DATA (S.S.R 2015-16)


Description of Item

Qty

3
4
5
Fixing of channels, levelling the concrete with beam vibrator, vacuum dewatering power
trowelling to finish as per the directions of Engineer-in -Charge, rate inclusive of labour
charges all complete for finished item of work
Unit = Sqm
Taking output = 100 Sqm
a) Machinery
Vaccum dewatering machine hire charges
Generator 30 KVA.Page no.80, Sl No.40 of S.O.R 2015-16

Unit

Sqm
Hrs

100.00
2.00

Smooth finishing power trowerller unskilled


Sqm
100.00
b) Labour
General operator skilled
Nos
0.50
Vacuum dewatering skilled
Nos
0.00
Vacuum dewatering un-skilled
Nos
0.00
Mason 1st Class
Nos
0.00
Add MA @ 20%
Rate per 100 Sqm
Rate per 1 Sqm
Over heads and Contractors profit @ 13.615%
Rate per 1 Sqm
Carrying cut groove cutting 75mm deep with petrol driven saw as per the directions of
Engineer-in-Charge, rate including of labour charges, machinery charges all complete for
finished item of work
Unit = Sqm
Taking output = 100 RM
a) Machinery
Generator 30 KVA.Page no.80, Sl No.40 of S.O.R 2015-16
Floor saw cutting hire charges Power Saw Cutter - Hand Operated
- Hire charges 1168 BMC-X.02 1 Hr 125
Water tanker-8000 ltr
Bitumen 60/70 Gr(M-074
Bitumen (60-70 grade)(Excluding taxes)
Tonne As per rates fixed by R&B Dept based on refinery rates
M-074 Page No.28 of S.O.R 2015-16 Part I - Materials not covered
under Irrigation basic data Common SoR 2015-16

b) Labour
General operator skilled
Floor power saw cutter skilled
Floor power saw cutter unskilled
Water tanker driver
Man Mazdoor
Rate per 100 RM
Rate per 1 RM
Over heads and Contractors profit @ 13.615%
Rate per 1 RM

Assistant Engineer(PH),

Deputy Exe Engineer,

Tadepalligudem Section.

PH Sub Dvn, Eluru.

Hrs
RM

4.00
100.00

Hrs
Kgs

0.00
0.00

Nos
Nos
Nos
Nos
Nos

0.50
0.50
1.00
0.50
1.00

Executive Engineer,
Eluru PH Division.

Superintending Enginee
Rajamahendravarm Circle

(S.S.R 2015-16)

ty Exe Engineer,

Sub Dvn, Eluru.

Rate

Amount

0.00
816.80

0.00
1633.60

0.00

0.00

420.00
420.00
320.00
420.00

210.00
0.00
0.00
0.00
42.00
1885.60
18.86
2.57
21.43

0.00
15.00

0.00
1500.00

865.50
33.71

0.00
0.00

420.00
0.00
0.00
0.00
0.00

210.00
0.00
0.00
0.00
0.00
1710.00
17.10
2.33
19.43

Executive Engineer,
Eluru PH Division.

Superintending Engineer(PH)
Rajamahendravarm Circle.