Name at a glance

Ajay Vasudev
Project Management

Profile & Experience

20 years total experience in energy sector in various activities like Feed,


Detail Engineering, Engineering Management and Overall Project
Management .In -charge of large LEPCC Petrochemical Project of OPal
of 100 to 200 CR with dedicated team, responsible and accountable for
all aspects from Basic Engg to Commissioning .Executed overseas
LSTK Projects by supplying entire Hydrogen Plant to Australia (BHP
Billiton) in record time of 14 Months. Recently supplied a MODULAR
Charge Heater to JGCS in Vietnam with in challenging schedule of 12
months. Prior to EPC Projects large number of Detail engineering
Project like DHDT,CDU,VDU, H2 ,HYCO are being handled both from
Domestic and International clients like Essar, GNFC, ONGC, Air
Products, Exxon Mobil, BHP Billiton, JGCS ,TOTAL FINA, BASF etc.
Skills in liaising with internal departments and external authority such as
consultants, contractors, and Government authorities for seamless
operation and timely completion of project .A team leader with strong
analytical /problem solving abilities.

Career Highlights Technip work history

Ajay Vasudev

Strategic Positions
Project Manager
Engineering Manager
Proposal Manager

Special Competences
Project Manager for Butene-1 Plant in Dahej Gujarat, Its LEPCC
Project (Licence, Engineering, Procurement, construction and
commissioning).This Plant was built in Grass root Petro Chemical
complex of OPal.
Project Manager for Hydrogen Plant (LSTK) supplied to Australia, BHP
Billiton was the Client, Complete plant was built in Modules, Pre
commissioned and shipped to Australia in record time.
Project Manager for Charge Heater (LSTK), supplied to Vietnam,
JGSC was the client Heater was built in various modules and shipped to
RP Complex .in record time 12 months.
.Project Manager for Detail Engineering for DHDT, CDU/VDU and NHT
for Essar Vadinar Refinery
.Project Manager for Detail Engineering for reloaction of H2 Plant for
Essar Vadinar Refinery.
.Project Manager for Detail Engineering for H2 Plant for TOTAL Fina,
Exxon Mobil, Air Products.
.

Main projects involved


Butene-1 Unit at Opal, Dahej INDIA (EPC)
Hydrogen Plant for BHP Billiton, Australia (EPC)
Charge Heater for JGCS, Vietnam (EPC)
Hydrogen Plant for Total Fina, France
Hydrogen Plant for Shell, Switzerland
Hydrogen Plant for Exxon Mobil, USA
CDU/VDU/NHT for Essar Refinery, Vadinar India

Project Management for EPC Contract


Engineering Management
Risk MANAGMENT
Procurement & Vendor management
Budget and Cost Control
Project Planning

Languages
English and Hindi

Relevant Strengths
Hands on site experience
Vendor Expediting
Engineering management
Resource planning

Qualifications
B.Tech ( Mech ), STJIT, DHARWARD

Page 1 of 4

Ajay Vasudev
Project Management
Detailed Background
WORK HISTORY WITH TECHNIP (SINCE dec 1998 )

Project Manager ( Aug 2013 till date )


Aug 2013 till date

Setting up Technip Modular Manufacturing Yard at Dahej at Water Front


Assume over all responsibilities starting from selection / acquisition of land from GIDC,
approval from various Government Authorities like GMB, MOeF etc. Finalization of
various consultants, agencies, vendors and contractors, preparation of various project
reports required for Ministry, giving representation to various Govt. Bodies for smooth
execution and timely completion of entire project.

Project Manager (May 2014-May 2015)


May 2014-2015

Supply of Charge Heater to JGCS for NSRP Complex in Vietnam


Assume overall responsibilities starting from Engineering , Developing modular
design , Finalization of schedule , making strategies while finalization the contractors ,
identifying the location near port for assembly the Heater , close monitoring of
vendors ,contractors progress including movements of material to vendors shops and
Port ,Packing, logistic of ODC consignment ,custom clearance for seamless execution
and meeting the dead line of ship birth date . This Heater was delivered completely in
Modular Form within 12 months from Adani HAZIRA Port.

Project Manager (April 2010-June 2014)


April 2010-June 2014

Butene-1 Plant (LEPCC) for Opal in Dahej Gujarat INDIA


Being LEPCC Project (License, Engineering ,Procurement ,Construction
Commissioning) the responsibilities includes from delivering the BDEP Package ,timely
completion of engineering , ordering ,finalization of sub contracts , monitoring the
construction and contractor progress closely , Pre commissioning activities , Reporting
to client and MGMT , Cost control , implementation of HSE standards at site, change
management for timely completion of entire Project .

