You are on page 1of 3
35 8270 ws + 88+ 2609# 9H SHANXI eof a "ARCHITECTURE Vol. 35 No.27 Sep. 2009 + ELL + th aR a SIMS: 1009.6825(2009)27-0088-03 OT SF GR in iF Rit RRB Me EVAR TARA TEM RBA A- PRET A RRS TF 9-9] BL SE BR RE Ait EA BR a ER EL RSH AEA A RT A AEE AE TE aH OLE PRMRS-TUAS.6 1 SERRE SA FART Se IRCA EPFL SEB HK BUR Fak 4 EI J BEA A I IE TT STL UBC ES BK Steal, SCF ok PELE 1) 30 ok IE a AY EF: 2) SF Aon SR 1 A PIF 2 Bete sie HER ACRE SA ICAL AE Ss MS 1 EW aE A, EAE CBRE BR HE NL I HF AAT (BRIEF, At: Ae JB Me FA PVA EME RGEC ESA. ARLHS 1-H HT a ‘nF PLS ACA St A REF 3) MF AE LB Fc EH: SA TFC PFE Dra HM TALE AL RAED URAC ACN SF EDM AM HIRE TIA, ALPE HAA Sk A BEART 4) Fh 2 HF 38k PR BERG FF 5 9 a A NY SF AC SF UE PPE ATTIRE OER II Oo AF 0 BE IE 2 PANE MRM FE Re Pe AWE DSR A ROGER RE ACH, AF DK ORL 4 8 I C4 ETI) A ‘Acti SHCA TB eH Ak SL SE I ok A SORE IROL. DRE HESSE FA LOPE A IT A AS AE 1 A A A FAA AL DE ok 3k AREA TI. 3) SF OME A A OE 97 CHK HE SERIE CARED IE ITER I) Be EAA CT SEALED) PELE DME AOE AEE SAREE A. 3 PRR SF EPPA A 1) HH BUM) AT AM AM EMI FIERA. (EE MIRE AHO — 2 A BE TB CER, LTA RCH I ACH HIF AC A BALK 5 2) 4 RRA PARE SIN ERIE FAR As, SESE AHP FHT A ORC ‘$e Bm: 2009.05.20, Hem ARIA (1932. i836 (1981 UMAR: SA A ATO EP TE HA De FR FDA: FA A SRO SUT AT. BE SUROLRIE F OPE SFT PERT 3) y SBA A ATT FUR EOR, ELSI BE SBA BE AAR 3B OL IAS LE BE ‘SNE HAG UR, AB DFS OO A A A BE RHR, FEMS ICIP ACA He BEA EERE BE HB HR st, Ai a — set A TT EG SAAN RAED AK, RUE RSMAS, BABE HELE EW eR BS A BO RS — NT WSF A RUA LE EL A PH, SAU EAST AB 20m~ 40 am EET. FA ‘BENE 800 rnmm~ 1 000 rom, HF LT Js BATE Et Pa SU MET PTE A ACE PEEL, — I (BLAH EA AL 5 PS CEE EG eA HOA ok St BAP A i HT 2 AI RT. RR ACH A — AT AP CE AEE BIE A A AA AL HEN kB IR FLAN 1, Bl 2 Bm A HT A A Be AHP BE EE ACP AD BK. cateerm recceee 100 RNAI ROE $0E20 7 A See (GRENIER sweety flO“ ax + psa ao 20 tc 2 AIMED BRIE: Sh OER AI EMAAR CBE KEM 541002 KAREN ARTES TBR IDE RRR $4102 358 27 200997 aT BRIE ESF AK TE EL} AA EN 3 RS LS A WSEAS. 2) AT FRAP A». 3) A BN FHI A PRT: W RIN A TE Hs H aR mE EAH, OAR BR AEF) —FF Us Hot » Hon » Hom PBUH SAR ASOOALISE Es For. Fou « Fou SP = MRA Fk RE HME Jl: V ABARAT: ga Me Fok AE IL] 3~ 5) wae Ten ranean [Fo [ro [P ienate Hs REBIW>ABA] BS RECIWCARA] Fi FFE BE LA AS” a HA, — A Bei kf BR EE Me A SARA ACI 3) ES WW 5 ARICA HAR ESBS NE EY Cesk Sk Hy AAI tek BALL AB HB BV ox SERN A WRIT ARCANE AT Fe W, STINET. CAMB, MERAH BE AE Fete Ho ATF BPE MAKIED Poy 0 STARA BSL 4) RESON LW AB RCP I BY AASL Hoy HERE ARREARS Vip 0, “FEES SPELL W AER ASP Hoy ARSE PINE AE ENLEN IED Fon SMEAR IO EW HF RK OPE FE A RA, SEA aE Wo = W— W HRS) HC i BCR MFI ARG FP A I Foy «LATE MARS F MOE Jt Se es RB SP, LO EF AG ACTED) Fy Mme ESN ABS EY HUET AE RR I Pow (Pog + Fow) BG PARRA Ha HUIMEER ATER FA ta BC EW PASAT ARG ALANS 5 IN AI HALE TE AAPOR F ALUN ASE, PTDL EALIRELIN) M, Q fit BREF AMA NEMS REE, VGH ERR MARA FECAL W BPP AE ASI DEAT HL W/F> 1.05). SARS CCIM 5) SU A W APSR J 0 Yk CETTE HM ARE THE A AORN Vip ex CLA SFR ER W SUTRA RAS CULAR 3), SEALE AE AAR Foy Sk AMES NG SHUMKS: Hog. PAERENR IE, ANGE AD Fon E( Hon + Hom) AKIRA TE MUR TE IC F ot Re EW Pee AA 1 ARR FR PARAS, [FW ve pee ROLLS AF GP PIT + 89° DDRII OTE, (BSE MIRA BED IAS ( Hyg + Hom) HOR