

100 Nos

1538.85

iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
Munj, Patha Ban, two lines, including tying around
the Bamboos.

Per
Chain of
one row

93.05

142.00

Per 30 M
of one
Row

93.05

142.00

3583.80

4037.65

ditto

3583.80

4037.65

10800.00

100 Nos

42 Staking with Bamboo from market and bushing from canal


plantation or private source (royalty of brushwood to be
paid to Forest Department or cost to private owner, if and
when required):a)

v) Cutting and supplying brushwood from canal


plantation or private source, lead within one mile
(1.6 Km), and wattling between stakes and
intertwining (thickness of wattled brushwood 1.0'
(300 mm) average).
b)

ditto

i) Supplying Bamboos 10'-1" to 12.0' (3.07 to 3.66


m) long, 2" to 5" (63 to 125 mm) dia.

100 Nos

ii) Sharpening one end of 10'-1" to 12.0'


(3.07 to 3.66 m) long Bamboos, 2" to
5" (63 to 125 mm) dia.

100 Nos

849.00

chapter-16(Protec & Div)

100 Nos

849.00

10800

Page 102

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)

d)

Labour

iii) Driving Bamboos 10'-1" to 12.0' (3.07 to 3.66 m)


long 2" to 5" (63 to 125 mm) dia, driven 2.75'
(840 mm) below the available bed or ground (average).

100 Nos

1669.80

iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.

Per chain
of one
row

310.20

v) Cutting and supplying brushwood from canal


plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' ( 300 mm)
average).

ditto

4380.75

Composite

Unit

100 Nos

Per 30 M
1118.90 of one Row

4957.35

ditto

11400.00

100 Nos

Labour

1669.80

Spec.
No.

310.20

1118.90

4380.75

4957.35

100 Nos

ii) Sharpening one end of 12'-1" to 14.0' (3.68 to 4.27


m) long Bamboos, 2" to 5" (63 to 125 mm) dia.

100 Nos

955.15

100 Nos

955.15

iii) Driving Bamboos 12'-1" to 14.0' (3.68 to 4.27 m)


long 2" to 5" dia, driven 3.5' (1.07 mm) below the
available bed or ground (average).

100 Nos

1910.30

100 Nos

1910.30

iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.

Per chain
of one row

310.20

v) Cutting and supplying brushwood from canal


plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).

ditto

5177.70

i) Supplying Bamboos 14'-1" to 16.0' (4.30 to 4.90 m)


long, 2" to 5" (63 to 125 mm) dia.

100 Nos

ii) Sharpening one end of 14'-1" to 16.0' (4.30 to


4.90 m) long Bamboos, 2" to 5" (63 to 125 mm) dia.

100 Nos

1061.30

100 Nos

1061.30

iii) Driving Bamboos 14'-1" to 16.0' long (4.30 to 4.90m)


2" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)
below the available bed or ground (average).
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.

100 Nos

2122.55

100 Nos

2122.55

Per Chain
of one
Row

310.20

1118.90

Per 30 M
of one
Row

310.20

1118.90

ditto

5965.10

6733.90

ditto

5965.10

6733.90

Per 30 M
1118.90 of one row

5841.70

ditto

12600.00

100 Nos

chapter-16(Protec & Div)

11400.00

310.20

1118.90

5177.70

5841.70

Remarks

Composite

i) Supplying Bamboos 12'-1" to 14.0' (3.68 to 4.27


m) long, 2" to 5" (63 to 125 mm) dia.

v) Cutting and supplying brushwood from canal


plantation or private source, lead within one mile

Rate (M etric System)

12600.00

Page 103

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)

Rate (M etric System)

Composite

Unit

Labour

100 Nos

Spec.
No.

Unit

Labour

i) Supplying Bamboos 16'-1" to 20' (4.9 to 6.10 m)


long, 2" to 5" (63 to 125 mm) dia.

100 Nos

ii) Sharpening one end of 16'-1" to 20' (4.9 to


6.10 m) long Bamboos, 2" to 5" (63 to 125 mm) dia.

100 Nos

1273.55

100 Nos

1273.55

iii) Driving Bamboos 16'-1" to 20' long (4.9 to 6.10 m)


2" to 5" (63 to 125 mm) dia, driven 4' (1.20 m)
below the available bed or ground (average).

100 Nos

2547.05

100 Nos

2547.05

iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.

Per Chain
of one
row

310.20

1118.90

Per 30 M
of one
row

310.20

1118.90

v) Cutting and supplying brushwood from canal


plantation or private source, lead within one mile
(1.6 Km) and wattling between stakes and intertwining
(thickness of wattled brushwood 1.0' (300 mm)
average).

ditto

7477.80

8456.15

ditto

7477.80

8456.15

43 Cutting and supplying brushwood from canal plantation or


from any other source, within one mile (1.6 Km).

100Cft.

310.20

379.95

cu.m

109.55

134.20

44 Filling brush wood only, thoroughly packed.

100Cft.

248.15

cu.m

87.65

45 Covering road 10' to 12' (3.00 to 3.65 m) wide, with 3"


(75 mm) sarkanda or jungle upto one chain lead (30 m).

Per
Chain

595.60

Per
30 M

595.60

46 a)
b)

100Sft.
100Sft.

3226.10
2729.75

Sq.m
Sq.m

347.15
293.70

Remarks

Composite

(1.6 Km) and wattling between stakes and intertwining


(thickness of wattled brushwood 1.0' (300 mm)
average).
e)

Gachi pitching 1' (300 mm) thick.


Gachi pitching done with silt clearance
and berm dressing.

13200.00

chapter-16(Protec & Div)

13200.00

Royalty to be paid to the Forest


Department or cost to the private
owner, if and when required.
Measured in compacted and
packed shape before filling.

Page 104

17. OUTLETS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Earthwork for outlets, excavation refilling, ramming and


puddling:a)

channels, discharge upto 50 cusecs.

Job

1034.00

Job

1034.00

b)

channels, discharge from 51 to 100 cusecs.

Job

1364.90

Job

1364.90

c)

channels, discharge from 101 to 200 cusecs.

Job

2068.00

Job

2068.00

d)

channels, discharge from 201 to 350 cusecs.

Job

2791.80

Job

2791.80

e)

channels, discharge over 350 cusecs.

Job

4136.00

Job

4136.00

Dismantling outlets:-

17.1
to
17.5

Includes consolidation of earth after


refilling.

18.1

These rates are for total


dismantlement and removal
of material. The rates do not
include earth work for which
rates are given in item 1,
above.

a)

old types, such as K.G.O's orifices, etc.

Each

1034.00

Each

1034.00

b)

A.P.M. or O.F., "H" upto 2.0 ft. (600 mm)

ditto

1551.00

ditto

1551.00

c)

A.P.M. or O.F., "H" from 2.1 ft. to 3.0'.


(630 mm to 900 mm)

ditto

2068.00

ditto

2068.00

d)

A.P.M. or O.F., "H" above 3.0'.


(900 mm)

ditto

2585.00

ditto

2585.00

e)

Tail cluster bifurcation

ditto

1551.00

ditto

1551.00

f)

Tail cluster trifurcation

ditto

2068.00

ditto

2068.00

g)

Tail cluster quardification

ditto

2585.00

ditto

2585.00

Each

437.80

Each

437.80

Job

920.05

Job

920.05

18.1, 21.1
& 21.2

Each

920.05

Each

920.05

18.1, 21.1
& 21.2

Making temporary A.P.M. bricks block and fixing at site.

Dismantling walls, taking out temporary


A.P.M. brick block, fixing iron block and
rebuilding dismantled walls.

Dismantling walls and fitting iron block of O.F. outlet.

Constructing, watching and removing bund for outlet built


in running water:-

791.80

Remarks

791.80 21.1 & 21.2

17.1
to
chapter-17(Outlet)

Page 105

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Each
ditto

2481.60
3350.15

Spec.
No.

Remarks

Composite
17.2

a)
b)

upto 3.0' (0.300 m) depth


above 3.0' (0.300 m) depth

Each
ditto

2481.60
3350.15

Adjusting "B" of tail cluster by dismantling and rebuilding


throat walls.

Each

498.50

990.05

Each

498.50

990.05

18.1, 21.1
& 21.2

Adjusting "Y" of an A.P.M. outlet, including dismantling


and rebuilding.

Each

973.50

1777.50

Each

973.50

1777.50

ditto

Extra labour in fixing A.P.M. and O.F. outlet blocks,


including dressing of bricks:a)
b)
c)
d)
e)

for channel depth of


for channel depth of
for channel depth of
for channel depth of
for channel depth of

5.0'. (1.5 m)
4.0'. (1.2 m)
3.0'. (900 mm)
2.0'. (600 mm)
less than 2.0'. (600 mm)

21.1 & 21.2 Rates to be Rs. 4.00 less in case


of O.F. outlets, where there is no
O.F. iron block.
Each
ditto
ditto
ditto
ditto

1061.30
795.95
636.75
530.65
424.50

1193.20
927.85
768.65
632.40
496.15

Each
ditto
ditto
ditto
ditto

1061.30
795.95
636.75
530.65
424.50

1193.20
927.85
768.65
632.40
496.15

Each

437.80

629.80

Each

437.80

629.80

Per Lft.

21.25

Metre

69.65

Each

504.60
to
1034.00

Each

363.00

10

Repairing damaged reducing collar of Hume pipe outlets.

11

Laying iron pipes for outlets.

12

Water allowance for constructing outlets or culverts, when


canal water is not flowing.

Each

504.60
to
1034.00

13

Hoisting and placing R.C. slab or stone in position on


outlets or W.C. culverts.

Each

363.00

14

Fixing pipe outlet, including back filling of earth and


puddling:a)
b)

15

21.1, 21.2
& 17.1 to
17.5
At the discretion of the
Engineer-in-charge depending upon
the distance and source of supply.

17.1 to 17.5
& 21.1 to
21.2
Rft.
ditto

94.50
40.45

103.30
49.25

Metre
ditto

310.00
132.65

338.85
161.5

Removing pipe outlet, refilling earth and puddling.


a)
b)

16

portion under bank.


portion under road, beyond bank.

portion under bank.


portion under road, beyond bank.

Rft.
ditto

82.70
31.00

Rft.
ditto

112.80
56.40

Metre
ditto

271.40
101.75

Metre
ditto

370.15
185.05

17.1
to
17.5

Changing pipe outlets by removing one pipe and replacing


it at the same site with another pipe complete with earth
and puddling.
a)
b)

portion under bank.


portion under road, beyond bank.

121.60
65.20

chapter-17(Outlet)

399
213.9
Page 106

18. ROAD & ROAD STRUCTURE


1
2
3

Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Sub-base & base construction


1

Providing and laying sub-base course of brick on edge


4" (113 mm) thick, including compaction to required
camber and grade.

100Cft.

2942.65

16633.45

cu.m

1039.35

5874.95

521-1
to
521-6

The nominal thickness of bricks


shall be taken for the purpose of
measurement and payment.

Providing and laying sub-base course of brick aggregate,


including compaction of sub-base course material to
required depth, camber, grade & density.

100Cft.

2259.90

3704.70

cu.m

798.20

1308.50

501-1
to
501-6

To be used only when brick


aggregate is cheaper than stone
aggregate.

a)

Providing and laying sub-base course of stone product


of approved quality and grade, including placing, mixing,
spreading and compaction of sub-base material to
required depth, camber, grade to achieve 100%
maximum modified AASHO dry density, including
carriage of all material to site of work except gravel and.
aggregate.

i)
ii)

Pit run or bed run gravel.


Crushed stone aggregate.

(b) Subsequent carriage of gravel and crushed stone


aggregate

ditto

100Cft.
100Cft.

2259.9
2259.9

2727.9
3411.9

100Cft. of
consolidated
sub-base

cu.m
cu.m

798.2
798.2

963.5
1205.1
1) The carriage of the whole distance
to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.

2) It shall be payable from the


nearest approved quarry.
3) The quantity of pit run
or bed run gravel and crushed stone

chapter-18(R & Road Struc)

Page 107

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 120 Cft.

a)

Providing and laying base course of crushed stone


aggregate of approved quality and grade, and supply and
spreading of stone screening, including placing, mixing,
spreading and compaction of base course material to
required depth, camber and grade to achieve 100%
maximum modified AASHO dry density, including
carriage of all materials to site of work except gravel and.
aggregate.

b)

Subsequent carriage of crushed stone aggregate.

100Cft.

2613.00

5710.20

cu.m

922.90

2016.85

501-1
to
501-6

100Cft. of
consoledated
base

1) The carriage for the whole


distance to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or
rail, as the case may be.

2) It shall be payable from the


nearest approved quarry.
3) The quantity of crushed stone aggregate
for payment of carriage shall be taken as per
actual loose volume but not more than 122
Cft.
5

Providing and laying road edging of 3" (75 mm) wide and
9" (225 mm) deep brick on end, complete in all respects.

Per Rft.

7.05

34.70

Metre

23.15

113.90 552-1 to
552-5

100Sft.

124.10

722.40

sq.m

13.35

77.75 601-1 to
601-6

100Sft.

124.10

486.60

sq.m

13.35

52.35 611-1 to
611-5

Bituminous Work & Resurfacing.


6

Providing and laying bituminous priming coat, using 10


lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg
kerosene and 0.5 Kg binder per square metre.
Providing and laying bituminous tack coat, using 10 lbs. of
bitumen per 100 Sft (0.49 Kg of bitumen per sq.m.)
a)

Providing surface treatment to roads, including supply


of bitumen and bajri/crushed stone aggregate of
approved quality, including cleaning of road surface,
heating and spraying bitumen, spreading bajri and rolling

612-1 to
612-6

chapter-18(R & Road Struc)

Page 108

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

with road roller (including its operation cost, fuel and


hire charges, etc.) etc. complete including carriage of all
materials to site of work except bajjri/crushed stone
aggregate.

1) 1st coat:i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25

100Sft.

113.25

1947.20

Sq.m

12.20

209.50

100Sft.

113.25

1697.45

Sq.m

12.20

182.65

100Sft.

87.10

1215.80

Sq.m

9.35

130.80

100Sft.

87.10

900.40

Sq.m

9.35

96.90

100Sft.

59.60

690.35

sq.m

6.40

74.30

mm) per 100 sq. feet or 1.96 Kg bitumen and 0.017


cu.metre bajri per square metre..
ii) 35 lbs. bitumen, and 4.0 Cft. bajri of nominal size "
(20 mm) per %Sft. or 1.72 Kg bitumen and 0.013 cu.metre

bajri per sq.metre.


2) 2nd coat:i) 25 lbs. bitumen, and 2.75 Cft. bajri of nominal size "
(13 mm) per %sft or 1.23 Kg bitumen and 0.008 cu. metre bajri per

sq.metre.
ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metre

bajri per sq. metre.


3) 3rd coat:14 lbs. bitumen, and 1.5 Cft. bajri of nominal size " (6
mm) per %sft or 0.69 Kg bitumen and 0.005 cubic metre
bajjri per sq.metre.

b)

Subsequent carriage of crushed stone aggregate/bajri,

100Cft.

cu.m

1) The carriage for the whole


distance to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.

2) It shal be payable from the


nearest approved quarry.

chapter-18(R & Road Struc)

Page 109

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

a)

11

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Resurfacing of road, including supply of bitumen and


bajri/crushed stone aggregate of approved quality,
including cleaning of road surface, heating and spraying
of bitumen, and spreading bajri/crushed stone
aggregate and rolling with road roller (including its
operation cost, fuel and hire charges, etc.) complete,
including carriage of all materials to site of work.

612-1
to
612-6

i) 22 lbs. bitumen, and 2.5 Cft. bajri of nominal size "


(13 mm) per %Sft. or 1.07 Kg bitumen and bajjri 0.007 cu.m
per sq.m.

100Sft.

75.50

1070.70

sq.m

8.10

115.20

ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006
cu.metre bajri per sq.metre.

100Sft.

75.50

972.10

sq.m

8.10

104.60

Subsequent carriage of crushed stone aggregate/bajri.

100Cft.

cu.m

a) Providing and laying plant premixed bituminous carpet,


including compaction and finishing to required camber, grade
and density.
(i) 3% Bitumen
(ii) 3.5% Bitumen
(iii) 4% Bitumen
(iv) 4.5% Bitumen
(v) 5% Bitumen
(vi) 5.5% Bitumen
(vii) 6% Bitumen
b) Subsequent carriage of crushed stone aggregate/bajri.

per inch
thickness
per 100Sft.
-do-do-do-do-do-do-do100Cft.

per 25mm
thickness
per Sq.m
-do-do-do-do-do-do-docu.m

Scarifying old road surface including removal of debris within


1 chain (30 m).

b)

10

Labour

Rate (M etric System)

806.10
806.10
806.10
806.10
806.10
806.10
806.10

2503.50
2725.25
2946.95
3168.65
3390.25
3612.10
3833.80

100Sft.

206.80

Per Rft.

109.05

Same remarks as against


item 8(b) above.

641-1 to
642-6
86.75
86.75
86.75
86.75
86.75
86.75
86.75

269.50
293.35
317.20
341.05
364.90
388.80
412.65
Same remarks as against item 8(b) above.

Sq.m

22.25

Metre

357.70

I ncidental Construction
12

Providing R.C.C. railing on bridges, as per standard drawing.

868.40

chapter-18(R & Road Struc)

2849.15

901-1
to
901-4

The rate includes cost of steel, its


fabrication, laying in position and
fastening, including cost of binding
wire and removal of rust from the
bars, etc.

Page 110

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

13

Providing and fixing G.I. pipe railing, as per


standard drawing.

14

Providing and fixing steel bearings of standard quality and


type at site of work.

Each Set
of one
end

15

Providing and fixing rubber bearing pad at site


of work.

Per
Cu. Inch

16

Providing and laying expansion joint of neoprine strip 4"x"


(100 mmx 6 mm) and plastic bitumen.

Per Rft.

17

Providing and fixing rain water outlet of A.C. pipe.

Each

18

Providing and erection at site of work:i)


ii)
iii)
iv)

19

Labour

Per Rft. of
3 rows of
Pipes

85.60

Rate (M etric System)

Composite

Unit

Labour
280.80

Spec.
No.

Composite
2249.05

685.50

Metre

2400.00

Each set
of one
end

18.00

cu.cm

70.60

178.60

Metre

231.70

585.95 921-1 to
921-4

35.30

339.65

Each

35.30

339.65 931-1 to
933-4

1.10

ditto

941-1 to The rate is for complete item of


941-5 work according to Standard design
4308.40
including cement concrete
322.30
foundation block and painting
520.75
letters etc.

Each
Each
Each

2094.65
102.00
197.05

4308.40
322.30
520.75

Each
Each
Each

2094.65
102.00
197.05

a) Mandatory.
b) Warning/Direction/Informatory.

Each
Each

675.60
654.40

4366.30
4103.60

Each
Each

675.60
654.40

4366.30
4103.60

100Cft.

2660.15

16350.95

cu.m

939.55

5775.15

chapter-18(R & Road Struc)

ditto

2400.00 911-1 to
911-6

R.C.C. mile/Km. stone


R.C.C. furlong/ Km. stone
R.C.C. boundary pillar.
Sign post of M.S. plate 1/8" thick (3 mm)

Providing and laying dry brick pavement/soling in streets or


roads, etc. sand grounted, laid in proper camber, including
preparation, watering, compaction of bed to proper camber,
and sand cushion.

Remarks

The nominal thickness of bricks


( 9" x 4-3/8"x 2-11/16") shall be taken
for the purpose of measurement
and payment.

Page 111

19. PLUMBING, SANITARY INSTALLATION & GAS FITTINGS


1
2

Rates for all finished works include the removal of surplus debris, unused material & by products.
The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of
Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,
Vol II, 1966 (Public Health Works).
The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Unit

Labour

Remarks

Composite

white
coloured

Each
Each

353.10
353.10

2,074.20
2,260.20

Each
Each

353.10
353.10

2,074.20
2,260.20

Each
Each

3.70
3.70

333.70
231.70

Each
Each

3.70
3.70

333.70
231.70

Each
Each

254.10
254.10

1,167.40
1,371.40

Each
Each

254.10
254.10

1,167.40
1,371.40

Providing and fixing, double seat and cover only.


i)
ii)

Composite

Spec.
No.

