80.

1:3:6(1cement:3coarsesand:6gradedstoneaggregate20mmnominalsize).

Code

Description

Unit

Quantity

Rate

Amount

Detailsofcostfor1cum.
MATERIAL:
0295

StoneAggregate(singlesize):20mmnominalsize

cum

0.7

1700.0

1190.0

0297

StoneAggregate(singlesize):10mmnominalsize

cum

0.24

1750.0

420.0

0982

Coarsesand(zoneIII)

cum

0.47

4950.0

2326.5

0367

PortlandCement(0.15674cum)
LABOUR:

tonne

0.22

8800.0

1936.0

0155

Mason(average)

Day

0.1

900.0

90.0

0114

Beldar

Day

1.63

240.0

391.2

0101

Bhisti

Day

0.7

760.0

168.0

0002

HirechargesofConcreteMixer0.25to0.40cum
withHopper

Day

0.07

2400.0

168.0

0012

Vibrator(Needletype40mm)

Day

0.07

500.0

35.0

TOTAL

6724.7

Costof1.0cum

6724.7

Say

6724.7/

Skilled

0.0

UnSkilled

391.2

SemiSkilled

258.0

Materials

5872.5

TotalAmount(ExcludeCPOH&WaterCharges)

6724.7/