ANALISIS BIAYA OPERASI ALAT BERAT UNTUK GALIAN TANAH, ANGKUTAN DUMP TRUCK DAN PEMADATAN

JENIS ALAT
SATUAN PEMBAYARAN

: Excavator, Dump Truck, Buldozer, Roller Vibro dan Water Tanker


: Rupiah/jam

No.

A.
1.
2.
3.
4.
5.
6.
7.

U RAIAN

KODE

URAIAN PERALATAN
Peralatan
Merk / Tipe
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat

URAIAN ANALISA HARGA SATUAN

SATUAN

Jenis

36,000,000

90,000,000

91,878,750

10,500,000

0.26380

0.26380

0.26380

0.26380

0.26380

Rp/jam

110,874.08

42,735.19

106,837.98

109,068.22

12,464.43

Rp/jam

934.00

360.00

900.00

918.79

105.00

Rp/jam

111,808.08

43,095.19

107,737.98

109,987.01

12,569.43

BIAYA OPERASI PER JAM KERJA


Bahan Bakar
= (12%-15%) x Pw x Ms

Rp/jam

159,600.00

120,000.00

180,000.00

98,400.00

120,000.00

12.00%

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Rp/jam

99,750.00

75,000.00

112,500.00

61,500.00

75,000.00

2.50%

3.

Biaya bengkel

= (6,25% - 8,75%)

Rp/jam

29,187.50

11,250.00

28,125.00

28,712.11

3,281.25

6.25%

4.

Perawatan dan
perbaikan

= (12,5%-17,5%)

Rp/jam

58,375.00

22,500.00

56,250.00

57,424.22

6,562.50

12.50%

5.
6.

Operator
= (m orang/jam) x U1
Pembantu operator = (n orang/jam) x U2

M
L

Rp/jam
Rp/jam

10,842.86
9,114.29

10,842.86
9,114.29

10,842.86
9,114.29

10,842.86
9,114.29

10,842.86
9,114.29

Biaya Operasi (per Jam)

Rp/jam

366,869.64

248,707.14

396,832.14

265,993.47

224,800.89

Rp/jam

478,677.72

291,802.33

504,570.12

375,980.48

237,370.32

Mb
Ms
Mp

Liter
Liter
Liter

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

b. Asuransi, dll.
Biaya Pasti per Jam
C.
1.

G = (E + F)

D.

BIAYA OPERASI ALAT / JAM = (G + P)

E.
1.
2.
3.

LAIN - LAIN
Bahan Bakar Premium (non subsidi)
Bahan Bakar Solar
(non subsidi)
Minyak Pelumas

x
x
/
/

Water Tank Truck

93,400,000

3.

Roller Vibro

3000-4500 L
100.0
4,000.0
5.0
2,000
105,000,000

=(i x
((BC)
(1+i)
=
^A
=
p
x)/
x
D)/W
Biaya Pasti per Jam :
( (1+i)
a. Biaya Pengembalian Modal B/W
^A1)

Rp

Bulldozer

5-8 Ton
82.0
7.1
5.0
2,000
918,787,500

Faktor Angsuran Modal

Dump Truck

100-150 HP
150.0
5.0
2,000
900,000,000

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat

HP
Tahun
Jam
Rp

Excavator
(Standard)
80-140 HP
133.0
0.9
5.0
2,000
934,000,000

KETERANGAN

3-4 M3
100.0
4.0
5.0
2,000
360,000,000

B.
1.

Pw
Cp
A
W
B

Perhitungan Biaya Operasi Peralatan

Suku bunga
i = 10%

Asuransi
p = 0.2%

Koef. Biaya OP alat

LAMPIRAN A.11
CONTOH PERHITUNGAN CARA MEKANIS
(informatif)

1) CONTOH AHSP PENGGALIAN TANAH DI SITU/WADUK

ANALISIS PRODUKTIVITAS PENGGALIAN TANAH DI SITU/WADUK DENGAN EXCAVATOR DI PONTON 1,


HASIL GALIAN DIANGKUT DENGAN PONTON 2

ANALISIS BIAYA OPERASI ALAT BERAT PENGGALIAN TANAH DI SITU/WADUK

Contoh AHSP Penggalian tanah di Situ/waduk dengan Exacavator di Ponton 1, hasil galian diangkut dengan Ponton 2

JENIS ALAT
: Excavator, Ponton dan Buldozer
SATUAN PEMBAYARAN
: Rupiah/jam
No.

(2) Tanah Galian


di Waduk/Situ

Jarak angkut ponton 2


ke daratan 1 km

Stock pile hasil galian


diratakan oleh Buldozer

B.
1.

3.

AHSP Galian tanah di Situ/Waduk


Kode

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2
3

Peralatan
Biaya Operasi Excavator 1 (long arm) + Ponton 1
Biaya Operasi Excavator 2 (long arm)
Biaya Operasi Buldozer meratakan + perapihan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m 3 (D+E)

Satuan Koefisien

Harga Satuan
(Rp)

L.01
L.04

OH
OH

0.1626
75,900.00
0.0163
95,700.00
Jumlah Harga Tenaga Kerja

jam
jam
jam

0.0449
647,523.69
0.0327
599,495.44
0.0191
504,570.12
Jumlah Harga Peralatan

Jumlah
(Rp)

Biaya Pasti per Jam

2.

15% x D

Tenaga Kerja
Bahan

Uraian

Kode

Peralatan
Biaya Operasi Ponton 2

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m 3 (D+E)

KETERANGAN

NO

= (2.5%-3%) x Pw x Mp

Rp

Rp/jam

Bulldozer

80-140 HP
133.0
0.6
5.0
2,000
1,500,000,000

80-140 HP
133.0
0.8
5.0
2,000
1,725,000,000

120.0
0.0
5.0
2,000
225,000,000

100-150 HP
150.0
0
5.0
2,000
900,000,000

150,000,000

172,500,000

22,500,000

90,000,000

0.26380

0.26380

0.26380

0.26380

178,063.30

204,772.79

26,709.49

106,837.98

Suku bunga
i = 10%

II.
F

Rp/jam

1,500.00

1,725.00

225.00

Rp/jam

179,563.30

206,497.79

26,934.49

Asuransi
900.00 p = 0.2%

Rp/jam

159,600.00

159,600.00

144,000.00

180,000.00

Rp/jam

99,750.00

99,750.00

90,000.00

112,500.00

Rp/jam

46,875.00

53,906.25

7,031.25

28,125.00

6.25%

Rp/jam

93,750.00

107,812.50

14,062.50

56,250.00

12.50%

= (6,25% - 8,75%)

Perawatan dan
perbaikan

= (12,5%-17,5%)

Satuan Koefisien
4

jam

Harga Satuan
(Rp)

4.
5.

Operator
= (m orang/jam) x U1
Pembantu operator = (n orang/jam) x U2

M
L

Rp/jam
Rp/jam

10,842.86
9,114.29

10,842.86
9,114.29

10,842.86
9,114.29

10,842.86
9,114.29

Biaya Operasi (per Jam)

Rp/jam

419,932.14

441,025.89

275,050.89

396,832.14

12.00%

Jumlah Harga Bahan

15% x D

D.

BIAYA OPERASI ALAT / JAM = (G + P)

E.

LAIN - LAIN
Bahan Bakar Premium (non subsidi)
Bahan Bakar Solar
(non subsidi)
Minyak Pelumas

jam

2.
3.
4.
5.

Fk
Fk1
L

1.20
1.00
1.00

km

Faktor pengembangan tanah


Faktor pengembangan tanah lepas
Jarak angkut
Urutan kerja :
a. Lebar situ diperkirakan 2.0 km
b. Excavator 1 + Ponton 1 mengeruk / menggali tanah
dan dimuat ke Ponton 2.
c. Ponton 2 mengangkut tanah hasil galian ketepi situ
d. Excavator 2 menurunkan tanah hasil galian pada
Ponton 2 ke darat tempat timbunan hasil galian
e. Bulldozer menghampar, meratakan dan merapihkan

ALAT
a. Excavator 1 (Long Arm) + Ponton 1
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat

V
Fb
Fa

0.60
0.70
0.69

Waktu Siklus
Menggali, swing dan memuat ke ponton 2
Swing kembali dan Lain - lain

Ts1
T. 1
T. 2
Ts.1

0.40
0.25
0.65

Menit
Menit
Menit
Menit

Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk )

Q.1

b. Ponton 2.
Kapasits
Faktor Efisiensi Alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong

Rp/jam

599,495.44

647,523.69

301,985.39

504,570.12

Mb
Ms
Mp

Liter
Liter
Liter

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

10,000.00
10,000.00
30,000.00

Ts.2
T.1
T.2
T.3
T.4
Ts.2

Kap. Produksi/jam = ( V x Fa x 60 ) / ( Ts.2 x Fk )

Q.2

Koefisien Alat/m3 = 1 / Q.2

44,902.80

Uraian

Kode

Satuan Koefisien
4

Harga Satuan
(Rp)

Jumlah
(Rp)

Bahan

C
1

Peralatan
Biaya Operasi Ponton 2

Jarak rata - rata.

m3
Pemuatan sedang
Kondisi operasi alat sedang
Pemeliharaan mesin baik

22.29

m3/jam

0.0449

jam

10.00
0.75
5.00
7.00

Km/jam
Km/jam

12.00
8.57
26.92
1.00
48.49

Menit
Menit
Menit
Menit
Menit
Menit

7.73

m3/jam

0.1293

V
Fb
Fa

0.60
0.90
0.69

m3
Baik

jam

m3

Waktu Siklus
Menggali, swing dan membuang ke tanggul
Swing kembali dan Lain - lain

Ts3
T. 1
T. 2
Ts.3

0.36
0.25
0.61

Menit
Menit
Menit
Menit

Kap. Produksi/jam = ( V x Fb x Fa x 60 ) / ( Ts.1 x Fk )

Q.3

30.54

m3/jam

0.0327

jam

Koefisien Alat/m3 = 1 / Q.3


d. Bulldozer 100 - 150 HP
Jarak gusur
Lebar blade
Tinggi blade
Faktor blade
Kecepatan maju ( 0.75 x 3.7 km/jam = 2.8 km/jam)
Kecepatan mundur ( 0.85 x 8.2 km/jam = 6.97 km/jam)
Waktu ganti persneling
Faktor Efisiensi Alat

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m 3 (D+E)

Jumlah Harga Bahan


jam

0.2390
301,985.39
Jumlah Harga Peralatan
15% x D

72,174.51
72,174.51
72,174.51
10,826.18

AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 5 km)

No
1
A

Tenaga Kerja

Bahan

D
Lb
Tb
Fb
F
R
Z
E

50.00
3.415
1.15
0.80
46.67
116.17
0.05
0.75

Pemuatan ringan
Kondisi operasi alat sedang
Pemeliharaan mesin baik

m
m
m

Uraian

Kode

Satuan Koefisien
4

Harga Satuan
(Rp)

Jumlah
(Rp)
7

Jumlah Harga Tenaga Kerja

Penggusuran sedang

Baik

3.61

m3

Waktu siklus = D/F + D/R + Z

Ts.4

1.55

Menit

Produksi menggusur tanah = ( q x 60 x E x Fk1 )/Ts4

Q4

104.771

m3

Produksi perataan tanah = ( q x 60 x E x Fk1 )/ 2Ts


( diperlukan 2 kali bolak balik )

Q4

52.385

m3

Koefisien Alat/m3 = 1 / Q4
Jumlah Harga Bahan

C
1

Peralatan
Biaya Operasi Ponton 2

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m (D+E)

0.3487
301,985.39
Jumlah Harga Peralatan
15% x D

0.0191

III.
jam

105,302.30
105,302.30
105,302.30
15,795.35
121,097.70

Tenaga.
a. Di Excavator 2 di darat menurunkan hasil galian
dari ponton 2 ke daratan
Produksi yang menentukan: 3 buah Ponton 2
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor

Q.1
Q.1'
P
M

23.20
162.42

m3/jam
m3/hari

2.00
0.20

OH
OH

0.0862
0.0086

jam
jam

52.39
366.70

m3/jam
m3/hari

AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 10 km)

No

Uraian

Kode

Satuan Koefisien
4

Harga Satuan
(Rp)

Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'

Jumlah
(Rp)
7

Tenaga Kerja
Jumlah Harga Tenaga Kerja

Bahan

C
1

Peralatan
Biaya Operasi Ponton 2

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m 3 (D+E)

Jumlah Harga Bahan


jam

0.6230
301,985.39
Jumlah Harga Peralatan
15% x D

188,136.90
188,136.90
188,136.90
28,220.53
216,357.40

b. Di Stock pile meratakan dan merapihkan dg


Buldozer di daratan
Produksi yang menentukan: Buldozer
Produksi / hari = Tk x Q.1
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1'
- Mandor : ( Tk x M ) : Q.1'

Q.1
Q.1'
P
M

4.00
0.40

0.0764
0.0076

D.65 E-8

m/menit
m/menit
Menit

83,000.70

Kap. Per siklus = Tb2 x Lb x Fb

1
A

KETERANGAN

Tenaga Kerja

1.5

V
Fa
v.1
v.2

Waktu Siklus :
Waktu tempuh isi
= ( L : v.1 ) x 60
Waktu tempuh kosong = ( L : v.2 ) x 60
Muat
= ( V : Q.1 ) x 60
Lain-lain

c. Excavator 2 (Long Arm)


Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat

39,045.94
39,045.94
39,045.94
5,856.89

Jumlah Harga Tenaga Kerja

1.4

SATUAN

7.00

2.50%

Jumlah Harga Tenaga Kerja

0.1293
301,985.39
Jumlah Harga Peralatan

KOEF

Tk

Koefisien Alat/m3 = 1 / Q.1


3.

1.
2.
3.

Jumlah
(Rp)

KODE

107,737.98

Biaya bengkel

U R A IA N
ASUMSI

1. Jam kerja efektif per hari

AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 3 km)

No
1
A

Pelumas

HP
Tahun
Jam
Rp

Ponton-2

83,031.90

C
1

1.3

G = (E + F)

BIAYA OPERASI PER JAM KERJA


Bahan Bakar
= (12%-15%) x Pw x Ms

x
x
/
/

Pw
Cp
A
W
B

Excavator 1+
Ponton-1

AHSP Angkutan material atau hasil galian dengan ponton (jarak angkut 1 km)

1
A

C.
1.

29,046.96
19,629.21
9,631.88
58,308.04
72,201.65
10,830.25

Untuk jarak angkut material atau hasil galian perlu disesuaikan dengan kondisi di lapangannya, dalam contoh ini disajikan
untuk jarak angkut 1 km, 3 km, 5 km dan 10 km seperti berikut ini:

=(i x
((BC)
(1+i)
=
=
^A
p x)/
x
D)/W
B/W
( (1+i)
^A1)

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal
b. Asuransi, dll.

12,337.95
1,555.66
13,893.61

Jumlah Harga Bahan

No

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
Faktor Angsuran Modal

1.2

Excavator 2
(Long Arm)

URAIAN PERALATAN
Jenis Peralatan
Merk / Tipe
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat

(4) Excavator 2
di darat menurunkan hasil galian
dari ponton 2 ke daratan

Uraian

Perhitungan Biaya Operasi Peralatan

I.
A.
1.
2.
3.
4.
5.
6.
7.

(3) Ponton 2 mengangkut


hasil galian ke darat

No

KODE SATUAN

(1) Excavator 1
di atas Ponton 1

1.1

U R A IA N

URAIAN ANALISA HARGA SATUAN

JENIS PEKERJAAN
: GALIAN TANAH / PENGERUKAN SITU
JARAK ANGKUT
: 1,0 Km
SATUAN PEMBAYARAN : M3

orang
orang

jam
jam

DAFTAR KUANTITAS DAN HARGA


PERKIRAAN BIAYA (ENGINEERING ESTIMATED)
Pekerjaan :
Lokasi
:
Tahun Angga:
Kabupaten :

Rehabilitasi DR. Sungai Tunjang 250 ha Kabupaten Barito Kuala


Desa Tunjang
2013
Barito Kuala - Kalimantan Selatan

No

Uraian

Satuan

I
1
2
3
4

PEKERJAAN PERSIAPAN
Administrasi teknik
Pembuatan papan nama pekerjaan
Mobilisasi dan demobilisasi Peralatan dan SDM
Pengukuran Kembali (Uitzet, MC0%MC100%)
a. 1 m2 Uitzet trase saluran
b. Pasang 1 m' profil melintang galian tanah

ls
bh
ls
m'
m'

Kode
Harga Satuan
Quantity
(AHSP) Pekerjaan (HSP)
Pekerjaan
( Rp. )
4
5
6

LA.03
L.04
T.04
T.05

Sub-Total I :
II
A
1
2
3
-

PEKERJAAN BOX CULVERT 1


PEKERJAAN TANAH
Pembersihan Lapangan
Pembersihan dan striping/kosrekan
Galian Tanah Biasa
Timbunan dan Pemadatan
Timbunan tanah
Pemadatan Tanah
Timbunan Pasir
Pemadatan Pasir

Harga Total
(Rp.)
7

m2
m3

T.01
T.06b

m3
m3
m3
m3

T.14a
T.14b
T.14c
T.14d

B
1

PEKERJAAN PASANGAN
Tiang Pancang Kayu Galam dia 10-12 cm

m1

P.07.a

C
1
2
3
4
5

PEKERJAAN BETON
Beton fc = 9,8 Mpa (K125)
Beton fc = 19,3 Mpa (K225)
Pekerjaan Besi Beton Biasa
Bekisting Beton Biasa tidak Ekspose
Vibrator

m3
m3
kg
m2
m3

B.03b
B.07b

D
1
2

PEKERJAAN DEWATERING
Kistdam pasir/tanah uk. 43 cm x 65 cm
Kerangka kayu kistdam pasir/tanah

bh
m3

Sub-Total II :

REKAPITULASI BIAYA
Pekerjaan :
Lokasi
:
Tahun Angga:
Kabupaten :

Rehabilitasi DR. Sungai Tunjang 250 ha Kabupaten Barito Kuala


Desa Tunjang
2013
Barito Kuala - Kalimantan Selatan

No.

