2014 - Baja SAE India CostReportTemplate
2014 - Baja SAE India CostReportTemplate
-The objective of the cost report is to report the cost value (suggested retail price) of the items selected
to build the car. The objective is not to report the cheapest price that an item can be purchased. For
example, if two schools are using the same Gear Box they both should be reporting the same price,
even though they might have purchased them for different prices, since both schools get the same value
from the Gear Box.
-The cost report should serve as two functions, (1) a bill of materials for the car, and (2) it should help
equalize teams that choose to use items of high value with teams that use items of low value.
-In industry it is very important to look at design and performance, as well as cost. Cost is the key
driving force to many design decisions. If shocks are selected that cost Rs 1,00,000 the team should
understand it will loose points in cost, but it might improve the score in the dynamic events. During
design presentations these cost decisions should be discussed.
Common Mistakes
- Teams did not use the correct template; the only template that is allowed is the template which posted
for that year. If you submit an older template you will receive a score of 0.
- Teams found prices at discount companies that were not suggested retail prices. Remember to use the
current retail price of all parts.
- Teams did not get signatures on the summary cost page. It is required that you print out the summary
cost with captain and advisor approval signatures. This must be scanned and placed in the PDF as
page #1.
- Reports were not labeled correctly.
- Make sure everything is filled out. Don't leave anything blank (quantities, descriptions, sub-assembly
times, etc.).
- Bring a printed copy of the cost report with you to competition.
It also would be helpful to bring drawings of any components that are hidden or enclosed. For
example, a exploded view of a transmission or the component drawings. This would help speed
up any verification process.
Submission of reports
All reports MUST be done using that year's template. Only one electronic copy will need to be
submitted by each team and this will be for all competitions in which the team is competing. The
template must be submitted as an Excel file (.xls or .xlsx). Do not add pictures, drawings or other things
that make this file larger.
All supporting documents (i.e.: scanned copy of the summary cost sheet with signature, cost overview,
cost sheets, pictures, ,receipts, drawings) should be included in the .PDF file. Only .PDF file will be
scored.
These files must be titled as specified in the rules. File size of PDF and EXCEL put together should not
exceed 6 MB
If the cost of your vehicle changes after you have submitted your cost report, then at registration you
must submit a "Cost Adjustment Form". When submitting this form you must have receipts or form
"B" attached for each changed item. See the rules for more details on the Cost Adjustment form.
Foreign Teams
All cost numbers are in Indian rupees at Indian cost. Non Indian teams must find the prices for each
item they are using in the India. If the exact item can not be found, then an item of similar use, function
and durability should be used. Foreign receipts are not acceptable.
Format
This year's cost report will be a 3 level bill of materials with standardized summaries in the 12 major cost
areas. The 3 levels consist of:
-Level 1(a) is the "Summary Cost" worksheet
-Level 1(b) Overview (optional)
-Level 2(a) is the group of 12 Form "A" worksheets. Each of these sheets come preloaded with a
reasonable number of lines which may be adjusted as required.
-Level 2(b) is the group of 12 Form "B" worksheets. Note that each of these worksheets may have
multiple items.
-Level 3 cost documentation
Documentation
Receipts, catalog pages, or other documentation of cost must be included in the .PDF. To help make the
documentation clear and readable, each receipt must have the appropriate final cost circled. Each
receipt should also have the section title, Form A line number, and Form B (if needed) line number
clearly marked. All of these receipts must be included in the .PDF file. Documentation should be in the
same order as presented in the report. For example, all the engine documentation first, followed by the
transmission documentation, etc.
Sample
There is a sample pair of Form A and Form B at the start of the worksheets. They are identical to the
others with the exception that they do not roll up to the final worksheet.
*Preferably, use SI standard for dimensions.
Cost Guide
The cost should reflect the prototype vehicle brought to competition. Included in this amount is the cost for the Brigss and
fixed price Rs. 25000, for the engine- to rationalise the price for all teams) but excluded are the costs of the required life pre
shield. Anything that is in the vehicle at the time of technical inspection must be represented in the cost report. Th
vehicle will be determined as the sum of the following items:
1. All purchased parts at full retail cost (INR), even if it was actually acquired with a discount or in a foreign country wher
would make it cheaper.