FLGLTE SFE BEF P ACIP ID 0 ABE ERS 8 W PEERED HD II Fom P= (For + Fou) — W. P= Fon (i For = W)o ALARA HEU OY I CR IL YC A I I TPREPL LE A,B TR 4 FRR REAL ME CCT Oe i BF ERAGE BM Ke AB TR LETT LA ATA, UCT RA IC AB DPR SOR, LG ABI 7 EAL BER A AAO 6, HS 7 BE in Ay FH A TE A eB I A AE SEACTR Jy SG 8 AE EE TE, TAR. Rt [ae [green Lim pane, Be RARERAREB ORE aK Ek Cy) qoreae name ri R7 ARERR weabiewet ariemiet | mms TT [Prac ToS [Fen tem TOS ge (Fa) AB i __ Fe) we se Foam PL Rs MES N RRL ho sear RAE ome RR SCRA ABECRR AUTOR, ATA ERP EF LA URE SG LT 11.4 2) AL PAR BSE O=N/F + M/W RH ARB HD , DOPE BEE UE A SUPER, SAAR EAT oR RIL A 5 TFT OR PA Re MR SPEAR RSE AH SRG SADR EAE RT 8 Ay BET 9} a 1) SHR AN RE SARS OT DUA FART CRE BBCI Sh Hop KAMEN Fog KAM PHL CON SERRATE HD Fy Bh TET AR SEL HRW PAE ERG Dy ET AP HH SH TE Bes 8 ns AH a A TN 21 AMR mao Eresia CeemR aR W Ss Caragaem) | " Sera Rar maa cpm aanan] Reaawn sak z aioe ana wag)" bane whee) perenne ee RR CaN ect Tae Eseiay ut Yo.35 89.27 +90 eos kon SHANI ARCHITECTURE Sen. 2009 1H -1009-6825(2009)27.0090.03 BSASRRRBEME TA HMR he eR LF BAT ROR AEM HE AE LO SAR A AA A A a Or A “HA RA Se AM BA A A A — TI IER OO RMN WEAK BERS ARK WAAR FSS TU44I SOMRARIRD:A ASCH MA HT: oP SLA EA eu) ETE ABAR SAA BA FLAY SD TRIER TIE aat]* ate Kees TAA, AA Be USAT LB aw BUT MOTE SR — HEAT TAN RINE EH FAT SR CTT OL. 1 BAAB HESS LEN HB tw yp dw tw, ko Cy, SEP Me M, S095: My MLE Ve Vy SWE AD ant axtayt * ayt DY” D ete 5 HEHE. 3, D ZARB RIBE, D = act ay se EUAN MRA HE, A = OCA: HIER. 1) RU A CAAA OB -w| =o = 0, 2 SEP CALI): aw 2) SE AEE HIED 0, BD ew 20RD, — AA REO SS BART NT OHTA BEAR ARATE TE. EINE IKIAL Soft [1] GB 50108-2001, 98 F ARERR ELS] YEE, FERRER 9 BP A RE LPR PAG [2] IG] 3-2002, th Rak aA tH HAE AMAL[S) AK Hop PEAKE Fog A, Alt Fog AH SKE [3] GB 50021-2001, # + rae ME[S). FERAL LUNA IER, EIA F Foy ARIEL, BL [4] GB/T 50279-1998, RA AAAS]. St RRA AE SUL OECTA MAE (S] JG] 72-2004, 366-2006 & ak 4.8 2 ALA AALS] FRIED) Fog RCRA ATOR. SABE HH 9 ia. Me [6] DBI/T 15-20-97, ARRAY CAH AMALS] SPELL R= PLARRGTUB, LAE) Fon HARE AIF (7) RAMP Fa RSNA RAM] RA BR PATI BHM QBS oa EW LAER ER AL MERA HS, 2001 111-114. MQ FRASER A A EAN Nea [8] Se AMR IH a EM) ae RAGS RR SS a A 591 sk deat 2001 9-16 WARM ETAT W AAT D Foy MIME [9] FHA RA A OR OR SLAM aR EM). ERT MQ AHL, SPR MATRA, BF LAT RIAL AEA eat, 2003 232-235. AREA RE BNM RES LB CMR: [10] AFORE. $8 An TAR SP RT aR A AA FAG. TURNTA ESM ILE 1. eM) ato ss 9 ak Nea ,2004;172-185. Anti-uplift problem of base room and the anti-uplift design YUAN Tlesyuan QIN Jun-ying Abstract: ‘Through listing the working form of underground water to underground project, the paper proposes the anti-uplift problems of un- derground water to underground project, and then introduces how to make the anti-uplift design of base room, it also points out that when the ‘base could not meet the anti-uplift stability situation, the anti-uplift anchor could be used as anti-uplift measure. ‘Key words: underground water, base room, anti-uplift, anti-uplift anchor, lateral pressure ‘HEIN ELMF 2009-04-30 ERED HECLOTS. ) Db USERRA AE AAP TRL YW ELAS: DBE BSE 710085 RUBTAC19S7. ), 38 ACE PERSONAE, BET ESE 710055, E_FE(198D. ),, PUEHP REISE TAPAS De SE 710082

You might also like