Demolition

Working Safely Together

2012 Copyright Heineken International

! PRE-CHECK
Work area and exclusion zones have been conrmed and communicated
Presence of overhead and underground lines, basements, ducts, pipelines,
voids and underground tank is known
All demolition equipment has been inspected
Dust suppression equipment is present
Fire-ghting measures and rst aid equipment are in place

DO

Use correct Personal Protective Equipment that is in good condition


Secure the area with barriers (e.g. red-white barrier tape)
Work only in the demarcated areas
Sign-in and out of site
Ask for more information about the demolition works if anything is unclear

Report unsafe behaviour and hazardous or unsafe situations immediately

DO NOT
Enter demolition areas unless you are authorised
Start work until you have been given permission
Handle or remove any materials if you suspect they could be hazardous or
cause personal injury
Mix or dispose demolition waste without approval
Use demolition equipment for other uses