Safety arrangements

o In case of Fire
o In case of Man overboard
o Personnel on board during launching
o Medical assistance available in case of injury

Removing objects from the jack cases that may interfere with jacking

Cranes secured

Lifeboats secured

Rescue Boat secured

Drill Floor equipment secured

Hull bottom work complete

Remove loose objects from the Derrick

Derrick equipment secured

Power available on the rig during launching

Skidding arrangements

Securing the rig while afloat

Jacking

Positioning the rig at the dock for optimal access

Rig access while the rig is at the dock (2 means of escape)

Air Gap at the dock