You are on page 1of 4

Customer name

_
Customer ref #
User name____________________________
Jobsite location
Zeeco Inc. ref #
Date: _________________Revision #: _____

Burners
Flares
Incinerators
Aftermarket Products & Services

FLARE SYSTEM DATA SHEET


FLARE TYPE:

Elevated Flare

Guy Wire Supported

Enclosed Ground Flare

Self-supported

FLARE TIP:

Non-assisted

DRUM TYPE:

Vertical Knockout

PURGE SEAL TYPE:

UNITS FOR DATA SHEET:


KG/HR
LB/HR
Flow:
Temperature:
Pressure:

PSIG

Radiation:

BTU/HR-FT2

Gas assisted

Liquid Seal

Gas Purge Seal

Air-assisted

Horizontal Knockout

Velocity Purge Seal

Heating Value:

BARG
KW/M 2

Sonic MJ
None

NM /HR

LBMOLES/HR

BTU/SCF

BTU/LB

KPAG
Velocity:

Enclosure Fence

None

SCFD
o

Multipoint Ground Flare

Derrick Supported

Steam assisted

Tripod Supported

Pit Flare

KJ/NM 3

KG/CM2
FT/SEC

MPH

M/SEC

PROCESS DATA:
PROCESS
RELIEF
CASE

FLOWRATE

TEMPERATURE

ALLOWABLE
SYSTEM PRESSURE
DROP

LOWER
HEATING
VALUE

RELIEF
DURATION
SHORT/LONG/
CONTINUOUS

MOLECULAR
WEIGHT

Maximum
Smokeless
Normal
Minimum

UTILITY DATA:
UTILITY

PRESSURE

TEMPERATURE

MOLECULAR
WEIGHT

LOWER HEATING
VALUE

Instrument Air

NA

NA

Plant Air

NA

NA

Plant Water

18

NA

LP Steam

18

NA

MP Steam

18

NA

HP Steam

18

NA

Fuel Gas
Natural Gas
Purge Gas

9/10/2009

Zeeco Inc.

22151 E. 91st St. Broken Arrow, OK, USA


PAGE 1

74014

Customer name
_
Customer ref #
User name____________________________
Jobsite location
Zeeco Inc. ref #
Date: _________________Revision #: _____

Burners
Flares
Incinerators
Aftermarket Products & Services

POWER TYPE

VOLTAGE

PHASE

HERTZ

AC or DC

General Instruments
General Lighting
Aviation Lighting
Ignition Control Panel
Motors Under 100 HP
Motors 101-500 HP
Motors 501-1000 HP
ENVIRONMENTAL DATA:
Average wind speed (process design)
Maximum wind speed (mechanical design)
Site elevation above sea level
Site relative humidity
Minimum ambient temperature
Average ambient temperature
Maximum ambient temperature
Seismic zone for site
Maximum allowable radiation:

at grade

with

without solar

at distance

with

without solar

at grade

smokeless

max. flow

at distance

smokeless

max. flow

of:
Solar radiation level at site
Maximum noise level (dBa):
of:
Electrical area classification at / near flare
CUSTOMER AND JOBSITE INFORMATION:
Customer name

End users name

Street address

Street address

Post office box

Post office box

City/State/Country/Zip

City/State/Country/Zip

Contact name

Contact name

Phone number

Phone number

Facsimile number

Facsimile number

9/10/2009

Zeeco Inc.

22151 E. 91st St. Broken Arrow, OK, USA


PAGE 2

74014

Customer name
_
Customer ref #
User name____________________________
Jobsite location
Zeeco Inc. ref #
Date: _________________Revision #: _____

Burners
Flares
Incinerators
Aftermarket Products & Services

GENERAL DESIGN CRITERIA:


Rank the following factors in order of importance (1-8)(1=high) relative to the flare equipment for this project:
Equipment cost
Installed cost

Utility usage
Smokeless capacity

Applicable specifications:

Experience
Weight

NEC
AWS

IEC
ASME

Per OSHA

Caged

Noise
Field service
NEMA
ANSI B31.3

AISC
ASCE 7-93

DETAILED SCOPE OF SUPPLY:


Ladders/platforms:
Ignition system:

Saf-T-Climb

Manual
Automatic relight
Sun/rain shield
Free standing
Direct high energy spark ignition
Per FAA
Strobe type

Galvanized

Painted

Pilot status monitors


Regulators
Self-inspirating type
FFG type
Optical pilot monitoring device

Aviation marking:

Per ICAO
L+P access

Fixed
Retractable
Incandescent type
Banded paint

Utility piping/wiring:

Pilot gas
Ignition lines
Steam lines
Conduit
Assist gas
Thermocouple wire
High energy ignitor wire
Power wire

Corrosion protection:

SP-2 cleaning
SP-6 sandblast SP-10 sandblast
Other___________
Red oxide primer
Inorganic zinc primer
Epoxy primer
Epoxy finish paint
Silicone finish paint
Other______________

DETAILED MECHANICAL DESIGN CRITERIA:


SYSTEM
COMPONENT

INTERNAL
DESIGN
PRESSURE

MECHANICAL
DESIGN
TEMPERATURE

NA

NA

MATERIAL OF
CONSTRUCTION

PROCESS SIDE
CORROSION
ALLOWANCE

Liquid Seal drum


Knockout drum
Flare gas riser
Gas Purge seal device
Support structure

NA

Steam piping
Pilot gas piping
Ignition piping

NOTE: Attach sketch if this is for modification to an existing flare system or existing vent system.
9/10/2009

Zeeco Inc.

22151 E. 91st St. Broken Arrow, OK, USA


PAGE 3

74014

Customer name
_
Customer ref #
User name____________________________
Jobsite location
Zeeco Inc. ref #
Date: _________________Revision #: _____

Burners
Flares
Incinerators
Aftermarket Products & Services

GAS COMPOSITION:
COMPONENT

Mole %

MAXIMUM
FLOW CASE

SMOKELESS
FLOW CASE

Weight %
NORMAL
FLOW CASE

MINIMUM
FLOW CASE

PILOT FUEL
GAS

Methane
Ethane
Propane
Butane
Pentane
Hexane
Heptane
Octane
C9+ Saturates
Ethylene
Propylene
Butylene
Butene
Butadiene
Acetylene
Benzene
Toluene
Xylene
Styrene
C9+ Unsaturates
Ammonia
Hydrogen
Hydrogen Sulfide
Carbon Monoxide
Carbon Dioxide
Water
Nitrogen
Oxygen

COMMENTS:
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
9/10/2009

Zeeco Inc.

22151 E. 91st St. Broken Arrow, OK, USA


PAGE 4

74014

You might also like