Providing and fitting glazed earthen ware water closet


European type, excluding seat and cover:i)
ii)

Labour

Rate (M etric System)

bakelite
plastic

Providing and fitting glazed earthen ware water closet,


squatter type (Orisa pattern), combined with foot rest.
i)
ii)

white
coloured

Providing and fitting white glazed earthen ware water closet,


squartter type, with separate foot rest.

Each

254.10

2,006.10

Each

254.10

2,006.10

Providing and fitting water closet, squatter type of terrazzo


concrete.

Each

254.10

591.40

Each

254.10

591.40

Providing and fitting glazed earthen ware wash hand basin


56x40 cm (22"x16") including bracket set, waste pipe and
waste coupling, etc.
i)
white, with pedestal
ii) coloured, with pedestal
iii) white, without pedestal
iv) coloured, without pedestal

Each
Each
Each
Each

331.65
331.65
292.90
292.90

2,437.65
2,623.65
1,696.90
1,744.90

Each
Each
Each
Each

331.65
331.65
292.90
292.90

2,437.65
2,623.65
1,696.90
1,744.90

Providing and fixing stainless steel sink with drain board, size
120x60 cm (48"x24") including bracket set, waste pipe and
waste coupling.

Each

292.90

4,382.85

Each

292.90

4,382.85

Providing and fitting terrazzo concrete sink 60x45 cm (24"x18")


with drain board of mosaic, including bracket set, waste pipe

Each

292.90

1,081.65

Each

292.90

1,081.65

chapter-19(PSI & GF)

Page 112

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

and waste coupling.


9

Providing and fixing glazed earthen ware sink, including


bracket set, waste pipe and waste coupling:i)
ii)

60x45 cm (24"x18")
37.5x45 cm (15"x18")

10

Providing and fixing glazed earthen ware flat back urinal.

11

Providing and fitting glazed earthen ware low down flushing


cistern 13,63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
i)
ii)

12

white
coloured

Each
Each

292.90
292.90

1,659.65
1,479.65

Each
Each

292.90
292.90

1,659.65
1,479.65

Each

176.55

879.40

Each

176.55

879.40

Each
Each

292.90
292.90

1,290.40
1,368.40

Each
Each

292.90
292.90

1,290.40
1,368.40

Each
Each

292.90
292.90

1,128.40
1,128.40

Each
Each

292.90
292.90

1,128.40
1,128.40

Each

292.90

1,316.55

Each

292.90

1,316.55

Each
Each

310.55
310.55

2,432.20
1,592.20

Each
Each

310.55
310.55

2,432.20
1,592.20

Each

17.65

189.70

Each

17.65

189.70

Each
Each

17.65
17.65

477.70
225.70

Each
Each

17.65
17.65

477.70
225.70

Each

23.55

408.30

Each

23.55

408.30

Each
Each

23.55
23.55

353.60
293.60

Each
Each

23.55
23.55

353.60
293.60

Providing and fitting plastic made low down flushing cistern


1363 litre (3 gallons) capacity, including bracket set, copper
connection, etc. complete.
i)
ii)

white
coloured

13

Providing and fixing white enameled cast iron low down flushing
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.

14

Providing and fixing cast iron high level flushing cistern


including cost of bracket set, copper connection, etc.
i)
ii)

13.63 litres (3 gallons) capacity


4.55 litres (1 gallon) capacity

15

Providing and fixing, chromium plated soap dish.

16

Providing and fitting, glazed earthen ware soap dish.


i)
ii)

white
coloured

17

Providing and fixing, chromium plated toilet paper holder.

18

Providing and fixing, chromium plated towel rail:i)


ii)

60 cm (24") long, and 2 cm (") dia.


50 cm (20") long, and 1.5 cm (") dia.

chapter-19(PSI & GF)

If rubber connection is used, the


composite rate will be reduced by
Rs. 12.50

Page 113

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

19

Providing and fixing looking glass 55x40 cm (22"x16") size,


and 5 mm thick, first quality.

20

Providing and fixing glass shelf 60x13 cm (24"x5"), with


5mm thick glass:i)
ii)

21

Each

Labour

44.15

Composite

376.25

Each
Each

55.15
35.30

377.55
80.90

Each
Each

55.15
35.30

377.55
80.90

White
Coloured

Each
Each

55.15
55.15

931.95
1,063.95

Each
Each

55.15
55.15

931.95
1,063.95

plastic soap dish


plastic toilet paper holder
plastic towel rail
plastic shelf 60x13 cm (24"x5") with bracket and railing.

Each
Each
Each
Each

17.65
23.55
23.55
23.55

157.05
221.10
245.10
427.05

Each
Each
Each
Each

17.65
23.55
23.55
23.55

157.05
221.10
245.10
427.05

Each
Each

23.55
23.55

539.55
695.55

Each
Each

23.55
23.55

539.55
695.55

Each
Each

23.55
23.55

275.55
179.55

Each
Each

23.55
23.55

275.55
179.55

Each

34.60

487.95

Each

34.60

487.95

Each
Each

23.55
23.55

347.55
329.55

Each
Each

23.55
23.55

347.55
329.55

Each

23.55

449.55

Each

23.55

449.55

Each
Each

23.55
23.55

329.55
407.55

Each
Each

23.55
23.55

329.55
407.55

Providing and fixing chromium plated pillar-cock, heavy:i)


ii)

24

376.25

Unit

Remarks

Providing and fitting:i)


ii)
iii)
iv)

23

44.15

Composite

Spec.
No.

Providing and fitting glazed earthen ware shelf 60x13 cm


(24"x5"), with chromium plated bracket and railing:i)
ii)

22

with chromium plated brackets and railing.


glass shelf only, without chromium plated brackets
and railing.

Each

Labour

Rate (M etric System)

2 cm (")
1.5 cm (")

Providing and fixing chromium plated stop cock, heavy:i)


ii)

2 cm (")
1.5 cm (")

25

Providing and fixing underground stop cock 13 mm ("),


with chromium plated cover.

26

Providing and fixing chromium plated bib cock:i)


2 cm (")
ii) 1.5 cm (")

27

Providing and fixing chromium plated tee stop cock


15mm (").

28

Providing and fixing chromium plated shower rose:i)


ii)

1.5x10 cm ("x4")
2x15 cm ("x6")

chapter-19(PSI & GF)

Page 114

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

29

Providing and fixing, chromium plated mixing valve, for wash


hand basin, sink or shower.

30

Providing and fixing gun metal peet/gate valve (screwed):i)


ii)
iii)
iv)
v)

31

30 mm (1") dia
40 mm(1") dia
50 mm(2") dia
65 mm(2") dia
80 mm(3") dia

Each

Labour
29.45

Composite
1,553.45

Each
Each
Each
Each
Each

35.30
35.30
35.30
35.30
35.30

437.30
587.30
815.30
1,283.30
1,895.30

Each
Each
Each
Each
Each

35.30
35.30
35.30
35.30
35.30

437.30
587.30
815.30
1,283.30
1,895.30

Each
Each
Each

23.55
35.30
47.10

371.55
635.30
773.10

Each
Each
Each

23.55
35.30
47.10

371.55
635.30
773.10

Each
Each

23.55
23.55

143.55
227.55

Each
Each

23.55
23.55

143.55
227.55

Each
Each

70.60
70.60

384.90
384.90

Each
Each

70.60
70.60

384.90
384.90

Each
Each

58.85
58.85

455.35
125.35

Each
Each

58.85
58.85

455.35
125.35

Each

88.30

681.80

Each

88.30

681.80

Per foot
Per foot

29.70
11.85

226.85
96.30

Metre
Metre

97.35
38.95

744.10
315.80

Per foot

6.55

147.45

Metre

21.55

483.55

For brass peet/gate valve (screwed),


the composite rates of items (i) to (v)
will be reduced by Rs. 66, 77, 95, 107
and 120 respectively.

13 mm (") dia
20 mm (") dia

Providing and fixing, floor trap of cast iron, including concrete


chamber all round, and C.I. grating:i)
ii)

34

1,553.45

Unit

Remarks

Providing and fixing, union brass cock.


i)
ii)

33

29.45

Composite

Spec.
No.

Providing and fitting, chromium plated or brass oxidised,


swan neck cock 15 mm (") dia.
i)
single way
ii) two way
iii) three way

32

Each

Labour

Rate (M etric System)

10x5 cm (4"x2")
10x7.5 cm (4"x3")

Providing and fitting "P" trap:i)


ii)

10 cm (4") of cast iron.


10 cm (4") glazed.

35

Providing and fitting 10 cm (4") gully trap, including cement


concrete, cost of PVC grating 15x15 cm (6"x6") and
masonry chamber 30x30 cm (12"x12").

36

Providing and fitting, cast iron soil pipe with:i)

lead caulked, yarn joint:a) 10 cm (4") i/d


b) 5 cm (2") i/d

ii)

cement caulked joint:a) 10 cm (4") i/d

chapter-19(PSI & GF)

Page 115

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

b) 5 cm (2") i/d
37

Composite

2.65

81.30

Metre

8.60

266.65

60 (2)" mm i/d
80 (3") mm i/d
100 (4") mm i/d
150 (6") mm i/d

Per foot
Per foot
Per foot
Per foot

5.25
5.85
6.55
8.75

29.85
70.65
105.45
131.15

Metre
Metre
Metre
Metre

17.25
19.15
21.55
28.70

97.85
231.75
345.90
430.15

lead caulked joint


cement caulked joint

In case of plug type, the composite


rate shall be increased by Rs.2 per kg.
24.20
14.75

152.45
113.20

Kg
Kg

24.20
14.75

152.45
113.20

Each
Each
Each

35.30
35.30
57.40

191.30
863.30
1,461.40

Each
Each
Each

35.30
35.30
57.40

191.30
863.30
1,461.40

Per foot

14.85

62.85

Metre

48.70

206.10

i)
single way
ii) two way
iii) three way

Each
Each
Each

23.55
35.30
47.10

197.55
299.30
491.10

Each
Each
Each

23.55
35.30
47.10

197.55
299.30
491.10

42

Providing and fitting nipple or bush, 6 mm to


10 mm (" to 3/8") i/d.

Each

17.65

48.55

Each

17.65

48.55

43

Providing and fixing, brass gas cock:Each


Each

3.70
133.75

93.70
105.70

Each
Each

3.70
133.75

93.70
105.70

Each
Each

5.90
5.90

83.90
125.90

Each
Each

5.90
5.90

83.90
125.90

Each

353.10

Each

353.10

Supply and fitting of cast iron manhole cover


with frame, etc. complete.
i)
30 cm (12") dia
ii) 45 cm (18") dia
iii) 60 cm (24") dia

40

Providing and fitting R.C.C. pipe 10 cm (4") dia, including


laying and jointing in trenches.

41

Providing and fitting chromium plated or oxidised, gas cock


6'mm ("):-

a)
b)

15 mm (") dia
20 mm (") dia

Providing and fixing brass stop cock/bib cock:a)


b)

45

Remarks

Composite

Per foot

Kg
Kg

44

Labour

Providing and fitting cast iron specials, such as tee bend,


collar, cross, etc. plain type:i)
ii)

39

Unit

Spec.
No.

Providing and fitting, A.C. soil pipe with cement caulked


joint, including all specials:i)
ii)
iii)
iv)

38

Labour

Rate (M etric System)

15 mm (") dia
20 mm (") dia

Hoisting and placing in position, precast R.C. latrine seats.

Replacement
chapter-19(PSI & GF)

Page 116

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

35.30
35.30

119.30
125.30

Each
Each

35.30
35.30

119.30
125.30

3 cm (1")
4 cm (1")

Each
Each

1.40
1.40

48.20
55.40

Each
Each

1.40
1.40

48.20
55.40

3 cm (1")
4 cm (1")

Each
Each

17.65
17.65

44.05
50.05

Each
Each

17.65
17.65

44.05
50.05

3 cm (1")
4 cm (1")

Each
Each

15.70
15.70

42.10
48.10

Each
Each

15.70
15.70

42.10
48.10

3 cm (1") i/d
4 cm (1")

Each
Each

35.30
35.30

551.30
671.30

Each
Each

35.30
35.30

551.30
671.30

wash hand basin and cistern


sinks

Each
Each

35.30
35.30

164.90
181.70

Each
Each

35.30
35.30

164.90
181.70

Each
Each

14.10
14.10

46.50
84.90

Each
Each

14.10
14.10

46.50
84.90

Each
Each
Each
Each
Each
Each

29.45
29.45
29.45
29.45
29.45
29.45

233.45
299.45
359.45
389.45
545.45
923.45

Each
Each
Each
Each
Each
Each

29.45
29.45
29.45
29.45
29.45
29.45

233.45
299.45
359.45
389.45
545.45
923.45

Providing and fixing 1.5 cm (") dia connection, including


check nuts, etc.:i)
ii)

Each
Each

Providing and fixing, angle iron brackets for:i)


ii)

3 cm (1")
4 cm (1")

Providing and fixing chromium plated bottle trap with waste


pipe, etc. complete:i)
ii)

Composite

Providing and fixing, flushing bend of PVC.


i)
ii)

Labour

Providing and fixing, waste pipe of PVC:i)


ii)

Unit

Remarks

Providing and fixing rubber plug with chain:i)


ii)

Composite

Spec.
No.

Providing and fixing, chromium plated waste coupling:i)


ii)

Labour

Rate (M etric System)

plastic rubber connection


copper connection

Providing and fixing brass ball float valve:i)


ii)
iii)
iv)
v)
vi)

1.5 cm (") dia


2.0 cm (") dia
2.5 cm (1") dia
3 cm (1") dia
4.0 cm (1") dia
5 cm (2") dia

chapter-19(PSI & GF)

Page 117

20. SURFACE DRAINAGE


1. Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).
2. Rates for all finished works include the removal of surplus debris, unused material and by products.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

B)

Labour

Composite
17.1

100Rft
ditto

1,000.25
1,000.25

4,111.05
3,927.40

Metre
ditto

32.80
32.80

134.85
128.80

100Rft
ditto

1,500.05
1,500.05

5,984.75
5,707.30

ditto
ditto

49.20
49.20

196.30
187.20

4" thick (113 mm)


i) ratio 1:3
ii) ratio 1:5

Pacca flat brick 3" (75 mm ) thick, laid in reimbursement,


in cement, sand mortar, on sides of drains and in other
works where required. All joints to be completely filled
and struck flush:a)
b)
c)

ratio 1:3
ratio 1:5
ratio 1:6

17.1

100Sft.
ditto
ditto

1,474.95
1,474.95
1,474.95

5,802.40
5,508.60
5,426.00

Sqm.
ditto
ditto

158.70
158.70
158.70

624.35
592.75
583.85

Pacca brick on edge, laid in reimbursement, in cement,


sand mortar, on sides of drains and on other works where
required. All joints to be completely filled and struck
flush:a)
b)
c)

Unit

ratio 1:3
ratio 1:5
ratio 1:6

17.1

100Sft.
ditto
ditto

2,090.90
2,090.90
2,090.90

8,613.85
8,142.80
8,025.50

Sqm.
ditto
ditto

225.00
225.00
225.00

926.85
876.15
863.55

Pacca flat brick, Herring bond pitching in cement, sand


mortar, laid to lines, grades, shapes and slopes as per
Engineer's drawing:a)
b)
c)

Remarks

3" thick (75 mm)


i) ratio 1:3
ii) ratio 1:5

Composite

Spec.
No.

Tega formed of pacca bricks on end, laid in and over


cement sand mortar projecting to a height of not more
than 6" (150 mm) top of drain along the property side
where required, laid to lines, grades, slopes and shape
according to the Engineer's drawing:a)

Labour

Rate (M etric System)

ratio 1:3
ratio 1:5
ratio 1:6

17.2

100Sft.
ditto
ditto

1,419.00
1419
1419

5,746.45
5452.65
5370

chapter-20(Surface Drainage)

Sqm.
ditto
ditto

152.70
152.7
152.7

618.30
586.7
577.8

Page 118

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Unit

Labour

ratio 1:3
ratio 1:5
ratio 1:6

Type I
Type II
Type III
Type IV
Type V
Type VI
Type VII
Type VIII
Type IX
Type X
Type XI
Type XII

Laying R.C.C hume pipes in position, including jointing:a) 6" to 12" (150 mm to 300 mm ) dia
b) 12" to 24" (300 mm to 600 mm) dia
c) 24" to 36" (600 mm to 900 mm) dia

Remarks

Composite

17.2

100Sft.
ditto
ditto

2,205.45
2,205.45
2,205.45

8,728.45
8,257.35
8,140.05

Sqm.
ditto
ditto

237.30
237.30
237.30

939.20
888.50
875.85

Constructing Punjab Standard Drains. of cement concrete


1:2 :5, with cement concrete bedding ratio 1:6:12,
complete, laid to lines, grades, slopes and shapes,
rendering exposed surface of concrete with 1:1 cement,
sand mortar, " (6 mm) thick, as per Engineer's drawing
(excluding excavation):a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)

Composite

Spec.
No.

Pacca brick on edge, Herring bond pitching in cement,


sand mortar, laid to lines, grades, shapes and slopes as
per Engineer's drawing:a)
b)
c)

Labour

Rate (M etric System)

17.1

Per Rft
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

33.90
67.80
89.60
106.80
141.30
162.60
180.20
201.25
270.25
296.80
331.60
353.50

88.30
165.00
215.70
257.40
351.10
402.65
444.00
499.20
704.65
772.50
859.00
911.85

Metre
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

111.20
222.45
293.95
350.35
463.50
533.25
591.05
660.15
886.50
973.60
1,087.60
1,159.40

289.70
541.25
707.55
844.25
1,151.55
1,320.75
1,456.25
1,637.35
2,311.30
2,533.70
2,817.50
2,990.95

Per Lft.
ditto
ditto

63.75
101.00
127.50

67.05
107.55
137.40

Metre
ditto
ditto

209.10
331.20
418.25

219.90
352.75
450.70

chapter-20(Surface Drainage)

Page 119

21. SEWERAGE
1
2

Specification No. correspond to Book of Specification of B& R Department Vol. II, 1966 (Public Health Works).
Rate for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Composite

Unit

Labour

Spec.
No.

Providing and laying non-reinforced concrete pipe,


moulded with cement concrete 1:1:3, conforming to
ASTM Specification C-14-73, Class 2, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing, cutting pipe where
necessary, finishing and testing, etc. complete.
i) 100 mm (4") i/d
ii) 150 mm (6") i/d
iii) 200 mm (8") i/d
iv) 225 mm (9:) i/d wall thickness 1 inch (25 mm)
v) 250 mm (10") i/d

Chapter - 8

Rft.
Rft.
Rft.

16.90
20.45
39.60

85.05
128.80
331.25

Metre
Metre
Metre

55.45
67.10
129.90

278.95
422.45
1086.50
ditto

Rft.
Rft.
Rft.
Rft.
Rft.