Project Manager (June 2009- Aug 2010)


June 2009-Aug 2010

Supply of Hydrogen Plant for BHP Billiton Australia , Perth


Responsibilities includes starting from finalization of contract as proposal manager and
thereafter executing the entire Project FOB with in RECORD time of 14 Months.
Assume full responsibilities starting from Engg phase, finalization of various modules,
routes survey Ordering& supplying the materials, Change management, finalization of
Contactor place near port to fabricate the entire Plant and erect it on Temporary
foundations so that also all instrumentation and electrical works shall be done prior to
Pre commissioning and thereafter dismantle in modules as designed and ship to
Australia. Ensuring the compliance of all material, HSE AQIS and Packing requirement.
The entire plant was shipped in three charted ships from ESSAR HAZIRA Port.

Project Manager( Nov 2008- Dec 2009)


Nov 2008 Dec 2009

Supply of Reformer for HYCO Plant at GNFC Gujarat INDIA


Assume complete responsibilities from engineering till supply of Reformer unit in
Page 2 of 4

various packages .Close coordination with Client for smooth, seamless and timely
assembly of Reformer at site.
Engineering Manager( April 2006- Dec 2008)
April 2006 Dec 2008

Detail engineering of CDU/VDU & for Essar Vadinar Refinery Expansion


Assume full responsibility starting from finalisation of Contract with Client, estimating
man hours defining scope, finalisation of deliverables and progress measurement
methods and deliverables schedule .Coordination with client and Engineering
discipline, taking lead role in Model reviews, Constructability reviews and
HAZOP/HAZID. Ensure timely release of deliverables as agreed in schedule.

Engineering Manager( Nov 2005- Jan 2007)


Nov 2005 Jan 2007

Detail engineering of Relocation of Hydrogen Plant from USA to Essar Vadinar Refinery
Responsible from prefeasibility , estimating the cost , making project viable , finalisation
of scope , collecting the old documents and put in right places for reference , involve in
constructability/model reviews, close coordination with vendors, change
management ,supporting in health check of equipments .Ensure safely and timely
execution .

Engineering Manager( JAN 2005- April 2006)


Jan 2005 April 2006

Detail engineering for Revamp of NHT CCR for Essar Vadinar Refinery
Responsible for entire engineering , ensure smooth transaction of documents from
ABB HAGUE office and put in right places for reference , involve in
constructability/model reviews, close coordination with vendors, change
management .Ensure safely and timely execution .

Engineering Manager( April 2004- June 2005)


April 2005 June 2005
Detail engineering for Hydrogen Plant for Exxon Mobil ,Joilet ,USA
Responsible for entire engineering starting from finalisation of scope , estimating man
hours , understanding client requirements , finalisation of schedule . Taking lead in
various review P&ID, Model Review, constructability review .HAZOP etc. Close
coordination with client thru VC and personal visits for smooth and timely execution.
Engineering Manager( May 2003- June 2004)
May 2003 June 2004
Detail engineering for Hydrogen Plant for TOTAL Fina ,La Harve, France
Visited to TP Netherlands office for 4 weeks along with all leads ,finalised the scope
man hours .A task force set up in office to ensure al deliverables shall be issued as
scheduled and committed to client .Actively participated in various reviews P&ID,
Model Review, constructability review .HAZOP etc.for smooth and timely execution.
Engineering Manager( Aug 2002- June 2003)
May 2003 June 2004

Detail engineering for Hydrogen Plant for Shell Refinery Cressier Switzerland
Responsible for finalisation of modular concept, estimating man hours , finalisation of
scope and schedule . Close coordination with client and with in discipline for timely
release of deliverables.

Engineering Manager( Aug 2002- June 2003)


May 2003 June 2004
Detail engineering for Reformer for BASF ,China
Responsible for entire engineering works , starting from finalisation of deliverables till
its release . Close monitoring of engineering activities and input required to ensure
timely release of deliverables..

Page 3 of 4

Ajay Vasudev
Project Management
PREVIOUS WORK HISTORY

JCE April 1995- Dec 1998


Mechanical Engineer (April

April 1995-Dec 1998

1995- Dec 1998)

Mechanical Design Engineer for IPCL CATALYST Project


Responsible for Mechanical design of Static equipments, vendor docs review, close
coordination with vendor and with inter discipline. Deputed to site for Inspection and
expediting the materials from Vendor shop.