Company Registration Number: 199201624D

Notice for Commencement of Earthworks within Vicinity of Telecommunication Cables


To :

Singapore Telecommunications Limited


Outside Plant Engineering
375 Tanjong Katong Road, #02-00
Blk 1 Katong Telecommunication Complex
Singapore 437132
Tel: 1800-3832480

Reference No.
(for Singtel use only)

1. Contractors Particulars
Name
_____________________________
NRIC No.
______________________________
Tel No.
_____________________________
Mobile No.
______________________________
Fax No.
_____________________________
Designation
______________________________
Company Name
_______________________________________________________________________________
Company Address
_______________________________________________________________________________
_______________________________________________________________________________

2. Site Supervisors Particulars


Name
_____________________________
Tel No.
_____________________________

NRIC No.
Mobile No.

______________________________
______________________________

3. Contracts Details
Principal
Tel No.
Contract Period From
Contract No.

Project Officer
Mobile No.
To
Works Order No.

______________________________
______________________________
______________________________
______________________________

NRIC No.
Mobile No.
Expiry Date

______________________________
______________________________
______________________________

_____________________________
_____________________________
_____________________________
_____________________________

4. TCDWs Particulars
Name
_____________________________
Tel No.
_____________________________
License No.
_____________________________

5. Works Details
Location of Proposed Earthworks
Duration From
Nature of Proposed Earthworks

______________________________________________________________________
_____________________________
To
______________________________
_____________________________________________________________________

Open trench Excavation

Soil Investigation

Sinking of earth rod, casing or tubes

Boring, dredging, jacking, leveling, pilling or tunneling

Others (Please specify)

______________________________________________________________________

Pipes Affected
_______________________________________
(No. of ways) identified by TCDW
Distance of work area boundary from cable plant
________________________________________________ meter
Depth of Earthworks
_________________________________________________________________________ meter
Actual Commencement Date (DD/MM/YY)
_____________________________________________________
Estimated Completion Date (DD/MM/YY)
_____________________________________________________

*
*

Is the work under S29(2)? Yes/No.


Already Commenced? Yes/No.
In the case of work carried out in the interest of public or private safety, described under S29(2), this form must be
submitted within 7 days after the earthwork had commenced.

6.

Declaration
(Please read carefully)

a.

Plant route plans have been obtained from Singtel

b.

Site survey / mapping done by TCDW for Singtels plant route relative to proposed
trial holes and earthworks position.

c.

Cable locations / route were marked out at site by TCDW.

d.

My staff and I have been briefed by TCDW on cable damage prevention.

e.

I have briefed the supervisor(s), workers and excavator operators on measures to


be taken to prevent damage to cable.

f.

I will stop all earthworks if telecommunication cables are damaged and immediately
inform Outside Plant Operations, Singtel.

I hereby declare that I know and understand my duties under the provision of the Telecommunication Act 1999 (and any
subsequent amendments thereto), and the information in this notice and any attached documents are true, correct and
complete to the best of my knowledge.
During the duration of the earthwork, I shall make myself readily contactable at the pager number given in this notice.

7.

______________________________________________

______________________________________________

Name and Job Title

Contractors Signature / Date & Company Stamp

Fees
A fee of $128.40 (every 1.5km) will be charged for each Notice For Commencement of Earthworks processed by
Singtel.

Please attach the following records together with your notice:


(i)

A sketch showing your proposed site plan with proposed trial holes and earthworks position relative to Singtels
plant route.

(ii) The work schedule of your project


(iii) The Cable Detection Drawing (from your TCDW).

Update on 27/01/2015