12.70
15.30
24.70
26.55
27.00

52.90
71.30
96.45
115.50
126.90

Metre
Metre
Metre
Metre
Metre

41.65
50.20
81.00
87.10
88.55

173.50
233.85
316.35
378.85
416.25

Providing and laying R.C.C. pipe sewers, moulded with


cement concrete 1:1:3 conforming to ASTM
Specification C-76-79, Class II. Wall B, including carriage
of pipe from factory to site of work, lowering in trenches to
correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc., complete.
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii
xiii)

310 mm (12") i/d


380 mm (15") i/d
460 mm (18") i/d
530 mm (21":) i/d
610 mm (24") i/d
690 mm (27") i/d
760 mm (30") i/d
840 mm (33") i/d
910 mm (36") i/d
1070 mm (42") i/d
1220 mm (48") i/d
1370 mm (54") i/d
1520 mm (60") i/d

Remarks

Composite

Providing and laying R.C.C. pipe, moulded with cement


concrete 1:1:3, with spigot socket or collar joint, etc.
including cost of reinforcement, conforming to B.S. 5911:
Part I: 1981, Class "L" including carriage of pipe from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where
necessary, finishing and testing, etc., complete.
i) 100 mm (4") i/d
ii) 150 mm (6") i/d
iii) 225 mm (9:) i/d

Labour

Rate (M etric System)

ditto

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

40.70
51.05
61.55
77.00
88.70
131.35
157.50
196.15
241.35
314
590.95
815.95
1039.5

399.40
490.20
535.15
684.10
817.25
1129.80
1211.55
1414.75
1893.85
2455.2
3269.7
4094.95
4682.8

chapter-21(Sewerage)

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

133.50
167.45
201.90
252.55
290.95
430.85
516.60
643.35
791.65
1029.9
1938.3
2676.3
3409.55

1310.05
1607.85
1755.30
2243.85
2680.60
3705.75
3973.90
4640.40
6211.85
8053.05
10724.6
13431.45
15359.6
Page 120

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

xiv) 1680 mm (66") i/d


xv) 1830 mm (72") i/d
4

1628.05
2019.95

Composite
5635.7
6391.90

Unit
Metre
Metre

Labour
5340
6625.45

310 mm (12") i/d


380 mm (15") i/d
460 mm (18") i/d
530 mm (21":) i/d
610 mm (24") i/d
690 mm (27") i/d
760 mm (30") i/d
840 mm (33") i/d
910 mm (36") i/d
1070 mm (42") i/d
1220 mm (48") i/d
1370 mm (54") i/d
1520 mm (60") i/d
1680 mm (66") i/d
1830 mm (72") i/d

310 mm (12") i/d


380 mm (15") i/d
460 mm (18") i/d
530 mm (21":) i/d
610 mm (24") i/d
690 mm (27") i/d
760 mm (30") i/d
840 mm (33") i/d
910 mm (36") i/d
1070 mm (42") i/d
1220 mm (48") i/d
1370 mm (54") i/d
1520 mm (60") i/d
1680 mm (66") i/d
1830 mm (72") i/d

Remarks

18485.1
20965.45
Chapter-8

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

40.70
51.05
61.55
77.00
88.70
131.35
157.50
196.15
241.35
314.00
600.05
828.65
1055.35
1653.40
2051.70

496.05
609.85
759.40
925.80
1076.55
1282.00
1548.15
1731.55
2260.35
2913.90
3596.65
4530.95
5581.95
7265.50
8998.55

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

133.50
167.50
201.90
252.55
291.00
430.80
516.60
643.30
791.60
1029.95
1968.10
2717.95
3461.50
5423.20
6729.50

1627.05
2000.30
2490.85
3036.60
3531.10
4204.95
5077.95
5679.50
7413.95
9557.60
11797.00
14861.50
18308.80
23830.85
29515.25

Providing and laying R.C.C. pipe sewers, moulded with


cement concrete 1:1:3 conforming to ASTM
Specification C-76-79, Class IV, Wall B, including carriage
of pipes from factory to site of work, lowering in trenches
to correct alignment and grade, jointing with rubber ring,
cutting pipes where necessary, testing, etc. complete:i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)

Spec.
No.

Composite

Providing and laying R.C.C. pipe sewers, moulded with


cement concrete 1:1:3 conforming to ASTM Specification
C-76-79, Class III, Wall B, including carriage of pipes from
factory to site of work, lowering in trenches to correct
alignment and grade, jointing with rubber ring, cutting pipes
where necessary, testing, etc. complete:i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii
xiii)
xiv)
xv)

Rft.
Rft.

Labour

Rate (M etric System)

Chapter - 8

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

40.70
51.05
61.55
77.00
88.70
131.35
157.50
196.15
241.35
314.00
600.05
828.65
1055.35
1653.40
2051.70

586.70
733.85
881.15
1032.15
1219.05
1572.90
1815.25
2030.20
2800.55
3436.30
4297.20
5581.75
7024.45
9224.50
10957.55

chapter-21(Sewerage)

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

133.50
167.50
201.90
252.55
291.00
430.80
516.60
643.30
791.60
1029.95
1967.85
2718.15
3461.50
5423.20
6729.50

1924.30
2407.00
2890.10
3385.45
3998.45
5159.05
5954.15
6659.00
9185.85
11271.15
14094.85
18308.05
23040.25
30256.30
35940.80

Page 121

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Composite

Unit

Labour

Spec.
No.

0-1 ft. (0 to 310 mm) below SSWL


0-2 ft. (0 to 610 mm) below SSWL
0-3 ft. (0 to 910 mm) below SSWL
0-4 ft. (0 to 1220 mm) below SSWL
0-5 ft. (0 to 1520 mm) below SSWL
0-6 ft. (0 to 1830 mm) below SSWL
0-7 ft. (0 to 2170 mm) below SSWL
0-8 ft. (0 to 2480 mm) below SSWL
0-9 ft. (0 to 2790 mm) below SSWL
0-10 ft. (0 to 3100 mm) below SSWL
0-11 ft. (0 to 3410 mm) below SSWL
0-12 ft. (0 to 3720 mm) below SSWL

Rft of
laid sewer
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

Metre of
251.85 laid sewer
472.35
ditto
812.7
ditto
1178.3
ditto
1650.95
ditto
2041.65
ditto
2440.70
ditto
2802.35
ditto
3019.35
ditto
3483.70
ditto
3878.35
ditto
4302.65
ditto

Remarks

Composite

Lowering of sub-soil water table, by installation of tubewells


along sewer line and pumping out water, for excavation in
open cutting below sub-soil water level, concreting, curing,
laying and jointing pipes, filling haunches, etc. till the
completion of sewer line, including disposal of pumped out
water:1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)

Labour

Rate (M etric System)

1) This rate shall be payable, in


addition to the item of excavation
below SSWL for sewers and
manholes under Chapter,
EARTHWORK
2) The grant of these rates shall be
subject to Superintending Engineer's
approval.

826.15
1549.35
2665.6
3864.85
5415.1
6696.6
8005.50
9191.65
9903.45
11426.50
12720.90
14112.60

Constructing gully grating chamber, 12"x12", ( 300x300


mm) complete in all respects:

3) The rate includes cost of


providing pumps, POL and all
operation charges at the site
of work, etc.

16.2

Pipe connection to be paid


separately.

Pipe connection to be paid


separately.

a)

with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame


hinged safety type.

Each

707.85

3064.75

Each

707.85

3064.75

b)

concrete Gully trap.

ditto

707.85

2839.75

ditto

707.85

2839.75

Each

2130.55

8440.50

Each

2130.55

8440.50

ditto

Constructing standard gully grating chamber, 3'x2'


(900x750 mm), with chinaware trap as per PHED Drawing
STD/PD No. 3 of 1977, complete in all respects.

Extra for making and finishing benching floor work in


manhole chamber, with 1/8" (3 mm) thick cement finish.

100Sft.

877.45

1377.45

Sq.m

94.40

148.20

14.4

10

Restoration of brick pavement on edge, over laid service


line, with 2" (50 mm) sand cushion under soling.

100Sft.

1284.70

3155.05

Sq.m

138.25

339.50

13.1

11

Restoration of flat brick pavement sand grouted, over 2"


(50 mm) thick dry sand cushion, under soling on laid
service line.

100Sft.

779.15

2092.70

Sq.m

83.85

225.20

13.1

12

Restoration of metalled road, on laid service line, including


compaction:-

13.1

a)

Carpetted road, with 2" (50 mm) carpet and 10" (250
mm) depth of stone metal for sub-base and base.

100Sft.

2233.70

7087.50

Sq.m

240.35

762.60

b)

Carpeted road, with 1" (38 mm) carpet and 6" (150
mm) depth of stone metal, for sub-base and base.

100Sft.

1586.60

5208.55

Sq.m

170.70

560.45

chapter-21(Sewerage)

Page 122

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)

13

Black Topped Road with two coats of surfacing & 10"


(250 mm) depth of stone metal, for sub base & base.

Providing and fixing 1"x1"x3/16" (31x31x5 mm) angle


iron step, in manhole chambers, including carriage and
setting the same in work to correct lines and levels.

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

100Sft.

828.15

3552.65

Sq.m

89.10

382.25

Each

77.60

227.40

Each

77.60

227.40

14.7

14

Fixing manhole frame and cover in R.C.C. slab including


carriage to site.

Per
set

203.20

Per
set

203.20

ditto

15

Providing and fixing 3" (75 mm) thick R.C.C. manhole


cover, 22" (550 mm) dia, with tee shaped C.I. frame of 20"
(500 mm) clear i/d (frame weighing 37.324 Kg. or one
maund) as per Standard Drawing STD/PD No. 5, of 1977,
complete in all respects.

Per
set

134.20

3029.25

Per
set

134.20

3029.25

ditto

Per
set

284.85

4301.25

Per
set

284.85

4301.25

15-A Providing and fixing 6" thick R.C.C. manhole


cover with tee shaped C.I. frame of 22" I/d (frame
weighing 37.324 Kg. or one maund as per Standard
Drawing STD/PD No. 6, of 1977, complete in all respect.
16

Providing and fixing, 6" (150 mm) thick R.C.C. manhole


cover for 22" as per standard drawing STD/PD No. 6 of
1977, complete in all respects.

Per
set

255.45

2455.20

Per
set

255.45

2455.20

ditto

17

Providing and fixing, 6" (150 mm) thick R.C.C. manhole


cover with 3"x3"x" (75x75x6mm) angle iron frame, 22"
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.

Per
set

213.00

3826.15

Per
set

213.00

3826.15

ditto

18

Desilting of disposal work collecting tank, including


removal of sludge within 3 chains (90 metre).

100Cft.

709.05

763.30

cum

250.45

269.60

16.2

19

Providing and installing, C.I. ventilating shaft painted with


bituminous paint with foundation bolts, as per PHED
Standard Drawing STD/PD No. 4 of 1977, complete in all
respects (except concrete foundation block):a)

14.6

6" (150 mm) i/d shaft


i) 18 ft. (5.5 metre) long
ii) 24 ft. (7.30 metre) long
iii) 30 ft. (9.15 metre) long
iv) 36 ft. (11 metre) long

b)

Remarks

Per Cwt
ditto
ditto
ditto

199.25
221.40
239.10
250.15

2659.85
2688.85
2704.85
2716.30

%kg
ditto
ditto
ditto

392.20
435.80
470.65
492.45

5235.95
5293.05
5324.55
5347.00

9" (225 mm) i/d shaft


chapter-21(Sewerage)

Page 123

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i) 18 ft. (5.5 metre) long


ii) 24 ft. (7.30 metre) long
iii) 30 ft. (9.15 metre) long
iv) 36 ft. (11 metre) long
c)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per Cwt
ditto
ditto
ditto

177.15
190.90
204.40
246.05

2634.05
2647.15
2660.45
2701.90

%kg
ditto
ditto
ditto

348.70
375.75
402.35
484.30

5185.10
5210.90
5237.10
5318.70

Per Cwt
ditto
ditto

157.50
202.50
236.25

2615.10
2657.10
2690.15

%kg
ditto
ditto

310.00
398.60
465.00

5147.85
5230.55
5295.55

Per well
Per well

5530.80
10975.80

12" (300 mm) i/d shaft


i) 18 ft. (5.5 metre) long
ii) 24 ft. (7.30 metre) long
iii) 30 ft. (9.15 metre) long

20

Labour

Rate (M etric System)

Silt clearing 10' (3.00 m) dia wells, and


removal of slush outside the compound:a)
b)

upto 10' (3.00 m) depth of slush


beyond 10' (3.00 m) depth of slush

chapter-21(Sewerage)

Per well
Per well

5530.80
10975.80

Page 124

22. SINKING OF WELLS


1
2

Rates for all finished works include the removal of surplus debris, unused material and byproducts.
Well curbs to be laid at spring level or as deep as possible.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Excavation of well in dry upto 20'(6 metre) below ground


level, and disposal of soil within one chain (30 metre)
a)

in ordinary soil or sand :i) from 0' to 5' (o to 1.5 m) depth


ii) from 5.1' to 10' (1.5 to 3.0 metre) depth
iii) from 10.1' to 15' (3.0 to 4.5 metre) depth
iv) from 15.1' to 20' (4.5 metre to 6.0 metre) depth

b)

c)

1000 Cft.

cu.m

ditto
ditto
ditto
ditto

3687.65
3851.45
4332.85
4973.15

ditto
ditto
ditto
ditto

130.25
136.05
153.05
175.65

1000 Cft.
ditto
ditto
ditto

4491.70
4695.20
5131.95
5772.20

cu.m
ditto
ditto
ditto

158.65
165.85
181.25
203.85

1000 Cft.
ditto
ditto
ditto

9688.15
10035.60
10462.45
11231.70

cu.m
ditto
ditto
ditto

342.20
354.45
369.55
396.70

1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto

19852.80
24816.00
29779.20
34742.40
39705.60
44668.80
49632.00
54595.20

cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto

701.20
876.50
1051.80
1227.10
1402.40
1577.70
1753.00
1928.30

1000 Cft.
ditto
ditto

27297.60
32260.80
37224.00

cu.m
ditto
ditto

964.15
1139.45
1314.75

in hard soil
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre) depth
in hard strata, such as shingle, gravel, etc.
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth

Labour

Rate (M etric System)

Dry sinking of well, including loading, and removing


excavated material within one chain (30 m):a)

in ordinary soil :i) from 10' to 15'(3.0 to 4.5 m) depth


ii) from 15.1' to 20'(4.5 to 6.0 m) depth
iii) from 20.1' to 25'(6.0 to 7.5 m) depth
iv) from 25.1' to 30'(7.5 to 9.0 m) depth
v) from 30.1' to 35'(9.0 to 10.5 m) depth
vi) from 35.1' to 40'(10.5 to 12.0 m) depth
vii) from 40.1'to 45'(12.0 to 13.5 m) depth
viii) from 45'(13.5 Sm) to any depth

b)

in hard soil :i) from 10' to 15'(3.0 to 4.5 m) depth


ii) from 15.1' to 20'(4.5 to 6.0 m) depth
iii) from 20.1' to 25'(6.0 to 7.5 m) depth

chapter-22(Sinking of Wells)

Page 125

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iv) from 25.1' to 30'(7.5 to 9.0 m) depth


v) from 30.1' to 35'(9.0 to 10.5 m) depth
vi) from 35.1' to 40'(10.5 to 12.0 m) depth
vii) from 40.1' to 45'(12.0 to 13.5 m) depth
viii) from 45'(13.5 m) to any depth
c)

Unit

Labour

ditto
ditto
ditto
ditto
ditto

42187.20
47150.40
52113.60
57076.80
62040.00

ditto
ditto
ditto
ditto
ditto

1490.05
1665.35
1840.65
2015.95
2191.25

1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto

37224.00
42187.20
47150.40
47770.80
57076.80
62040.00
67003.20
71966.40

cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto

1314.75
1490.05
1665.35
1687.25
2015.95
2191.25
2366.55
2541.85

from o' to 10'(0 to 3.0 m) depth


above 10' to 20'(3.0 to 6.0 m) depth
above 20' to 30'(6.0 to 9.0 m) depth
above 30' to 40'(9.0 to 12.0 m) depth
above 40' to 50'(12.0 to 15.0 m) depth
above 50' to 60'(15.0 to 18.0 m) depth
above 60' to 70'(18.0 to 21.0 m) depth
above 70' to 80'(21.0 to 24.0 m) depth
above 80'(24.0 m) to any depth

1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

30204.70
64185.00
78996.90
102696.00
114106.65
128370.00
131661.55
135126.30
146708.55

cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

1066.85
2267.00
2790.15
3627.20
4030.25
4534.05
4650.30
4772.65
5181.75

from o' to 10'(0 to 3.0 m) depth


above 10' to 20'(3.0 to 6.0 m) depth
above 20' to 30'(6.0 to 9.0 m) depth
above 30' to 40'(9.0 to 12.0 m) depth
above 40' to 50'(12.0 to 15.0 m) depth
above 50' to 60'(15.0 to 18.0 m) depth
above 60' to 70'(18.0 to 21.0 m) depth
above 70' to 80'(21.0 to 24.0 m) depth

1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto

42177.95
52722.45
63266.95
84355.90
97333.75
105444.90
115030.80
119371.60

cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto

chapter-22(Sinking of Wells)

*841-1
to
841-9

The outer dimensions of the curb


shall form basis of payment.

*841-1
to
841-9

The outer dimensions of the curb


shall form basis of payment.

Wet sinking of well in cohesive soil (value of Cmore than


5), for depths below spring level, including charges of
machinery shoring, kentledge and removal of excavated
spoil within one chain (30 m):i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

Remarks

Composite

Wet sinking of well in ordinary soil (value of C upto 5), for


depths below spring level, including charges of machinery,
shoring, kentledge and removal of excavated spoil within
one chain (30 m):i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)

Composite

Spec.
No.

in hard strata, such as shingle, gravel, etc.


i) from 10' to 15'(3.0 to 4.5 m) depth
ii) from 15.1' to 20'(4.5 to 6.0 m) depth
iii) from 20.1' to 25'(6.0 to 7.5 m) depth
iv) from 25.1' to 30'(7.5 to 9.0 m) depth
v) from 30.1' to 35'(9.0 to 10.5 m) depth
vi) from 35.1' to 40'(10.5 to 12.0 m) depth
vii)from 40.1' to 45'(12.0 to 13.5 m) depth
viii) from 45'-1" (13.5 m) to any depth

Labour

Rate (M etric System)

1489.75
1862.15
2234.60
2979.45
3437.85
3724.30
4062.90
4216.20
Page 126

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

ix)
5

Wet sinking of well in shingle, or gravel, etc, for depths


below spring level, including charges of machinery,
shoring, kentledge and removal of excavated spoil within
one chain (30 m) :i)
from o' to 10'(0 to 3.0 m) depth
ii) above 10' to 20'(3.0 to 6.0 m) depth
iii) above 20' to 30'(6.0 to 9.0 m) depth
iv) above 30' to 40'(9.0 to 12.0 m) depth
v) above 40' to 50'(12.0 to 15.0 m) depth
vi) above 50' to 60'(15.0 to 18.0 m) depth
vii) above 60' to 70'(18.0 to 21.0 m) depth
viii) above 70' to 80'(21.0 to 24.0 m) depth
ix) above 80'(24.0 m) to any depth

Making and fixing in position, kiker wood well curb.

Laying well curb in position only.

Providing, making and laying R.C.C. well curb in position,


using coarse sand, including all kinds of form, moulds,
curing, shuttering, rendering and finishing the exposed
surface, (including screening and washing of aggregate :a)
b)

above 80'(24.0 m) to any depth

Ratio 1:1:3
ratio 1:2:4

Rate (British System)


Unit

Labour

ditto

1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

Rate (M etric System)

Composite
126533.90

Unit

Labour

ditto

57515.40
70296.60
84355.90
115030.80
126533.90
140593.20
147132.40
150635.55
166491.95

cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto

Per Cft.

844.60

2311.00

cu.m

29830.45

Each

282.50

Each

282.50

Per Cft.
ditto

184.20
184.20

382.75
354.90

Spec.
No.

Remarks

Composite
4469.20
*841-1
to
841-9

The outer dimensions of the curb


shall form basis of payment.

*841-1
to
841-9

1) If concrete mixer is supplied by


Government, all charges including
depreciation will be recovered from
the contractor.
2) The rate does not include cost of
steel reinforcement and its labour for
bending, which is payable, separately.

2031.45
2482.85
2979.45
4062.90
4469.20
4965.75
5196.70
5320.45
5880.50
81624.95
-

cu.m
ditto

6506.15
6506.15

13519.00
12534.95

Providing and fixing structural steel for cutting


edge.

100Kg

663.30

10307.35

100Kg

663.30

10307.35

10

Making and removing false masonry on well.

100Cft.

5997.65

19984.30

cu.m

2118.35

7058.45

841-1 to
841-9
21.1 to
The rate includes dismantling of false
21.5 & 18.1 masonry, scraping bricks obtained
from dismantling and credit of
byproducts.

Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".

chapter-22(Sinking of Wells)

Page 127

23. TUBEWELL AND WATER SUPPLY


1
2

Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Unit

Labour

3" (75 mm) i/d


4" (100 mm) i/d
5" (125 mm) i/d
6" (150 mm) i/d
8" (200 mm) i/d
10" (250 mm) i/d
12" (300 mm) i/d
15" (375 mm) i/d
18" (450 mm) i/d

5" (125 mm) i/d


6" (150 mm) i/d
8" (200 mm) i/d
10" (250 mm) i/d
12" (300 mm) i/d
15" (375 mm) i/d
18" (450 mm) i/d

Chap. 2

Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
ditto
ditto

54.50 Per Metre


74.45 of bore
134.90
ditto
205.20
ditto
267.65
ditto
338.20
ditto
367.00
ditto
551.30
ditto
584.95
ditto

178.80
244.25
442.40
673.05
877.90
1109.30
1203.80
1808.20
1918.60
ditto

Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto

227.10 Per Metre


319.80 of bore
362.65
ditto
414.30
ditto
450.80
ditto
646.85
ditto
680.50
ditto

744.95
1048.90
1189.55
1358.95
1478.60
2121.65
2232.05

Boring for tubewell in all types of soil except shingle,


gravel & rock, from a depth of 200.1 ft. to 300 ft. (60
to 90 m) below ground level, including sinking and
withdrawing of casing pipe, complete:a)
5" (125 mm) i/d
b)
6" (150 mm) i/d
c)
8" (200 mm) i/d
d) 10" (250 mm) i/d
e) 12" (300 mm) i/d
f)
15" (375 mm) i/d
g)
18" (450 mm) i/d
Boring for tubewell in all types of soil except shingle,
gravel & rock, from a depth of 300.1 ft. to 400 ft.
(90 to 120 m) below ground level, including sinking and
withdrawing of casing pipe, complete:a)

8" (200 mm) i/d

Remarks

Composite

Boring for tubewell in all types of soil except shingle,


gravel & rock, from a depth of 100.1 ft. to 200 ft.
(30 to 60 m) below ground level, including sinking and
withdrawing of casing pipe, complete:a)
b)
c)
d)
e)
f)
g)

Composite

Spec.
No.

Boring for tubewell in all types of soil except shingle and


rock, from ground level to 100 ft. (30 m) depth, including
sinking and withdrawing of casing pipe, complete:a)
b)
c)
d)
e)
f)
g)
h)
i)

Labour

Rate (M etric System)

ditto

Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto

317.30 Per Metre


409.35 of bore
457.05
ditto
514.90
ditto
544.95
ditto
710.60
ditto
745.50
ditto

1040.75
1342.70
1499.15
1688.90
1787.45
2330.85
2445.25
Chap. 2

Rft of bore

552.05 Per Metre


chapter-23(Tubewell)

1810.80
Page 128

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

b)
c)
d)
e)
5

10"
12"
15"
18"

(250 mm) i/d


(300 mm) i/d
(375 mm) i/d
(450 mm) i/d

ditto
ditto
ditto
ditto

Composite
616.10
648.00
869.15
872.85

Unit

Labour

of bore
ditto
ditto
ditto

Spec.
No.

2020.85
2125.50
2850.80
2863.00
ditto

from ground level to 250 ft. (75 m) below ground level:-

i) 15" to 18" (375 to 450 mm) i/d


ii) 20" to 26" (500 to 650 mm) i/d
b)

Per Rft.
of bore
ditto

440.40
633.35

Per Metre
of bore
ditto

1444.50
2077.40

Upto 2 cusec discharge


Above 2 cusec discharge

Rft
of bore
ditto

440.40
633.35

Per Metre
of bore
ditto

1444.50
2077.40

Upto 2 cusec discharge


Above 2 cusec discharge

exceeding 250 ft. (75 m) depth below ground level:-

i) 15" to 18" (375 to 450 mm) i/d


ii) 20" to 26" (500 to 650 mm) i/d
Boring for tubewell in shingle, gravel and rock, including
sinking and withdrawing of casing pipe:a)

ditto

Per Rft.
of bore
ditto

993.20
1343.30

Per Metre
of bore
ditto

3257.75
4405.95

Upto 2 cusec discharge


Above 2 cusec discharge

ditto
ditto

993.20
1343.30

ditto
ditto

3257.75
4405.95

Upto 2 cusec discharge


Above 2 cusec discharge

exceeding 200 ft. (60 m) depth below


ground level:i) 12" to 18" (300 to 450 mm) i/d
ii) 20" to 26" (500 to 650 mm) i/d

Providing strong substantially built box of deodar wood


4'x2'x9" (1200x750x225 mm), with compartments, lock
and locking arrangement, for preserving samples of strata
from bore hole.

Job for
complete bore

664.60

12279.40

Job for
complete bore

664.60

12279.40

Furnishing sample of water from bore hole.

Per Set
of 2
bottles

118.80

170.70

Per Set
of 2
bottles

118.80

170.70

Providing and installing, brass strainer in tubewell bore


hole, including sockets, special sockets, studs, etc.
complete:a)
b)

Location and depth of shingle,


gravel or rock is to be determined
from the bore log.

from ground level to 200 ft. (60 m) below ground level:-

i) 12" to 18" (300 to 450 mm) i/d


ii) 20" to 26" (500 to 650 mm) i/d
b)

Remarks

Composite

Direct Rotary/Reverse Rotary drilling of bore for tubewells,


in all types of soil except shingle, gravel and rock:a)

Labour

Rate (M etric System)

2" i/d, 5/32" (50 mm i/d 4 mm) thick


3" i/d, 5/32" (75 mm i/d 4 mm) thick

ditto

Chap. 2

ditto

Per Rft.
Per Rft.

26.45
26.45

771.95 Per Metre


1132.10 Per Metre

chapter-23(Tubewell)

86.75
86.75

Cost/labour of jointing both ends is


included in the rate.

2532.00
3713.25
Page 129

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)

4" i/d, 3/16" (100 mm i/d 5 mm) thick


5" i/d, 3/16" (125 mm i/d 5 mm) thick
6" i/d, 3/16" (150 mm i/d 5 mm) thick
7" i/d, 3/16" (175 mm i/d 5 mm) thick
8" i/d, 3/16" (200 mm i/d 5 mm) thick
9" i/d, 3/16" (225 mm i/d 5 mm) thick
10" i/d, 3/16" (250 mm i/d 5 mm) thick
10" i/d, " (250 mm i/d 6 mm) thick
12" i/d, " (300 mm i/d 6 mm) thick
15" i/d, " (375 mm i/d 6 mm) thick
18" i/d, " (450 mm i/d 6 mm) thick
20" i/d, " (500 mm i/d 6 mm) thick
22" i/d, " (550 mm i/d 6 mm) thick

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

Labour
35.25
39.90
44.10
51.65
63.00
63.00
71.15
71.15
72.40
83.20
83.20
98.35
99.60

Rate (M etric System)

Composite
1418.10
1671.60
1791.30
2146.40
2763.60
2819.25
2904.05
3675.80
4184.20
5154.70
5858.20
6470.80
7430.70

Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

Labour
115.65
130.95
144.55
169.45
206.70
206.70
233.35
233.35
237.40
272.90
272.90
322.65
326.70

Spec.
No.

Composite
4651.40
5482.95
5875.40
7040.20
9064.70
9247.20
9525.25
12056.60
13724.10
16907.45
19214.90
21224.25
24372.70

10 Providing and installing M.S. Bail plug in tubewell bore


hole:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)

2" i/d, 1.5 ft. (50 mm i/d 450 mm) long.


3" i/d, 1.5 ft. (75 mm i/d 450 mm) long.
4" i/d, 2 ft. (100 mm i/d 600 mm) long.
5" i/d, 2 ft. (125 mm i/d 600 mm) long.
6" i/d, 2 ft. (150 mm i/d 600 mm) long.
7" i/d, 2 ft. (175 mm i/d 600 mm) long.
8" i/d, 2 ft. (200 mm i/d 600 mm) long
9" i/d, 2 ft. (225 mm i/d 600 mm) long
10" i/d, 2 ft. (250 mm i/d 600 mm) long
12" i/d, 2 ft. (300 mm i/d 600 mm) long
15" i/d, 2 ft. (375 mm i/d 600 mm) long
18" i/d, 2 ft. (450 mm i/d 600 mm) long
20" i/d, 2 ft. (500 mm i/d 600 mm) long
22" i/d, 2 ft. (550 mm i/d 600 mm) long

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

120.00
120.00
200.25
200.25
270.45
270.45
333.20
333.20
333.20
399.90
399.90
481.10
523.20
523.20

573.70
759.95
1468.50
1847.95
2333.85
2707.00
2999.80
3327.75
4259.75
5122.70
6305.85
7184.85
7970.65
8769.95

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

120.00
120.00
200.25
200.25
270.45
270.45
333.20
333.20
333.20
399.90
399.90
481.10
523.20
523.20

3" i/d (75 mm)


4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)
8" i/d (200 mm)
10" i/d (250 mm)
12" i/d (300 mm)

In the case of increase or decrease


in the length of Bail plug, the rates
will be increased or decreased as
per rates given in serial No. 14 of
this chapter for the respective
diameter.

573.70
759.95
1468.50
1847.95
2333.85
2707.00
2999.80
3327.75
4259.75
5122.70
6305.85
7184.85
7970.65
8769.95

11 Providing and installing, P.V.C. strainer B.S.S. Class 'B',


in tubewell bore hole, including sockets and solvents, etc.
complete:a)
b)
c)
d)
e)
f)
g)

Remarks

Chap. 2

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

19.30
22.00
23.30
27.30
37.25
38.15
38.15

Per Rft.

13.55

120.10
176.80
239.30
315.30
757.25
1130.15
1514.15

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

63.35
72.20
76.50
89.55
122.25
125.10
125.10

394.00
579.95
784.95
1034.20
2483.85
3706.90
4966.40

53.15 Per Metre

44.45

174.3

12 Providing and installing P.V.C. strainer B.S.S. Class `D' ,


in tubewell bore hole, including sockets and solvent, etc.
complete:a)

1" i/d (30 mm)

chapter-23(Tubewell)

Page 130

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

b)
c)
d)
e)
f)
g)

1" i/d (40 mm)


2" i/d (50 mm)
3" i/d (75 mm)
4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

13.85
14.00
19.35
21.95
23.30
42.20

59.45
90.80
184.95
290.75
425.30
612.20

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

45.45
45.85
63.40
72.00
76.45
138.45

195
297.75
606.55
953.65
1395
2008.05

Each
Each
Each
Each
Each
Each
Each
Each

9.80
11.00
12.00
15.65
18.60
19.60
22.90
22.90

62.60
83.00
123.60
180.05
352.20
487.60
658.90
682.90

Each
Each
Each
Each
Each
Each
Each
Each

9.80
11.00
12.00
15.65
18.60
19.60
22.90
22.90

62.60
83.00
123.60
180.05
352.20
487.60
658.90
682.90

Each
Each
Each
Each
Each
Each
Each

6.75
7.10
7.35
9.80
11.05
12.00
15.7

34.35
47.90
67.35
90.20
117.85
165.60
216.1

Each
Each
Each
Each
Each
Each
Each

6.75
7.10
7.35
9.80
11.05
12.00
15.7

34.35
47.90
67.35
90.20
117.85
165.60
216.1

13 Providing and installing P.V.C. Bail/End plug, in tubewell


bore hole:i)

B.S.S. Class `B'

a)
b)
c)
d)
e)
f)
g)
h)

3" i/d (75 mm)


4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)
8" i/d (200 mm)
10" i/d (250 mm)
12" i/d (300 mm)
14" i/d (350 mm)

ii)

B.S.S. Class `D'

a)
b)
c)
d)
e)
f)
g)

1" i/d (30 mm)


1" i/d (40 mm)
2" i/d (50 mm)
3" i/d (75 mm)
4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)

14 Providing and installing M.S. blind pipe socketed/welded


joint, M.S. reducer (where necessary), in tubewell bore
hole, including jointing/welding with strainer, etc.
complete:a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)

2" i/d, 1/8" (50 mm i/d 3 mm) thick


3" i/d, 1/8" (75 mm i/d 3 mm) thick
4" i/d, 1/8" (100 mm i/d 3 mm) thick
5" i/d, 3/16" (125 mm i/d 5 mm) thick
6" i/d, 3/16" (150 mm i/d 5 mm) thick
7" i/d, 3/16" (175 mm i/d 5 mm) thick
8" i/d, 3/16" (200 mm i/d 5 mm) thick
9" i/d, 3/16" (225 mm i/d 5 mm) thick
10" i/d, " (250 mm i/d 6 mm) thick
12" i/d, " (300 mm i/d 6 mm) thick
15" i/d, " (375 mm i/d 6 mm) thick
18" i/d, " (450 mm i/d 6 mm) thick
20" i/d, " (500 mm i/d 6 mm) thick
22" i/d, " (550 mm i/d 6 mm) thick

Chap.
2

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

72.30
72.30
90.45
90.45
129.05
129.05
150.55
150.55
150.55
180.70
180.70
221.30
238.50
238.50

253.20
332.10
435.80
778.65
942.65
1078.25
1327.95
1501.75
1922.95
2265.70
2786.95
3461.65
3838.90
4198.90

chapter-23(Tubewell)

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

237.15
237.15
296.70
296.70
423.30
423.30
493.80
493.80
493.80
592.70
592.70
725.85
782.30
782.30

830.55
1089.30
1429.40
2554.00
3091.90
3536.65
4355.75
4925.75
6307.30
7431.50
9141.20
11354.20
12591.50
13772.45
Page 131

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

15 Providing and installing P.V.C. blind pipe, B.S.S. Class


`B', in tubewell bore hole, including sockets and solvents
and jointing with strainer, etc. complete.
a)
b)
c)
d)
e)
f)
g)
h)

3" i/d (75 mm)


4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)
8" i/d (200 mm)
10" i/d (250 mm)
12" i/d (300 mm)
14" i/d (350 mm)

Remarks

ditto

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

25.40
28.75
30.05
36.05
48.00
50.05
59.70
56.60

125.30
179.50
239.75
329.45
499.80
752.05
1038.90
1228.40

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

83.35
94.25
98.60
116.85
157.40
164.15
195.85
185.70

411.00
588.75
786.40
1079.20
1639.30
2466.70
3407.65
4029.20

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

16.00
16.30
17.30
21.85
28.75
30.05
36.85

51.10
62.20
87.50
176.65
286.15
416.15
593.05

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

52.55
53.50
56.80
71.75
94.25
98.60
120.90

167.70
204.05
287.05
579.50
938.55
1365.00
1945.25

16 Providing and installing P.V.C. blind pipe, B.S.S. Class


`D', in tubewell bore hole, including sockets and solvents
and jointing with strainer, etc. complete.
a)
b)
c)
d)
e)
f)
g)

1" i/d (30 mm)


1" i/d (40 mm)
2" i/d (50 mm)
3" i/d (75 mm)
4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)

17 Testing and developing of tubewell of size 6" (150 mm)


i/d and above continuously.
i)

upto 1.5 cs. discharge

ii)

above 1.5 cs. discharge

18 Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3


mm), around tubewell in bore hole.

Compressor, accessories along with


working staff, to be supplied by
Government.
Per
Hour
ditto
Per Cft.

818.20

29.50

991.60

Per
Hour
ditto

81.15

cu.m

818.20
991.60
1041.95

2866.20

19 Laying cutting, jointing, testing and disinfecting cast iron


pipe line in trenches, with spigot and socket caulked lead
joints, including cost of materials, such as lead, yarn, etc.
complete in all respects:-

a)
b)
c)
d)
e)
f)
g)
h)

3" (75 mm) i/d


4" (100 mm) i/d
5" (125 mm) i/d
6" (150 mm) i/d
8" (200 mm) i/d
10" (250 mm) i/d
12" (300 mm) i/d
15" (375 mm) i/d

The rate includes wastage, etc.

Chap.
2

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

50.55
62.70
78.70
92.90
112.05
169.20
198.60
256.25
chapter-23(Tubewell)

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.

165.80
205.70
258.15
304.80
367.50
555.00
651.30
840.45
Page 132

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i)

18" (450 mm) i/d

Labour

Per Rft.

Rate (M etric System)

Composite

Unit

Labour

337.85 Per Metre

Spec.
No.

Composite
1108.10

20 Laying, cutting, jointing, testing and disinfecting cast iron


pipe line in trenches, with flanged and flanged joints,
complete in all respects:a)
b)
c)
d)
e)
f)
g)
h)
i)

3" (75 mm) i/d


4" (100 mm) i/d
5" (125 mm) i/d
6" (150 mm) i/d
8" (200 mm) i/d
10" (250 mm) i/d
12" (300 mm) i/d
15" (375 mm) i/d
18" (450 mm) i/d

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

22.70
25.10
36.10
39.75
46.70
65.00
76.15
104.85
133.00

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

3" (75 mm) i/d


4" (100 mm) i/d
5" (125 mm) i/d
6" (150 mm) i/d
8" (200 mm) i/d
10" (250 mm) i/d
12" (300 mm) i/d
15" (375 mm) i/d
18" (450 mm) i/d

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

11.00
12.60
16.15
18.15
24.70
31.20
37.10
53.60
64.15

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

a)
b)
c)
d)
e)
f)
g)
h)
i)

Chap. 2

1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.

Chap.
2

Cost of sockets, tees, elbows,


bends, valves, crosses, unions and
plugs, etc. is included in the rates.

Light Quality
" i/d (15 mm) 2mm thick
" i/d (20 mm) 2.35mm thick
1" i/d (25 mm) 2.65mm thick
1" i/d (32 mm) 2.65mm thick
1" i/d (40 mm) 2.9mm thick
2" i/d (50 mm) 2.9mm thick
2" i/d (65 mm) 3.25mm thick
3" i/d (75 mm) 3.25mm thick
4" i/d (100 mm) 3.65mm thick

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

9.25
10.05
11.35
11.45
11.55
12.95
13.55
15.65
16.80

54.10
76.55
105.65
133.55
164.60
206.20
289.25
337.70
473.15

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

30.40
33.00
37.15
37.50
37.85
42.50
44.45
51.30
55.15

177.45
251.05
346.45
438.05
539.80
676.30
948.65
1107.60
1551.90

ii) M edium Quality


a)
b)

1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.

36.10
41.25
53.00
59.45
81.05
102.30
121.65
175.75
210.45

22 Providing, laying, cutting, jointing, testing and disinfecting


G.I. pipeline in trenches, with socket joints, using G.I.
pipes of B.S.S. 1387-1967 complete in all respects, with
specials and valves.
i)

ditto

74.40
82.40
118.50
130.40
153.10
213.15
249.80
343.70
436.30

21 Laying, cutting, jointing, testing and disinfecting cast iron


pipe line in trenches with Tyton joints, complete in all
respects:a)
b)
c)
d)
e)
f)
g)
h)
i)

Remarks

" i/d (15 mm) 2.65mm thick


" i/d (20 mm) 2.65mm thick

Per Rft.
Per Rft.