2. Receipts for all components over Rs. 200 (Indian Rupees) must be included.
(A) The receipts must be numbered and labeled, and included in the .PDF file.
(B) The full retail cost of parts must be used in the Cost Report. Discounted or wholesale prices are not to be used. If a p
donated or discounted, the full retail cost for the part must still be used (or a part of similar specification).
(C) The supplier/retailers phone number must be included with each receipt.
(D) If the actual receipt for a part is not available, a photocopy of a page from a catalog of the part in question will be acc
(E) Receipts that are dated less than three (3) years prior to the Competition, i.e. no older than 3 years, are valid. Part p
that year (year of competition). (Provide current year quotations for the previous years purchased parts used in the c
previous years original receipt. Use current years quote for cost calculations.)
(F) For foreign purchased parts, if current year quotations are not available then use the currency conversion ra
book appendix.
3. All modified purchased parts should use full retail cost, plus the cost of the modifications taken from the Operations C
rule book appendix.
4. Fabricated/Manufactured parts use the cost for the basic material from the Materials Cost Table (refer rule book, appe
the weight must include any scrap from cutting or machining. If the material is not listed in the table then a receipt for
provided. The cost for making the part will then be added using the rates from the Operations Cost Table (refer rule boo
5. Fabricated/Manufactured parts do not include design or setup time for your manufacturing, actual run time only.
Base
Labor
Cost =
50
(Indian Rupees)
Car Number
Total Cost (Rs)
Thi
som
sub
be
eac
1234
Ma
ma
any
Sect #
1
2
3
4
5
6
7
8
9
10
11
12
Item
Description of change
Subassembly Costs
Material
Labor
Engine
Transmission
Drive Train
Steering
Suspension
Frame
Body
Brakes
Safety Equipment
Electrical Equipment
Fasteners
Miscellaneous
Rs0.00
Rs0.00
Sum of
Adj.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs0.00
Subtotal
Material
Labor
25,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs25,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs0.00
Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
Item
Engine
Transmission
Drive Train
Steering
Suspension
Frame
Body
Brakes
Safety Equipment
Electrical Equipment
Fasteners
Miscellaneous
;
Team Captain:
Financial Head:
Level 1 Summary
Description
Engine, Engine Mountings, Engine Subframe, Fuel Tank, Exhaust System, Catalytic Convertor, Engine Oil, e
Gearbox, Clutches, Accelerator Pedal, CVT, Shift Mechanisms, Transmission Oil etc.
Drive Shafts, Bearings, Axles, Tyres, Rims, Hub, etc.
Steering Wheel, Intermediate Shafts, Gear Box, Tie Rods, etc.
A Arms, Spindles, Shock Absorbers, Springs, etc.
Structural Members, Roll Cage, Mounts, Firewall, Seat, etc.
Outer Covering, Fenders, Skid Plates, etc.
Mech/Hyd. Components, Pedals, Lines, Fittings, Fluid, etc.
Kill Switch, Fire Extinguisher, Safety Harness, etc.
Battery, Starter, Cables, Wiring, Safety Device, etc.
Nuts, Bolts, Spring Washer, etc. (don't include fasteners in each subassembly, put the QTY of each various
Paint, Trim, etc. and other items.
