You are on page 1of 1

Certificates

1
2
3
4
5
6

Certified
Certified
Certified
Certified
Certified
Certified

that
that
that
that
that
that

the work is in progress.


the work is carried out as per agreement conditions and A
there are no recoveries due from contractor except statut
there are no Quality control adverse remarks
the materials are procured by the contractor himself.
this bill has not been prepared and paid previously

Assistant Engineer (PH),


Deputy Executive Engineer,
Executive
Engineer,
Tanuku Section
P.H.Sub-Division,
P.H.Division,
Bhimavarm.
Eluru.

Seigniorage Charges
Sl
No

Quanti Sand
ty

1.

Filling with Sand.


Qty vide page no. of M.B

Metal

cum

Cum

Plain Cement Concrete (1:4:8)


Qty vide page no. of M.B
Cum

cum

Cum

Cum

Plain Cement Concrete (1:3:6)


Qty vide page no. of M.B
Cum

Cum

Cum

Cum

Plastering with C.M(1:4) 12 mm thick

Sqm

Cum

M30 Design Mix Concrete.


Qty vide page no. of M.B
Metal:
Kg/Cum
(0.90 )-Coefficient
Sand:
Kg/Cum
(0.45)-Coefficient)

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Total=

X
X
Rs.80.00/ Rs.50.00/
1 Cum
1 Cum

Assistant Engineer (PH),


Executive Engineer (PH),
Tanuku Section.
Eluru Division.

Deputy Executive Engineer (PH),


Bhimavarm sub-division.