We observe: All construction beginning with Foundation So we have The compacted soil to -0.20m Then, false floor level to +- 0.00 After level underlayment to +0.13 And finally finished floor level to +0.15 Indeed of the foundations of this the pile and we have continually column with a width of 0.25 m and a high of which it is a vertical load transmitting element of the slab lightened of 0.25 m of thikness and beam slab. To the left this cantilver of 0.60 m of width To the right and dow this stair That part of the hall And leads to the second floor Which is at a level of 2.90 m
-the counter , where the ultraceramic plate -aluminium sink -and cabinet 2- IN THE DINING ROOM, is observed -the table and chairs Behind this the glass dour siliding natural color with tempered glass of 8 mm of thickness Also the bathroom is observed the door, here the jamb and the panel is also the toilet and sink Then we have the stairs acceso to the floor two which starts from the hall. We observed the pace and contrapas of 12 cm the hall of the second floor is observed
Which it is a highly dynamic environment
Here we see three bedrooms abd two bathrooms To the left is the balcony And finally we have Doubl pitch-roof Next miss melissa.