Date:
sting Sheet
Subtotal
Material
Labor
25,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25,000.00
0.00
Approval Date:
Revision: A
Totals
Fabricated
Item
Part Name
1 Roll Cage and rear frame
2 Seat Mounting
3 Bushings
4
5
6
7
8
9
Purchased
Vendor
X
X
X
MISC
Qty
1
1
1
Material
Cost
134.53
2.75
100.00
of Cost
the items in this subassembly
Subsystem Assy
134.53
2.75
100.00
0.00
0.00
0.00
0.00
0.00
0.00
237.28
ExtendedTotal
Labor Cost
Extended
Material Cost
Labor Cost
5,625.00
512.00
0.00
Linked to sheet B
Linked to sheet B
5,625.00
512.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,759.53
514.75
100.00
0.00
0.00
0.00
0.00
0.00
0.00
4.17
4.17
6,141.17
6,374.28
Total:
Labor Cost
assembly)
Labor Cost
assembly)
6,378.45
Material Cost
(Subsystem)
Linked to sheet B
Linked to sheet B
m total cost
(labour
m assy cost)
Item
Labor:
Manufacturing Process
1
Cut Pipes
2
Bending
3
Radiusing at ends
4
5
6
Unit
cm^3
cm^3
Amount
209.36
17.66
Amount
957.00
6.00
60.00
Weight
1.65
0.14
Unit
cm
bend
end
Rs/Unit
79.75
23.62
Subtotal:
Rs/Unit
5.00
40.00
10.00
Subtotal:
To Form A Line
Line
Item
1
2
3
4
5
6
Labor:
Manufacturing Process
Cut pipes
Cut plates
Radiusing at ends
Drill Holes
Weld plates
Material Total
Labor Total
Subassembly Total
Density
0.01
0.01
Unit
cm^3
cm^3
Amount
3.60
10.53
Amount
32.00
16.00
2.00
4.00
48.00
Weight
0.03
0.08
Unit
cm
cm
end
hole (light)
cm
Rs/Unit
24.00
25.00
Subtotal:
Rs/Unit
5.00
5.00
10.00
3.00
5.00
Subtotal:
To Form A Line
Item
Line
Material Total
Labor Total
Subassembly Total
Item
Description: Bushings
Material:
Part Name
Material
1
Bushings
2
Density
Unit
piece
Amount
2.00
Weight
0.00
0.00
Rs/Unit
50.00
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly Total
Cost (Rs)
131.25
3.28
134.53
Cost (Rs)
4785.00
240.00
600.00
0.00
0.00
0.00
5625.00
134.53
5625.00
5759.53
Cost (Rs)
0.68
2.07
2.75
Cost (Rs)
160.00
80.00
20.00
12.00
240.00
0.00
512.00
2.75
512.00
514.75
Cost (Rs)
100.00
0.00
100.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
100.00
than manufacturing
material handling,
etc. to be considered
C4.7
Totals
X
X
X
Qty
1
Material
Cost
Labor Cost
25,000.00
25,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ExtendedTotal
Vendor
Labor Cost
Extended
Material Cost
Fabricated
Item
Part Name
1 Engine
2 Engine Mountings
3 Drive Shaft
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25,000.00
Total:
25,000.00
Material Cost
(Subsystem)
Labor Cost (
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Item
Line
Material Total
Labor Total
Subassembly Total
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Item
Line
Material Total
Labor Total
Subassembly Total
Density
Unit
Amount
Weight
Rs/Unit
1
2
0.00
0.00
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Item
Line
Material Total
Labor Total
Subassembly To
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly To
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly To
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Item
Density
Unit
Amount
1
2
Weight
0.00
0.00
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
1
2
3
4
5
6
To Form A Line
Unit
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
1
2
3
4
5
6
To Form A Line
Unit
Weight
0.00
0.00
Rs/Unit
Subtotal:
Unit
Rs/Unit
Subtotal:
Weight
0.00
0.00
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Unit
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Weight
0.00
0.00
Rs/Unit
Subtotal:
Unit
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Item
Line
Material Total
Labor Total
Subassembly Total
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly Total
Item
Line
Density
Unit
Amount
1
2
Weight
0.00
0.00
Rs/Unit
Subtotal:
Labor:
Manufacturing Process
Amount
Unit
Rs/Unit
1
2
3
4
5
6
Subtotal:
To Form A Line
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subsystem Assembly Time (minutes)
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Material
Cost
Labor Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Totals
ExtendedTotal
Qty
Labor Cost
Vendor
Extended
Material Cost
Part Name
Fabricated
Item
1
2
3
4
5
6
7
8
9
Purchased
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
1
2
Labor:
Manufacturing Process
Amount
Weight
0.00
0.00
Unit
1
2
3
4
5
6
To Form A Line
Item
Line
Density
Unit
Amount
Weight
1
2
Labor:
Manufacturing Process
Amount
Unit
1
2
3
4
5
6
To Form A Line
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs/Unit
Subtotal:
Rs/Unit
Subtotal:
Material Total
Labor Total
Subassembly Total
Cost
Rs0.00
Rs0.00
Rs0.00
Cost
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00
Rs0.00