9.25
10.05

66.85 Per Metre


84.25 Per Metre

chapter-23(Tubewell)

30.40
33.00

219.25
276.25

i.Cost of sockets, tees, elbow,


bends, valves, crosses, unions and
plugs etc is included in the rates
except for internal G.I piping (1"dia,
Page 133

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

c)
d)
e)
f)
g)
h)
i)
j)
k)

1" i/d (25 mm) 3.25mm thick


1" i/d (32 mm) 3.25mm thick
1" i/d (40 mm) 3.25mm thick
2" i/d (50 mm) 3.65mm thick
2" i/d (65 mm) 3.65mm thick
3" i/d (75 mm) 4.05mm thick
4" i/d (100 mm) 4.5mm thick
5" i/d (150 mm) 4.85mm thick
6" i/d (200 mm) 4.85mm thick

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

11.35
11.45
11.75
12.95
13.55
15.65
16.80
19.50
19.80

122.20
155.15
178.25
244.70
311.10
398.80
567.10
761.50
896.30

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

37.15
37.50
38.50
42.50
44.45
51.30
55.15
63.90
64.95

400.75
508.80
584.75
802.60
1020.40
1308.10
1860.05
2497.75
2939.85

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

9.25
10.05
11.35
11.45
11.75
12.95
13.55
15.65
16.80
19.50
19.80

93.20
120.70
177.50
227.95
258.60
354.15
443.30
569.60
774.65
957.95
1130.95

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

30.45
33.00
37.15
37.50
38.50
42.50
44.45
51.30
55.15
63.90
64.95

305.75
395.9
582.25
747.7
848.15
1161.7
1454.1
1868.25
2540.8
3142
3709.45

3/4"dia & 1/2"dia) for Bath rooms/


Levorotary.
ii.For internal G.I piping (1"dia, 3/4"dia &
Bath room(s)/ Levorotary of rate
(composite) shall be reduced by 8%
and specials mentioned above may
be paid at the rates placed on
Website as per actual quantity used.

iii) Heavy Quality

a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)

" i/d (15 mm) 3.25mm thick


" i/d (20 mm) 3.25mm thick
1" i/d (25 mm) 4.05mm thick
1" i/d (32 mm) 4.05mm thick
1" i/d (40 mm) 4.05mm thick
2" i/d (50 mm) 4.5mm thick
2" i/d (65 mm) 4.5mm thick
3" i/d (75 mm) 4.85mm thick
4" i/d (100 mm) 5.4mm thick
5" i/d (125 mm) 5.4mm thick
6" i/d (150 mm) 5.4mm thick

23 Providing, laying, cutting, jointing, testing and disinfecting


Asbestos Cement / Fibre Cement pipe line in trenches, with
comet joint and rubber ring, complete in all respects:B Class Working Pressure
a)
3" i/d (75 mm)
b)
4" i/d (100 mm)
c)
6" i/d (150 mm)
d)
8" i/d (200 mm)
e) 10" i/d (250 mm)
f) 12" i/d (300 mm)
g) 14" i/d (350 mm)
h) 16" i/d (400 mm)
i)
18" i/d (450 mm)
j)
20" i/d (500 mm)
k) 24" i/d (600 mm)
l)
28 i/d (700 mm)
m) 32 i/d (800 mm)
n) 40 i/d 1000 mm)
24 C Class Working Pressure
a)
3" i/d (75 mm)
b)
4" i/d (100 mm)
c)
6" i/d (150 mm)
d)
8" i/d (200 mm)
e) 10" i/d (250 mm)
f) 12" i/d (300 mm)
g) 14" i/d (350 mm)

PS 428 &
ISO 160

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

12.15
12.85
17.60
24.25
31.55
40.20
46.45
52.45
61.85
72.70
86.85
92.55
101.45
114.10

219.45
285.10
450.95
757.35
1030.65
1361.50
1950.10
2479.65
3084.50
3795.00
5237.25
8398.50
9613.15
14815.70

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

39.75
42.10
57.65
79.50
103.50
131.85
152.40
172.00
202.95
238.50
284.85
303.50
332.70
374.30

719.80
935.15
1479.10
2484.05
3380.55
4465.75
6396.40
8133.30
10117.10
12447.65
17178.10
27547.15
31531.15
48595.50

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

12.15
12.85
17.60
24.25
31.55
40.20
46.45

219.45
313.80
540.85
854.70
1191.70
1657.40
2841.65

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

39.75
42.10
57.65
79.50
103.50
131.85
152.40

719.80
1029.30
1773.95
2803.45
3908.80
5436.25
9320.55

chapter-23(Tubewell)

Providing and installing specials


and valves is not included in the
rate, which is payable separately.

PS 428 &
ISO 160

Page 134

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

h) 16" i/d (400 mm)


i)
18" i/d (450 mm)
j)
20" i/d (500 mm)
k) 24" i/d (600 mm)
25 D Class Working Pressure
a)
3" i/d (75 mm)
b)
4" i/d (100 mm)
c)
6" i/d (150 mm)
d)
8" i/d (200 mm)
e) 10" i/d (250 mm)
f) 12" i/d (300 mm)
g) 14" i/d (350 mm)
h) 16" i/d (400 mm)
i)
18" i/d (450 mm)
j)
20" i/d (500 mm)

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Per Rft.
Per Rft.
Per Rft.
Per Rft.

52.45
61.85
72.70
88.00

3629.60
4451.10
5298.70
7459.95

Per Metre
Per Metre
Per Metre
Per Metre

172.00
202.95
238.50
288.60

11905.15
14599.70
17379.75
24468.70

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

12.15
12.85
17.60
24.25
31.55
40.20
46.45
52.45
61.85
72.70

219.45
356.25
649.45
1145.60
1689.85
2465.15
4094.70
5287.35
6368.60
7767.00

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

39.75
42.10
57.65
79.50
103.50
131.85
152.40
172.00
202.95
238.50

719.80
1168.55
2130.20
3757.60
5542.70
8085.75
13430.60
17342.45
20888.95
25475.75

26 Providing, laying, cutting, jointing, testing and disinfecting


P.V.C. pipe line of B.S.S. with `B' Class working pressure
pipe, in trenches, complete in all respects:a)
b)
c)
d)
e)
f)
h)
g)

3" i/d (75 mm)


4" i/d (100 mm)
5" i/d (125 mm)
6" i/d (150 mm)
8" i/d (200 mm)
10" i/d (250 mm)
12" i/d (300 mm)
14" i/d (350 mm)

27 Providing, laying, cutting, jointing, testing and disinfecting


pipe line in trenches with P.V.C. pipes of B.S.S. with `D'
Class working pressure complete in all respects:a)
2" i/d (50 mm)
b)
3" i/d (75 mm)
c)
4" i/d (100 mm)
d)
5" i/d (125 mm)
e)
6" i/d (150 mm)

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

3.70
4.70
5.75
6.05
8.60
11.30
14.00
18.00

3.00
3.65
4.65
5.65
5.95

105.60
158.45
219.60
305.30
469.40
727.35
1012.75
1213.25

74.60
161.55
267.20
399.45
573.30

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

12.10
15.35
18.80
19.85
28.15
37.10
45.90
59.05

9.85
11.90
15.20
18.55
19.55

b)

C.I.S.S. Specials, with spigot. and


socket joint:i)
3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d

Per Kg.
Per Kg.
Per Kg.

20.45
11.15
8.35

119.00
109.65
106.90

Per Kg
Per Kg
Per Kg

20.45
11.15
8.35

PS 428 &
ISO 160

Chap
2

Providing and installing specials


and valves is not included in the
rate, which is payable separately.

ditto

Providing and installing specials


and valves is not included in the
rate, which is payable separately.

9.1

i) Labour rates include the cost of


jointing material & labour.

346.30
519.70
720.35
1001.45
1539.70
2385.70
3321.90
3979.40

244.70
529.80
876.35
1310.30
1880.40

28 Providing and fixing cast iron special of B.S.S. Class `B'


(such as bend, tee cross collar, reducer, tail piece,
flanged spigot, cap, flanged socket, taper, angle branch,
plug etc.) for cast iron pipe line , complete:a)

Remarks

119.00
109.65
106.90

ii) The internal dia of the pipe, from


which the branch is taken out will
be considered the internal dia for
the purpose of payments of
specials.

C.I. flanged specials, with flanged and


chapter-23(Tubewell)

Page 135

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

flanged joints:i)
3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d
c)

Per Kg
Per Kg
Per Kg

8.55
2.35
3.75

107.10
100.90
100.90

Per Kg
Per Kg
Per Kg

8.55
2.35
3.75

107.10
100.90
100.90

Per Kg
Per Kg
Per Kg

11.10
11.10
11.10

109.60
109.60
109.60

Per Kg
Per Kg
Per Kg

11.10
11.10
11.10

109.60
109.60
109.60

C.I. Specials, with tyton joints:i)


3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d

29 Providing and fixing cast iron specials of B.S.S. Class 'B'


(such as bend, tee, cross collar, reducer, tail piece,
flanged socket, flanged spigot, cap, taper, angle branch,
plug, etc) for Asbestos cement pipe line, with comet joint
and rubber ring, complete.
i)
3" to 6" (75 to 150 mm) i/d
ii) 8" to 18" (200 to 450 mm) i/d
iii) 20" to 24" (500 to 600 mm) i/d
30 Providing and fixing sluice valve of B.S.S. quality and
weight, Class `B', for cast iron pipe line, and Asbestos
cement pipe line (including cost of jointing material):a)
3" i/d (75 mm)
b)
4" i/d (100 mm)
c) 5" i/d (125 mm)
d)
6" i/d (150 mm)
e)
8" i/d (200 mm)
f) 10" i/d (250 mm)
g) 12" i/d (300 mm)
h) 16" i/d (400 mm)
i)
18" i/d (450 mm)
31 Providing and fixing, sluice valve of B.S.S. quality and
weight, for Asbestos cement pipe line, with comet joint
and rubber ring, complete (including cost of jointing
materials):a)
3" i/d (75 mm)
b)
4" i/d (100 mm)
c) 6" i/d (150 mm)
d)
8" i/d (200 mm)
e) 10" i/d (250 mm)
f) 12" i/d (300 mm)
g) 16" i/d (400 mm)
h) 18" i/d (450 mm)
32 Providing and fixing, fire hydrants B.S.S. quality and
weight of 2" (65 mm) dia (including cost of jointing
material).

9.1

Per Kg
Per Kg
Per Kg

12.00
6.25
5.00

110.55
104.80
103.55

Per Kg
Per Kg
Per Kg

12.00
6.25
5.00

2) The internal dia of the pipe, from


which the branch is taken out, will
be considered the internal dia for
the purpose of payment.

110.55
104.80
103.55
9.1

Each
Each
Each
Each
Each
Each
Each
Each
Each

720.30
783.90
1411.00
1504.20
1756.30
2986.50
3356.05
4451.20
5123.10

6624.30
7803.90
9571.00
12904.20
22636.30
29146.50
37736.05
58451.20
119123.10

Each
Each
Each
Each
Each
Each
Each
Each
Each

720.30
783.90
1411.00
1504.20
1756.30
2986.50
3356.05
4451.20
5123.10

Labour rates include cost of jointing


material and labour.

6624.30
7803.90
9571.00
12904.20
22636.30
29146.50
37736.05
58451.20
119123.10
9.1

Each
Each
Each
Each
Each
Each
Each
Each

414.30
505.15
632.15
1027.90
1314.00
1555.95
1838.20
2177.70

5454.30
6265.15
10592.15
19027.90
23994.00
29755.95
57038.20
101777.70

Each
Each
Each
Each
Each
Each
Each
Each

414.30
505.15
632.15
1027.90
1314.00
1555.95
1838.20
2177.70

5454.30
6265.15
10592.15
19027.90
23994.00
29755.95
57038.20
101777.70

Each

56.90

4736.90

Each

56.90

4736.90

chapter-23(Tubewell)

1) Labour rates include the cost of


jointing material and labour.

9.1

Labour rates include cost of jointing


material and labour.

1) Labour rates include cost of


jointing material and labour.

Page 136

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite
2) Connecting pipes and specials,
if used, will be paid extra.

33 Providing and fixing, air valve 2 (65mm) dia of B.S.S.


quality and weight (complete with jointing material).

ditto

a)

single

Each

121.05

3361.05

Each

121.05

3361.05

b)

double

Each

121.05

7621.05

Each

121.05

7621.05

34 Providing and fitting C.I. flanges on pipes, including


turning, threading, facing and fitting, etc. complete in all
respects:-

ditto

a)

3" to 6" (75 to 150 mm) i/d

Per Kg

30.90

107.95

Per Kg

30.90

107.95

b)

8" to 12" (200 to 300 mm) i/d

Per Kg

19.40

96.45

Per Kg

19.40

96.45

c)

15" to 18" (375 to 450 mm) i/d

Per Kg

16.50

93.55

Per Kg

16.50

93.55

52.85
65.65
60.55

Per cm i/d
of pipe
ditto
ditto

35 Cutting C.I. pipe, and welding spigot or socket, flanged or


tyton end, after finishing ends of pipes:
a)
b)
c)

3" to 6" (75 to 150 mm) i/d


8" to 12" (200 to 300 mm) i/d
15" to 18" (375 to 450 mm) i/d

Per Inch
i/d of pipe
ditto
ditto

21.15
26.25
24.20

36 Providing, laying, cutting, jointing, testing and disinfecting


G.I. pipe line in trenches, with flanged joints, using G.I.
pipe of B.S.S. 1387-1967 complete in all respects,
including specials and valves:i)

G.I. flanged joints (Heavy Quality)


a) 1" i/d (40 mm)
b) 2" i/d (50 mm)
c) 2" i/d (65 mm)
d) 3" i/d (75 mm)
e) 4" i/d (100 mm)
f) 6" i/d (150 mm)
g) 8" i/d (200 mm)

ii)

Cost of sockets, tees, elbows,


bends, valves, crosses, unions and
plugs, etc. is included in the rates.

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

16.45
16.45
17.60
17.70
20.50
23.25
23.25

263.25
358.20
447.45
572.30
778.50
961.60
1133.80

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

54.00
54.00
57.80
58.10
67.20
76.20
76.35

863.50
1174.85
1467.70
1877.20
2553.45
3154.00
3718.95

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

18.70
17.60
19.80
19.85
22.85
25.75

204.70
276.15
350.95
447.75
636.70
852.85

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

61.35
57.70
65.00
65.15
74.95
84.55

671.35
905.75
1151.10
1468.65
2088.45
2797.30

C.I. flanged joints (Medium Quality)


a) 1" i/d (40 mm)
b) 2" i/d (50 mm)
c) 2" i/d (65 mm)
d) 3" i/d (75 mm)
e) 4" i/d (100 mm)
f) 6" i/d (150 mm)

chapter-23(Tubewell)

Page 137

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

g) 8" i/d (200 mm)

Labour

Rate (M etric System)

Composite

Per Rft.

25.90

Class `B' working pressure:a) 3" i/d (75 mm)


b) 4" i/d (100 mm)
c) 5" i/d (125 mm)
d) 6" i/d (150 mm)

Each
Each
Each
Each

87.70
100.50
125.65
129.75

213.70
370.50
653.65
898.95

Class `D' working pressure:a) 1" i/d (30 mm)


b) 1" i/d (40 mm)
c) 2" i/d (50 mm)
d) 3" i/d (75 mm)
e) 4" i/d (100 mm)
f) 5" i/d (125 mm)
g) 6" i/d (150 mm)

Each
Each
Each
Each
Each
Each
Each

58.00
62.35
67.30
87.70
100.50
125.65
129.75

Each
Each
Each
Each

Unit

1002.65 Per Metre

Labour

Spec.
No.

Remarks

Composite

85.00

3288.75

Each
Each
Each
Each

87.70
100.50
125.65
129.75

213.70
370.50
653.65
898.95

91.60
98.35
139.30
274.90
536.10
1121.65
1545.75

Each
Each
Each
Each
Each
Each
Each

58.00
62.35
67.30
87.70
100.50
125.65
129.75

91.60
98.35
139.30
274.90
536.10
1121.65
1545.75

131.55
152.70
185.65
194.65

611.55
1088.70
2057.65
2150.65

Each
Each
Each
Each

131.55
152.70
185.65
194.65

611.55
1088.70
2057.65
2150.65

Each
Each
Each
Each
Each
Each
Each

88.55
93.80
100.45
131.55
152.70
185.65
194.65

220.55
253.40
310.45
593.55
1088.70
2045.65
2114.65

Each
Each
Each
Each
Each
Each
Each

88.55
93.80
100.45
131.55
152.70
185.65
194.65

220.55
253.40
310.45
593.55
1088.70
2045.65
2114.65

Each
Each
Each
Each
Each
Each
Each
Each

62.15
75.00
93.70
97.85
141.45
166.15
192.35
215.90

146.15
225.00
303.70
385.85
789.45
1906.15
4272.35
3455.90

Each
Each
Each
Each
Each
Each
Each
Each

62.15
75.00
93.70
97.85
141.45
166.15
192.35
215.90

146.15
225.00
303.70
385.85
789.45
1906.15
4272.35
3455.90

37 Providing and installing P.V.C. bends, of B.S.S.


i)

ii)

38 Providing and installing P.V.C. tees, of B.S.S.


i)

Class `B' working pressure:a) 3" i/d (80 mm)


b) 4" i/d (100 mm)
c) 5" i/d (125 mm)
d) 6" i/d (150 mm)

ii)

Class `D' working pressure:a) 1" i/d (30 mm)


b) 1" i/d (40 mm)
c) 2" i/d (50 mm)
d) 3" i/d (75 mm)
e) 4" i/d (100 mm)
f) 5" i/d (125 mm)
g) 6" i/d (150 mm)

39 Providing and installing P.V.C. sockets, B.S.S.


i)

Class `B' working pressure:a) 3" i/d (75 mm)


b) 4" i/d (100 mm)
c) 5" i/d (125 mm)
d) 6" i/d (150 mm)
e) 8" i/d (200 mm)
f) 10" i/d (250 mm)
g) 12" i/d (300 mm)
h) 14" i/d (350 mm)

chapter-23(Tubewell)

Page 138

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

ii)

Class `D' working pressure:a) 1" i/d (30 mm)


b) 1" i/d (40 mm)
c) 2" i/d (50 mm)
d) 3" i/d (75 mm)
e) 4" i/d (100 mm)
f) 5" i/d (125 mm)
g) 6" i/d (150 mm)

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Each
Each
Each
Each
Each
Each
Each

36.75
41.05
46.00
62.15
75.00
93.70
97.85

59.55
72.25
96.40
216.95
360.60
621.70
1021.85

Each
Each
Each
Each
Each
Each
Each

36.75
41.05
46.00
62.15
75.00
93.70
97.85

59.55
72.25
96.40
216.95
360.60
621.70
1021.85

Each
Each
Each
Each
Each
Each
Each
Each

87.70
100.50
125.65
129.75
184.00
208.75
243.40
266.95

129.70
154.50
194.05
211.35
319.60
382.75
457.00
534.55

Each
Each
Each
Each
Each
Each
Each
Each

87.70
100.50
125.65
129.75
184.00
208.75
243.40
266.95

129.70
154.50
194.05
211.35
319.60
382.75
457.00
534.55

Each
Each
Each

58.00
62.35
67.30

78.40
89.95
102.10

Each
Each
Each

58.00
62.35
67.30

78.40
89.95
102.10

40 Providing and installing P.V.C. Tapered core, B.S.S.


i)

Class `B' working pressure:a) 3" i/d (75 mm)


b) 4" i/d (100 mm)
c) 5" i/d (125 mm)
d) 6" i/d (150 mm)
e) 8" i/d (200 mm)
f) 10" i/d (250 mm)
g) 12" i/d (300 mm)
h) 14" i/d (350 mm)

ii)

Class `D' working pressure:a) 1" i/d (30 mm)


b) 1" i/d (40 mm)
c) 2" i/d (50 mm)

41 Making connection for new watersupply lines with the


running main, including excavation of trench and refilling,
complete, but excluding cost of pipe and specials, etc.

The rate includes the component of


bailing out water from the trench
and cutting of existing pipe line.

Diameter of running main:


Per
i)
ii)
iii)
iv)
v)
vi)
vii)

upto 6" i/d (150 mm)


upto 8" i/d (200 mm)
upto 10" i/d (250 mm)
upto 12" i/d (300 mm)
upto 16" i/d (400 mm)
upto 20" i/d (500 mm)
upto 24" i/d (600 mm)

Connection

ditto
ction
ditto
ditto
ditto
ditto

Per
1417.35
1789.60
2524.50
3455.10
4236.55
5492.85
6600.00

chapter-23(Tubewell)

Connection

ditto
ction
ditto
ditto
ditto
ditto

1417.35
1789.60
2524.50
3455.10
4236.55
5492.85
6600.00

Page 139

24. ELECTRIC INSTALLATION


Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Supply and erection of G.I. pipes for wiring purposes, including


pull boxes, inspection boxes, bends, tees, etc. complete with
all specials.
a) on surface, including clamps, etc.
i)
ii)
iii)
iv)
v)
vi)
vii)

15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d

38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

17.20
17.20
17.20
21.55
21.55
25.65
32.60

63.65
77.60
100.15
129.10
156.25
193.35
300.75

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

56.50
56.50
56.50
70.60
70.60
84.05
107.00

208.85
254.50
328.50
423.50
512.55
634.25
986.45

b) recessed in walls, including hooks, cutting jharries and


repairing surface:
i)
ii)
iii)
iv)
v)
vi)
vii)
2

Remarks

15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d

38.3
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

25.85
25.85
26.90
26.90
29.35
40.35
64.60

69.55
84.85
108.90
133.70
162.55
207.20
332.65

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

84.75
84.75
88.30
88.30
96.30
132.40
211.85

228.05
278.30
357.25
438.45
533.20
679.55
1,091.10

Supply and erection of M.S. conduit pipes for wiring, including


pull boxes, inspection boxes, bends, tees, etc. complete with
all specials.

