3.2.

Mechanical Design
Strength calculations

Equipment datasheets

General arrangement drawings


Detail drawings
3.3

Preparation for Transportation, Packing and Storage

Loose supplied vessels will be supplied ready for transportation on (wooden transport) saddles. All open

connections will be blinded of during transportation. Materials to be used for this operation are plastic and
wood. Process internals for the pressure vessels will be installed at the vessel suppliers premises. Loose

supplied items will be packed in wooden crates in order to prevent damage during transportation. Currently
DDP Delivery in The Netherlands has been considered.
3.4

Supply of Spare Parts for Commissioning and Start-up

We have included for spare parts for commissioning and start up in the initial item price. Please note that
spare parts for startup and commissioning will be limited to:

10% spare parts consisting of bolting and gaskets with a minimum of one gasket per nozzle size

3.5

Pre-commissiong, Commissiong and Start-up Assistance

All forms of commissioning as well as start-up assistance can be arranged by Frames, although this is

considered optional. The Frames service rates as applicable for the project at hand based on location can be
provided upon request.
3.6

Training of Personnel

Training of personnel can be arranged by Frames, although this is considered optional.