Harga Satuan
(Rp.)
(b)

Uraian/ Jenis Pekerjaan


(a)

1
2

PEKERJAAN PERSIAPAN
PEKERJAAN BOX CULVERT 1

TOTAL 1 s/d 7
PPN 10%
JUMLAH
DIBULATKAN

(A)
(B)
(C)
(D)

:
:
:
:

Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

LAMPIRAN A.10
DAFTAR HSP-SDA, PROVINSI KALIMANTAN SELATAN

No
1
A
1

2
UMUM
PEKERJAAN TANAH (T.xx)
** Semua pekerjaan tanah sudah termasuk perataan dan perapihan

1.1 PEKERJAAN PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH


1.1.1 1 m2 Pembersihan dan striping/kosrekan
1.1.2 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm
1.1.3 Cabut 1 tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul kayu dan akar-akarnya
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
1.2.10
1.2.11
1.2.12
1.2.13
1.2.14
1.2.15
1.2.16
1.2.17
1.2.18

1.2.27
1.2.28
1.2.29
1.2.30
1.2.31

GALIAN TANAH
1 m2 Uitzet trase saluran
Pasang 1 m' profil melintang galian tanah
1 m3 Galian tanah biasa sedalam < 1 m
1 m3 Galian tanah biasa sedalam s.d. 2 m
1 m3 Galian tanah biasa sedalam s.d. 3 m
1 m3 Galian tanah biasa dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian tanah berbatu sedalam < 1 m
1 m3 Galian tanah berbatu sedalam s.d. 2 m
1 m3 Galian tanah berbatu sedalam s.d. 3 m
1 m3 Galian tanah berbatu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian batu sedalam < 1 m
1 m3 Galian batu sedalam s.d. 2 m
1 m3 Galian batu sedalam s.d. 3 m
1 m3 Galian batu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1 m3 Galian tanah cadas atau tanah keras sedalam < 1 m
1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 2 m
1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 3 m
1 m3 Galian tanah cadas atau tanah keras dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman
1m
1 m3 Galian lumpur sedalam < 1 m
1 m3 Galian lumpur sedalam s.d. 2 m
1 m3 Galian lumpur sedalam s.d. 3 m
1 m3 Galian tanah lumpur dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
1m3 Galian pasir untuk fondasi bangunan sedalam s.d 1m
1m3 Galian pasir untuk fondasi bangunan sedalam s.d 2m
1m3 Galian pasir untuk fondasi bangunan sedalam s.d 3m
1m3 Galian pasir untuk fondasi bangunan dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman
1m
Contoh 1m perkuatan dinding galian untuk 1 m' paling bawah, menggunakan Baja INP-10 dan Balok Kayu 8/12
Contoh 1 m penambahan setiap tinggi 1 m' perkuatan dinding galian, menggunakan Tiang INP-10 dan Balok Kayu 8/12
Contoh 1 m perkuatan dinding galian dengan Turap untuk 1 m' paling bawah, dg turap INP-8
Contoh 1 m perkuatan dinding galian dengan Turap INP-8 untuk setiap penambahan tinggi 1 m'
Peledakan batuan

1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.3.7
1.3.8
1.3.9
1.3.10
1.3.11
1.3.12
1.3.13
1.3.14
1.3.15

PEKERJAAN TIMBUNAN DAN PEMADATAN


1 m3 Timbunan tanah atau urugan tanah kembali
1 m3 Pemadatan tanah
1 m3 Timbunan pasir sebagai bahan pengisi
1m3 Pemadatan pasir sebagai bahan pengisi
Mengangkut 1 m3 hasil galian dengan jarak angkut > 3m s.d. < 5 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 5 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 10 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 30 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 100 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 200 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 300 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 400 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 500 m
Mengangkut 1 m3 hasil galian > 500m untuk setiap penambahan jarak angkut 100 m

1.2.19
1.2.20
1.2.21
1.2.22
1.2.23
1.2.24
1.2.25
1.2.26

Satuan

Kode
(AHSP)

m2
m2
pohon

T.01
T.02
T.03

5,897.43
7,454.01
38,058.10

m'
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

T.04
T.05
T.06a
T.06b
T.06c
T.06d
T.07a
T.07b
T.07c
T.07d
T.08a
T.08b
T.08c
T.08d
T.09a
T.09b
T.09c
T.09d

2,840.04
25,916.63
55,337.55
66,346.09
74,700.78
24,867.12
156,077.97
204,878.25
185,466.83
38,031.08
383,257.81
419,821.88
456,680.81
99,581.63
142,269.38
156,226.63
166,842.00
29,235.30

m3
m3
m3
m3
m3
m3
m3
m3

T.10a
T.10b
T.10c
T.10d
T.11a
T.11b
T.11c
T.11d

81,875.99
119,914.41
152,350.28
9,829.05
65,166.60
78,140.95
88,461.45
9,829.05

m3
m'
m'
m'
m3

T.12a
T.12b
T.12c
T.12d
T.13

1,153,925.18
940,809.66
564,713.25
408,645.60

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

T.14a
T.14b
T.14c
T.14d
T.15a.1)
T.15a.2)
T.15a.3)
T.15a.4)
T.15a.5)
T.15a.6)
T.15a.7)
T.15a.8)
T.15a.9)
T.15a.10)
T.15a.11)

Uraian

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5

32,435.87
57,770.25
315,316.20
33,798.50
23,011.36
24,867.12
26,537.30
33,032.44
39,156.43
55,672.65
88,148.36
120,624.08
153,099.79
180,936.11
32,661.29

PEKERJAAN PASANGAN
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6

Pasangan batu dengan mortar jenis PC-PP (1 m3)


Mortar tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
Mortar tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
Mortar tipe O (mutu PP tertentu setara dengan campuran 1 PC:5 PP)
Bongkar 1 m3 pasangan batu
1 m3 Persiapan pemanfaatan kembali material batu dari bekas bongkaran pasangan batu

m3
m3
m3
m3
m3
m3

P.01a
P.01b
P.01c
P.01d
P.01e
P.01f

1,375,390.80
1,285,690.80
1,215,701.80
1,165,193.80
226,399.93
28,570.60

2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5

1 m3 Pasangan Bata merah


Mortar tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
Mortar tipe O (mutu PP tertentu setara dengan campuran 1 PC:5 PP)
Mortar campuran 1 PC:6 PP
Bongkar 1 m3 pasangan bata merah

m3
m3
m3
m3
m3

P.02a
P.02b
P.02c
P.02d
P.02e

1,146,108.40
1,096,232.90
1,069,265.40
1,059,651.40
95,774.30

2.3 Pekerjaan siaran dengan mortar jenis PC-PP (1 m2)


2.3.1 Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
2.3.2 Siaran dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)

m2
m2

P.03a
P.03b

61,441.74
59,820.24

2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6

m2
m2
m2
m2
m2
m2

P.04a
P.04b
P.04c
P.04d
P.04e
P.04f

65,353.47
61,361.24
59,039.85
83,888.31
81,289.87
76,916.37

Pekerjaan plesteran dengan mortar jenis PC-PP (1 m2)


Trasraam tebal 1 cm, dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
Trasraam tebal 1,5 cm, dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)

Satuan

Kode
(AHSP)

m3

P.05

bh

P.06a.1.a

1,805,898.36

bh

P.06a.1.b

1,832,399.02

bh

P.06a.1.c

2,503,439.03

bh

P.06a.2.a

2,659,717.82

bh

P.06a.2.b

2,696,787.72

bh

P.06a.2.c

3,661,800.68

bh

P.06a.3.a

3,509,599.27

bh

P.06a.3.b

3,561,176.42

bh

P.06a.3.c

4,824,994.05

bh

P.06a.4.a

1,084,470.24

bh

P.06a.4.b

1,094,900.80

bh

P.06a.4.c

1,565,575.16

bh

P.06a.5.a

1,599,804.16

bh

P.06a.5.b

1,622,082.36

bh

P.06a.5.c

2,229,082.95

bh

P.06a.6.a

2,110,732.77

bh

P.06a.6.b

2,146,133.74

bh
m2

P.06a.6.c
P.06a.7

2,929,256.66
421,055.25

bh

P.06b.1.a

2,762,214.62

bh

P.06b.1.b

2,877,513.62

bh

P.06b.2.a

3,175,316.28

bh

P.06b.2.b

3,374,896.02

bh

P.06b.3.a

3,660,483.12

bh

P.06b.3.b

3,691,776.69

m2

P.06b.4

430,884.30

m
m
m
m3

P.07.a
P.07.b
P.07.c
P.07.d

17,760.14
19,516.19
24,316.14
28,997.71

2.8 Pasangan batu muka dan batu candi


2.8.1 Batu muka (1 m2)
2.8.2 Batu candi (1 m2)

m2
m2

P.08
P.08a
P.08b

197,621.98
247,071.98

2.9
2.9.1
2.9.2
2.9.3

Pasangan Geotekstil
Pemasangan Geotekstil (1 m2) Tipe-A
Pemasangan Geotekstil (1 m2), Tipe-B
Pemasangan Geotekstil (1 m2), Tipe-C

m2
m2
m2

P.09a
P.09b
P.09c

84,480.15
168,909.24
313,497.36

2.10

Bar Screen/saringan kasar (1 buah)

bh

P.10

461,805.50

2.11

1 buah ambang ukur pada bangunan pengukur dan/atau pengatur

No

Uraian

2.5
2.6
2.6.1
2.6.1.1
a)
b)
c)
2.6.1.2
a)
b)
c)
2.6.1.3
a)
b)
c)
2.6.1.4
a)
b)
c)
2.6.1.5
a)
b)
c)
2.6.1.6
a)
b)
c)
2.6.1.7

Pasangan Batu Kosong (1 m3)


Pasangan batu bronjong kawat (SNI 03-0090-1998)
Pasangan batu bronjong kawat Bentuk I
Bentuk I, Tipe A Bronjong kawat uk. L=2,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
Bentuk I, Tipe B Bronjong kawat uk. L=3,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
Bentuk I, Tipe C Bronjong kawat uk. L=4,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
Bentuk I, Tipe D Bronjong kawat uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
Bentuk I, Tipe E Bronjong kawat uk. L=3,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
Bentuk I, Tipe F Bronjong kawat uk. L=4,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 80 x 100mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 100 x 120 mm;
Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06a

2.6.2 Pasangan bronjong kawat Bentuk II


2.6.2.1 Bentuk II, Tipe G Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,17 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
a)
ukuran lubang heksagonal 60 x 80mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
b)
ukuran lubang heksagonal 80 x 100 mm;
2.6.2.2 Bentuk II, Tipe H Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,23 m berisi batu kali/belah (buat sendiri)
a)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
ukuran lubang heksagonal 60 x 80mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
b)
ukuran lubang heksagonal 80 x 100 mm;
2.6.2.3 Bentuk II, Tipe I Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,30 m berisi batu kali/belah (buat sendiri)
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm,
a)
ukuran lubang heksagonal 60 x 80mm;
Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm,
b)
ukuran lubang heksagonal 80 x 100 mm;
2.6.2.4 1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06b
2.7
a)
b)
c)
d)

Cerucuk dan Pemasangan Modul Bronjong


1 m panjang cerucuk kayu/dolken diameter 8 cm 10 cm
1 m panjang cerucuk bambu diameter 8 cm 10 cm
1 m panjang cerucuk tiang beton diameter 10 cm 12 cm
Pemasangan modul 1m3 bronjong kawat menjadi struktur krib sungai

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
576,960.75

bh

P.11

239,172.69

2.12 Pasangan 1m2 Lempengan Rumput


2.12.1 Penanaman rumput lempengan
2.12.2 Pembabadan rumput

m2
m2

P.12a
P.12b

12,359.05
9,426.07

2.13 Pekerjaan Pantai


2.13.1 Penanaman 1 pohon Bakau
2.13.2 Matras Bambu

m2
m2

P.13a
P.13b

9,008.82
128,610.25

2.14
2.14.1
2.14.2
2.14.3
2.14.4

bh
bh
bh
bh

P.14a
P.14b
P.14c
P.14d

34,953.47
82,796.55
124,685.24
262,181.43

Pasangan Armor
Pembuatan 1 bh Kubus Beton ukuran 30 x 30 x 30 cm
Pembuatan Kubus Beton ukuran 40 x 40 x 40 cm
Pembuatan 3B: Blok Beton Bergigi
Pembuatan Blok beton berat 0,5 ton Quadripod, tetrapod, dolos, tribar dll.

No

Satuan

Kode
(AHSP)

3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

4
P.14e
P.14f
P.14g
P.14h
P.14i
P.14j
P.14k
P.14l
P.14m
P.14n
P.14o
P.14p
P.14q

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
408,131.50
297,943.65
391,497.61
409,825.50
445,119.00
472,363.65
485,646.15
507,577.80
512,890.80
518,203.80
526,173.30
548,104.95
553,417.95

bh
bh

P.15a
P.15b

19,658.10
1,064,384.35

Uraian

1
2.14.5
2.14.6
2.14.7
2.14.8
2.14.9
2.14.10
2.14.11
2.14.12
2.14.13
2.14.14
2.14.15
2.14.16
2.14.17

2
Pembuatan Blok beton berat 0,75 ton Quadripod, tetrapod, dolos, tribar dll.
Pembuatan Blok beton berat 1,0 ton Quadripod, tetrapod, dolos, tribar dll.
Pemasangan armor per-1 m3
Pasangan 1 m3 batu 1kg - 3 kg
Pasangan 1m3 batu 3 kg - 5 kg
Pasangan 1m3 batu 5 kg - 10 kg
Pasangan 1m3 batu 10 kg - 30 kg
Pasangan 1m3 batu 30 kg - 50 kg
Pasangan 1m3 batu 50 kg - 100 kg
Pasangan 1m3 batu 100 kg - 200 kg
Pasangan 1m3 batu 200 kg - 300 kg
Pasangan 1m3 batu 300 kg - 400 kg
Pasangan 1m3 batu 400 kg - 500 kg

2.15 Pasangan Krib laut


2.15.1 Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai (1 buah)
2.15.2 Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c= 7,4MPa(K-100)
2.16

Pasangan Pipa Suling-suling (1 m')

m'

P.16

70,573.49

2.17

1 m' Peilskaal/Mistar duga muka air

m'

P.17

446,520.23

PEKERJAAN PEMBUATAN BETON


Pekerjaan 1 m3 beton untuk lantai kerja (bedding)
Pekerjaan 1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49 (Molen)
Pekerjaan 1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48 (Manual)
Pekerjaan 1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48 (Molen)
Menggunakan Ready Mixed dan Pompa Beton
1 m beton menggunakan bahan aditif

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

B.01
B.02a
B.02b
B.03a
B.03b
B.04a
B.04b
B.05a
B.05b
B.06a
B.06b
B.07a
B.07b
B.08a
B.08b
B.09a
B.09b
B.10a
B.10b
B.11a
B.11b
B.12a
B.12b
B.13.a
B.13.b

Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikan campuran beton setiap kenaikan vertikal
4 m dan jarak horizontal setiap 25 m ke tapak pengecoran
1 m3 beton dicorkan pada tapak berjarak < 10 m atau dengan ketinggian/kedalaman < 1 m, secara manual
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), secara manual
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan pompa beton
Penggunaan vibrator
Tenaga kerja manual + vibrator
1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal), manual
1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal), menggunakan pompa beton

m3
m3
m3
m3
m3
m3
m3

B.14.a
B.14.b.1)
B.14.b.2)
B.15a
B.15b
B.16a
B.16b

40,299.11
49,145.25
47,258.10
40,068.88
64,641.50
24,572.63
47,258.10

100 kg
100 kg
100 kg

B.17
B.18
B.19

9,820.03
29,591.23
46,407.89

100 kg
100 kg
100 kg
100 kg

B.20a
B.20b
B.20c
B.20d

40,492.65
29,810.30
46,242.65
50,267.65

PEKERJAAN BETON (B.xx)


3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.1.11
3.1.12
3.1.13
3.1.14
3.1.15
3.1.16
3.1.17
3.1.18
3.1.19
3.1.20
3.1.21
3.1.22
3.1.23
3.1.24
3.1.25
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.3
3.3.1
3.3.2
3.3.3
3.3.4
a.
b.
c.
d.

