You are on page 1of 5

Cost of Poor Quality

by C. Vishwanathan on August 21, 2012 in Course Preparation, Guests Column, LSSBB, Quality Management, Trainer Articles
Like
Tweet

00

Tweet

Share
Share

Before we could start discussing anything, let me forewarn you that this article is going to be a long one, so take some time off your busy schedules reading it.
As the title says, Cost of Poor Quality it is; a term that is misconstrued badly in the Six Sigma fraternity. In fact the term Cost of Poor Quality (referred to
hereafter as COPQ), is used so commonly even in Non-Six Sigma companies that this often deserves more than a merit or a discussion.
I also duly acknowledge the contribution of Dr Joseph Juran and his The Quality Handbook, which helped me compose this article.
Simple things first COPQ is the cost or price a company pays when all of its products are not perfect. In other words, COPQ would go away completely if
the products are made perfectly and without any need to rework them whatsoever. So, in simple words, COPQ is a possible loss and we are looking up to
companies to avoid this possible loss to them.
Can COPQ be avoided completely?
Ignorance to this concept could lead most to ambitiously proclaim, I would want to reduce my COPQ to 0 Lovely thoughts and as the concept of COPQ is
unravelled to you slowly, you may say it is possible. But practically, it is like scaling the Great Wall of China on the back of an old turtle. You know you would
get there, but how much time God knows!! Companies may not be able to live with such uncertainty especially when it comes to costs and timelines.
COPQ is
The summation of three different costs
Costs of non-conformities
Cost of inefficient processes
Cost of lost opportunities for sales
You would find a lot of companies referring to the same concept as Economics of Quality and that is absolutely fine. It is just a difference in the way how the
concept is termed and used.
COPQ as used in companies
Companies prefer categorizing COPQ in four different categories and until date, this is the best way how COPQ could be broken down
Internal Failure Cost
External Failure Cost
Prevention Cost
Appraisal Cost
Internal Failure Cost
These costs are due to deficiencies discovered before delivery of the product, with the product not being able to meet stated and perceived needs of the
customer. These costs also include process inefficiencies and process losses (See rework) even if the customer needs are met.
Failure to meet customer needs Examples are Downgrading, scrap and rework
Inefficient processes Unplanned downtime, variability of product characteristics, Difference from benchmarked products
External Failure Cost
These costs are associated with deficiencies found after product is delivered to the customer. This cost will also factor in costs due to missed sales. How? For
example, you shipped 100 pens to the customer and the customer reports 10 pens defective. Chances are He wouldnt pay for these 10 pens. Assume
price per pen is $5. Means $50 lost due missed sales and this is nothing but an external failure cost for the company!

Failure to meet customer needs Warranty


Cost due lost sales Customer Defectives
Appraisal Cost
These are costs associated/incurred to meet the degree of conformance or determine the degree of conformance to customer requirements. You normally
associate appraisal costs with inspections, audits, and evaluation of stocks.
In collecting appraisal costs, what is decisive is the kind of work done and not the department name (the work may be done by chemists in the laboratory, by
sorters in Operations, by testers in Inspection, or by an external firm engaged for the purpose of testing). Also note that industries use a variety of terms for
appraisal, e.g., checking, balancing, reconciliation, review.
Prevention Cost
Prevention costs are incurred to keep the Appraisal and Failure Costs to a bare minimum. Goes to show that appraisal and failure costs are often treated as
direct indicators of how inefficient the process could be, in terms of passing defects on! Obviously no business would like to pass defects to the customer and
thats why Prevention costs kick in.
The compilation of prevention costs is initially important because it highlights the small investment made in prevention activities and suggests the potential for
an increase in prevention costs with the aim of reducing failure costs.
Experience also suggests, however, that continuing measurement of prevention costs can usually be excluded in order to (1) focus on the major opportunity,
i.e., failure costs, and (2) avoid the time spent discussing what should be counted as prevention costs.
This part of the section focuses on the question How much is it costing our organization by not doing a good job on quality? Thus we will use the term cost
of poor quality. Most (but not all) of the total of the four categories is the cost of poor quality (clearly, prevention costs are not a cost of poor quality.) Strictly
defined, the cost of poor quality is the sum of internal and external failure costs categories. But this assumes that those elements of appraisal costs
e.g., 100 percent sorting inspection or reviewnecessitated by inadequate processes are classified under internal failures. This emphasis on the cost of
poor quality is related to a later focus in the section, i.e., quality improvement, rather than just quality cost measurement.
An example
A table shown below has COPQ calculated for a nuts and bolts manufacturing company
Cost of quality
failures losses

