TECHNICAL SCHEDULES

No

Description

OFFICE

1.

Area

2.

Rooms

Employer's Requirements

Bidder's Data

20.00 x 24.00 m
2 floors
1st Floor
- Lobby/recepcionist
- Owner room (6 units)
- Meeting room
- Staff area (30 persons)
- Toilet and Pantry

Adjustable
6 x 3.00 x 3.00 m
4.00 x 6.00 m
16.00 x 10.00 m
Adjustable

2nd Floor
- Director room (3 units)

3 x 5.00 x 4.00 m

- General Manager room (2 units)

2 x 4.00 x 4.00 m

- BOD Waiting room


- Meeting room

Adjustable
7.00 x 5.00 m

- Meeting BOD

4.00 x 5.00 m

- BOD dining room

4.00 x 5.00 m

- Toilet and Pantry

5.00 x 5.00 m

- BOD Toilet

3.00 x 5.00 m

3.

Structure

Concrete Structure

4.

Footing structure

Precast Concrete Pile

5.

Column Structure

Composite Structure

6.

Roof

7.

Polynum

Zincalume
yes

WORKSHOP,WAREHOUSE AND HEAVY FABRICATION

1.

Area

2.

Top Elevation

3.

Over Head Crane Capacity

2 x 10 T

4.

Over Head Crane Elevation

+9.00 m

5.

Structure

6.

Footing structure

7.

Cladding and Roof

8.

Floor surfacing

20.00 x 108.00 m
+13.50 m

Steel Structure
Concrete Pile
yes, Zincalume
Reinforced Concrete
finishing floor hardener

9.

Sliding Door

MARINA/MOBILE HOIST (500 TONNES)

1.

Area

2.

Railway Structure

3.

Footing structure

4.

Floor surfacing

yes, Steel

Reinforced Concrete
Concrete Pile
Reinforced Concrete
finishing floor hardener

Rainway beam

steel structure

Remarks

D.

AREA REPAIR TUG BOAT

1.

Area

2.

Structure

3.

Footing structure

4.

Floor surfacing

5.

Tug Boat capacity

80.00 x 50.00 m
Steel Structure
Concrete Pile
Reinforced Concrete
quantity
length

4 units
24 metres
27 metres
29 metres
33 metres

gross tonage

E.

OPEN YARD (STORAGE AREA)

1.

Area

2.

Structure

3.

Footing structure

4.

Floor surfacing

500 T

40.00 X 20.00 m
Steel Structure
Concrete Pile
Reinforced Concrete

F.

GENSET ROOM & FUEL TANK

1.

Area

2.

Structure

3.

Footing structure

4.

Floor surfacing

5.

Genset Capacity

6.

Fuel Tank Capacity

20.00 x 20.00 m
Steel Structure
Concrete Pile
Reinforced Concrete
2x 650 Kva
12000 L

G.

AREA REPAIR BARGES (AIRBAG)

1.

Area

2.

Structure

3.

Footing structure

4.

Floor surfacing

5.

Barges capacity

150.00 x 200.00 m
Wooden pile
Permanent Unsealed
quantity

4 units

length

240 feet
270 feet
300 feet
330 feet

6.

Self Propelled Barges (SPB)


quantity
gross weight

4 units
10000 DWT
12000 DWT
15000 DWT

7.

Slipway

gradient
length

H.

OPEN YARD (SEMI FINISH BLOCK)

1.

Structure

2.

Footing structure

3.

Floor surfacing

2.5
adjustable

Steel Structure
Concrete Pile
Reinforced Concrete
finishing floor hardener

I.

OPEN YARD - EX REPAIR

1.

Structure

2.

Footing structure

3.

Floor surfacing

Steel Structure
Concrete Pile
Reinforced Concrete
finishing floor hardener

J.

SUBCONT COMPARTMENTS

1.

Structure

2.

Footing structure

3.

Floor surfacing

Steel Structure
Concrete Pile
Reinforced Concrete
finishing floor hardener

K.

WATER TREATMENT INSTALLATION

1.

Structure

2.

Footing structure

3.

Floor surfacing

Steel Structure
Concrete Pile
Reinforced Concrete
finishing floor hardener

L.

JETTY/LCT

1.

Length

2.

Width

3.

Footing structure

4.

Floor surfacing

20.00 m
4.00 m
Concrete Pile/ Sheet pile
Reinforced Concrete
finishing floor hardener

M.

MOSQUE

1.

Structure

2.

Footing structure

Wood Structure
Wooden pile

N.

ACCESS ROAD

1.

Length

2.

Finished with

3.

Access road surface type

Concrete pavement

4.

Parking/turning area surface type

Concrete pavement

6.00 m