PEKERJAAN PEMBESIAN BETON


Pembesian 100 kg dengan besi polos atau ulir
Pembesian 100 kg jaring kawat (wire mesh)
Pembesian 100 kg kabel prestressed polos/strand
Penambahan koefisien untuk mengangkut/menaikkan 100 kg tulangan setiap kenaikan vertikal 4m atau jarak horizontal setiap 25
m ke tapak pemasangan
Secara manual (kenaikan 4 m)
secara mekanis (penambahan jarak horizontal 10m s.d 25m)
secara Mekanis (setiap penambahan jarak horizontal 25m)
Mekanis (kenaikan setiap 4m)

963,666.13
1,002,760.33
1,075,219.13
1,056,257.74
1,128,628.50
1,098,368.30
1,170,739.07
1,148,032.61
1,220,436.39
1,195,635.06
1,268,038.84
1,230,958.56
1,303,329.32
1,254,622.88
1,326,993.65
1,295,115.78
1,367,486.55
1,307,778.07
1,380,148.84
1,408,696.61
1,469,097.94
1,425,190.53
1,485,591.86
1,182,530.63
55,200.00

3.4
3.4.1
3.4.2
3.4.3

PEKERJAAN PEMBUATAN/PENYEDIAAN BEKISTING BETON


Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Pekerjaan 1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm (tanpa perancah)

m2
m2
m2

B.21
B.22
B.23

226,643.15
217,673.84
360,522.01

3.4.4
3.4.5
3.4.6
3.4.7
3.4.8
3.4.9
3.4.10
3.4.11
3.4.12
3.4.13
3.4.14
3.4.15
3.4.16
3.4.17
3.4.18
3.4.19

Pekerjaan 1 m2 perancah bekisting kaso 5/7 cm tinggi 4 m*


Pekerjaan 1 m2 perancah bekisting kayu dolken diameter 8 cm 10 cm tinggi 4 m **
Pekerjaan Bekisting balok beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan Perancah Bekisting balok dengan Kaso 5/7 tinggi 4 m
Pekerjaan Perancah Bekisting balok dengan Kayu dolken diameter 8 cm tinggi 4 m
Pekerjaan Bekisting kolom beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting kolom beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting dinding beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan multiflex 12 mm/18 mm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bongkar 1 m2 bekisting secara biasa
Pekerjaan Bongkar 1 m2 bekisting secara hati-hati
Pekerjaan Menggenangi air 100 m2 permukaan beton
Pekerjaan Menyirami air 100 m2 permukaan beton (Memasang 100 m2 terpal/karung goni basah)
Pekerjaan Menyirami air 100 m2 permukaan beton (Menyirami 100 m2 Terpal/Karung Goni dengan air selama 4 hari)

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

B.24
B.25
B.26
B.27
B.28
B.29
B.30
B.31
B.32
B.33
B.34
B.35
B.36
B.37
B.38a
B.38b

370,278.15
151,867.05
495,509.70
332,554.70
151,867.05
429,672.20
486,085.80
412,651.63
475,873.45
412,651.63
478,571.70
2,457.26
5,897.43
74,517.70
254,582.40
186,725.50

No

Uraian

3.5
3.5.1
3.5.2
3.5.3
3.5.4
3.5.5
3.5.6
4

Kode
(AHSP)

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5

m2
m2
m'
m'
m'
m'

B.39
B.40
B.41
B.42
B.43
B.44

439,869.83
143,326.80
100,113.96
119,814.67
151,590.37
162,099.38

PEKERJAAN PEMANCANGAN
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8

AHSP pemancangan secara manual/tanpa mesin menggunakan Tripod dan Hammer


Tiang Pancang Kayu Gelondongan
Tiang Pancang Baja Pipa atau Kotak
Tiang Pancang Beton Bertulang (30 x 30 cm)
Tiang Pancang Beton Bertulang (40 x 40 cm)
Turap Kayu Dolken
Turap Baja Profil Larsen
Turap beton Bertulang Precast (30 x 12 cm)
Turap Beton Bertulang Pre-cast (40 x 15 cm)

m'
m'
m'
m'
m'
m'
m'
m'

F.01
F.02
F.03
F.04
F.05
F.06
F.07
F.08

128,925.52
650,182.24
501,679.84
461,519.74
148,778.95
227,892.63
131,917.43
334,404.48

4.2
4.2.1
4.2.2
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
4.2.9

AHSP Pemancangan Secara Mekanis


Tiang Pancang Kayu Gelondongan
Tiang Pancang Baja Pipa atau Kotak
Tiang Pancang Beton Bertulang (30 x 30 cm)
Tiang Pancang Beton Bertulang (40 x 40 cm)
Turap Kayu Dolken
Turap Baja Profil Larsen
Turap Beton Bertulang Pre-cast (30 x 12 cm)
Turap Beton Bertulang Pre-cast (40 x 15 cm)

m'
m'
m'
m'
m'
m'
m'
m'

F.10
F.11
F.12
F.13
F.14
F.15
F.16
F.17

121,502.79
631,030.08
494,217.79
795,811.80
112,097.64
215,055.20
211,058.81
328,258.43

5.1
5.1.1
5.1.2
5.1.3

PEKERJAAN DEWATERING
Kistdam pasir/tanah
1 bh Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg) uk. 43 x 65 cm
1 bh Kistdam pasir/tanah dibungkus karung plastik bagor atau terpal uk. 45 x 120 cm
1 bh geobag pasir/tanah uk. 145 x 240 cm

bh
bh
m3

D.01
D.01a
D.01b
D.01c

26,356.62
24,022.93
631,984.80

5.2

Kerangka kayu untuk 1 m3 kistdam pasir/tanah uk. 43 cm x 65 cm

m3

D.02

142,307.90

5.3

Kerangka baja profil L.50.50.5 atau L.60.60.6 atau besi profil berlubang untuk 1 m3 kistdam pasir/tanah ukuran

hari

D.03

400,406.43

5.4

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 5 kW dengan suction head max. 3m dan discharge head
max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)

hari

D.04

1,197,253.50

5.5

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 10 kW dengan suction head max. 3m dan discharge head
max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)

hari

D.05

1,882,233.75

5.6

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 20 kW dengan suction head max. 3m dan discharge head
max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)

hari

D.06

3,259,600.25

bh

H.01

273,699.05

bh

H.02

6,202,351.78

bh

H.03

1,414,356.30

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m3
jam
jam
lokasi
sampel
bh
titik

AT.01
AT.02
AT.03
AT.04
AT.05
AT.06
AT.07
AT.08
AT.09
AT.10
AT.11
AT.12
AT.13
AT.14
AT.15
AT.16
AT.17
AT.18

382,001.25
553,050.45
511,421.00
516,765.05
348,663.34
349,133.54
248,255.86
1,820,296.90
360,641.97
4,072,887.67
69,722.61
2,168,104.22
962,601.75
354,981.12
720,544.00
1,808,892.50
314,030.50
1,453,025.00

m'
m'

LA.01a
LA.01b

494,449.17
363,080.76

6
6.1
6.2

6.3

7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
8

PEKERJAAN PEMBONGKARAN KONSTRUKSI BETON DALAM RANGKA RENOVASI


Bongkar 1 m3 beton secara konvensional
Bongkar 1 m3 beton dengan Jack Hammer
Pekerjaan Memasang 1m water stop PVC lebar 150 mm
Pekerjaan Memasang 1 m water stop PVC lebar 200 mm
Pekerjaan Memasang 1m water stop PVC lebar 230 mm 320 mm
Pekerjaan Pemasangan water stop 1m Rubber lebar 150 mm 200 mm

Satuan

PEKERJAAN PINTU AIR


Biaya Pemasangan Pintu Angkat
Contoh Pintu Angkat No.1; Lebar B = 200mm; H = 250mm; H1 = 500mm dan TR = 1050mm
Biaya Pemasangan Pintu Sorong Kayu
Contoh Pintu Sorong Kayu dengan Roda Gigi (Stang Draat Ganda) No.1; Lebar B = 1500mm; H = 1500mm; H1 = 3000mm dan
TR = 3800mm
Biaya Pemasangan Pintu Sorong Baja dengan Roda Gigi
Contoh Pintu Sorong Baja dengan Roda Gigi (Stang Double) No.1; Lebar B = 500mm; H = 500mm; H1 = 1000mm dan TR =
1900mm
PEKERJAAN AIRTANAH
1 m' Pengambilan dan Deskripsi Sampel Batuan (termasuk laporan)
1m' Pengeboran dia. 8 3/4"
1m' Reaming dia. 8 3/4" - 12"
1m' Reaming dia. 8 3/4" - 14 3/4"
1m' Bongkar pasang Temporary Cassing (ID) 12"
1m' Bongkar pasang Temporary Cassing (ID) 17"
1m' Pengadaan dan Pemasangan Cassing Pipa Black Steel 6"
1m' Pengadaan dan Pemasangan LC Screen 6"
1m' Pengadaan dan Pemasangan Cassing Pipa Black Steel 8"
1m' Pengadaan dan Pemasangan LC Screen 8"
1 m' Pengadaan dan Pemasangan Pipa Sounding PVC 1"
1 m3 Pengadaan dan Pemasangan Gravel Pack
1 Jam Pencucian Sumur *
1 Jam Uji Pemompaan *
1 lokasi Pasang dan bongkar Peralatan Uji
Sampling 1 sampel Analisa Kualitas Air
1 bh Patok Sumur
1 titik Electric Logging

PEKERJAAN LAIN-LAIN
7.1 Pemagaran daerah kerja
7.1.1 Rangka baja L.40.40.4
7.1.2 Rangka Kayu
7.2

Pembuatan direksi keet, los kerja dan gudang

m2

LA.02

1,726,693.45

7.3

Pembuatan papan nama pekerjaan

bh

LA.03

1,046,276.90

paket
paket
paket

L.04
LA.04a
LA.04b
LA.04c

5,117,500.00
41,400,000.00
94,908,868.94

7.4
7.4.1
7.4.2
7.4.3

Mobilisasi
Investigasi Lapangan
Sewa Lahan
Fasilitas

No
1
7.4.4 Kebutuhan lain-lain

7.5 Foto dokumentasi


7.5.1 1 Set foto dokumentasi menggunakan Camera
7.5.2 1 Set foto dokumentasi menggunakan Camera Digital tanpa Film
7.6

Satuan

Kode
(AHSP)

3
paket

4
LA.04d

Harga Satuan
Pekerjaan (HSP)
( Rp. )
5
242,937,500.00

paket
paket

LA.05a
LA.05b

3,279,540.00
1,864,610.00

Uraian

Test bahan dan pengujian mutu pekerjaan

7.7 Penggambaran
7.7.1 Peta situasi atau peta steak out bangunan
7.7.2 Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan
banyak bentuk-bentuk duplikasi ukuran A1
7.7.3 Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak
duplikasi bentuk gambar ukuran A1
7.7.4 Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1

LA.06

lbr
lbr

1)
LA.07a

554,242.50

lbr

LA.07b

221,484.25

lbr

LA.07c

13,759.75

7.8 Copy atau penggandaan buku/kontrak/laporan


7.8.1 Fotocopy dan jilid
7.8.2 1 set As built drawing (reduce dan copy kalkir serta blue/black print)

jilid
set

LA.08a
LA.08b

31,050.00
1,943,212.50

7.9 1 m2 Pengangkatan Gulma Terapung


7.9.1 Secara Manual
7.9.2 Secara Mekanis

m2
m2

LA.09a
LA.09b

2,948.72
1,402.29

7.10 1 m3 Pengangkatan Gulma Padat, ketebalan 25cm


7.10.1 Secara Manual
7.10.2 Secara Mekanis

m3
m3

LA.10a
LA.10b

49,145.25
19,780.82

ANALISA HARGA SATUAN PEKERJAAN


UraianPekerjaan
SatuanMataPembayaran
KuantitasPekerjaan
KuantitasPembayaran

:
:
:
:

AdministrasiTeknik
Ls
1.00
Rp
4,050,000

No.

Uraian Pekerjaan

Satuan

Kuantitas

Jumlah
Dibulatkan

Harga Satuan
(Rp.)
5

PembuatanDokumenKontrak
DokumenKontrak

bh

5.00 350,000

PembuatanLaporan-Laporan
LaporanHarian,Mingguan,Bulanan,dll

lap

5.00 160,000

PembuatanRencanaMutuKontrak(RMK)
RMK

lap

5.00 100,000

PhotoDokumentasi
CetakPhotodanJilid

bh

5.00 200,000

Jumlah Harga
(Rp.)
6

1,750,000

800,000

500,000

1,000,000
4,050,000
4,050,000

AHSP.Pus Air.13
A.
A.1

A.1.1
T.01

UMUM
PEKERJAAN TANAH (T.xx)
Pekerjaan tanah ini meliputi pekerjaan galian dan timbunan tanah serta houling yang dapat dilaksanakan baik secara manual
maupun secara mekanis.
Secara manual menggunakan tenaga manusia
a. AHSP pembersihan dan pengupasan permukaan tanah
1 m2 Pembersihan dan striping/kosrekan
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%) (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.060
75,900.00
0.006
95,700.00
Jumlah Harga Tenaga Kerja

4,554.00
574.20
5,128.20

Jumlah Harga Bahan

Jumlah Harga Peralatan

T.02

15% x D

1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm
No

T.03

5,128.20
769.23
5,897.43

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

B
1

Bahan
Minyak tanah

M.130

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%) (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.0750
75,900.00
0.0075
95,700.00
Jumlah Harga Tenaga Kerja

5,692.50
717.75
6,410.25

0.01
7,150.00
Jumlah Harga Bahan

71.50
71.50

Jumlah Harga Peralatan

6,481.75
972.26
7,454.01

15% x D

Cabut 1 tunggul pohon tanaman keras diameter > 15 cm dan membuang sisa tunggul kayu dan akar-akarnya
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
3

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Chainsaw

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - pohon (D+E)

Harga Satuan
(Rp)
6

0.200
75,900.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

E.06

Sewa-hari

0.100
160,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
15,180.00
1,914.00
17,094.00
16,000.00
16,000.00
33,094.00
4,964.10
38,058.10

AHSP.Pus Air.14
b. AHSP uitzet trase saluran dan pasang profil melintang
T.04

1 m2 Uitzet trase saluran


No

Uraian

Kode

Satuan

Koefisien

L.01
L.06
L.05

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Pembantu Juru Ukur
Juru Ukur

Bahan

C
1
2

Peralatan
Waterpass
Theodolith

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m1 (D+E)

Harga Satuan
(Rp)
6

0.012
75,900.00
0.004
63,800.00
0.004
75,900.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

E.50
E.41

Sewa-hari
Sewa-hari

0.004
100,000.00
0.004
150,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
910.80
255.20
303.60
1,469.60
400.00
600.00
1,000.00
2,469.60
370.44
2,840.04

AHSP.Pus Air.15
T.05

Pasang 1 m' profil melintang galian tanah


No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

0.060
75,900.00
0.020
95,700.00
0.006
95,700.00
0.020
75,900.00
0.020
63,800.00
Jumlah Harga Tenaga Kerja

4,554.00
1,914.00
574.20
1,518.00
1,276.00
9,836.20

M.33.d
M.35.e
M.65.b

m3
m3
kg

0.0025
1,400,000.00
0.0042
1,500,000.00
0.200
12,500.00
Jumlah Harga Bahan

3,500.00
6,300.00
2,500.00
12,300.00

E.50

Sewa-hari

0.004
100,000.00
Jumlah Harga Peralatan

400.00
400.00
22,536.20
3,380.43
25,916.63

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang kayu
Mandor
Juru Ukur
Pembantu juru ukur

B
1
2
3

Bahan
Kaso 4/6 cm
Papan 2/20
Paku

C
1

Peralatan
Waterpass

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m1 (D+E)

15% x D

AHSP.Pus Air.16
c. AHSP pekerjaan tanah cara manual
Pelaksanaan galian tanah T.06 s.d T.11 secara umum sudah termasuk pembuangan hasil
galian dengan jarak angkut L < 3 m serta perataan dan perapihan, jika diperlukan angkutan
dengan jarak laninnya lihat T.15: angkutan material dan/atau hasil galian
Jika pada pelaksanaan penggalian tanah diperlukan perkuatan dinding galian tanah, perlu
ditambah dengan analisa pada T.12.
c.1. Galian tanah
T.06
Pekerjaan Galian Tanah Biasa
T.06a 1 m3 Galian tanah biasa sedalam < 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.5630
75,900.00
0.0563
95,700.00
Jumlah Harga Tenaga Kerja

42,731.70
5,387.91
48,119.61

Jumlah Harga Bahan

Jumlah Harga Peralatan

T.06b

48,119.61
7,217.94
55,337.55

15% x D

1 m3 Galian tanah biasa sedalam s.d. 2 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.6750
75,900.00
0.0675
95,700.00
Jumlah Harga Tenaga Kerja

51,232.50
6,459.75
57,692.25

Jumlah Harga Bahan

Jumlah Harga Peralatan

T.06c

57,692.25
8,653.84
66,346.09

15% x D

1 m3 Galian tanah biasa sedalam s.d. 3 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.7600
75,900.00
0.0760
95,700.00
Jumlah Harga Tenaga Kerja

57,684.00
7,273.20
64,957.20

Jumlah Harga Bahan

Jumlah Harga Peralatan

T.06d

64,957.20
9,743.58
74,700.78

15% x D

1 m3 Galian tanah biasa dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)
6

0.0700
75,900.00
0.0070
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
5,313.00
669.90
5,982.90
5,982.90
897.44

AHSP.Pus Air.17
F

Harga Satuan Pekerjaan per - m3 (D+E)

