You are on page 1of 2

August 2016 LARE Grant Awards

Water Body (County)

Project

Grant Award

Beauty Creek (Porter)

Engineering feasibility of channel erosion control

$52,000

Blue River (Washington)

Watershed land treatment

$30,000

Cedar Creek (DeKalb)

Watershed land treatment

$26,000

Deep River (Lake)

Engineering feasibility study of dam removal

$25,000

Driftwood River (Bartholomew)

Watershed land treatment

$30,000

Eagle Creek (Boone)

Streambank stabilization

$100,000

Eel River (Wabash)

Watershed land treatment

$45,000

Fox Lake (Steuben)

Bank stabilization

$25,000

Iroquois River and Carpenter Creek (Jasper)

Watershed land treatment

$30,000

Lake Galbraith (Marshall)

Water quality monitoring

$15,000

Little River (Huntington)

Dam removal

$80,000

Loefler and Scott ditches (Gibson)

Watershed land treatment

$10,000

Metz Lateral (Big Creek) (Posey)

Streambank stabilization

$15,000

Mississinewa River (Grant)

Design for streambank stabilization

$20,000

Mississinewa River (Delaware and Randolph)

Watershed land treatment

$25,000

Ohio River (Posey)

Engineering feasibility for streambank stabilization

$20,000

Pigeon Creek (Gibson)

Water quality monitoring

$8,000

Pretty Lake (LaGrange)

Water quality monitoring

$12,000

Silver Creek, Neiman Creek, Loon Creek and Wabash River (Wabas Watershed diagnostic study

$38,000

Spy Run Creek (Allen)

Stream habitat enhancement

$100,000

St. Marys River (Allen)

Streambank stabilization

$100,000

Sugar Creek (Boone)

Watershed land treatment

$45,000

Sugar Creek (Clinton)

Watershed land treatment

$45,000

Tippecanoe River (Kosciusko)

Dam removal

$40,000

Trail Creek (LaPorte)

streambank stabilization

$64,000

Turkey Creek (Kosciusko)

Design for channel erosion control

$20,000

Turtle Creek (Sullivan)

Watershed land treatment

$30,000

Upper Tippecanoe River (Kosciusko)

Watershed land treatment

$45,000

Upper Tippecanoe River (Whitley)

Watershed land treatment

$45,000

Veale, Aikman and Hawkins creeks (Daviess)

Watershed land treatment

$45,000

Walnut Creek (Grant and Blackford)

Engineering feasibility for streambank stabilization

$20,000

Webster Lake (Kosciusko)

Bank stabilization on Kline Island

$41,000

Yellow River (Marshall)

Design for streambank stabilization

$50,000

Total = $ 1,296,000

You might also like