38.4 & 38.6

a) on surface, including clamps, etc.


i)
16 mm i/d
ii)
20 mm i/d
iii)
25 mm i/d
iv)
32 mm i/d
v)
40 mm i/d
vi)
50 mm i/d
b) recessed in walls, including cutting jharries, cost of
hooks and repairing surface etc.
i)
ii)
iii)

16 mm i/d
20 mm i/d
25 mm i/d

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

11.95
11.95
11.95
11.95
13.45
16.55

33.10
38.60
43.95
48.55
61.35
74.95

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

39.25
39.25
39.25
39.25
44.15
54.30

108.55
126.55
144.15
159.20
201.25
245.90
38.3 &
38.7

Per Rft.
Per Rft.
Per Rft.

23.05
23.05
25.85

45.25
50.20
57.50

Per Metre
Per Metre
Per Metre

chapter-24(Electric Installation)

75.65
75.65
84.75

148.40
164.60
188.55
Page 140

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

iv)
v)
vi)
3

Per Metre
Per Metre
Per Metre

88.30
92.10
96.30

Composite
208.10
245.65
289.60

12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d

38.3 &
38.5

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

20.85
21.55
23.90
25.85
26.90
28.10

31.40
34.65
41.20
49.30
58.95
72.00

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

68.35
70.60
78.45
84.75
88.30
92.10

103.05
113.60
135.05
161.75
193.45
236.10

12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

5.40
5.40
5.40
6.15
6.15
7.40

16.70
19.15
24.55
32.70
42.70
59.55

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

17.65
17.65
17.65
20.20
20.20
24.35

54.75
62.75
80.45
107.25
140.10
195.35

12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d

38.4

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

14.10
15.05
15.55
18.80
20.50
22.55
30.05

59.20
76.00
101.00
123.45
139.45
181.10
347.75

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

46.20
49.30
51.00
61.60
67.20
73.95
98.60

194.20
249.20
331.25
404.90
457.45
594.00
1,140.65

Supply and erection PVC pipe for recessed wiring (main and
sub-main) purpose, including bends, specials, etc. in floor,
wall or trenches:i)
ii)
iii)

63.45
74.90
88.30

Labour

Supply and erection of G.I. flexible pipe for wiring, including


welding of sockets, nipples and check nuts, etc. complete:i)
ii)
iii)
iv)
v)
vi)
vii)

26.90
28.10
29.35

Unit

Remarks

Supply and erection of PVC pipe for wiring on surface


including clamps inspection boxes, pull boxes, bends, tees,
repairing surface, etc., complete with all specials:i)
ii)
iii)
iv)
v)
vi)

Per Rft.
Per Rft.
Per Rft.

Composite

Spec.
No.

Supply and erection of PVC pipe for wiring recessed in walls,


including inspection boxes, pull boxes, hooks, cutting jharries,
and repairing surface, etc., complete with all specials.
i)
ii)
iii)
iv)
v)
vi)

32 mm i/d
40 mm i/d
50 mm i/d

Labour

Rate (M etric System)

50 mm i/d
80 mm i/d
100 mm i/d

38.2 &
38.3

Per Rft.
Per Rft.
Per Rft.

28.10
32.30
32.30

73.65
94.60
120.25

Per Metre
Per Metre
Per Metre

92.10
105.95
105.95

241.65
310.25
394.45

Supply and erection of PVC pipe for surface wiring (main and
sub-main) including clamps, inspection boxes, pull boxes
bends etc., complete with all specials:chapter-24(Electric Installation)

Page 141

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

i)
ii)
iii)

50 mm i/d
80 mm i/d
100 mm i/d

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Per Rft.
Per Rft.
Per Rft.

7.40
10.75
12.30

54.30
89.85
113.55

Per Metre
Per Metre
Per Metre

24.35
35.30
40.35

178.10
294.75
372.45

Supply and erection of wooden strip batten for wiring


purposes, including clips, insulation cleats, etc.

Per Rft.

2.15

4.45

Per Metre

7.05

14.60

38.8

Supply and erection of Sahl wood casing and capping for


wiring purposes, including insulation cleats, screws, etc.
complete.

Per Rft.

2.15

13.70

Per Metre

7.05

45.00

38.8

10 Supply and erection of single core PVC insulated copper


conductor cables, in prelaid PVC pipe/M.S. conduit/G.I
pipe/wooden strip batten/wooden casing an capping/G.I.
wire/trenches (rate for cables only):a)

Additional width required to


accommodate wires will be provided
by erection of additional strips.

38.1

250/440 volts, PVC insulated:


i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

b)

Remarks

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

4.30
4.30
4.30
4.80
5.40
6.65
15.40
17.95

10.75
11.15
15.00
21.90
31.05
74.25
120.90
165.00

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

14.10
14.10
14.10
15.70
17.65
21.75
50.45
58.85

35.20
36.60
49.20
71.85
101.85
243.50
396.55
541.15

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

4.80
4.80
4.80
5.05
5.65
6.50

11.20
11.65
15.50
22.20
31.35
74.15

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

15.70
15.70
15.70
16.60
18.60
21.40

36.75
38.15
50.80
72.75
102.80
243.15

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

4.30
4.30
4.30
4.80
5.40

10.30
13.30
17.55
24.90
34.90

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

14.10
14.10
14.10
15.70
17.65

33.75
43.60
57.65
81.65
114.50

250/440 volts, PVC insulated cotton braided and


compounded cables:i)
ii)
iii)
iv)
v)
vi)

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")

11 Supply and erection of single core PVC insulated, PVC


sheathed copper conductor, 250/440 volts grade cable
(BSS-2004), in prelaid PVC pipes/M.S. conduit/G.I.
pipe/wooden strip batten/wooden casing and
capping/trenches, etc. (rate for cable only):i)
ii)
iii)
iv)
v)

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")

chapter-24(Electric Installation)

Page 142

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

vi)

7/1.63 mm (7/0.064")

Per Rft.

Labour
6.65

Rate (M etric System)

Composite
67.80

Unit
Per Metre

Labour
21.75

Spec.
No.

Composite
222.45

12 Supply and erection of single core PVC insulated, PVC


sheathed copper conductor, 660/1100 volts grade cable, in
prelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches,
etc (rate for cable only):i)
ii)
iii)
iv)
v)
vi)
vii)

7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.62 mm (37/0.103")

38.1 to
38.7
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

6.50
7.20
7.85
8.60
14.85
17.95
25.35

76.45
127.95
172.65
328.55
456.85
573.05
878.80

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

21.40
23.55
25.70
28.25
48.70
58.85
83.10

250.75
419.65
566.35
1,077.65
1,498.40
1,879.70
2,882.45

13 Supply and erection of copper conductor cables for service


connection, in prelaid pipe/G.I. wire/trenches, etc. (rate for
cable only):a)

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

4.80
4.80
4.80
5.05
5.65
6.50

18.05
24.90
33.45
48.30
68.15
134.50

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

15.70
15.70
15.70
16.60
18.60
21.40

59.20
81.65
109.75
158.40
223.50
441.15

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

5.05
5.05
5.05
5.65
6.00
6.85

26.45
37.15
50.00
72.60
103.00
207.30

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

16.60
16.60
16.60
18.60
19.60
22.40

86.80
121.90
164.00
238.20
337.90
679.85

Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

5.40
5.40
5.65
5.65
6.00
6.85
9.55

33.65
46.45
63.30
92.95
133.10
269.55
502.40

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

17.65
17.65
18.60
18.60
19.60
22.40
31.40

110.30
152.40
207.60
304.90
436.60
884.20
1,647.90

PVC insulated, PVC sheathed 4 core,


660/1100 volt non armoured cable:i)
ii)
iii)
iv)
v)
vi)
vii)

d)

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")

PVC insulated, PVC sheathed 3 core,


660/1100 volt cable:i)
ii)
iii)
iv)
v)
vi)

c)

ditto

PVC insulated, PVC sheathed twin core, 250/440 volts.


i)
ii)
iii)
iv)
v)
vi)

b)

Remarks

3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")

PVC insulated, PVC sheathed 4 core 660/1100 volt grade cable,

Cost of trenches where necessary


chapter-24(Electric Installation)

Page 143

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

armoured with G.I. wire 16 SWG.


i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/1.83 mm (19/0.072")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.36 mm (37/0.093")
37/2.62 mm (37/0.103")

is included in the rates.


Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.

9.55
10.25
10.75
11.65
11.95
14.35
17.20
21.55

560.05
748.05
1,012.55
1,416.40
1,928.65
2,437.85
2,971.30
3,698.10

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

31.40
33.65
35.30
38.15
39.25
47.10
56.50
70.60

1,836.90
2,453.50
3,321.15
4,645.85
6,325.95
7,996.15
9,745.80
12,129.75

14 Supply and erection of M.S. sheet box of 16 SWG, 10 cm (4")


deep, with 4.75 mm thick (3/16") bakelite sheet top, for
recessed wiring, including making holes for regulators,
switches, plugs, etc.
i)
ii)
iii)
iv)
v)
vi)

10 x 10 cm (4"x4")
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")

15 Supply and erection of round block of Sahl wood, 10x4 cm


(4"x1") thick.

38.1
to
38.7
Each
Each
Each
Each
Each
Each

70.60
88.30
117.70
141.25
176.55
235.40

139.80
185.30
236.75
343.85
453.85
590.15

Each
Each
Each
Each
Each
Each

70.60
88.30
117.70
141.25
176.55
235.40

139.80
185.30
236.75
343.85
453.85
590.15

Each

20.20

33.50

Each

20.20

33.50

16 Supply and erection of teak wood board, 4.5 cm (1") thick.


i)
ii)
iii)
iv)
v)

17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")

Remarks

38.1

38.1
Each
Each
Each
Each
Each

28.25
28.25
31.40
35.30
40.35

85.30
97.65
114.40
155.60
211.35

Each
Each
Each
Each
Each

28.25
28.25
31.40
35.30
40.35

85.30
97.65
114.40
155.60
211.35

Each
Each
Each
Each
Each

28.25
28.25
31.40
35.30
40.35

64.90
83.45
98.35
118.35
140.05

Each
Each
Each
Each
Each

28.25
28.25
31.40
35.30
40.35

64.90
83.45
98.35
118.35
140.05

17 Supply and erection of Sahl wood board, 4.5 cm (1") thick.


i)
ii)
iii)
iv)
v)

17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")

18 Supply and erection of iron/aluminum clad, 500 volts main


switches with kitkat fuses, on angle iron board with 3 mm
(1/8") thick M.S. sheet covering, including bonding to earth
with necessary flexible pipe and thimbles, etc.
a)

38.1

double pole:
i)

15/20 Amp.

Each

470.80

1,523.05

Each

chapter-24(Electric Installation)

470.80

When the base frame is already


installed, the labour and composite
rates will be reduced as follows:- For
15 to 35 Amps. by Rs. 21.20 and Rs.
145.50. For 60 to 65 Amps. by Rs.
38.80 and Rs. 252.60. For 100 Amps.
by Rs. 38.80 and Rs. 350.80.

1,523.05
Page 144

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

ii)
iii)
iv)
b)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Each
Each
Each

470.80
706.20
706.20

1,813.50
2,368.40
2,924.60

Each
Each
Each

470.80
706.20
706.20

1,813.50
2,368.40
2,924.60

Each
Each

706.20
470.80

2,086.00
2,283.20

Each
Each

706.20
470.80

2,086.00
2,283.20

Each
Each
Each

470.80
706.20
925.10

2,456.25
3,112.10
3,843.95

Each
Each
Each

470.80
706.20
925.10

2,456.25
3,112.10
3,843.95

triple pole:
i)
ii)

c)

30/35 Amp.
60/65 Amp.
100 Amp.

Labour

Rate (M etric System)

15/20 Amp.
30/35 Amp.

triple pole with neutral link:


i)
ii)
iii)

30/35 Amp.
60/65 Amp.
100 Amp.

19 Supply and erection of iron/aluminum clad, 500 volts main


switches with triple pole and neutral link and HRC fuses, on
angle iron board with 3 mm (1/8") thick M.S. sheet covering,
including bonding to earth with necessary flexible pipe and
thimbles.
60/65 Amp
100 Amp
150 Amp
200 Amp
300 Amp
400 Amp
500 Amp

38.1

Each
Each
Each
Each
Each
Each
Each

706.20
925.10
925.10
2,118.60
2,118.60
3,001.35
3,177.90

3,159.05
4,416.20
5,981.00
9,733.00
11,142.00
15,028.85
19,002.50

Each
Each
Each
Each
Each
Each
Each

706.20
925.10
925.10
2,118.60
2,118.60
3,001.35
3,177.90

i)
2 way, 15 Amp per way
ii) 3 way, 15 Amp per way
iii) 4 way, 15 Amp per way
iv) 5 way, 15 Amp per way
v) 6 way, 15 Amp per way
vi) 7 way, 15 Amp per way
vii) 8 way, 15 Amp per way
viii) 9 way, 15 Amp per way
ix) 10 way, 15 Amp per way
x) 11 way, 15 Amp per way
xi) 12 way, 15 Amp per way
xii) 2 way, 30 Amp per way
xiii) 3 way, 30 Amp per way
xiv) 4 way, 30 Amp per way
xv) 5 way, 30 Amp per way
xvi) 6 way, 30 Amp per way
xvii) 7 way, 30 Amp per way

i) For 60/65 Amp. by Rs. 21.20 and


Rs. 145.50.
ii) For 100 to 300 Amp. by Rs. 21.20
and Rs. 350.80
iii) For 400 to 500 Amp. by Rs. 42.20
and Rs. 526.20

3,159.05
4,416.20
5,981.00
9,733.00
11,142.00
15,028.85
19,002.50

20 Supply and erection of iron/aluminum clad, branch


distribution board, 250 volt, on angle iron frame of suitable
size with 3 mm (1/8") M.S. sheet covering:

ditto

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
353.10
353.10
353.10
353.10
353.10
353.10

643.00
643.00
717.15
778.95
822.20
877.85
927.25
982.90
1,063.25
1,125.05
1,180.65
760.70
766.85
828.65
896.65
939.90
1,007.90

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

chapter-24(Electric Installation)

235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
235.40
353.10
353.10
353.10
353.10
353.10
353.10

When the base frame is already


installed, the labour & composite
rates will be reduced as follows:-

When the base frame is already


installed the labour and composite
rates will be reduced by Rs. 19.50 &
Rs. 152.20 respectively.

643.00
643.00
717.15
778.95
822.20
877.85
927.25
982.90
1,063.25
1,125.05
1,180.65
760.70
766.85
828.65
896.65
939.90
1,007.90
Page 145

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

xviii)8 way, 30 Amp per way


xix) 9 way, 30 Amp per way
xx) 10 way, 30 Amp per way

Each
Each
Each

Labour
353.10
353.10
353.10

Rate (M etric System)

Composite
1,063.50
1,112.95
1,199.45

Unit
Each
Each
Each

Labour
353.10
353.10
353.10

Spec.
No.

Composite
1,063.50
1,112.95
1,199.45

21 Supply and erection of bus bars, for 500 volts 3 phase A.C.
supply with four copper bars, including glazed porcelain
bridges, on angle iron board, fixed with rag bolts and M.S.
sheet box 1.5 mm thick, etc. complete:i)

60 Amp. with 4 copper bars


size 1"x1/8" (40 x 3 mm)
ii) 100 Amp. with 4 copper bars
size 1"x1/8" (40 x 3 mm)
iii) 200 Amp with 4 copper bars
size 2"x1/8" (50x 3 mm)
iv) 300 Amp with 4 copper bars
size 2"x3/16" (50x 5 mm)
v) 500 Amp with 4 copper
size 2"x1/4" (50x 6 mm)
22 i)

ii)

Supply and erection of plain pendent lamp holder,


complete with bakelite lamp holder and flexible twin wire
23/0.0076" upto 2 metre length (without bulb and shade).
Extra for additional length of flexible wire, beyond
2 metres.

38.1

Each

839.85

2,943.95

Each

839.85

2,943.95

Each

839.85

2,943.95

Each

839.85

2,943.95

Each

1,326.60

3,529.60

Each

1,326.60

3,529.60

Each

1,588.95

3,791.95

Each

1,588.95

3,791.95

Each

1,016.40

3,826.00

Each

1,016.40

3,826.00

Each

14.70

106.85

Each

14.70

106.85

Per Rft.

--

1.65

Per Metre

--

When the base frame is already


installed the labour and composite
rates will be reduced by Rs. 21.20 and
Rs. 145.50 respectively.

38.1

5.45

23 Supply and erection of counter weight pedent with porcelain


counter weight, and fitting on bakelite lamp holder, with
flexible twin wire 23/0.0076" complete (without bulb and
shade).

Each

29.45

238.70

Each

29.45

238.70

38.1

24 Supply and erection of stiff pedent with brass/metal pipe 6.3


cm (2.5") long, and 15 mm (") dia brass oxidised or painted,
along with brass lamp holder with VIR/PVC cable 3/0.74 mm
(3/0.029").

Each

44.20

385.20

Each

44.20

385.20

ditto

25 Supply and erection of 22.5 cm (9") long swan neck plain


brass/steel brass oxidised bracket lamp holder, complete.

Each

45.75

109.40

Each

45.75

109.40

ditto

26 Supply and erection of wall type/pole type bracket, with double


cover water tight reflector, flexible wire and brass bolder.

Each

63.15

422.05

Each

63.15

422.05

ditto

27 Supply and erection of bakelite button holder shade, large


size.

Each

10.15

49.55

Each

10.15

49.55

ditto

28 Supply and erection of call bell 220/250 volts, fixed on teak


wood board 17.5x10 cm (7"x4").

Each

44.20

229.55

Each

44.20

229.55

38.1

chapter-24(Electric Installation)

Remarks

Page 146

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

29 Supply and erection of bell push or bed switch, with 5 metres


twin flexible wire 23/0.0076".

Each

8.85

211.35

Each

8.85

211.35

38.1

30 Supply and erection of ceiling rose, bakelite.

Each

14.70

34.75

Each

14.70

34.75

ditto

Each
Each
Each
Each
Each
Each
Each

14.10
14.10
14.10
14.10
19.60
19.60
19.60

31.70
31.70
26.50
49.00
48.75
42.60
43.80

Each
Each
Each
Each
Each
Each
Each

14.10
14.10
14.10
14.10
19.60
19.60
19.60

31.70
31.70
26.50
49.00
48.75
42.60
43.80

ditto

31 Supply and erection of switches 5 Amp.


i)
ii)
iii)
iv)
v)
vi)
vii)

open type
piano type
ring type, recessed
plate type, recessed
double control, open type
double control, ring type recessed
double control, piano type

32 Supply and erection of switches 10/15 Amp.


i)
ii)

open type
recessed type

ditto
Each
Each

14.10
14.10

40.85
50.75

Each
Each

14.10
14.10

40.85
50.75

33 Supply and erection of wall socket with 3 pin 5 Amp, shoe.

Each

14.10

77.90

Each

14.10

77.90

ditto

34 Supply and erection of 3 pin. 5 Amp wall socket.

Each

14.10

53.20

Each

14.10

53.20

ditto

35 Supply and erection of 3 pin, 10/15 Amp. wall socket.


i)
ii)

open type
recessed type

ditto
Each
Each

14.10
14.10

47.00
84.10

Each
Each

14.10
14.10

47.00
84.10

36 Supply and erection of 3 pin switch and plug combined,


recessed type.
i)
ii)

5 Amp
10/15 Amp

37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe,
open type.

ditto

Each
Each

14.10
14.10

67.55
93.30

Each
Each

14.10
14.10

67.55
93.30

Each

14.10

145.90

Each

14.10

145.90

38 Supply and erection of cut out, bakelite.


i)
ii)

open type
recessed type

ditto
Each
Each

7.85
7.85

34.55
40.75

Each
Each

7.85
7.85

34.55
40.75

39 Supply and erection of button holder.


i)
ii)

bakelite large size


brass

40 Supply and erection of brass bracket with holder.

ditto

38.1
Each
Each

8.85
8.85

28.15
40.50

Each
Each

8.85
8.85

28.15
40.50

Each

11.75

43.45

Each

11.75

43.45

chapter-24(Electric Installation)

ditto
Page 147

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

41 Supply and erection of bell push open/recessed type


(without flexible wire).