6,880.34

AHSP.Pus Air.18
T.07
T.07a

Galian Tanah Berbatu


1 m3 Galian tanah berbatu sedalam < 1 m
No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer **

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

1.3510
75,900.00
0.1351
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
102,540.90
12,929.07
115,469.97

Jumlah Harga Bahan

D
E
F

T.07b

E.14

Sewa-hari

0.150
135,000.00
Jumlah Harga Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

15% x D

20,250.00
20,250.00
135,719.97
20,358.00
156,077.97

1 m3 Galian tanah berbatu sedalam s.d. 2 m


No
1
A
1
2

Tenaga Kerja
Tukang gali
Mandor

Bahan

C
1

Peralatan
Jack hammer **

Uraian

Kode

Satuan

Koefisien

L.02
L.04

OH
OH

Harga Satuan
(Rp)
6

1.500
95,700.00
0.150
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

D
E
F

E.14

Sewa-hari

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

0.150
135,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
143,550.00
14,355.00
157,905.00
20,250.00
20,250.00
178,155.00
26,723.25
204,878.25

AHSP.Pus Air.19
T.07c

1 m3 Galian tanah berbatu sedalam s.d. 3 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F
***

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

Harga Satuan
(Rp)

Jumlah
(Rp)

1.650
75,900.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja

125,235.00
15,790.50
141,025.50

Jumlah Harga Bahan

T.07d

E.14

Sewa-hari

0.150
135,000.00
Jumlah Harga Peralatan

20,250.00
20,250.00
161,275.50
24,191.33
185,466.83

15% x D

1 m3 Galian tanah berbatu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F
***

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

Harga Satuan
(Rp)
6

0.150
75,900.00
0.015
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
11,385.00
1,435.50
12,820.50

Jumlah Harga Bahan

T.08
T.08a

E.14

Sewa-hari

0.150
135,000.00
Jumlah Harga Peralatan
15% x D

20,250.00
20,250.00
33,070.50
4,960.58
38,031.08

Galian Batu
1 m3 Galian batu sedalam < 1 m
No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer **

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

3.3780
75,900.00
0.3378
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
256,390.20
32,327.46
288,717.66

Jumlah Harga Bahan

D
E
F

T.08b

E.14

Sewa-hari

0.330
135,000.00
Jumlah Harga Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

15% x D

44,550.00
44,550.00
333,267.66
49,990.15
383,257.81

1 m3 Galian batu sedalam s.d. 2 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer **

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

3.750
75,900.00
0.375
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

E.14

Sewa-hari

0.330
135,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
284,625.00
35,887.50
320,512.50
44,550.00
44,550.00
365,062.50
54,759.38
419,821.88

AHSP.Pus Air.20
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.08c

1 m3 Galian batu sedalam s.d. 3 m


No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer **

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

4.125
75,900.00
0.413
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
313,087.50
39,476.25
352,563.75

Jumlah Harga Bahan

D
E
F

T.08d

E.14

Sewa-hari

0.330
135,000.00
Jumlah Harga Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

15% x D

44,550.00
44,550.00
397,113.75
59,567.06
456,680.81

1 m3 Galian batu dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer **

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

0.3750
75,900.00
0.0375
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

D
E
F
F

E.14

Sewa-hari

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Harga Satuan Pekerjaan per - m3 (D+E)
** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

0.330
135,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
28,462.50
3,588.75
32,051.25
44,550.00
44,550.00
76,601.25
11,490.19
88,091.44
99,581.63

AHSP.Pus Air.21
T.09
T.09a

Galian tanah cadas atau tanah keras


1 m3 Galian tanah cadas atau tanah keras sedalam < 1 m
No

Uraian

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F
***

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

1.250
75,900.00
0.125
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
94,875.00
11,962.50
106,837.50

Jumlah Harga Bahan

T.09b

E.14

Sewa-hari

0.125
135,000.00
Jumlah Harga Peralatan
15% x D

16,875.00
16,875.00
123,712.50
18,556.88
142,269.38

1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 2 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F
***

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

Harga Satuan
(Rp)
6

1.3920
75,900.00
0.1392
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
105,652.80
13,321.44
118,974.24

Jumlah Harga Bahan

T.09c

E.14

Sewa-hari

0.125
135,000.00
Jumlah Harga Peralatan
15% x D

16,875.00
16,875.00
135,849.24
20,377.39
156,226.63

1 m3 Galian tanah cadas atau tanah keras sedalam s.d. 3 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F
***

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0

Harga Satuan
(Rp)
6

1.500
75,900.00
0.150
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
113,850.00
14,355.00
128,205.00

Jumlah Harga Bahan

T.09d

E.14

Sewa-hari

0.125
135,000.00
Jumlah Harga Peralatan
15% x D

16,875.00
16,875.00
145,080.00
21,762.00
166,842.00

1 m3 Galian tanah cadas atau tanah keras dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Jack hammer ***

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.100
75,900.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

E.14

Sewa-hari

0.125
135,000.00
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
7,590.00
957.00
8,547.00
16,875.00
16,875.00
25,422.00
3,813.30
29,235.30

AHSP.Pus Air.22
*** Jika dilaklukan tanpa menggunakan peralatan, maka harga satuan diberi nilai 0
T.10
T.10a

Galian Lumpur
1 m3 Galian lumpur sedalam < 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.833
75,900.00
0.083
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
63,224.70
7,971.81
71,196.51
71,196.51
10,679.48
81,875.99

AHSP.Pus Air.23
T.10b

1 m3 Galian lumpur sedalam s.d. 2 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

1.220
75,900.00
0.122
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
92,598.00
11,675.40
104,273.40

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.10c

15% x D

104,273.40
15,641.01
119,914.41

1 m3 Galian lumpur sedalam s.d. 3 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

1.550
75,900.00
0.155
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan
15% x D

Jumlah
(Rp)
7
117,645.00
14,833.50
132,478.50
132,478.50
19,871.78
152,350.28

AHSP.Pus Air.24
T.10d

1 m3 Galian tanah lumpur dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.100
75,900.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
7,590.00
957.00
8,547.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.11
T.11a

15% x D

8,547.00
1,282.05
9,829.05

Galian pasir untuk fondasi bangunan


1m3 Galian pasir untuk fondasi bangunan sedalam s.d 1m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.663
75,900.00
0.066
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
50,321.70
6,344.91
56,666.61

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.11b

15% x D

56,666.61
8,499.99
65,166.60

1m3 Galian pasir untuk fondasi bangunan sedalam s.d 2m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.795
75,900.00
0.080
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
60,340.50
7,608.15
67,948.65

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.11c

15% x D

67,948.65
10,192.30
78,140.95

1m3 Galian pasir untuk fondasi bangunan sedalam s.d 3m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.900
75,900.00
0.090
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
68,310.00
8,613.00
76,923.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.11d

15% x D

76,923.00
11,538.45
88,461.45

1m3 Galian pasir untuk fondasi bangunan dengan kedalaman > 3m, tambahan koefisien untuk setiap penambahan kedalaman 1 m
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

E
F

Overhead + Profit (Contoh 15%)


Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.100
75,900.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah AHSP.Pus Air.25


(Rp)
7
7,590.00
957.00
8,547.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.12

15% x D

8,547.00
1,282.05
9,829.05

Perkuatan dinding galian dan alat bantu gali


Perkuatan dinding galian sangat tergantung pada potensi kelongsoran galian tanahnya, untuk tanah biasa dan tanah berbatu
sering diperlukan jika kedalaman galiannya lebih dari 2 m, sedangkan untuk tanah cadas/keras apalagi batu pada umumnya
tidak diperlukan perkuatan. Hal ini sering dilakukan pada galian tanah dengan kedalaman > 1 m dalam rangka pemasangan pipa,
gorong-gorong dan/atau box culvert

AHSP.Pus Air.26

T.12a

1 m perkuatan dinding galian untuk 1 m' paling bawah


No

Uraian

Kode

Satuan

Koefisien
5

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor

L.01
L.02
L.04

OH
OH
OH

B
1
2

Bahan {Lihat Tabel A.2}


Tiang rangka perkuatan ddg. (Tabel A.2a)
Dinding perkuatan (Tabel A.2b)

M.xx
M.xx

m3 atau kg
m2 atau m3

Peralatan
Tripod/Tackle&handle/Crane 2T *)

Harga Satuan
(Rp)

Jumlah
(Rp)

b) + q)
c) + r)
d) + s)
Jumlah Harga Tenaga Kerja
a)
p)
Jumlah Harga Bahan

D
E
F

T.12a

Sewa-hari

e) + t)
Jumlah Harga Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)
*) Coret yg tidak perlu

15% x D

Contoh 1m perkuatan dinding galian untuk 1 m' paling bawah, menggunakan Baja INP-10 dan Balok Kayu 8/12
No

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1.6600
75,900.00
0.8300
95,700.00
0.1660
95,700.00
Jumlah Harga Tenaga Kerja

125,994.00
79,431.00
15,886.20
221,311.20

5.240
0.109

12,000.00
4,158,000.00
Jumlah Harga Bahan

62,880.00
453,222.00
516,102.00

0.1900
1,400,000.00
Jumlah Harga Peralatan

266,000.00
266,000.00
1,003,413.20
150,511.98
1,153,925.18

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor

B
1
2

Bahan {Lihat Tabel A.2}


Tiang rangka perkuatan ddg, INP-10
Dinding perkuatan, Kayu 8/12

M.54.g
M.33.b

kg
m3

Peralatan
Tripod/Tackle&handle/Crane 2T *)

E.07.a

Sewa-hari

D
E
F

T.12b

E.xx

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)
*) Coret yg tidak perlu

15% x D

1 m penambahan setiap tinggi 1 m' perkuatan dinding galian


No

Uraian

Kode

Satuan

Koefisien
5

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor

L.01
L.02
L.04

OH
OH
OH

B
1
2

Bahan {Lihat Tabel A.2}


Tiang rangka perkuatan ddg (Tabel A.2a)
Dinding perkuatan (Tabel A.2b)

M.xx
M.xx

m3 atau kg
m2 atau m3

Peralatan
Tripod/Tackle&handle/Crane 2T *)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

g) + v)
75,900.00
h) + w)
i) + x)
95,700.00
Jumlah Harga Tenaga Kerja
f)
u)
Jumlah Harga Bahan

D
E
F

T.12b

E.xx

Sewa-hari

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)
*) Coret yg tidak perlu

j) + y)
Jumlah Harga Peralatan
15% x D

Contoh 1 m penambahan setiap tinggi 1 m' perkuatan dinding galian, menggunakan Tiang INP-10 dan Balok Kayu 8/12
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

No
1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.2}
Pekerja
Tukang
Mandor

B
1
2

Bahan {Lihat Tabel A.2}


Tiang rangka perkuatan ddg, INP-10
Dinding perkuatan, Kayu 8/12

Peralatan
Tripod/Tackle&handle/Crane 2T *)

D
E
F

T.12c

Uraian

Harga Satuan
(Rp)

Jumlah AHSP.Pus Air.27


(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1.1980
75,900.00
0.5990
95,700.00
0.1198
95,700.00
Jumlah Harga Tenaga Kerja

90,928.20
57,324.30
11,464.86
159,717.36

M.54.g
M.33.b

kg
m3

3.500
0.091

12,000.00
4,158,000.00
Jumlah Harga Bahan

42,000.00
378,378.00
420,378.00

E.xx

Sewa-hari

0.1700
1,400,000.00
Jumlah Harga Peralatan

238,000.00
238,000.00
818,095.36
122,714.30
940,809.66

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

15% x D

1 m perkuatan dinding galian dengan Turap untuk 1 m' paling bawah


No

Uraian

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor

B
1

Bahan {Lihat Tabel A.3}


Perkuatan Dinding Galian dengan Turap
(Lihat Tabel A.3)

Peralatan
Tripod/Tackle&handle/Crane 2T *)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

M.xx

m3 atau kg

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

b)
c)
d)
Jumlah Harga Tenaga Kerja

a)
Jumlah Harga Bahan

E.xx

Sewa-hari

e)
Jumlah Harga Peralatan

D
E
F

T.12c

15% x D
-

Contoh 1 m perkuatan dinding galian dengan Turap untuk 1 m' paling bawah, dg turap INP-8
No

Uraian

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor

B
1

Bahan {Lihat Tabel A.3}


Perkuatan Dinding Galian dengan Turap
Baja INP-8

Peralatan
Tripod/Tackle&handle/Crane 2T *)

D
E
F

T.12d

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1.5000
75,900.00
0.5000
95,700.00
0.1500
95,700.00
Jumlah Harga Tenaga Kerja

113,850.00
47,850.00
14,355.00
176,055.00

M.54.f

kg

15.00

247,500.00

E.45

Sewa-hari

16,500.00

Jumlah Harga Bahan

247,500.00

0.1500
450,000.00
Jumlah Harga Peralatan

67,500.00
67,500.00
491,055.00
73,658.25
564,713.25

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

15% x D

1 m perkuatan dinding galian dengan Turap untuk setiap penambahan tinggi 1 m'
No

Uraian

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor

B
1

Bahan
Perkuatan Dinding Galian dengan Turap

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

M.xx

m3 atau kg

Harga Satuan
(Rp)
6

g)
h)
i)
Jumlah Harga Tenaga Kerja
f)

Jumlah
(Rp)
7

AHSP.Pus Air.28
(Lihat Tabel A.3)
Jumlah Harga Bahan
C

Peralatan
Tripod/Tackle&handle/Crane 2T *)

E.xx

Sewa-hari

j)
Jumlah Harga Peralatan

D
E
F

T.12d

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

15% x D
-

Contoh 1 m perkuatan dinding galian dengan Turap INP-8 untuk setiap penambahan tinggi 1 m'
No

Uraian

1
A
1
2
3

2
Tenaga Kerja {Lihat Tabel A.3}
Pekerja
Tukang
Mandor

B
1

Bahan {Lihat Tabel A.3}


Perkuatan Dinding Galian dengan Turap
Baja INP-8

Peralatan
Tripod/Tackle&handle/Crane 2T *)

D
E
F

Harga Satuan
(Rp)

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1.2000
75,900.00
0.4000
95,700.00
0.1200
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
38,280.00
11,484.00
140,844.00

M.54.f

kg

10.00

165,000.00

M.125.b

Sewa-hari

16,500.00

Jumlah Harga Bahan

165,000.00

0.1100
450,000.00
Jumlah Harga Peralatan

49,500.00
49,500.00
355,344.00
53,301.60
408,645.60

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

15% x D

CATATAN:
Perkuatan dinding galian selain menggunakan T.12, dapat pula menggunakan AHSP F.01 s.d. F.18 sesuai dengan
kebutuhan pelaksanaan pekerjaan

T.13

Peledakan batuan

Pelaksanaan peledakan batuan biasanya harus dilakukan oleh suatu badan yang berwenang atau perusahaan yang telah
mempunyai izin resmi misalnya PT. Dahana, Tasikmalaya, Indonesia. Perhitungan biaya untuk cara ini, sangat ditentukan oleh
tingkat kekerasan atau jenis batuannya, posisi lokasi dan dimensi batuannya. Untuk keperluan harga satuan diperlukan deskripsi
kondisi-kondisi tersebut yang kemudian akan dapat dihitung harga satuannya dari pelaksana peledakannya
T.14
T.14a

Timbunan dan Pemadatan


1 m3 Timbunan tanah atau urugan tanah kembali
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.330
75,900.00
0.033
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
25,047.00
3,158.10
28,205.10

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.14b

15% x D

28,205.10
4,230.77
32,435.87

1 m3 Pemadatan tanah
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Pemadat Timbunan (Stamper)

Harga Satuan
(Rp)
6

0.500
75,900.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

E.31

Sewa-hari

0.050
150,000.00
Jumlah Harga Peralatan

Jumlah
(Rp)
7
37,950.00
4,785.00
42,735.00
7,500.00
7,500.00

AHSP.Pus Air.29
D
E
F
T.14c

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

1 m3 Timbunan pasir sebagai bahan pengisi


No

T.14d

50,235.00
7,535.25
57,770.25

15% x D

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

0.400
75,900.00
0.040
95,700.00
Jumlah Harga Tenaga Kerja

30,360.00
3,828.00
34,188.00

B
1

Bahan
Pasir pasang

M.14.b

m3

1.200
200,000.00
Jumlah Harga Bahan

240,000.00
240,000.00

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

274,188.00
41,128.20
315,316.20

15% x D

1m3 Pemadatan pasir sebagai bahan pengisi


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Pemadat Timbunan (Stamper)

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.100
75,900.00
0.010
680,000.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
7,590.00
6,800.00
14,390.00

Jumlah Harga Bahan

T.15
T.15
T.15a.1)

E.31

Sewa-hari

0.100
150,000.00
Jumlah Harga Peralatan
15% x D

15,000.00
15,000.00
29,390.00
4,408.50
33,798.50

c. Pekerjaan angkutan hasil galian/material


Angkutan Material dan/atau Hasil Galian
a)
Secara Manual
Mengangkut 1 m3 hasil galian dengan jarak angkut > 3m s.d. < 5 m
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.2480
75,900.00
0.0124
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
18,823.20
1,186.68
20,009.88

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.2)

15% x D

20,009.88
3,001.48
23,011.36

Mengangkut 1 m3 hasil galian dengan jarak angkut 5 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Harga Satuan
(Rp)
6

