You are on page 1of 6

1 : South:: CPC rollout nationwide as per

attached PIP
Two Steps are of CPC Trial i.e SRB Over HSUPA & HSDPA are
completed in RNC 401 & RNC 402 , whereas in RNC 413 they
are planned , PIP is being followed and aligned as of today
RNCs

SRB Over HSUPA

SRB Over HSDPA

CPC Swtich Enabling

401

Done

Done

Planned

402

Done

Done

Planned

413

Planned

Planned

Planned

RNC 401 (SRB OVER HSUPA & SRB OVER HSDPA COMPLETED)

FIELD IMPROVEMENT
A part of VIP route was taken for the testing
32% of improvement has been observed after SRB over
HSUPA implementation
Pre

RNC 402(SRB OVER HSUPA & SRB OVER HSDPA COMPLETED)


Observations:
RAB HSDPA/HSUPA has been improved due to
CMP_DRD_SRBOVERH_SWITCH which is enabled on RNC
402. It is suggested to implement on RNC401 to improve PS
accessibility
DCR HSDPA/HSUPA and voice is more degraded after SRB
over HSDPA. Longer trend will be helpful in % degradation
Voice Accessibility is on its previous trend
CS/Multi RAB drops are following increasing trend
No CS/PS blocking has been observed
No gain or loss in CS/PS traffic observed
Mobility KPIs (SHO) are degraded after SRB over HSDPA
CPU load is same it was in the previous trend
UL CE consumption has been slightly increased while DL CE
consumption is on its old trend
CST is following its old trend
Couple of spikes have been observed in RTWP. Under
Observation

FIELD IMPROVEMENT RNC 402


A part of VIP route was taken for the testing
27% of improvement has been observed after SRB over
HSUPA implementation in more then 3Mbps samples

Pre HSUPA

Comparison

2 : South:: (HSDPA/IUR & BLER Opt) switches


response from PMCL.
HSDPA Over Iur:
Queries raised by PMCL and we are trying to response back with
Iur Utilization , multiple teams has been contacted to know the
actual bandwidth being Set between RNC 401 & RNC 402 over Iur,
Secondly PMCL has suggested to shift this Trial after CPC and
Garbled Voice feature completion , thus we would having only 1
working day before OMO .
Burst BLER HSDPA Optimization

Similarly the Sites being proposed for this Trial were evaluated on
31st May and now PMCL wants us to re-evaluate the Scope , which
is in progress and will be shared by 25th July COB

3 : South:: PS Precise power control feature


trial on RNC413
This feature is already implemented in South RNCs

4 : South:: OMO quality patches to be closed by


21st July

5 : South:: MAH society optimization to be


closed