Each

Labour

7.85

Rate (M etric System)

Composite

28.40

Unit

Each

Labour

7.85

Spec.
No.

Composite

28.40

42 Supply and erection of kitkat, 500 volt:


i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

15/20 Amp
30/35 Amp
60/65 Amp
100 Amp
200 Amp
300 Amp
400 Amp
500 Amp

Each
Each
Each
Each
Each
Each
Each
Each

14.35
15.65
23.95
26.90
30.75
30.75
40.65
40.65

46.80
48.10
70.30
116.55
157.45
318.15
396.00
572.15

Each
Each
Each
Each
Each
Each
Each
Each

14.35
15.65
23.95
26.90
30.75
30.75
40.65
40.65

46.80
48.10
70.30
116.55
157.45
318.15
396.00
572.15
38.1

i)

double rod (80 watts) with two chokes and 2 starters.

Per set

254.10

1,212.30

ii)

single rod (40 watts) with one choke and one starter.

ditto

203.30

iii) round tube, 32 watt, with one choke and one starter,
without cover.

Each

iv)

ditto

Per set

254.10

1,212.30

642.35

ditto

203.30

642.35

203.30

700.45

Each

203.30

700.45

169.40

790.15

ditto

169.40

790.15

44 Providing and fixing M.S. iron box for housing main switches,
made of 1.5 mm (1/16") thick M.S. sheet, with locking
arrangement, including painting:i)
ii)
iii)
iv)

60x35x15 cm (24"x14"x6")
95x40x20 cm (38"x16"x8")
105x52.5x22.5 cm (42"x21"x9")
135x70x27.5 cm (54"x28"x11")

ditto

ditto

43 Supply and erection of tube light, including rod, choke, starter


with frame, flexible wire, including connection from ceiling
rose, etc., complete.

round tube, 32 watt with one chock and one starter, with
cover.

Remarks

ditto

Each
Each
Each
Each

530.25
765.90
1,164.70
1,281.25

2,078.80
2,585.40
3,577.65
5,025.50

Each
Each
Each
Each

530.25
765.90
1,164.70
1,281.25

2,078.80
2,585.40
3,577.65
5,025.50

45 Supply and erection of girder clamp hook, 16 mm (5/8") with


M.S. plate 25x6 mm (1"x"), with bolts and nuts for hanging
ceiling fans.

Each

33.90

148.85

Each

33.90

148.85

38.1
&
38.10

46 Supply and erection of girder strut, of M.S. tee section


40x40x6 mm (1"1"x "), complete with clamp, bolts and
nuts, etc., including fixing with cement concrete 1:3:6.

Each

44.20

898.25

Each

44.20

898.25

ditto

47 Supply and erection of roof suspension hook, 16 mm (5/8")


dia rod with 75x40x3 mm (3"x1"x1/8") M.S. steel channel,
with clamp, bolts and nuts, etc., including fixing with cement

Each

47.40

1,226.05

Each

47.40

1,226.05

38.1

chapter-24(Electric Installation)

Page 148

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

concrete 1:3:6.
48 Supply and erection of roof suspension hook of M.S plate
75x40x12.7mm (3"x1"x") with 16 mm (5/8") hook complete
with bolts, nuts and fixing with cement concrete 1:3:6

Each

63.15

506.20

Each

63.15

506.20

49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook,
placed at the time of casting of slab.

Each

18.10

35.40

Each

18.10

35.40

ditto

50 Erection of circular L.T. pole in cement concrete 1:3:6 one


metre below ground level (excluding the cost of pole),
including cement concrete collar (1:2:4) excavation of
foundation, and finishing surface.

Each

567.80

2,317.55

Each

567.80

2,317.55

38.12

Each
Each

126.10
147.15

572.75
1,240.45

Each
Each

126.10
147.15

572.75
1,240.45

51 Supply and erection of bracket of M.S. channel 75x40x6 mm


(3"x1"x") section:i)
ii)

0.60 metre (2') long for 2 lines.


1.200 metre (4') long for 4 lines.

52 Supply and erection of anchor rod Henley type for pole,


including necessary clamps and 7/12" stay wire, straining
screws, etc., erected in cement concrete 1:3:6 and collar of
cement concrete.

Per Rft.

8.50

22.15

Per Metre

27.80

72.60

38.14

53 Supply and erection of stay for house service pipe, erected


with straining screws and 7/14" stay wire, complete.

Per Rft.

12.30

34.55

Per Metre

40.35

113.40

ditto

54 Supply and erection of house service pipe Henley (G.I. pipe


water quality) or pole type, 50 mm (2") dia, erected to instal
insulated overhead line,include shackle insulator for holding
insulated wire and straining devices for bearer wire and other
accessories etc., complete.

Per Rft.

53.85

255.30

Per Metre

176.55

837.40

55 Supply and erection of house service pipe 50 mm (2") dia G.I.


pipe Henley or pole type for bare copper wire overhead line,
including shackle insulator, straining devices and other
accessories etc.

Per Rft.

49.45

249.15

Per Metre

162.25

817.30

56 Supply and erection of lightning arrestor horn type, complete.

Each

265.30

2,490.10

Each

265.30

2,490.10

57 Supply and erection of shackle insulator, medium size.

Each

33.30

200.15

Each

33.30

200.15

38.12

58 Supply and erection of pin insulator, green medium size.

Each

33.30

82.75

Each

33.30

82.75

ditto

59 Supply and erection of bare copper conductor wire No. 2 to


No. 10 SWG, including binding wire No. 16 SWG.

Per Kg

17.30

1,071.60

Per Kg

17.30

1,071.60

38.1

60 Supply and erection of G.I. wire of all sizes, including binding


wire No. 16 SWG for support of rubber wire or earthing wire,

Per Kg

17.30

132.25

Per Kg

17.30

132.25

ditto

chapter-24(Electric Installation)

Page 149

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

pole to pole etc.


61 Wiring overhead line in 2 single core, PVC/weather proof
cable, on G.I. wire No. 8 SWG bearer wire and in house
service pipe, including connection through joint box.
i)
ii)
iii)
iv)

3/0.74 mm (3/0.029")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")

38.12

Per Rft.
ditto
ditto
ditto

4.50
4.50
4.50
4.50

12.50
20.85
27.50
36.65

Per Metre
ditto
ditto
ditto

14.75
14.75
14.75
14.75

41.00
68.40
90.20
120.20

Per Rft.

8.30

21.60

Per Metre

27.15

70.75

Each

221.10

973.00

Each

221.10

973.00

Each
ditto

442.20
442.20

2,864.75
3,247.90

Each
ditto

442.20
442.20

2,864.75
3,247.90

Each
ditto

169.40
203.30

1,096.40
1,995.50

Each
ditto

169.40
203.30

1,096.40
1,995.50

66 Manufacture and erection of angle iron lattice steel structure


pole (36.0') 10,923 mm long 9348 mm (30.5') above ground
level) 355 mm (14") square at base and 204 mm (8") square at
top for electric distribution line, using 1"x1"x3/16" (30x30x5
mm) angle iron legs and "x"1/8" (20x20x3 mm) angle iron
bracing 420 mm (17") long fixed between legs on all the four
sides in diagonal position, and 1"x1"x3/16"(45x45x5 mm)
angle iron on top and 4 bands of M.S. flat iron 2"x" (50x6 mm)
305 mm (12") centre to centre, as per standard drawing
including silver painting of pole 3 coats, excavation and refilling
of foundation cement concrete 1:2:4. 6'-0"x1'-8"x1'-8"
(1807x500x500 mm) for foundation, etc, complete in all
respects.

Each

7,436.30

22,723.80

Each

7,436.30

22,723.80

38.13

The composite rate will be reduced


or increased by Rs. 36.50 for each
(100 mm) of reduction or addition in
the height of the pole above ground
level.

67 Manufacture and erection of galvanized angle iron lattice steel


structure pole 37 ft. (11.25 m) long 30 ft. (9 m) above ground
level), 34" square (850 mm) at base, 13.75" (35 mm) square at
top, for electric distribution line, using 2"x2"x5/32"
(50x50x4mm) high tensile steel angle iron legs, and 1-3/8"x
1-3/8"x1/8" (35x35x3 mm) M.S. angle iron bracings fixed
between legs on all the four sides in diagonal position as per

Each

7,190.95

34,361.45

Each

7,190.95

34,361.45

38.13

The composite rate will be reduced


or increased by Rs. 237.00 for each
foot (300 mm) of reduction or
addition in the height of the pole
above ground level.

62 Supply and erection of all aluminum stranded hard drawn bare


conductor, of size 7/3.099 mm (7/0.122").
63 Supply and erection of street light pole bracket 30 mm (1")
G.I. pipe 2 metre long, complete with 2 No. pole clamp.

38.1

64 Supply and erection of pole mounted street light, holders,


shade and glass, etc., for fitting 125/250 watts mercury vapour
lamp (excluding cost of lamps):
i)
ii)

G.E.C. design
Philips design

65 Supply and fitting of mercury vapour lamp, complete with


choke set.
i)
125 watt lamp
ii) 250 watt lamp

chapter-24(Electric Installation)

Page 150

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

standard drawing including silver painting of pole, excavation


and refilling of foundation, one ft. (300 mm) thick cement
concrete 1:3:6 foundation of outer size 8'x3'x3'
(2400x1050x1050 mm), etc. complete in all respects.
68 Earthing of iron clad/aluminum switches, etc. with G.I. wire No.
8 SWG in G.I. pipe 15 mm (") dia, recessed or on surface of
wall and floor, complete with 1.5 metre long G.I. pipe, 50 mm
(2") dia with reducing socket 4 to 5 metre below ground level,
and 2 metre away from building plinth.
69 Earthing of Metallic cases, etc. with G.I. wire No. 8 SWG, in
15 mm (") dia G.I. pipe, best quality:i)
on surface, including clamps, etc.
ii) recessed in wall, including hooks,
jharries and making good surface.

Job

973.50

4,001.05

Job

973.50

4,001.05

38.11
Per Rft.
ditto

10.10
23.75

55.30
69.90

Per Metre
ditto

33.15
77.90

181.40
229.35

70 Bonding to earth with wire on surface, including cost of wire,


clamps, thimbles, etc.
a)

ditto

G.I. wire:
i)
ii)

Per Rft.
ditto

4.30
4.30

10.85
6.05

Per Metre
ditto

14.10
14.10

35.65
19.85

Per Rft.
ditto

4.30
4.30

11.60
7.10

Per Metre
ditto

14.10
14.10

38.05
23.35

71 Erection only, of lightning conductor of copper tape, including


supply of copper staple and copper nails and cement, sand
mortar.

Per Rft.

16.20

20.80

Per Metre

53.05

68.15

38.11

72 Supply and erection of 600x600x3 mm (2'x2'x1/8") copper


plate, including revitting to copper tape and placing in mixture
of salt and charcoal, etc.

Each

649.00

4,512.20

Each

649.00

4,512.20

ditto

Per Rft.
ditto

23.75
23.75

265.25
315.55

Per Metre
ditto

77.90
77.90

869.95
1,035.10

Job

442.20

2,778.25

Job

442.20

2,778.25

b)

8 SWG
16 SWG

Copper wire:
i)
ii)

16 SWG
20 SWG

Rate includes all materials required


in erection (excluding copper tape
lightning conductor).

73 Supply and erection of copper tape, including copper staple


copper nails, cement, sand, etc.
i)
ii)

tape 40x3 mm (1"x1/8")


tape 50x3 mm (2"x1/8")

74 Supply and erection of 25 mm (1") dia and one metre long


lightning conductor copper rod with 5 spikes on ball and base,
etc. complete.
75 Supply and erection of electric energy meter, including meter
testing fee, etc.

38.1
chapter-24(Electric Installation)

Page 151

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

a)

Composite

Unit

Labour

Spec.
No.

Composite

1x10 Amp, 250 volts


1x30 Amp, 250 volts

Each
ditto

176.55
176.55

2,312.55
2,312.55

Each
ditto

176.55
176.55

2,312.55
2,312.55

Each
ditto
ditto

353.10
508.20
508.20

6,108.30
6,263.40
6,263.40

Each
ditto
ditto

353.10
508.20
508.20

6,108.30
6,263.40
6,263.40

three phase, 4 wires:


i)
ii)
iii)

3x15 Amp, 400 volts


3x50 Amp, 400 volts
3x80 Amp, 400 volts

76 Rewinding of A.C. ceiling fan, capacitor type, including cost of


wire, leatheride paper cotton tape, soldering, etc.
i)
ii)

1200 mm (48") sweep, 275-300 RPM.


1400 mm (56") sweep, 250-275 RPM.

The credit of out turn of dismantled


material has been accounted for in
the rate.
Each
ditto

342.40
381.15

960.00
1,104.45

Each
ditto

342.40
381.15

960.00
1,104.45

77 Rewinding of A.C. exhaust fan, including cost of wire,


leatheride paper, cotton tape, soldering, etc.
i)
ii)

Remarks

single phase:
i)
ii)

b)

Labour

Rate (M etric System)

375 mm (15") sweep, and 1300-1500 RPM


450 mm (18") sweep, and 1300-1500 RPM

The credit of out turn of dismantled


material has been accounted for in
the rate.
Each
ditto

235.40
235.40

663.90
744.85

Each
ditto

235.40
235.40

663.90
744.85

78 Rewinding of pedestal fan 600 mm (24") sweep, and 900-950


RPM, including wire, leatheride paper, cotton, tape, etc.

Each

282.50

864.20

Each

282.50

864.20

79 Supply and fitting of regulator knob with shaft


and plate of electric fan regulator.

Each

44.15

105.95

Each

44.15

105.95

38.1

80 Supply and fitting of capacitor 2.2 uF, for ceiling fans.

Each

35.30

60.05

Each

35.30

60.05

ditto

81 Supply and fitting of ball bearing of size


6201, 6202 or 6203 for ceiling fans.

Each

44.15

167.75

Each

44.15

167.75

ditto

82 Rewinding regulator of ceiling fan 48"/56" (1200/1400 mm)


sweep, to control 3/4 speeds.

Each

88.30

201.60

Each

88.30

201.60

83 Erection of ceiling fan alongwith regulator (all sizes), including


carriage from local Railway Station/Store to site of work,
electric wire/cable for suspension rod and board connection,
and cutting, threading on the rod, where necessary.

Each

171.25

209.40

Each

171.25

209.40

chapter-24(Electric Installation)

The credit of out turn of dismantled


material has been accounted for in
the rate.

The credit out turn of dismantled


material has been accounted for in
the rate.

Page 152

25. IRON WORK


The Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

Railway Track, etc.


1

Laying, linking and packing tramway line.

100Lft.

1623.60

Metre

53.25

Dismantling tramway track.

100Lft.

538.85

Metre

17.65

Laying, linking of B.G. track, including packing,


straightening and leveling.

100Lft.

4218.50

Metre

138.35

Linking points and crossings, complete with fastenings.

Each

4082.10

Each

4082.10

Bending or strainghtening B.G. rail with Jim


Crow.

Each
Point

451.45

Each
Point

451.45

Fixing street lamp posts.

Each

527.35

Each

527.35

Binding ends of sleepers and timber of all sizes and kinds,


including spreading and restacking.

100 Nos

4943.40

100 Nos

4943.40

Opening stacks of sleepers and timber of all kinds and


sizes, including spreading for inspection and restacking
within one chain lead.

100 Nos

621.30

100 Nos

621.30

Per Cwt

2610.30

7763.95

100 Kg

5138.40

15283.35

10 Fabrication of heavy steel work, with angle, tees, flat iron


round iron and sheet iron for making trusses, girders,
tanks, etc., including cutting, drilling, revitting, handling,
assembling and fixing, but excluding erection in position.

Per Cwt

917.40

5816.70

100 Kg

1805.90

11450.15

11 Erection and fitting in position iron trusses, staging of


water tanks, etc.

Per Cwt

294.80

100 Kg

580.30

12 Fixing corrugated iron sheet, including revitting, etc.

100 Sft.

1061.30

sq.m

114.20

13 Erecting corrugated iron sheet tanks, upto 20'


(6 m) height.

Per Cwt

512.70

100 Kg

1009.30

I RON WORK
9

Small iron work, such as gusset plates, knees, bends,


stirrups, straps, rings, etc. including cutting, drilling,
riveting, handling, assembling and fixing; but excluding
erection in position.

chapter-25(Iron work)

Page 153

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

14 Erecting rolled steel beams or old rails, in roofs, etc.,


erection and fixing in position.

Per Cwt

311.65

100 Kg

613.45

15 Erecting rolled steel beams or rails, erection for posts etc.


(other than in roofs).

Per Cwt

151.35

100 Kg

297.95

16 Making bolts and nuts of iron rods.

Per Cwt

1994.85

100 Kg

3926.85

Per Cut
Per Cut

199.00
293.55

Per Cut
Per Cut

199.00
293.55

Per
Cut

94.75

Per Cwt
Cut

94.75

19 Bending rolled steel beams or rails.

Per
Bend

100.00

Per
Bend

100.00

20 Drilling holes, in plates upto " (13 mm) thick, per inch
dia, (25mm) or part thereof.

Per
Hole

39.85

Per
Hole

39.85

21 Extra for drilling holes in plates over " (13 mm) thick, per
inch dia, (25 mm) or part thereof.

Per
Hole

22.15

Per
Hole

22.15

22 Rivetting 1/8" dia (3 mm).

100 Nos

519.75

100 Nos

519.75

23 Cutting out Rivets, all sizes.

100 Nos

1666.50

100 Nos

1666.50

24 Fitting and erection of gutters of sheet iron.

Per Lft.

66.25

Metre

217.25

25 Cutting and fixing iron bars, for barred windows.

Per bar

37.90

Per bar

37.90

Each
Cut

20.50

Each
Cut

20.50

444.40
26.55

Per
Notch
sq.m

444.40

28 Hoop iron netted trellis work fixed with nails.

Per
Notch
Per Sft.

29 Fixing zinc iron or G.I. sheet on table tops.

Per Sft.

15.60

sq.m

167.95

30 Making and fixing steel grated doors, complete with


locking arrangement, angle iron frame 2"x2"x3/8"
(50x50x10 mm) and " (20 mm) square bars 4" (100 mm)
centre to centre.

Per Sft.

161.95

694.30

sq.m

1742.45

7470.60

31 Making and fixing steel grated door with 1/16" thick


(1.5mm) sheeting, including angle iron frame 2"x2"x3/8"
(50x50x10 mm) and " (20 mm) square bars 4" (100 mm)

Per Sft.

168.25

800.65

sq.m

1810.25

8615.00

7867.45

Remarks

15487.10

17 Cutting rails, rolled steel joists and beams, with hacksaw:a)


b)

upto 6" size (150 mm)


above 6" size (150 mm)

18 Cutting rails or rolled steel beams of size below 6"


(150 mm), with jim.

26 Cutting G.I. sheets.


27 Notching web or foot of rail posts, for housing rail beams.

359.45

617.45

chapter-25(Iron work)

359.45

617.45

285.50

Page 154

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

centre to centre, with locking arrangement.


32 Making and fixing grating in opening, including fixing at
site with flat iron 2"x3/8" (50x10 mm) and " (19 mm)
square bars, at 4" (100 mm) centre to centre.

Per Sft.

64.95

337.00

sq.m

698.60

3626.30

33 Providing and fixing stair railing (all types and designs) of


hard wood, including bends and corners, screwed to
5/8"x5/8" (16x16 mm) M.S. square bars 2.75 ft. (838 mm)
high, at 5.5 inch (137 mm) inch centre to centre, fixed in
steps of stairs, M.S. flat 1"x1/8" (25x3 mm) welded to
bars, painting/polishing 3 coats, etc. complete.