0.2680
75,900.00
0.0134
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan
Jumlah Harga Peralatan

Jumlah
(Rp)
7
20,341.20
1,282.38
21,623.58
21,623.58

AHSP.Pus Air.30
E
F
T.15a.3)

Overhead + Profit (Contoh 15%)


Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

3,243.54
24,867.12

Mengangkut 1 m3 hasil galian dengan jarak angkut 10 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.2860
75,900.00
0.0143
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
21,707.40
1,368.51
23,075.91

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.4)

15% x D

23,075.91
3,461.39
26,537.30

Mengangkut 1 m3 hasil galian dengan jarak angkut 30 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.3560
75,900.00
0.0178
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
27,020.40
1,703.46
28,723.86

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.5)

15% x D

28,723.86
4,308.58
33,032.44

Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.4220
75,900.00
0.0211
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
32,029.80
2,019.27
34,049.07

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.6)

15% x D

34,049.07
5,107.36
39,156.43

Mengangkut 1 m3 hasil galian dengan jarak angkut 100 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

0.6000
75,900.00
0.0300
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
45,540.00
2,871.00
48,411.00

Jumlah Harga Bahan


Jumlah Harga Peralatan
15% x D

48,411.00
7,261.65
55,672.65

T.15a.7) Mengangkut 1 m3 hasil galian dengan jarak angkut 200 m


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

AHSP.Pus Air.31
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

0.9500
75,900.00
0.0475
95,700.00
Jumlah Harga Tenaga Kerja

7
72,105.00
4,545.75
76,650.75

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.8)

15% x D

76,650.75
11,497.61
88,148.36

Mengangkut 1 m3 hasil galian dengan jarak angkut 300 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

1.3000
75,900.00
0.0650
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
98,670.00
6,220.50
104,890.50

Jumlah Harga Bahan


Jumlah Harga Peralatan

T.15a.9)

15% x D

104,890.50
15,733.58
120,624.08

Mengangkut 1 m3 hasil galian dengan jarak angkut 400 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

1.6500
75,900.00
0.0825
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
125,235.00
7,895.25
133,130.25

Jumlah Harga Bahan


Jumlah Harga Peralatan
15% x D

133,130.25
19,969.54
153,099.79

T.15a.10) Mengangkut 1 m3 hasil galian dengan jarak angkut 500 m


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

1.9500
75,900.00
0.0975
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
148,005.00
9,330.75
157,335.75

Jumlah Harga Bahan


Jumlah Harga Peralatan
15% x D

157,335.75
23,600.36
180,936.11

T.15a.11) Mengangkut 1 m3 hasil galian > 500m untuk setiap penambahan jarak angkut 100 m
No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

0.3520
75,900.00
0.0176
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Jumlah
(Rp)
7
26,716.80
1,684.32
28,401.12
-

AHSP.Pus Air.32
C

Peralatan

D
E
F

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Peralatan

A.1.2

Pekerjaan Tanah Secara Mekanis, Lihat Alat Berat:


01_Galian Situ/Waduk
02_Galian Sungai diangkut Dump Truck
03_Angkutan Material/hasil galian Lintas Pulau
04_Gali, Angkut dan Pemadatan

15% x D

28,401.12
4,260.17
32,661.29

A.2
P.01
P.01a

PEKERJAAN PASANGAN
Pasangan batu dengan mortar jenis PC-PP (1 m3)
Mortar tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
No

P.01b

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

M.05

m3

1.200

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

Batu

2
3

Pasir Pasang
Portland Cement

M.14.b
M.15

m3
kg

0.440
200,000.00
252
1,740.00
Jumlah Harga Bahan

88,000.00
438,480.00
803,680.00

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.167
400,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

66,800.00
66,800.00
1,195,992.00
179,398.80

Harga Satuan Pekerjaan per - m3 (D+E)

2.700
75,900.00
0.900
95,700.00
0.090
95,700.00
0.270
95,700.00
Jumlah Harga Tenaga Kerja
231,000.00

15% x D

7
204,930.00
86,130.00
8,613.00
25,839.00
325,512.00
277,200.00

1,375,390.80

Mortar tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)


No

P.01c

Uraian

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

M.05

m3

1.200

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

Batu

2
3

Pasir Pasang
Portland Cement

M.14.b
M.15

m3
kg

0.485
200,000.00
202
1,740.00
Jumlah Harga Bahan

97,000.00
351,480.00
725,680.00

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.167
400,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

66,800.00
66,800.00
1,117,992.00
167,698.80

Harga Satuan Pekerjaan per - m (D+E)

2.700
75,900.00
0.900
95,700.00
0.090
95,700.00
0.270
95,700.00
Jumlah Harga Tenaga Kerja
231,000.00

15% x D

7
204,930.00
86,130.00
8,613.00
25,839.00
325,512.00
277,200.00

1,285,690.80

Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah (Rp)

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

Batu kali

M.05

m3

2
3

Pasir Pasang
Portland Cement

M.14.b
M.15

m3
kg

C
1

Peralatan
Molen

E.28.b

Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

2.700
75,900.00
0.900
95,700.00
0.090
95,700.00
0.270
95,700.00
Jumlah Harga Tenaga Kerja
1.200

231,000.00

204,930.00
86,130.00
8,613.00
25,839.00
325,512.00
277,200.00

0.520
200,000.00
163.000
1,740.00
Jumlah Harga Bahan

104,000.00
283,620.00
664,820.00

0.167
400,000.00
Jumlah Harga Peralatan

66,800.00
66,800.00
1,057,132.00
158,569.80

15% x D

1,215,701.80

P.01d

Mortar tipe O (mutu PP tertentu setara dengan campuran 1 PC:5 PP)


No

P.01e

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1

Bahan
Batu kali

M.05

m3

2
3

Pasir Pasang
Portland Cement

M.14.b
M.15

m3
kg

C
1

Peralatan
Molen

E.28.b

Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)
6

2.700
75,900.00
0.900
95,700.00
0.090
95,700.00
0.270
95,700.00
Jumlah Harga Tenaga Kerja
1.200

231,000.00

Jumlah
(Rp)
7
204,930.00
86,130.00
8,613.00
25,839.00
325,512.00
277,200.00

0.544
200,000.00
135.000
1,740.00
Jumlah Harga Bahan

108,800.00
234,900.00
620,900.00

0.167
400,000.00
Jumlah Harga Peralatan

66,800.00
66,800.00
1,013,212.00
151,981.80

15% x D

1,165,193.80

Bongkar 1 m3 pasangan batu


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2

Peralatan
*)
Palu/Godam (Baja keras)
Pahat Beton (Baja keras)

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)
6

1.850
75,900.00
0.185
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
140,415.00
17,704.50
158,119.50

Jumlah Harga Bahan

P.01f

E.30
E.29

bh
bh

0.050
100,000.00
0.150
225,000.00
Jumlah Harga Peralatan
15% x D

Harga Satuan Pekerjaan per - m3 (D+E)


*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0

5,000.00
33,750.00
38,750.00
196,869.50
29,530.43
226,399.93

1 m3 Persiapan pemanfaatan kembali material batu dari bekas bongkaran pasangan batu
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2

Peralatan
*)
Palu/Godam (Baja keras)
Pahat Beton (Baja keras)

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)
6

0.200
75,900.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
15,180.00
1,914.00
17,094.00

Jumlah Harga Bahan

P.02
P.02a

E.30
E.29

bh
bh

0.010
100,000.00
0.030
225,000.00
Jumlah Harga Peralatan
15% x D

Harga Satuan Pekerjaan per - m3 (D+E)


*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0

1,000.00
6,750.00
7,750.00
24,844.00
3,726.60
28,570.60

1 m3 Pasangan Bata merah


Mortar tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No
1
A
1
2

Tenaga Kerja
Pekerja
Tukang batu

Uraian

Kode

Satuan

Koefisien

L.01
L.02

OH
OH

2.400
1.200

Harga Satuan
(Rp)
6
75,900.00
95,700.00

Jumlah
(Rp)
7
182,160.00
114,840.00

P.02b

3
4

Kepala Tukang
Mandor

B
1
2
3

Bahan
Bata merah
Portland Cement
Pasir pasang

Peralatan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

0.240
95,700.00
0.240
95,700.00
Jumlah Harga Tenaga Kerja

22,968.00
22,968.00
342,936.00

M.04.c
M.15
M.14.b

bh
kg
m3

500
700.00
132
1,740.00
0.37
200,000.00
Jumlah Harga Bahan

350,000.00
229,680.00
74,000.00
653,680.00

Jumlah Harga Peralatan

996,616.00
149,492.40

15% x D

1,146,108.40

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.400
75,900.00
1.200
95,700.00
0.240
95,700.00
0.240
95,700.00
Jumlah Harga Tenaga Kerja

182,160.00
114,840.00
22,968.00
22,968.00
342,936.00

M.04.c
M.15
M.14.b

bh
kg
m3

500
700.00
106.5
1,740.00
0.375
200,000.00
Jumlah Harga Bahan

350,000.00
185,310.00
75,000.00
610,310.00

Jumlah Harga Peralatan

953,246.00
142,986.90

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

B
1
2
3

Bahan
Bata merah
Portland Cement
Pasir pasang

Peralatan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m (D+E)

15% x D

1,096,232.90

Mortar tipe O (mutu PP tertentu setara dengan campuran 1 PC:5 PP)


No

P.02d

OH
OH

Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)


No

P.02c

L.03
L.04

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.400
75,900.00
1.200
95,700.00
0.240
95,700.00
0.240
95,700.00
Jumlah Harga Tenaga Kerja

182,160.00
114,840.00
22,968.00
22,968.00
342,936.00

M.04.c
M.15
M.14.b

bh
kg
m3

500
700.00
89.0
1,740.00
0.410
200,000.00
Jumlah Harga Bahan

350,000.00
154,860.00
82,000.00
586,860.00

Jumlah Harga Peralatan

929,796.00
139,469.40

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

B
1
2
3

Bahan
Bata merah
Portland Cement
Pasir pasang

Peralatan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1,069,265.40

Mortar campuran 1 PC:6 PP


No
1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

B
1
2
3

Bahan
Bata merah
Portland Cement
Pasir pasang

Peralatan

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.400
75,900.00
1.200
95,700.00
0.240
95,700.00
0.240
95,700.00
Jumlah Harga Tenaga Kerja

182,160.00
114,840.00
22,968.00
22,968.00
342,936.00

M.04.c
M.15
M.14.b

bh
kg
m3

500
700.00
75
1,740.00
0.49
200,000.00
Jumlah Harga Bahan

350,000.00
130,500.00
98,000.00
578,500.00

Jumlah Harga Peralatan

P.02e

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

921,436.00
138,215.40

15% x D

1,059,651.40

Bongkar 1 m3 pasangan bata merah


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2

Peralatan
Palu / Godam
Pahat Beton (Baja keras)

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.600
75,900.00
0.060
95,700.00
Jumlah Harga Tenaga Kerja

45,540.00
5,742.00
51,282.00

Jumlah Harga Bahan

P.03
P.03a

bh
bh

0.050
100,000.00
0.120
225,000.00
Jumlah Harga Peralatan

5,000.00
27,000.00
32,000.00
83,282.00
12,492.30

15% x D

95,774.30

Pekerjaan siaran dengan mortar jenis PC-PP (1 m 2)


Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
No

P.03b

E.30
E.29

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.150
95,700.00
0.015
95,700.00
0.015
95,700.00
Jumlah Harga Tenaga Kerja

22,770.00
14,355.00
1,435.50
1,435.50
39,996.00

M.14.b
M.15

m3
kg

0.012
200,000.00
6.340
1,740.00
Jumlah Harga Bahan

2,400.00
11,031.60
13,431.60

Jumlah Harga Peralatan

53,427.60
8,014.14

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

61,441.74

Siaran dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.150
95,700.00
0.015
95,700.00
0.015
95,700.00
Jumlah Harga Tenaga Kerja

22,770.00
14,355.00
1,435.50
1,435.50
39,996.00

M.14.b
M.15

m3
kg

0.018
200,000.00
4.840
1,740.00
Jumlah Harga Bahan

3,600.00
8,421.60
12,021.60

Jumlah Harga Peralatan

52,017.60
7,802.64

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m (D+E)

15% x D

59,820.24

P.04

Pekerjaan plesteran dengan mortar jenis PC-PP (1 m 2)

P.04a

Trasraam tebal 1 cm, dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

No

P.04b

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.150
95,700.00
0.015
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

22,770.00
14,355.00
1,435.50
2,871.00
41,431.50

M.14.b
M.15

m3
kg

0.014
200,000.00
7.240
1,740.00
Jumlah Harga Bahan

2,800.00
12,597.60
15,397.60

Jumlah Harga Peralatan

56,829.10
8,524.37

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m (D+E)

15% x D

65,353.47

Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.150
95,700.00
0.015
95,700.00
0.015
95,700.00
Jumlah Harga Tenaga Kerja

22,770.00
14,355.00
1,435.50
1,435.50
39,996.00

M.14.b
M.15

m3
kg

0.016
200,000.00
5.840
1,740.00
Jumlah Harga Bahan

3,200.00
10,161.60
13,361.60

Jumlah Harga Peralatan

53,357.60
8,003.64

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

61,361.24

Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
No

P.04d

Jumlah
(Rp)

Kode

1
A
1
2
3
4

No

P.04c

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.150
95,700.00
0.015
95,700.00
0.015
95,700.00
Jumlah Harga Tenaga Kerja

22,770.00
14,355.00
1,435.50
1,435.50
39,996.00

M.14.b
M.15

m3
kg

0.018
200,000.00
4.450
1,740.00
Jumlah Harga Bahan

3,600.00
7,743.00
11,343.00

Jumlah Harga Peralatan

51,339.00
7,700.85

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

59,039.85

Trasraam tebal 1,5 cm, dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan campuran 1 PC:2 PP)
No
1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Harga Satuan
(Rp)
6

0.384
75,900.00
0.192
95,700.00
0.019
95,700.00
0.019
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
29,145.60
18,374.40
1,818.30
1,818.30
51,156.60

P.04e

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

0.020
200,000.00
10.224
1,740.00
Jumlah Harga Bahan

4,000.00
17,789.76
21,789.76

Jumlah Harga Peralatan

72,946.36
10,941.95

15% x D

83,888.31

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.384
75,900.00
0.192
95,700.00
0.019
95,700.00
0.019
95,700.00
Jumlah Harga Tenaga Kerja

29,145.60
18,374.40
1,818.30
1,818.30
51,156.60

M.14.b
M.15

m3
kg

0.030
200,000.00
7.776
1,740.00
Jumlah Harga Bahan

6,000.00
13,530.24
19,530.24

Jumlah Harga Peralatan

70,686.84
10,603.03

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

81,289.87

Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
No

P.05

m3
kg

Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No

P.04f

M.14.b
M.15

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.384
75,900.00
0.192
95,700.00
0.019
95,700.00
0.019
95,700.00
Jumlah Harga Tenaga Kerja

29,145.60
18,374.40
1,818.30
1,818.30
51,156.60

M.14.b
M.15

m3
kg

0.024
200,000.00
6.280
1,740.00
Jumlah Harga Bahan

4,800.00
10,927.20
15,727.20

Jumlah Harga Peralatan

66,883.80
10,032.57

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2

Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m (D+E)

15% x D

76,916.37

Pasangan Batu Kosong (1 m3)


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1

Bahan
Batu/batu belah

M.05

m3

1.200

Pasir Pasang

M.14.b

m3

0.432
200,000.00
Jumlah Harga Bahan

86,400.00
363,600.00

Peralatan
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

501,705.00
75,255.75

1.000
75,900.00
0.500
95,700.00
0.050
95,700.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

15% x D

231,000.00

7
75,900.00
47,850.00
4,785.00
9,570.00
138,105.00
277,200.00

Harga Satuan Pekerjaan per - m3 (D+E)

576,960.75

Pasangan batu bronjong kawat (SNI 03-0090-1998)


Pasangan batu bronjong kawat Bentuk I
1) Bentuk I, Tipe A Bronjong kawat uk. L=2,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu
P.06a.1.a
P.06
P.06a

No

P.06a.1.b

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
M.131
M.132
M.133.a

OH
OH
OH
OH

3.270
75,900.00
1.090
95,700.00
1.400
75,900.00
0.467
95,700.00
Jumlah Harga Tenaga Kerja

248,193.00
104,313.00
106,260.00
44,691.90
503,457.90

m3
kg

2.800
231,000.00
21.710
19,350.00
Jumlah Harga Bahan

646,800.00
420,088.50
1,066,888.50

Jumlah Harga Peralatan

1,570,346.40
235,551.96

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

M.135.a
M.135.b

Peralatan

M.135.d

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Pera M.137


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

M.134

15% x D

1,805,898.36

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06a.1.c

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

3.360
75,900.00
1.120
95,700.00
1.400
75,900.00
0.476
95,700.00
Jumlah Harga Tenaga Kerja

255,024.00
107,184.00
106,260.00
45,553.20
514,021.20

M.05
M.61

m3
kg

2.800
231,000.00
22.355
19,350.00
Jumlah Harga Bahan

646,800.00
432,569.25
1,079,369.25

Jumlah Harga Peralatan

1,593,390.45
239,008.57

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

1,832,399.02

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

5.730
75,900.00
1.910
95,700.00
1.400
75,900.00
0.710
95,700.00
Jumlah Harga Tenaga Kerja

