ROSARIO MINE

MAN TAKRAF
KRUPP
EXISTING
FUTURE

115-CR-003
60 x 113

WEIGHT SCALE

115-BN-001
(655 T)

115-FE-201

115-ER-01

115-CV-202

Fixed with Jack

115-ER-02

115-CV-205
Winch

115-ER-05A

SURGE PILE
110,000 T
22,000 T LIVE

115-FE-202

115-FE-203

110-ER-05
115-CV-203

GRAVITY

115-ER-05B

120-BN-001
(200 T)

120-FE-202

120-FE-203
(FUTURE)

UJINA PLANT
110-CV-001
110-CV-002
110-CV-003

DATE

REV

CHK

03/01/03

LN

PRINTED: 12/15/03

COL-APP A-MATERIAL FLOW REV 0.VSD

MATERIAL FLOW OVERVIEW

UJINA ROSARIO TRANSITION


PROJECT
COLLAHUASI, CHILE

SHEET: 1/7

Control Philosophy - Appendix A

JOB : 229

CONVEYOR DYNAMICS, INC

This drawing is the property of Conveyor Dynamics Inc. It is loaned upon the express condition that it shall not be copied or reproduced in any manner, that it shall not be submitted to others for examination without
the consent of Conveyor Dynamics Inc., that it shall not be used in any other way detrimental to the interests of Conveyor Dynamics Inc. and that it shall be returned to Conveyor Dynamics Inc. upon demand.

115-CV-201