Welding Procedure Specification (WPS)


DAS OFFSHORE ENGG.PVT. LTD

lcope Of Work
)escription

FIRE WATER SYSTEM PARADIP CRUDE OIL TANK FARM LOCATION

>ioe-Pioe/Pioe-Fitti ns

/VPS No.

OCL/DAS/NOCPL/WPS-1

)QR No.

rocL/DAS/NOCPL/PQR-1

\PPLICABLE CODE

qNSt 8.31.4, APt 1104

]ASE MATERIAL

lS

3589 Gr. 410


L4" NB

)IAMETER

)iameter Range

7.92mm
5" to 36" NB

RANGE QUALIFIED

Ihk 3.96 mm to 15.8 mm

/t/ELD PROGRESSION

ROOT - UPHILL, OTHER PASSES - DOWNHILL

THICKNESS

FILLER MATERIAL

:5010,

No of Welder

WELDING PROCESS

JMAW

WELDING TYPE

MANUAL

ut/ELDING PROGRESSION

UPHILL

WELDING POSITION

5G

7018

DOWN HILL

NO. OF WELDER

3NE

NO. OF PASS & SEQUENCE

AS PER JOINT DESIGN

:LEANING METHOD

GRINDING(AFTER ROOT PASS) AND POWR BRUSH (AFTER ALL OTHER PASSES)

MIN. PREHEAT TEMPERATURE

10

MAx.INTERPASS TEMPERATURE

250'C

PWHT

NA

METHOD OF BACK GOUGING

NA

Remarks:

Visual Site lnspection along with 10% Radiography.

WELDING PARAMETERS
Welding Consumable
Pass

No

Weldint Parameters

WELD
Process

ravell

Welding

Welding

Speed

Position

Direction

AWS Class

Dia (mm)

Polarity

Amp. (A)

volt(v)

Remarks

(mm/Min)
ROOT

SMAW

Ador

6010

25

DCEP

80-120

23-27

105-210

6G

UP

HILV

Era/t{.{+ttt
HOT

SMAW

Ador

7018

32

DCEP

90-r.10

26-32

110-240

6G

UP

HILV

FLL

SMAW

Ador

7018

DCEP

80-r.10

26-30

L70-240

6G

UP

HILV

hF*'

Ar
\1.--

DOWN HILI.
CAP

SMAW

Ador

7018

DCEP

80-110

25-30

90-170

6G

UP

HILV

DOWN HILI

Prepared BylChecked By

Reiviewed

t&,

By

Approved by

..$o

XF".l'
Vx\

\5

q'Ar#',"
o9-f,1ry,
(.1 ^rrr