Professional Documents
Culture Documents
Formwork
Formwork
Date:
o
o
o
o
o
o
o
Causes of Failures
Stripping time requirements
Tolerances ( ACI: 347)
Think About:
How the poor formwork planning affect cost & completion time of the project ?
Study the IS requirements for stripping time for the concrete formwork & tolerances permitted.