Per Rft.

319.05

787.75

Metre

1046.75

2584.55

34 Providing/fixing stair railing consisting of M.S. Box section


size 1-1/2"x3" of 16 SWG welded with M.S. flat 1"x1/8"
continuously and welded over M.S. square bars 5/8"x5/8"
punched in M.S. flat 2 ' high @ 5" c/c fixed in steps of
stair I/C painting 3 coats complete.

Per Rft.

164.40

522.00

Metre

539.35

1712.65

35 Providing and fixing terrace railing of 2" (50 mm) i/d


conduit pipe 16 SWG, welded with 5/8"x5/8" (16x16 mm)
square bar 2.75 ft. (838 mm) high fixed at 5" (125 mm)
centre to centre, in reinforced cement concrete slab with
suitable arrangement, complete in all respects, as per
design and drawing.

Per Rft.

118.80

558.90

Metre

389.76

1833.66

36 Providing and fixing collapsible gate made of 2"x2"x""


(50x50x6 mm) tee iron at top and bottom, channel iron
verticals "x"x"x1/8" (20x6x6x3 mm) at 3" (75 mm) to
5" (125 mm) centre to centre (approximate) and flat iron
crosses 3"x3/16" (75x5 mm), and best quality rollers at
bottom of 3" (75 mm) diameter including holdfasts,
handles 12" (300 mm) long of "x"x"x1/8" (20x6x6x3
mm) channel iron, locking arrangement inside and
outside, painting 3 coats of black Japan enameled,
complete in working order.

Per Sft.

239.35

653.35

sq.m

2575.35

7030.00

37 Providing and fixing 24 SWG G.I. sheet rolling shutter,


consisting of steel frame of M.S. channel 2"x1"x1/8"
(50x30x3 mm), angle iron 1"x1"x1/8" (40x40x3 mm),
M.S. plate 1'x1'x1/8" (300x300x3 mm), G.I. pipe 1" (37
mm) dia, springs 2' (600 mm) centre to centre, rollers, 24
SWG G.I. covering 1 ft. x 1 ft. (300x300 mm), handles,
holdfast, and painting three coats, complete in all
respects.

Per Sft.

52.75

209.35

sq.m

567.65

2252.45

38 Providing and fixing M.S. angle iron 1"x1"x"


(40x40x6 mm) edge protector nozing of steps of stairs,
having holdfast or 3/8" (10 mm) dia M.S. bars 8" (200 mm)
long welded at 2' (600 mm) centre to centre and
embedded in cement concrete on steps, complete in all
respects.

Per Rft.

24.95

137.35

Metre

81.75

450.60

chapter-25(Iron work)

The composite rate shall be


reduced or increased by Rs. 31.90
for each foot of reduction or
addition in the height of the square
bars.

-do-

Page 155

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

39 Providing and fixing stair railing of 2" (63 mm) i/d G.I.
pipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars
2'-9" (838 mm) high, fixed in each step, complete in all
respects, including painting, polishing three coats.

Per Rft.

140.40

650.25

Metre

460.65

2133.35

40 Providing and fixing G.I. wire gauze 24 SWG, 12x12


meshes per square inch, fixed to steel windows or doors,
etc., complete in all respects.

Per Sft.

23.55

62.60

sq.m

253.30

673.65

41 Providing and fixing steel windows with openable glazed


panels, using beam section for frame 1"x1"x5/8"x1/8"
(40x25x16x3 mm), Z-section for leaves "x1"x"x1/8"
(20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3
mm), glass panes, wooden screed for glazing embedded
over a thin layer of putty duly screwed with leaves, brass
fittings, holdfast, duly painted, complete in all respects,
including all cost of material and labour, etc. as per
approved design and as directed by the
Engineer-in-charge:-

The composite rate shall be


reduced or increased by Rs. 31.90
for each foot of reduction or
addition in the height of the square
bars.

For fixed pannels, the composite


rate will be reduced by Rs.30.00
per Sft. or Rs. 305.00 per Sq.
metre.

a)

without wire gauze:


Per Sft.
ditto
ditto
ditto
ditto

60.85
60.85
60.85
60.85
60.85

310.55
313.00
316.70
322.90
335.25

sq.m
ditto
ditto
ditto
ditto

654.70
654.70
654.70
654.70
654.70

3341.35
3367.95
3407.85
3474.35
3607.35

b)

i) glass pane 2 mm thick


ii) glass pane 2.5 mm thick
iii) glass pane 3 mm thick
iv) glass pane 4 mm thick
v) glass pane 5 mm thick
fixed with wire gauze, 22 SWG
i) glass pane 2 mm thick
ii) glass pane 2.5 mm thick
iii) glass pane 3 mm thick
iv) glass pane 4 mm thick
v) glass pane 5 mm thick

Per Sft.
ditto
ditto
ditto
ditto

85.45
85.45
85.45
85.45
85.45

373.40
375.90
379.60
385.75
398.15

sq.m
ditto
ditto
ditto
ditto

919.65
919.65
919.65
919.65
919.65

4017.85
4044.45
4084.35
4150.85
4283.85

Per Sft.

57.05

317.15

Sq.m

614.05

3412.60

ditto

55.30

196.60

ditto

595.05

2115.50

42 Providing and fixing steel windows using M.S. sheet (16


SWG) moulded tubular pipe 1"x1" (40x40mm) for
frame and 1"x1" (30x30mm) for leaves including M.S.
square bars "x" (6x6 mm) welded around each panel
of frame, 5 mm thick glass panes fixed with double M.S.
square tubular pipe 3/8"x3/8" (10x10mm) (22 SWG)
beading with U' shaped rubber lining, brass fitting,
holdfast, including painting three coats complete in all
respects.
a) For openable panels fixed with wire
gauze 24 SWG, 12x12 mesh and glass
panes " (6 mm) thick.
b) For fixed panels without wire gauze.

Remarks

chapter-25(Iron work)

Page 156

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

43 Providing and fixing windows consisting of M.S. box


section frame 2"x1" (50x40mm), leaves frame 1-"x1"
(40x25mm) box section frame for glazing 3/8"x3/8"
(10x10mm) using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"
(5 mm) thick glass panes M.S. box section "x"
(13x13mm) of 16 SWG for fixing 24 SWG wire gauze on
outer side by means of "x1/8" (20x3mm) M.S. flat and
screws I/C all C.P. fitting and painting 3 coats complete in
all respect.

Per Sft.

63.40

395.05

Sq.m

682.20

4250.70

44 Providing and fixing windows consisting of M.S. box


section frame 2"x1", (50x40mm) leaves frame 1"x1"
(40x25mm) box section frame for glazing 3/8"x3/8"
(10x10mm) using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"
(5 mm) thick glass panes M.S. box section "x"
(13x13mm) of 16 SWG for fixing 24 SWG wire gauze on
outer side by means of "x1/8" (20x3mm) M.S. flat and
screws including grill of M.S. flat "x1/8" (13x3mm) or
"x" (6x6mm) square bar with independent frame of
"x" (13x13mm) box section of 16 SWG i/c all C.P.
fitting and painting 3 coats complete in all respect.

Per Sft.

79.45

459.00

Per Sft.

854.95

4939.05

Each

529.65

569.20

Each

529.65

569.20

46 Supply and fixing iron grating for fire place.

Per Sft.

101.65

206.70

sq.m

1093.65

2224.10

47 Fixing copper flashing, including cutting of sheets,


grooving and rivetting.

Per Lft.

44.20

Metre

145.05

48 Providing and fixing angle iron railing, using 2"x2"x3/8"


(63x63x10 mm) angle iron post 4" (113 mm) long, 5' to
6' (1500 to 1800 mm) apart, with 2"x2"x3/8" (63x63x10
mm) angle iron top rail, and two rows of M.S. flat 2"x"
(63x6 mm) including fixing to side of Bridge/structure with
U.bolt 1' (450 mm) long " (20 mm) dia, painting posts,
etc. complete in all respects.

Per Rft.

74.15

758.25

Metre

243.35

2487.75

49 Providing and fixing barbed wire fencing on compound


wall, consisting of 1"x1"x3/16" (40x40x5 mm), angle
iron post 3 ft. (990 mm) long, 5 to 6 ft. (1500 to 1800
mm) centre to centre, embedded in cement concrete
1:4:8, base of size 9"x9"x12" (225x225x300 mm), and
three rows of barbed wire, painting posts, etc. complete in
all respects.

100Rft.

1622.75

9772.80

Metre

53.25

320.65

50 Providing and fixing barbed wire fencing on compound

100Rft.

2668.95

12434.70

Metre

87.55

407.95

45 Flapping G.I. pipes for bath room drains.

chapter-25(Iron work)

Remarks

Page 157

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Remarks

Composite

wall, consisting of 1"x1"x3/16" (40x40x5mm) angle


iron post 3' (900 mm) long, 4' (1200 mm) apart embedded
in cement concrete 1:4:8 base of size 6"x6"x9"
(150x150x225 mm) and 4 rows of barbed wire, including
binding wire, painting posts, etc. complete in all respects.
51 Providing and fixing all types of partly fixed and partly
openable glazed anodised bronze colour aluminium
doors, using delux section of M/s Al-Cop or Pakistan
Cables, having chowkat frame of size 40 x 100 mm (1" x
4") and leaf frame of 60x40mm (2"x1") wide sections
including the cost of " (5 mm) thick imported tinted
glass with aluminium triangular gola and rubber gasket to
support the glass and leaf edging, using approved
standard fittings, locks, 3" (75 mm) wide long handles
etc., and hardware any required as approved by the
engineer in-charge.

52 Providing and fitting all types of glazed aluminium


windows of anodised bronze colour partly fixed and partly
sliding using delux sections of M/s Al-Cop or Pakistan
Cables having frame size of 100 x 20 mm (4"x") and
leaf frame sections of 50 x 20 mm (2"x"), all of 1.6mm
thickness including 5 mm thick imported tinted glass with
rubber gasket using approved standard latches, hardware
etc., as approved by the Engineer in-charge.

Per Sft

83.15

520.45

sq. m

894.70

5600.05

Per Sft

119.35

412.15

sq. m

1284.20

4434.75

(1) Increase rate by Rs. 40.00 per


Sft or Rs.430.50 per Sq-metre if
sections thickness is 2 mm.
(2) Reduce rate by Rs.20.00 per Sft
or Rs.215.20 per Sq-metre if
sections are of dull aluminimum
shade.
(3) Reduce rate by Rs.20.00 per
Sft or Rs.215.20 per Sq-metre if
local glass is used.

(1) Reduce rate by Rs.20.00 per Sft


or Rs.215.20 per Sq-metre if
section thickness is 1.2 mm.
(2) Reduce rate by Rs.20.00 per Sft
or Rs.215.20 per Sq-metre if
sections are of dull aluminium
shade.
(3) Reduce rate by Rs.20.00 per Sft
or Rs.215.20 per sq-metre if local
glass is used.

chapter-25(Iron work)

Page 158

26. MISCELLANEOUS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Notice board made of cement, sand mortar 1:3.

Fixing handles to iron hammers.

Providing and fixing barbed wire fencing, with 4 horizontal


and 2 number cross wires fixed with posts of R.C.C., 1:2:4
(straining posts 7'x9"x9" (2.13 mx225x225 mm) at 100'
(30 m) centre to centre, stiffening posts 7'x6"x6" (2.13
mx150x150 mm) at 50 ft. (15 m) interval and intermediate
post 7'x5"x5" (2.13 mx125x125 mm) at 8 ft.(2.4 m) centre
to centre), including cost of steel, its fabrication and
placing of steel reinforcement, eye bolts, washers, etc.
complete.
Surveying

Supplying Bamboo Jhandies 10' to 12' (3.00 to 3.65 m) with

Labour

Rate (M etric System)

Composite

Unit

Labour

Spec.
No.

Composite

Per Sft.

57.50

67.20

Per
sq.m

618.75

723.30

Each

73.55

Each

73.55

100Lft.

Remarks

6,032.45

23,655.80

L.m.

197.90

776.10

Each

37.50

167.25

Each

37.50

167.25

100Nos.

117.70

135.40

100Nos.

117.70

135.40

The board is to be of cement


plaster " (13 mm) thick, with 2"
(50 mm) wide and 1" (25 mm) thick
beading.

Vertical bars in straining and


stiffening posts to be 4 No. each by
" (13 mm) dia and for
intermediate posts to be 4 No. of
3/8" (10 mm) dia Stirrups for all
posts to be " (6 mm) dia. at 12"
(300 mm) centre to centre.

iron shoes, and flags 15" (375mm) square.


5

Supplying wooden pegs for levelling, 1" (40 mm) dia, 6"

(150mm) long.
6

Supplying wooden pegs for alignment, 2" to 3" dia (50 to


75 mm), 9" (225 mm) long.

100Nos.

282.50

486.40

100Nos.

282.50

486.40

Fixing enamalled iron gauges flush with masonry, including

Per Lft.

66.35

75.25

Per
L.M.

217.60

246.80

Each

44.20

cost of hooks.
8

Placing boundary pillars in position, including digging pits.

Each

44.20

Fixing main line type distance mark in position, including


making 1:3:6 cement concrete base block, size
14"x10"x15" (350x250x375 mm).

Each

194.70

351.35

Each

194.70

351.35

Per cut

44.20

Per cut

44.20

Composite rate does not include


cost of iron distance marks.

Hand Pumps & Pressure Pipes


10

Cutting pipes, upto 2" (50 mm) dia.

chapter-26( Misc)

Page 159

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

11

Cutting pipe, above 2" (50 mm) dia.

12

Threading pipe ends, 1" (40 mm) to 4" (100 mm) dia.

13

Assembling 1" (40 mm) dia pressure pipe.

14

Boring and fixing 1" (40 mm) dia pressure pipe:

a)
b)
c)

in ordinary soil
in clay
in shingle

15

Repairs to hand pump, pulling out and refitting.

16

Fixing hand pump (Machine only)

Per cut

Labour

Rate (M etric System)

Composite

80.45

Unit

Per cut

Labour

Spec.
No.

Remarks

Composite

80.45

Each
End

56.00

Each
End

56.00

100Lft.

204.60

Per Metre

6.70

Per Lft.
Per Lft.
Per Lft.

71.95
141.75
211.53

Per Metre
Per Metre
Per Metre

236.00
465.00
694.00

Per Lft.

31.90

Per Metre

104.60

Each

141.25

Each

141.25

Rest House Furniture & Fuel, etc.


17

Washing Niwar of bed.

Per bed

465.30

496.45

Per bed

465.30

496.45

18

Washing Durries.

100Sft.

620.40

694.55

sq.m

66.80

74.75

19

Recaning chairs:
Each
Each
Each
Each
Each
Each
Each

247.15
317.80
176.55
282.50
176.55
494.35
706.20

282.90
368.20
178.80
301.80
224.45
565.80
1,000.35

Each
Each
Each
Each
Each
Each
Each

247.15
317.80
176.55
282.50
176.55
494.35
706.20

282.90
368.20
178.80
301.80
224.45
565.80
1,000.35

Each

1,059.30

1,773.70

Each

1,059.30

1,773.70

i)
ii)
iii)
iv)
v)
vi)
vii)

office chairs, single caning seat only.


office chairs, double canning seat only.
office chairs, single caning back only.
office chairs, double caning back only.
easy chairs, single caning seat only.
easy chairs, double caning seat only.
easy chairs, single caning only, back and seat in one
piece.
viii) easy chairs, double caning back & seat in one piece
or couches with caned area about 16 Sft (1.5 Sqm).
20

Making and fixing Hat pegs ordinary.

Each

127.10

490.50

Each

127.10

490.50

21

Weaving charpoy.

Each

459.05

Each

459.05

22

Sweeping chimney.

Each

103.40

104.70

Each

103.40

104.70

23

Picture railing, including making, fixing and painting.

Per Lft.

36.35

113.30

Per LM

119.30

371.75

24

Cutting fuel wood, from plantation.

100Kg

138.50

100Kg

138.50

25

Splitting fuel wood.

100Kg

290.05

100Kg

290.05

chapter-26( Misc)

Page 160

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

26

Burning charcoal, including loading, unloading and


repairing kilns.

27

Filling cement bags with coal and sewing (including cost


of strings).

28

Supplying manure.

29

Washing punkha frills.

30

Washing:a)
b)

table cloth
napkins, dusters, etc.

Labour

Rate (M etric System)

Composite

100Kg of
Charcoal

469.55

100Cft.

1,271.80

Cart
Load

Unit

Labour

Spec.
No.

Composite

100Kg of
Charcoal

469.55

1,274.95

cu.m

449.20

450.30

155.10

291.05

Cart
Load

155.10

291.05

Each

141.25

Each

141.25

Each
Each

35.30
23.55

Each
Each

35.30
23.55

31

Hoisting and placing sleepers for centring, including


carriage within one chain.

Each
No.

55.35

Each
No.

55.35

32

Dismantling sleepers from centring, including stacking


within one chain.

Each
No.

63.10

Each
No.

63.10

33

Dredging Sumps.

Per
Shift

2,326.50

Per
Shift

2,326.50

34

Fixing `U' bolt in masonry or concrete, including levelling


and tying for fixing angle iron post.

Each

169.40

Each

169.40

35

Bailing out water:382.80

cu.m
ditto

65.75
7.30

13.50

Per Nos.

110.55

a)
b)

by hand
by pump

36

Drilling holes in R.C. Trough.

37

Supplying and laying polythene sheet over D.P.C. under


floors and on roofs, etc.
i)
ii)

300 gauge (.003" thick)


500 gauge (.005" thick)

38

Laying 2" (50 mm) thick sand and bitumen carpet, on top
of foundation of oil tank.

39

Cutting hole 4"x6" (100x150 mm) in stone masonry or


brick wall with chisel, repairing masonry and removing
debris within one chain lead.

1000 Cft.
1000 Cft.

1,861.20
207.30

Per Nos.

110.55

Remarks

Capacity of cart, 20 Cft. (0.57


cu.m).

Not less than five gangmen to be


employed for each shift to ensure
effective dredging.

Rate includes cost of providing


pump, POL and operation charges,
etc.

The rate includes overlaps.


Per Sft.
Per Sft.

1.05
2.10

2.65
3.45

sq.m
sq.m

11.40
22.80

28.55
37.15

100Sft.

1,225.20

5,438.35

sq.m

131.85

585.15

Per
Hole

189.50

Per
Hole

189.50

chapter-26( Misc)

Same rate to be paid for other type


of masonry and R.C.C. work.

Page 161

MRS, BI-ANNUAL PERIOD (1st FEBRUARY, 2016 TO 31st JULY, 2016) DISTRICT RAWALPINDI
Sr.
No.

Description

Rate (British System)


Unit

Labour

Rate (M etric System)

Composite

40

Making 1"x1" (40x40 mm) groove in wall of stone or


brick masonry in cement for fixing planks upto 9" (225
mm) deep.

Per
Plank

165.85

41

Drilling holes in stone or brick masonry upto 2" (50 mm)


dia, per inch (25 mm) depth.

Per hole
per inch
depth

62.05

42

Spraying anti-termite liquid mixed with water in the ratio of


1:40.

100Sft. of
each
spray

70.60

209.00

43

Providing and fixing barbed wire fencing, with 4 horizontal


and two cross wires, with R.C.C. 1:2:4 posts, 5.5'x6"x9"
(1.68mx150mmx225 mm) at 8 ft. (2.45 m) centre to
centre, reinforced with 4 No. 3/8" (10 mm) dia vertical bars
and 1/8" (3 mm) dia stirrups 12" (300 mm) centre to
centre, complete in all respects.
7,153.70
7,868.35

23,756.95
26,074.85

i)
ii)

without cement concrete base.


in cement concrete 1:4:8 base of size 12"x12"x21"
(300x300x525 mm).

100Rft.
100Rft.

chapter-26( Misc)

Unit

Labour

Spec.
No.

Composite

Per
Plank

165.85

Per hole
per c.m
depth

24.80

sq.m of
each
spray

7.60

22.50

234.65
258.10

779.25
855.25

Per Metre
Per Metre

Remarks

Page 162