434,907.00
182,787.00
106,260.00
67,947.00
791,901.00

M.05
M.61

m3
kg

2.80
231,000.00
38.15
19,350.00
Jumlah Harga Bahan

646,800.00
738,202.50
1,385,002.50

Jumlah Harga Peralatan

2,176,903.50
326,535.53

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Wire mesh 5mm ulir, kotak 10 x 10 cm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

2)

Bentuk I, Tipe B Bronjong kawat uk. L=3,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)

15% x D

2,503,439.03

P.06a.2.a

(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu
No

P.06a.2.b

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

4.740
75,900.00
1.580
95,700.00
2.100
75,900.00
0.684
95,700.00
Jumlah Harga Tenaga Kerja

359,766.00
151,206.00
159,390.00
65,458.80
735,820.80

M.05
M.61

m3
kg

4.200
231,000.00
31.358
19,350.00
Jumlah Harga Bahan

970,200.00
606,777.30
1,576,977.30

Jumlah Harga Peralatan

2,312,798.10
346,919.72

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,659,717.82

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06a.2.c

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

4.860
75,900.00
1.620
95,700.00
2.100
75,900.00
0.696
95,700.00
Jumlah Harga Tenaga Kerja

368,874.00
155,034.00
159,390.00
66,607.20
749,905.20

M.05
M.61

m3
kg

4.200
231,000.00
32.296
19,350.00
Jumlah Harga Bahan

970,200.00
624,927.60
1,595,127.60

Jumlah Harga Peralatan

2,345,032.80
351,754.92

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,696,787.72

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

8.250
75,900.00
2.750
95,700.00
2.100
75,900.00
1.035
95,700.00
Jumlah Harga Tenaga Kerja

626,175.00
263,175.00
159,390.00
99,049.50
1,147,789.50

M.05
M.61

m3
kg

4.20
231,000.00
55.10
19,350.00
Jumlah Harga Bahan

970,200.00
1,066,185.00
2,036,385.00

Jumlah Harga Peralatan

3,184,174.50
477,626.18

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Wire mesh 5mm ulir, kotak 10 x 10 cm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

3,661,800.68

Bentuk I, Tipe C Bronjong kawat uk. L=4,0m x B=1,0 m x T= 1,0 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu

3)

P.06a.3.a

No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

P.06a.3.b (b)

OH
OH
OH
OH

6.180
75,900.00
2.060
95,700.00
2.800
75,900.00
0.898
95,700.00
Jumlah Harga Tenaga Kerja

469,062.00
197,142.00
212,520.00
85,938.60
964,662.60

M.05
M.61

m3
kg

5.600
231,000.00
41.011
19,350.00
Jumlah Harga Bahan

1,293,600.00
793,562.85
2,087,162.85

Jumlah Harga Peralatan

3,051,825.45
457,773.82

15% x D

3,509,599.27

Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba

No

P.06a.3.c

L.01
L.02
L.01
L.04

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

6.360
75,900.00
2.120
95,700.00
2.800
75,900.00
0.916
95,700.00
Jumlah Harga Tenaga Kerja

482,724.00
202,884.00
212,520.00
87,661.20
985,789.20

M.05
M.61

m3
kg

5.600
231,000.00
42.237
19,350.00
Jumlah Harga Bahan

1,293,600.00
817,285.95
2,110,885.95

Jumlah Harga Peralatan

3,096,675.15
464,501.27

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

3,561,176.42

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

10.800
75,900.00
3.600
95,700.00
2.800
75,900.00
1.360
95,700.00
Jumlah Harga Tenaga Kerja

819,720.00
344,520.00
212,520.00
130,152.00
1,506,912.00

M.05
M.61

m3
kg

5.600
231,000.00
72.100
19,350.00
Jumlah Harga Bahan

1,293,600.00
1,395,135.00
2,688,735.00

Jumlah Harga Peralatan

4,195,647.00
629,347.05

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

4,824,994.05

Bentuk I, Tipe D Bronjong kawat uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu

4)

P.06a.4.a

No
1
A
1
2
3
4

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

2.280
0.760
0.700
0.298

Harga Satuan
(Rp)
6
75,900.00
95,700.00
75,900.00
95,700.00

Jumlah
(Rp)
7
173,052.00
72,732.00
53,130.00
28,518.60

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

P.06a.4.b (b)

m3
kg

327,432.60

1.400
231,000.00
15.100
19,350.00
Jumlah Harga Bahan

323,400.00
292,185.00
615,585.00

Jumlah Harga Peralatan

943,017.60
141,452.64

15% x D

1,084,470.24

Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba

No

P.06a.4.c

M.05
M.61

Jumlah Harga Tenaga Kerja

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

2.340
75,900.00
0.780
95,700.00
0.700
75,900.00
0.234
95,700.00
Jumlah Harga Tenaga Kerja

177,606.00
74,646.00
53,130.00
22,393.80
327,775.80

M.05
M.61

m3
kg

1.400
231,000.00
15.551
19,350.00
Jumlah Harga Bahan

323,400.00
300,911.85
624,311.85

Jumlah Harga Peralatan

952,087.65
142,813.15

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

1,094,900.80

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

3.960
75,900.00
1.320
95,700.00
0.700
75,900.00
0.466
95,700.00
Jumlah Harga Tenaga Kerja

300,564.00
126,324.00
53,130.00
44,596.20
524,614.20

M.05
M.61

m3
kg

1.40
231,000.00
26.53
19,350.00
Jumlah Harga Bahan

323,400.00
513,355.50
836,755.50

Jumlah Harga Peralatan

1,361,369.70
204,205.46

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

1,565,575.16

Bentuk I, Tipe E Bronjong kawat uk. L=3,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu

5)

P.06a.5.a

No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

3.330
75,900.00
1.110
95,700.00
1.050
75,900.00
0.438
95,700.00
Jumlah Harga Tenaga Kerja

252,747.00
106,227.00
79,695.00
41,916.60
480,585.60

M.05
M.61

m3
kg

2.100
231,000.00
21.987
19,350.00
Jumlah Harga Bahan

485,100.00
425,448.45
910,548.45

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

Jumlah Harga Peralatan

P.06a.5.b

1,599,804.16

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06a.5.c

15% x D

1,391,134.05
208,670.11

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

3.390
75,900.00
1.130
95,700.00
1.050
75,900.00
0.440
95,700.00
Jumlah Harga Tenaga Kerja

257,301.00
108,141.00
79,695.00
42,108.00
487,245.00

M.05
M.61

m3
kg

2.100
231,000.00
22.644
19,350.00
Jumlah Harga Bahan

485,100.00
438,161.40
923,261.40

Jumlah Harga Peralatan

1,410,506.40
211,575.96

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

1,622,082.36

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

5.250
75,900.00
1.750
95,700.00
1.050
75,900.00
0.630
95,700.00
Jumlah Harga Tenaga Kerja

398,475.00
167,475.00
79,695.00
60,291.00
705,936.00

M.05
M.61

m3
kg

2.100
231,000.00
38.620
19,350.00
Jumlah Harga Bahan

485,100.00
747,297.00
1,232,397.00

Jumlah Harga Peralatan

1,938,333.00
290,749.95

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,229,082.95

Bentuk I, Tipe F Bronjong kawat uk. L=4,0m x B=1,0 m x T= 0,5 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu

6)

P.06a.6.a

No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

4.350
75,900.00
1.450
95,700.00
1.400
75,900.00
0.575
95,700.00
Jumlah Harga Tenaga Kerja

330,165.00
138,765.00
106,260.00
55,027.50
630,217.50

M.05
M.61

m3
kg

2.800
231,000.00
28.858
19,350.00
Jumlah Harga Bahan

646,800.00
558,402.30
1,205,202.30

Jumlah Harga Peralatan

1,835,419.80
275,312.97

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,110,732.77

P.06a.6.b

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06a.6.c

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

4.470
75,900.00
1.490
95,700.00
1.400
75,900.00
0.587
95,700.00
Jumlah Harga Tenaga Kerja

339,273.00
142,593.00
106,260.00
56,175.90
644,301.90

M.05
M.61

m3
kg

2.800
231,000.00
29.721
19,350.00
Jumlah Harga Bahan

646,800.00
575,101.35
1,221,901.35

Jumlah Harga Peralatan

1,866,203.25
279,930.49

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,146,133.74

(c) Kawat bronjong wire mesh 5mm ulir, dan kawat pengikat 2,0 mm, ukuran lubang kotak 100 x 100 mm;
No

P.06a.7

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

6.81
75,900.00
2.27
95,700.00
1.40
75,900.00
0.82
95,700.00
Jumlah Harga Tenaga Kerja

516,879.00
217,239.00
106,260.00
78,569.70
918,947.70

M.05
M.61

m3
kg

2.800
231,000.00
50.720
19,350.00
Jumlah Harga Bahan

646,800.00
981,432.00
1,628,232.00

Jumlah Harga Peralatan

2,547,179.70
382,076.96

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 3 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

7)

1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06a


(Tenaga kerja untuk 1 m3 volume batu bronjong)

15% x D

2,929,256.66

Harga Satuan
(Rp)

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

0.500
75,900.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja

37,950.00
4,785.00
42,735.00

M.05
P.06a.x

m3
bh

1.4
231,000.00
1.00
Jumlah Harga Bahan

323,400.00
323,400.00

Jumlah Harga Peralatan

366,135.00
54,920.25

A
1
2

Tenaga Kerja *)
Pekerja (isian batu dan pemasangan)
Mandor

B
1
2

Bahan
Batu / batu belah
Kawat Bronjong

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

15% x D

Harga Satuan Pekerjaan per - m3 (D+E)


*) Koefisien ini untuk volume bronjong 1 m3, misal volume 2m3 maka koefisien harus dikalikan 2

421,055.25

P.06b

Pasangan bronjong kawat Bentuk II


1) Bentuk II, Tipe G Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,17 m berisi batu kali/belah (buat sendiri)
P.06b.1.a
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan

Jumlah

No

P.06b.1.b

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

7.650
75,900.00
2.550
95,700.00
1.428
75,900.00
0.908
95,700.00
Jumlah Harga Tenaga Kerja

580,635.00
244,035.00
108,385.20
86,876.46
1,019,931.66

M.05
M.61

m3
kg

2.856
231,000.00
37.326
19,350.00
Jumlah Harga Bahan

659,736.00
722,258.10
1,381,994.10

Jumlah Harga Peralatan

2,401,925.76
360,288.86

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,0 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,762,214.62

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06b.2.a

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

6.300
75,900.00
2.100
95,700.00
1.428
75,900.00
0.773
95,700.00
Jumlah Harga Tenaga Kerja

478,170.00
200,970.00
108,385.20
73,956.96
861,482.16

M.05
M.61

m3
kg

2.856
231,000.00
50.696
19,350.00
Jumlah Harga Bahan

659,736.00
980,967.60
1,640,703.60

Jumlah Harga Peralatan

2,502,185.76
375,327.86

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

2,877,513.62

2) Bentuk II, Tipe H Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,23 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu
No

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

8.040
75,900.00
2.680
95,700.00
1.932
75,900.00
0.997
95,700.00
Jumlah Harga Tenaga Kerja

610,236.00
256,476.00
146,638.80
95,432.04
1,108,782.84

M.05
M.61

m3
kg

3.864
231,000.00
39.265
19,350.00
Jumlah Harga Bahan

892,584.00
759,777.75
1,652,361.75

Jumlah Harga Peralatan

2,761,144.59
414,171.69

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,0 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

No
1
A
1
2
3

Jumlah
(Rp)

Kode

1
A
1
2
3
4

P.06b.2.b (b)

Harga Satuan
(Rp)

Uraian

15% x D

3,175,316.28

Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01

OH
OH
OH

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu

7.200
2.400
1.932

Harga Satuan
(Rp)
6
75,900.00
95,700.00
75,900.00

Jumlah
(Rp)
7
546,480.00
229,680.00
146,638.80

P.06b.3.a

Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

0.913
95,700.00
Jumlah Harga Tenaga Kerja

87,393.24
1,010,192.04

M.05
M.61

m3
kg

3.864
231,000.00
53.329
19,350.00
Jumlah Harga Bahan

892,584.00
1,031,916.15
1,924,500.15

Jumlah Harga Peralatan

2,934,692.19
440,203.83

15% x D

3,374,896.02

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

8.520
75,900.00
2.840
95,700.00
2.520
75,900.00
1.104
95,700.00
Jumlah Harga Tenaga Kerja

646,668.00
271,788.00
191,268.00
105,652.80
1,215,376.80

M.05
M.61

m3
kg

5.040
231,000.00
41.520
19,350.00
Jumlah Harga Bahan

1,164,240.00
803,412.00
1,967,652.00

Jumlah Harga Peralatan

3,183,028.80
477,454.32

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,0 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

3,660,483.12

(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,7 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, ukuran luba
No

P.06b.4

OH

3) Bentuk II, Tipe I Bronjong kawat uk. L=6,0m x B=2,0 m x T= 0,30 m berisi batu kali/belah (buat sendiri)
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,00 mm, kawat sisi 3,40 mm dan kawat pengikat 2,0 mm, ukuran lu
No

P.06b.3.b

L.04

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.01
L.04

OH
OH
OH
OH

6.300
75,900.00
2.100
95,700.00
2.520
75,900.00
0.882
95,700.00
Jumlah Harga Tenaga Kerja

478,170.00
200,970.00
191,268.00
84,407.40
954,815.40

M.05
M.61

m3
kg

5.040
231,000.00
56.392
19,350.00
Jumlah Harga Bahan

1,164,240.00
1,091,185.20
2,255,425.20

Jumlah Harga Peralatan

3,210,240.60
481,536.09

1
A
1
2
3
4

Tenaga Kerja
Pekerja Penganyam
Tukang Penganyam
Pekerja Pengisi Batu
Mandor

Bahan

1
2

Batu / batu belah


Kawat Bronjong dia 2,7 mm

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

4)

1 m3 Pasangan Bronjong Kawat pabrikasi untuk P.06b


(Tenaga kerja untuk 1 m3 volume batu bronjong)

15% x D

3,691,776.69

No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

M.05
P.06b.x

m3
bh

A
1
2

Tenaga Kerja *)
Pekerja (isian batu dan pemasangan)
Mandor

B
1
2

Bahan
Batu / batu belah *)
Kawat Bronjong

Peralatan

Harga Satuan
(Rp)

Jumlah
(Rp)

0.600
75,900.00
0.060
95,700.00
Jumlah Harga Tenaga Kerja
1.40
231,000.00
1.00
Jumlah Harga Bahan

45,540.00
5,742.00
51,282.00
323,400.00
323,400.00

Jumlah Harga Peralatan


D
E
F

P.07
P.07.a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

374,682.00
56,202.30

15% x D

Harga Satuan Pekerjaan per - m (D+E)


*) Koefisien ini untuk volume bronjong 1 m3, misal volume 2m3 maka koefisien harus dikalikan 2

430,884.30

Cerucuk dan Pemasangan Modul Bronjong


1 m panjang cerucuk kayu/dolken diameter 8 cm 10 cm
No

Uraian

Kode

Satuan

Koefisien
5

1
A
1
2
3

2
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)

L.01
L.04
L.05

OH
OH
OH

B
1

Bahan
Kayu Galam dia 8 - 10 cm

M.31.b

C
1
2
3

Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken

E.45
E.01.a
E.02.c

Sewa-hari
Sewa-hari
Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)

Jumlah
(Rp)

0.030
75,900.00
0.003
95,700.00
0.005
75,900.00
Jumlah Harga Tenaga Kerja

2,277.00
287.10
379.50
2,943.60

1.05
1,666.67
Jumlah Harga Bahan

1,750.00
1,750.00

0.005
450,000.00
0.005
450,000.00
0.250
25,000.00
Jumlah Harga Peralatan

2,250.00
2,250.00
6,250.00
10,750.00
15,443.60
2,316.54

15% x D

17,760.14

*) Jika tidak menggunakan tripod/crane maka HSD peralatan = 0, dan koefisien pekerja (L.01) diubah menjadi 0,06.