Amount

Percent

Defective stock

$3,276

0.42%

Repairs to product

$73,200

9.45%

Collect Scrap

$2,800

0.36%

Waste Scrap

$1,87,300 24.18%

Consumer adjustments $4,08,201 52.69%


Downgrading products NC
Policy adjustment

NC

Total

$6,74,777 87.11%

Cost of appraisal
Incoming inspection

$23,700

3.06%

Spot check inspection $66,910

8.64%

$90,610
Cost of Prevention
Plant quality Control

11.70%

Engineering

$9,276

1.20%

Total

$9,276

1.20%

Grand COPQ

$7,74,663 100.00%

Okay, so the grand COPQ as on date is about $800,000, and as we can see, Failure costs contribute the most to the Cost of Quality (About 53%). Now, the
prevention costs, which normally should be a bit high to offset the failure costs, are seen at a low of about 1.2%. More focus is needed on part of the company
to install preventive mechanisms so that the failure costs are reduced.
Key COPQ Analysis
Failure costs are way too high and prevention costs are way too low. The company needs to invest more in preventive activities, which is thought of as an
effective way to reduce Failure costs.
The key categories are the failure cost elements because these provide the major opportunity for reduction in costs and for removal of the causes of customer
dissatisfaction. These costs should be attacked first. Appraisal costs are also an area for reduction, especially if the causes of the failures are identified and
removed so as to reduce the need for appraisal.
Hidden Costs
It is the worst nightmare for any OPEX guy or a Project Manager. While the COPQ categorization of different costs is elaborate enough to cover all the costs
associated with poor quality products, hidden costs is something that doesnt figure in any list. Some, and not all, of the hidden cost titles are summarized
below
Cost of redesign poor quality products
Cost of changing the process due to non-adherence to customer requirements
Cost of Software changes
Cost of downtime
Extra indirect charges included (Space charges)
Cost of errors in support processes and not really the core processes
COPQ interpretations
The failure costs: These equal zero when the product is 100 per cent good, and rise to infinity when the product is 100 per cent defective. The target thus
for the business is to maintain their defective goods at a minimum level, which would mean that the failure costs, a summation of internal and external
failure costs, are always at a minimum.
That being said, reducing failure costs would always mean investing more on the prevention costs. Is the organization ready for it?
Appraisal and Prevention Costs: These costs would be the lowest when 100% goods are defective (Note how they work exact the opposite of Failure
costs), and would be the highest for all the products to be perfect. Makes logical sense, doesnt it? If your process has a very low percentage of prevention
costs, it means you have not installed enough preventive mechanisms, and it obviously means, the chances of a defect to go through is really high. Same
logic applies to appraisal costs as well!
COPQ A summary
COPQ or COQ, Cost of Quality, is not the cost of producing Good quality products, which may be the first confusion for a lot of people when they hear about
this term. It is actually the price incurred by the company in making poor quality products.
COPQ is broadly categorized into three costs 1) Due non-conformities, 2) Due lost sales and 3) Due inefficient processes. When companies refer to these
costs, theyd stick with these categories or look at four categories Internal Failure Cost, External Failure Cost, Appraisal Cost and Prevention Cost.
Internal Failure Costs are costs incurred in pre-delivery non-conformities or poor processes. External Failure Costs are costs incurred in post-delivery nonconformities or lost sales.

Every company should decidedly try to reduce the failure costs, which more often than not, makes up for a huge amount in the end COPQ figure. High
prevention costs may not really worry the company a lot especially if the failure costs are low, but a call on the prevention costs would be taken by the top
leadership of the company.
At the end of the day, the COPQ number is merely a reflection of the quality of your processes and quality of your products and should be treated that way!
Author
C.Vishwanathan
Mr. C.Vishwanathan is a Lean Six Sigma Master Black Belt and a Lean Deployment Specialist, with over 1500 hours of experience in Training and 5000 hours
in Project consulting. He is currently the Head-Faculty, Chief Mentor and Co-Founder at The School of Continuous Improvement and a Faculty Trainer LSS
with Simplilearn.
Like
Tweet

00

0 Comments

Tweet

Share
Share

Simplilearn Blog

Login

Sort by Best

Share

Favorite

Start the discussion

Be the first to comment.

WHAT'S THIS?

ALSO ON SIMPLILEARN BLOG

Evaluation of Certifications Which is The Right One For


You?

The PRINCE2 methodology: In Conversation with Clark


Rodrigues

1 comment 8 months ago

2 comments 10 months ago

S Bartfast Very limited analysis of project management

Angel Great opportunity for achievers. Thank you Simplilearn.

certification and training courses available. PMP

Stakeholder Analysis Why is it important?

Are you truly Listening?

1 comment 2 months ago

2 comments a year ago

Amol Palekar Good Blog. A lot of projects are deemed

Sabyasachi Gupta Thanks Maria ..Hope you enjoyed reading the

unsuccessful just because project managers fail

article..

Subscribe

Add Disqus to your site

You might also like