Ruang Lingkup
Penanggung Jawab
Wewenang
: Departemen Operation
Lokasi
: Area Boiler
Work Instruction:
1. Check all permit are cancelled.
Electrical System checking for 6.3KV.
a. Check Earthing Switch is not engaged. The same can be done by checking the position of the earthing
switch lock available at the front side of the panel. Also check the status of the earthing switch lamp. The
Earthing switch indication lamp should not glow.
b. Check whether the breaker is in service position. Check the indication Truck service position is ON
and the indication Truck Test position is OFF
c. Ensure that the "Local/Remote" selector switch is in Remote position if the equipment need to be started
from DCS/SCADA.
d. Ensure there is no alarm/operation indication in the relay.
e. ross check the status of the breaker and the earth switch from SCADA monitor
MEKI MUNAWAR
Prepared by
Approved by