P.07.b

1 m panjang cerucuk bambu diameter 8 cm 10 cm


No

P.07.c

Uraian

Kode

Satuan

Koefisien
5

1
A
1
2
3

2
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)

L.01
L.04
L.05

OH
OH
OH

B
1

Bahan
Kayu Galam dia 8 - 10 cm

M.31.b

C
1
2
2

Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken

E.45
E.01.a
E.02.c

Sewa-hari
Sewa-hari
Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.036
75,900.00
0.004
95,700.00
0.006
75,900.00
Jumlah Harga Tenaga Kerja

2,732.40
382.80
455.40
3,570.60

1.05
1,666.67
Jumlah Harga Bahan

1,750.00
1,750.00

0.006
450,000.00
0.006
450,000.00
0.250
25,000.00
Jumlah Harga Peralatan

2,700.00
2,700.00
6,250.00
11,650.00
16,970.60
2,545.59

15% x D

19,516.19

1 m panjang cerucuk tiang beton diameter 10 cm 12 cm


No

Uraian

Kode

Satuan

Koefisien

L.01
L.04
L.05

OH
OH
OH

1
A
1
2
3

2
Tenaga Kerja
Pekerja
Mandor
Operator Tripod/Crane *)

B
1

Bahan
Kayu Galam dia 8 cm

M.31.b

C
1
2
2

Peralatan
Tripod tinggi 5 m
Alat pancang Hammer 0.5 ton
Alat penyambung tiang pancang dolken

E.45
E.01.a
E.02.c

Sewa-hari
Sewa-hari
Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.040
75,900.00
0.004
95,700.00
0.010
75,900.00
Jumlah Harga Tenaga Kerja

3,036.00
382.80
759.00
4,177.80

1.03
1,666.67
Jumlah Harga Bahan

1,716.67
1,716.67

0.010
450,000.00
0.010
450,000.00
0.250
25,000.00
Jumlah Harga Peralatan

4,500.00
4,500.00
6,250.00
15,250.00
21,144.47
3,171.67

15% x D

F
P.07.d

Harga Satuan Pekerjaan per - m' (D+E)

24,316.14

Pemasangan modul 1m3 bronjong kawat menjadi struktur krib sungai


No
1
A
1
2
3

Uraian

Kode

Satuan

Koefisien

L.01
L.04
L.05

OH
OH
OH

M.32

m2

Tenaga Kerja
Pekerja
Mandor
Operator Crane *)

B
1

Bahan
Lapisan ijuk 5 cm (hanya untuk bronjong
yang menempel dengan tanah)

Peralatan

Crane daya angkat 5 ton (long arm)15 m

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)
6

0.120
75,900.00
0.012
95,700.00
0.010
75,900.00
Jumlah Harga Tenaga Kerja
1.150

10,000.00

Jumlah Harga Bahan


E.07.b

Sewa-hari

0.01

P.08
P.08a

15% x D

Harga Satuan Pekerjaan per - m3 (D+E)


*) Jika operator Crane sudah termasuk dalam Sewa-hari Crane, maka HSD operator Crane = 0

9,108.00
1,148.40
759.00
11,015.40
11,500.00
11,500.00
2,700.00
2,700.00
25,215.40
3,782.31
28,997.71

Pasangan batu muka dan batu candi


Batu muka (1 m2)
No

P.08b

270,000.00

Jumlah Harga Peralatan

Jumlah
(Rp)

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.240
75,900.00
0.120
95,700.00
0.012
95,700.00
0.024
95,700.00
Jumlah Harga Tenaga Kerja

18,216.00
11,484.00
1,148.40
2,296.80
33,145.20

M.07b
M.14.b
M.15

m2
m3
kg

1.250
100,000.00
0.025
200,000.00
5.000
1,740.00
Jumlah Harga Bahan

125,000.00
5,000.00
8,700.00
138,700.00

Jumlah Harga Peralatan

171,845.20
25,776.78

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan

1
2
3

Batu muka
Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)


Pembongkaran pasangan batu muka 35% harga pasangan

15% x D

197,621.98

Batu candi (1 m2)


No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.240
75,900.00
0.120
95,700.00
0.012
95,700.00
0.024
95,700.00
Jumlah Harga Tenaga Kerja

18,216.00
11,484.00
1,148.40
2,296.80
33,145.20

M.07a
M.14.b
M.15

m2
m3
kg

1.200
140,000.00
0.025
200,000.00
5.000
1,740.00
Jumlah Harga Bahan

168,000.00
5,000.00
8,700.00
181,700.00

Jumlah Harga Peralatan

214,845.20
32,226.78

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor

B
1
2
3

Bahan
Batu candi
Pasir Pasang
Portland Cement

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)


Pembongkaran pasangan batu candi 35% harga pasangan

15% x D

247,071.98

P.09
P.09a

Pasangan Geotekstil
Pemasangan Geotekstil (1 m 2) Tipe-A
No

P.09b

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.100
75,900.00
0.020
95,700.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

7,590.00
1,914.00
957.00
10,461.00

M.122.a

m2

1.050
60,000.00
Jumlah Harga Bahan

63,000.00
63,000.00

Jumlah Harga Peralatan

73,461.00
11,019.15

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok/gali
Mandor

Bahan

Geotekstil

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

84,480.15

Pemasangan Geotekstil (1 m 2), Tipe-B


No

P.09c

Harga Satuan
(Rp)

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.160
75,900.00
0.032
95,700.00
0.016
95,700.00
Jumlah Harga Tenaga Kerja

12,144.00
3,062.40
1,531.20
16,737.60

M.122.b

m2

1.080
120,500.00
Jumlah Harga Bahan

130,140.00
130,140.00

Jumlah Harga Peralatan

146,877.60
22,031.64

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok/gali
Mandor

Bahan

Geotekstil

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

168,909.24

Pemasangan Geotekstil (1 m 2), Tipe-C


No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.240
75,900.00
0.048
95,700.00
0.024
95,700.00
Jumlah Harga Tenaga Kerja

18,216.00
4,593.60
2,296.80
25,106.40

M.122.c

m2

1.100
225,000.00
Jumlah Harga Bahan

247,500.00
247,500.00

Jumlah Harga Peralatan

272,606.40
40,890.96

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok/gali
Mandor

Bahan

Geotekstil

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

313,497.36

Pasangan Bar Screen (saringan kasar) Bangunan Intake, Pengukur, dan Pengatur
P.10

Bar
Screen/saringan
(1 buah)
Saringan
kasar terbuatkasar
dari besi
beton sesuai dengan kebutuhan, misalnya menggunakan besi beton diameter 12 mm berjarak
as ke as satu sama lain 3,5 cm dihitung dalam m 2, AHSP-nya sebagai berikut:
No
1
A
1
2

Tenaga Kerja
Pekerja
Tukang batu

Uraian

Kode

Satuan

Koefisien

L.01
L.02

OH
OH

0.750
0.250

Harga Satuan
(Rp)
6
75,900.00
95,700.00

Jumlah
(Rp)
7
56,925.00
23,925.00

P.11

3
4

Kepala Tukang batu


Mandor

B
1
2

Bahan
Besi beton dia 12 mm
Baja profil L.40.40.4

C
1
2

Peralatan
Alat las listrik atau las diesel
Bor listrik

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - buah (D+E)

OH
OH

M.55.d
M.54.g

m
m

E.22
E.04

Sewa-hari
Sewa-hari

0.025
95,700.00
0.075
95,700.00
Jumlah Harga Tenaga Kerja

2,392.50
7,177.50
90,420.00

30
6,833.33
4
12,000.00
Jumlah Harga Bahan

205,000.00
48,000.00
253,000.00

0.15
385,000.00
0.02
20,000.00
Jumlah Harga Peralatan

57,750.00
400.00
58,150.00
401,570.00
60,235.50

15% x D

461,805.50

1
buah
ambang ukur pada
dan/atau
pengatur
dan
pemasangannya
pakaibangunan
dynabolt pengukur
atau raamset
setiap
20 cm. Masing-masing tipe sesuai dengan bentuk bangunannya,
maka AHSP ambang ukur dapat dihitung sebagai berikut
No
1
A
1
2
3
4

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

M.57

bh

21

M.54.g

4
12,000.00
Jumlah Harga Bahan

48,000.00
153,000.00

E.22
E.04

Sewa-hari
Sewa-hari

0.050
385,000.00
0.060
20,000.00
Jumlah Harga Peralatan

19,250.00
1,200.00
20,450.00
207,976.25
31,196.44

Bahan
Dynabolt / raamset dia 8 mm *)
panjang 4 - 5 cm
Baja profil L.40.40.4
*)

C
1
2

Peralatan
Alat las listrik atau las diesel
Bor listrik

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan
(Rp)

Uraian

Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang batu
Mandor

B
1

P.12
P.12a

L.03
L.04

0.250
75,900.00
0.125
95,700.00
0.013
95,700.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja
5,000.00

15% x D

Harga Satuan Pekerjaan per - buah (D+E)


*) Koefisien disesuikan dengan spektek atau kebutuhan di lapangan

7
18,975.00
11,962.50
1,196.25
2,392.50
34,526.25
105,000.00

239,172.69

Pasangan 1m2 Lempengan Rumput


Penanaman rumput lempengan

No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

0.100
75,900.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

7,590.00
957.00
8,547.00

B
1

Bahan
Gebalan rumput

M.13

m2

1.10
2,000.00
Jumlah Harga Bahan

2,200.00
2,200.00

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

Jumlah Harga Peralatan

P.12b

10,747.00
1,612.05

15% x D

12,359.05

Pembabadan rumput
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1

Peralatan
Alat potong rumput

Harga Satuan
(Rp)
6

0.0070
75,900.00
0.0007
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
531.30
66.99
598.29

Jumlah Harga Bahan


M.133

sewa-hari

0.007
1,000,000.00
Jumlah Harga Peralatan

7,000.00
7,598.29

P.13
P.13a

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

Penanaman 1 pohon Bakau

P.14a

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

0.0080
75,900.00
0.0008
95,700.00
Jumlah Harga Tenaga Kerja

607.20
76.56
683.76

1
3,500.00
1
2,000.00
Jumlah Harga Bahan

3,500.00
2,000.00
5,500.00

0.002
75,000.00
0.005
300,000.00
Jumlah Harga Peralatan

150.00
1,500.00
1,650.00
7,833.76
1,175.06

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

B
1
2

Bahan
Bibit Mangrove
Ajir tinggi 2m

M.113
M.109

phn
bh

C
1
2

Peralatan
Kendaraan pengangkut
Rakit

M.138
M.136

sewa-hari
sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - pohon bakau (D+E)

15% x D

9,008.82

Matras Bambu

No

P.14

9,426.07

Pekerjaan Pantai

No

P.13b

8,196.58
1,229.49

15% x D

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

0.5000
75,900.00
0.0500
95,700.00
Jumlah Harga Tenaga Kerja

37,950.00
4,785.00
42,735.00

B
1
2

Bahan
Bambu
Tali pengikat

M.30.a
M.141

bh
m

4
13,900.00
5
2,500.00
Jumlah Harga Bahan

55,600.00
12,500.00
68,100.00

C
1

Peralatan
Alat bantu

LS

1
1,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

1,000.00
1,000.00
111,835.00
16,775.25

Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

128,610.25

Pasangan
Armor
Berbagai jenis
armor yang terbuat dari beton diantaranya berbentuk kubus, 3B, Quadripod, tetrapod, dolos, tribar dll. Untuk
pembuatan dan pemasangan berbagai jenis armor sebagai berikut:
Pembuatan 1 bh Kubus Beton ukuran 30 x 30 x 30 cm
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.050
75,900.00
0.010
95,700.00
0.005
95,700.00
Jumlah Harga Tenaga Kerja

3,795.00
957.00
478.50
5,230.50

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
B.17

m3
kg

0.027
1,303,329.32
3.24
6,833.33
Jumlah Harga Bahan

35,189.89
22,140.00
22,140.00

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

0.0054
400,000.00
0.0027
134,750.00
0.002
250,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

2,160.00
363.83
500.00
3,023.83
30,394.33
4,559.15

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

34,953.47

P.14b

Pembuatan Kubus Beton ukuran 40 x 40 x 40 cm


No

P.14c

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.100
75,900.00
0.020
95,700.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

7,590.00
1,914.00
957.00
10,461.00

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
M.55.d

m3
kg

0.064
1,303,329.32
7.68
6,833.33
Jumlah Harga Bahan

83,413.08
52,480.00
52,480.00

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

0.016
400,000.00
0.016
134,750.00
0.002
250,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

6,400.00
2,156.00
500.00
9,056.00
71,997.00
10,799.55

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

82,796.55

Pembuatan 3B: Blok Beton Bergigi


No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.120
75,900.00
0.024
95,700.00
0.012
95,700.00
Jumlah Harga Tenaga Kerja

9,108.00
2,296.80
1,148.40
12,553.20

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
M.55.d

m3
kg

0.100
1,303,329.32
12.00
6,833.33
Jumlah Harga Bahan

130,332.93
82,000.00
82,000.00

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor 3B

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

0.025
400,000.00
0.025
134,750.00
0.002
250,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

10,000.00
3,368.75
500.00
13,868.75
108,421.95
16,263.29

Harga Satuan Pekerjaan per - bh (D+E)


- Pasangan 3B akan terpasang 4,4 buah /m2

15% x D

124,685.24

P.14d

Pembuatan Blok beton berat 0,5 ton Quadripod, tetrapod, dolos, tribar dll.
No

P.14e

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.190
75,900.00
0.038
95,700.00
0.019
95,700.00
Jumlah Harga Tenaga Kerja

14,421.00
3,636.60
1,818.30
19,875.90

0.227
1,303,329.32
27.27
6,833.33
Jumlah Harga Bahan

296,211.21
186,363.64
186,363.64

0.0455
400,000.00
0.0227
134,750.00
0.0020
250,000.00
Jumlah Harga Peralatan

18,181.82
3,062.50
500.00
21,744.32
227,983.85
34,197.58

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
M.55.d

m3
kg

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

262,181.43

Pembuatan Blok beton berat 0,75 ton Quadripod, tetrapod, dolos, tribar dll.
No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.280
75,900.00
0.056
95,700.00
0.028
95,700.00
Jumlah Harga Tenaga Kerja

21,252.00
5,359.20
2,679.60
29,290.80

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
M.55.d

m3
kg

0.341
1,303,329.32
40.91
6,833.33
Jumlah Harga Bahan

444,316.81
279,545.45
279,545.45

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

0.0852
400,000.00
0.0852
134,750.00
0.0020
250,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

34,080.00
11,480.70
500.00
46,060.70
354,896.95
53,234.54

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

408,131.50

P.14f

Pembuatan Blok beton berat 1,0 ton Quadripod, tetrapod, dolos, tribar dll.
No

P.14g

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.400
75,900.00
0.080
95,700.00
0.040
95,700.00
Jumlah Harga Tenaga Kerja

30,360.00
7,656.00
3,828.00
41,844.00

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Campuran beton, K > 250
Tulangan praktis 120 kg/m3

B.07b
M.55.d

m3
kg

0.227
1,303,329.32
27.27
6,833.33
Jumlah Harga Bahan

296,211.21
186,363.64
186,363.64

C
1
2
3

Peralatan
Molen
Vibrator
Cetakan Armor

E.28.b
E.47
M.116

sewa-hari
sewa-hari
bh

0.0568
400,000.00
0.0568
134,750.00
0.002
250,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

22,720.00
7,653.80
500.00
30,873.80
259,081.44
38,862.22

Harga Satuan Pekerjaan per - bh (D+E)

15% x D

297,943.65

Pemasangan armor per-1 m3


No

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.520
75,900.00
0.104
95,700.00
0.052
95,700.00
Jumlah Harga Tenaga Kerja

39,468.00
9,952.80
4,976.40
54,397.20

P.14x
M.14.b

m3
m3

1.050
259,081.44
0.07
200,000.00
Jumlah Harga Bahan

272,035.51
14,000.00
286,035.51

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu/tembok
Mandor

B
1
2

Bahan
Armor
Pasir pasang

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Peralatan

P.14h

391,497.61

Pasangan 1 m3 batu 1kg - 3 kg

No

P.14i

340,432.71
51,064.91

15% x D

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

1.000
75,900.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

75,900.00
9,570.00
85,470.00

B
1

Bahan
Batu 1 kg - 3 kg

M.05

m3

1.1
231,000.00
Jumlah Harga Bahan

254,100.00
254,100.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.1
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

16,800.00
16,800.00
356,370.00
53,455.50

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

409,825.50

Pasangan 1m3 batu 3 kg - 5 kg

No
1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

Harga Satuan
(Rp)
6

1.000
75,900.00
0.200
95,700.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
75,900.00
19,140.00
9,570.00
104,610.00

P.14j

Batu 3 kg - 5 kg

M.05

m3

1.15
231,000.00
Jumlah Harga Bahan

265,650.00
265,650.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.1
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

16,800.00
16,800.00
387,060.00
58,059.00

Harga Satuan Pekerjaan per - m3 (D+E)

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.100
75,900.00
0.220
95,700.00
0.110
95,700.00
Jumlah Harga Tenaga Kerja

83,490.00
21,054.00
10,527.00
115,071.00

B
1

Bahan
Batu 5 kg - 10 kg

M.05

m3

1.2
231,000.00
Jumlah Harga Bahan

277,200.00
277,200.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.11
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

18,480.00
18,480.00
410,751.00
61,612.65

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

472,363.65

Pasangan 1m3 batu 10 kg - 30 kg

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.100
75,900.00
0.220
95,700.00
0.110
95,700.00
Jumlah Harga Tenaga Kerja

83,490.00
21,054.00
10,527.00
115,071.00

B
1

Bahan
Batu 10 kg - 30 kg

M.05

m3

1.25
231,000.00
Jumlah Harga Bahan

288,750.00
288,750.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.11
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

18,480.00
18,480.00
422,301.00
63,345.15

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

485,646.15

Pasangan 1m3 batu 30 kg - 50 kg

No

P.14m

Uraian

1
A
1
2
3

No

P.14l

445,119.00

Pasangan 1m3 batu 5 kg - 10 kg

No

P.14k

15% x D

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.200
75,900.00
0.240
95,700.00
0.120
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
22,968.00
11,484.00
125,532.00

B
1

Bahan
Batu 30 kg - 50 kg

M.05

m3

1.28
231,000.00
Jumlah Harga Bahan

295,680.00
295,680.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.12
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

