S.N
o.
1
Final Profire
Comments Rev04
Control panel status
Faults are shown in
Fire Alarm & Detection
System (refer
Performance TestSection 2) CIVILCO
Update
Work
completed
and refer the
attached
photo.
D14 Ventilation
arrangemenr in Fire
Pump room.
(BAM/CIVILCO)
F1-FHC Identification
in ground floor. (BAM)
Work
completed
and refer the
attached
photo.
Work
completed
and refer the
attached
photo.
Work
completed
and refer the
attached
photo.
Work
completed
and refer the
attached
photo.
Work
completed
and refer the
attached
photo.
Photo
G1 Fire Extinguisher
installation in Kitchen
area. (CIVILCO)
Work
completed
and refer the
attached
photo.
Work
Completed
Work
completed
and refer the
attached
photo.
10
C3 Access panels in
the vertical shaft to be
identified. (BAM)
Work
completed
and refer the
attached
photo.
11
D9 Letter to be
submitted for the AntiVortex installation.
(CIVILCO)
I1 Duct identification
to be completed.
(CIVILCO)
Done.
12
Work
completed
and refer the
attached
photo.
13
I2 Damper
identification to be
completed. (CIVILCO)
Work
completed
and refer the
attached
photo.