20,160.00
20,160.00
441,372.00
66,205.80

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

507,577.80

Pasangan 1m3 batu 50 kg - 100 kg

No
1
A
1

Tenaga Kerja
Pekerja

Uraian

Kode

Satuan

Koefisien

L.01

OH

1.200

Harga Satuan
(Rp)
6
75,900.00

Jumlah
(Rp)
7
91,080.00

P.14n

2
3

Tukang batu
Mandor

L.02
L.04

OH
OH

0.240
95,700.00
0.120
95,700.00
Jumlah Harga Tenaga Kerja

22,968.00
11,484.00
125,532.00

B
1

Bahan
Batu 50 kg - 100 kg

M.05

m3

1.3
231,000.00
Jumlah Harga Bahan

300,300.00
300,300.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.12
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

20,160.00
20,160.00
445,992.00
66,898.80

Harga Satuan Pekerjaan per - m (D+E)

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.200
75,900.00
0.240
95,700.00
0.120
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
22,968.00
11,484.00
125,532.00

B
1

Bahan
Batu 100 kg - 200 kg

M.05

m3

1.32
231,000.00
Jumlah Harga Bahan

304,920.00
304,920.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.12
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

20,160.00
20,160.00
450,612.00
67,591.80

Harga Satuan Pekerjaan per - m (D+E)

15% x D

518,203.80

Pasangan 1m3 batu 200 kg - 300 kg

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.200
75,900.00
0.240
95,700.00
0.120
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
22,968.00
11,484.00
125,532.00

B
1

Bahan
Batu 100 kg - 200 kg

M.05

m3

1.35
231,000.00
Jumlah Harga Bahan

311,850.00
311,850.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.12
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

20,160.00
20,160.00
457,542.00
68,631.30

Harga Satuan Pekerjaan per - m (D+E)

15% x D

526,173.30

Pasangan 1m3 batu 300 kg - 400 kg

No

P.14q

Uraian

1
A
1
2
3

No

P.14p

512,890.80

Pasangan 1m3 batu 100 kg - 200 kg

No

P.14o

15% x D

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.300
75,900.00
0.260
95,700.00
0.130
95,700.00
Jumlah Harga Tenaga Kerja

98,670.00
24,882.00
12,441.00
135,993.00

B
1

Bahan
Batu 100 kg - 200 kg

M.05

m3

1.38
231,000.00
Jumlah Harga Bahan

318,780.00
318,780.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.13
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

21,840.00
21,840.00
476,613.00
71,491.95

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

548,104.95

Pasangan 1m3 batu 400 kg - 500 kg

No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

P.15
P.15a

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang batu
Mandor

L.01
L.02
L.04

OH
OH
OH

1.300
75,900.00
0.260
95,700.00
0.130
95,700.00
Jumlah Harga Tenaga Kerja

98,670.00
24,882.00
12,441.00
135,993.00

B
1

Bahan
Batu 100 kg - 200 kg

M.05

m3

1.4
231,000.00
Jumlah Harga Bahan

323,400.00
323,400.00

C
1

Peralatan
Wheel Loader

E.25a

jam

0.13
168,000.00
Jumlah Harga Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

21,840.00
21,840.00
481,233.00
72,184.95

Harga Satuan Pekerjaan per - m (D+E)

15% x D

553,417.95

Pasangan Krib laut


Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai (1 buah)
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - buah (D+E)

Harga Satuan
(Rp)
6

0.200
75,900.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
15,180.00
1,914.00
17,094.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

P.15b

17,094.00
2,564.10
19,658.10

Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c= 7,4MPa(K-100)

No

P.16

15% x D

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.200
75,900.00
0.200
95,700.00
0.020
95,700.00
0.120
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
19,140.00
1,914.00
11,484.00
123,618.00

247
1,740.00
869
142.86
999
148.15
215
0.05
Jumlah Harga Bahan

429,780.00
124,142.86
148,000.00
10.75
701,933.61

0.250
400,000.00
Jumlah Harga Peralatan

100,000.00
100,000.00
925,551.61
138,832.74

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
ltr

C
1

Peralatan
Molen

E.28.b

Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - buah (D+E)

15% x D

1,064,384.35

Pasangan Pipa Suling-suling (1 m')


No
1
A
1.
2.

Tenaga Kerja
Pekerja
Mandor

B
1.
2.
3.

Bahan
Pipa PVC dia. 2"
Ijuk
Kerikil

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

0.10
75,900.00
0.01
95,700.00
Jumlah Harga Tenaga Kerja

7,590.00
957.00
8,547.00

M.107.e
M.32
M.12

m
kg
m3

1.050
45,925.00
0.100
10,000.00
0.018
200,000.00
Jumlah Harga Bahan

48,221.25
1,000.00
3,600.00
52,821.25

Peralatan

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

Jumlah Harga Peralatan

P.17

15% x D

61,368.25
9,205.24
70,573.49

1 m' Peilskaal/Mistar duga muka air


(diambil dari AHSP Hidrologi)
No

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.04
L.08

OH
OH
OH

0.250
75,900.00
0.025
95,700.00
0.025
650,000.00
Jumlah Harga Tenaga Kerja

18,975.00
2,392.50
16,250.00
37,617.50

P.02b
M.54.g
M.53.f
M.57

m'
m3
kg
kg
bh

1
150,000.00
0.09
1,096,232.90
5.50
12,000.00
0.50
12,000.00
4.00
5,000.00
Jumlah Harga Bahan

150,000.00
98,660.96
66,000.00
6,000.00
20,000.00
340,660.96

LS

1.00
10,000.00
Jumlah Harga Peralatan

10,000.00
10,000.00
388,278.46
58,241.77

1
A
1
2
3

2
Tenaga Kerja
Pekerja
Mandor
Akhli madya (sipil/hidrologi)

B
1
2
3
4
5

Bahan
Mistar Ukur besi/allumunium pelat
Pasangan bata merah 1pc: 4ps
(*
Batang skoor L.40.40.4
(*
Pelat setrip / 3x30x300mm
Dynabolt/raamset dia 8 mm panjang 4-5 cm

C
1

Peralatan
Alat bantu

D
E

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

F Harga Satuan Pekerjaan per - m1 (D+E)


(* Jika dipasang pada dinding tembok/pasangan, koefisien ini = 0 atau HSD = 0

15% x D

446,520.23

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 80 x 100mm;

gikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;

engikat 2,0 mm, ukuran lubang heksagonal 60 x 80mm;

gikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;

engikat 2,0 mm, ukuran lubang heksagonal

60 x 80mm;

gikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;

engikat 2,0 mm, ukuran lubang heksagonal 60 x 80mm;

gikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;

AHSP.Pus Air.85

A.3

PEKERJAAN BETON (B.xx)


- Pembuatan campuran beton B.01 s.d. B.12 sudah termasuk pengecoran sampai dengan jarak < 5m, m
untuk pengecoran dengan jarak > 5m dan/atau kenaikan elevasi, lihat B.14 s.d B.16.
- Semua tipe mutu beton dapat menggunakan bahan aditif, lihat B.13
- Bekisting B.21 s.d. B.23 (tanpa perancah), dalam perhitungan bekisting keseluruhan harus ditambah pe
yaitu pada B.24 atau B.25

A.3.1

Koefisien untuk analisis harga satuan pekerjaan pembuatan beton

B.01

1 m3 beton untuk lantai kerja (bedding)


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang batu
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.320
75,900.00
0.220
95,700.00
0.022
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
m3
m3
L

247
1,740.00
0.621
200,000.00
0.74
200,000.00
215
0.05
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

B.02
B.02a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 7,4 MPa (K100), slump (122) cm, w/c = 0,87
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2
3

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil

M.15
M.14.a
M.12

kg
m3
m3

Harga Satuan
(Rp)
6

1.650
75,900.00
0.275
95,700.00
0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja
247
0.621
0.74

1,740.00
200,000.00
200,000.00

AHSP.Pus Air.86

Air

M.02

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

B.02b

Menggunakan Molen
No

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

M.15
M.14.a
M.12
M.02

kg
m3
m3
L

247
1,740.00
0.621
200,000.00
0.74
200,000.00
215
0.05
Jumlah Harga Bahan

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
1 Molen 0,35 m3

D
E
F

Harga Satuan
(Rp)

Uraian

1
A
1
2
3
4

B.03
B.03a

15% x D

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 9,8 MPa (K125), slump (122) cm, w/c = 0,78
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1
2

Bahan
PC / Portland Cement
PB / Pasir Beton

M.15
M.14.a

kg
kg

Harga Satuan
(Rp)
6

1.650
75,900.00
0.275
95,700.00
0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja
276
828

1,740.00
142.86

AHSP.Pus Air.87

3
4

Kr / Krikil
Air

Peralatan

M.12
M.02

kg
L

1012
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.03b

B.04
B.04a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

276
1,740.00
828
142.86
1012
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu fc = 12,2 MPa (K150), slump (122) cm, w/c = 0,72
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B
1

Bahan
PC / Portland Cement

M.15

kg

Harga Satuan
(Rp)
6

1.650
75,900.00
0.275
95,700.00
0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja
299

1,740.00

AHSP.Pus Air.88

2
3
4

PB / Pasir Beton
Kr / Krikil
Air

Peralatan

M.14.a
M.12
M.02

kg
kg
L

799
142.86
1017
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.04b

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

299
1,740.00
799
142.86
1017
148.15
215
0.05
Jumlah Harga Bahan

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

Peralatan
1 Molen

D
E
F

B.05
B.05a

15% x D

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 14,5 MPa (K175), slump (122) cm, w/c = 0,66
Manual
No
1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Harga Satuan
(Rp)
6

1.650
75,900.00
0.275
95,700.00
0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja

AHSP.Pus Air.89

1
2
3
4

PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

326
1,740.00
760
142.86
1029
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.05b

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Menggunakan molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

326
1,740.00
760
142.86
1029
148.15
215
0.05
Jumlah Harga Bahan

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

Peralatan
1 Molen

D
E
F

B.06
B.06a

15% x D

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 16,9 MPa (K200), slump (122) cm, w/c = 0,61
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Harga Satuan
(Rp)
6

1.650
75,900.00
0.275
95,700.00
0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja

AHSP.Pus Air.90

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

352
1,740.00
731
142.86
1031
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.06b

B.07
B.07a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

352
1,740.00
731
142.86
1031
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 19,3 MPa (K225), slump (122) cm, w/c = 0,58
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Harga Satuan
(Rp)
6

1.650
0.275
0.028
0.165

75,900.00
95,700.00
95,700.00
95,700.00

AHSP.Pus Air.91

Jumlah Harga Tenaga Kerja


B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

371
1,740.00
698
142.86
1047
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

B.07b

Menggunakan Molen
No

B.08
B.08a

15% x D

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

371
1,740.00
698
142.86
1047
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 21,7 MPa (K250), slump (122) cm, w/c = 0,56
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

Harga Satuan
(Rp)
6

1.650
0.275
0.028
0.165

75,900.00
95,700.00
95,700.00
95,700.00

AHSP.Pus Air.92

Jumlah Harga Tenaga Kerja


B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

384
1,740.00
692
142.86
1039
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

B.08b

Menggunakan Molen
No

B.09
B.09a

15% x D

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

384
1,740.00
692
142.86
1039
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 24,0 MPa (K275), slump (122) cm, w/c = 0,53
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang

Harga Satuan
(Rp)
6

1.650
0.275
0.028

75,900.00
95,700.00
95,700.00

AHSP.Pus Air.93

Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

L.04

OH

0.165
95,700.00
Jumlah Harga Tenaga Kerja

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

406
1,740.00
684
142.86
1026
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.09b

B.10
B.10a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

406
1,740.00
684
142.86
1026
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 26,4 MPa (K300), slump (122) cm, w/c = 0,52
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

L.01
L.02

OH
OH

Tenaga Kerja
Pekerja
Tukang batu

Harga Satuan
(Rp)
6

1.650
0.275

75,900.00
95,700.00

AHSP.Pus Air.94

3
4

Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

L.03
L.04

OH
OH

0.028
95,700.00
0.165
95,700.00
Jumlah Harga Tenaga Kerja

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

413
1,740.00
681
142.86
1021
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.10b

B.11
B.11a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.323
75,900.00
0.189
95,700.00
0.019
95,700.00
0.132
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

413
1,740.00
681
142.86
1021
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

0.250
400,000.00
Jumlah Harga Peralatan
15% x D

1 m3 beton mutu, fc = 28,8 MPa, (K325), slump (122) cm, w/c = 0,49
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1

L.01

OH

Tenaga Kerja
Pekerja

Harga Satuan
(Rp)
6

2.100

75,900.00

AHSP.Pus Air.95

2
3
4

Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

Peralatan

L.02
L.03
L.04

OH
OH
OH

0.350
95,700.00
0.035
95,700.00
0.210
95,700.00
Jumlah Harga Tenaga Kerja

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

439
1,740.00
670
142.86
1006
148.15
215
0.05
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F

B.11b

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Menggunakan Molen
No

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.680
75,900.00
0.240
95,700.00
0.024
95,700.00
0.168
95,700.00
Jumlah Harga Tenaga Kerja

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

439
1,740.00
670
142.86
1006
148.15
215
0.05
Jumlah Harga Bahan

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air
Peralatan
1 Molen

D
E
F

Harga Satuan
(Rp)

Uraian

1
A
1
2
3
4

B.12
B.12a

15% x D

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

1 m3 beton mutu, fc = 31,2 MPa, (K350), slump (122) cm, w/c = 0,48
Manual
No

Uraian

Kode

Satuan

Koefisien

1
A

Tenaga Kerja

Harga Satuan
(Rp)
6

AHSP.Pus Air.96

1
2
3
4

Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.100
75,900.00
0.350
95,700.00
0.035
95,700.00
0.210
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

448
1,740.00
667
142.86
1000
148.15
215
0.05
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Peralatan

B.12b

B.13
B.13.a

15% x D

Menggunakan Molen
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.680
75,900.00
0.240
95,700.00
0.024
95,700.00
0.168
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
PC / Portland Cement
PB / Pasir Beton
Kr / Krikil
Air

M.15
M.14.a
M.12
M.02

kg
kg
kg
L

448
1,740.00
667
142.86
1000
148.15
215
0.05
Jumlah Harga Bahan

C
1

Peralatan
Molen

E.28.b

Sewa-hari

0.250
400,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

Menggunakan Ready Mixed dan bahan aditif


Menggunakan Ready Mixed dan Pompa Beton
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

AHSP.Pus Air.97

A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1

Bahan *
Campuran Beton Ready Mixed

Peralatan
1 Pompa dan conveyor beton

D
E
F
*
B.13.b

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
75,900.00
0.250
95,700.00
0.025
95,700.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

M.09.x

m3

1.02
875,000.00
Jumlah Harga Bahan

E.35

Sewa-hari

0.120
200,000.00
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)
Sesuai dengan mutu beton yang digunakan

15% x D

1 m beton menggunakan bahan aditif

Semua tipe mutu beton dapat menggunakan bahan aditif, kebutuhan dan waktu serta pelaksanaan cur
dengan spesifikasi teknik dari pabrik pembuat bahan aditifnya. Prosedur pencampurannya dilakuka
pencampuran bahan, dan sebagai contoh untuk bahan aditif pengerasan dibutuhkan 1,2 L/m. Berba
admixture sebagai bahan kimia tambahan untuk berbagai keperluan diantaranya:
-Meningkatkan kinerja kelecakan (kematangan) adukan beton tanpa menambah air;
-Mengurangi penggunaan air dalam campuran beton tanpa mengurangi kelecakan;
-Mempercepat pengikatan hidrasi semen atau pengerasan beton;
-Memperlambat pengikatan hidrasi semen atau pengerasan beton;
-Meningkatkan kinerja kemudahan pemompaan beton;
-Mengurangi kecepatan terjadinya slump loss;
-Mengurangi susut beton atau memberikan sedikit pengembangan volume beton (ekspansi);
-Mengurangi terjadinya bleeding;
-Mengurangi terjadinya segregasi.

B.13.b

1 m beton menggunakan bahan aditif


No

Uraian

Kode

Satuan

Koefisien

1
A

Harga Satuan
(Rp)
6

Tenaga Kerja
Jumlah Harga Tenaga Kerja

B
1

Bahan
Bahan Aditif *

Peralatan

D
E
F

M.03

1.2
40,000.00
Jumlah Harga Bahan

Jumlah Harga Peralatan


Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
Overhead + Profit (Contoh 15%)
15% x D
3
Harga Satuan Pekerjaan per - m (D+E)
* Dosis atau jumlah bahan aditif yang ditambahkan agar disesuaikan dengan petunjuk penggunaannya

AHSP.Pus Air.98

A.3.2
B.14
B.14.a

Penambahan koefisien Tenaga Kerja dan/atau Peralatan


Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikan campuran beton den
1 m3 beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m
(Manual)
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.410
75,900.00
0.041
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Peralatan


15% x D

B.14.b
1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal)
B.14.b.1) Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.500
75,900.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

B.14.b.2) Menggunakan pompa beton


No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

0.200
0.020

75,900.00
95,700.00

AHSP.Pus Air.99

Jumlah Harga Tenaga Kerja


B

Bahan
Jumlah Harga Bahan

B.15
B.15a

C
1

Peralatan
Pompa dan Conveyor beton

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

E.35

Sewa-hari

0.120
200,000.00
Jumlah Harga Peralatan
15% x D

Penggunaan vibrator
Vibrator
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.250
75,900.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

B.15b

C
1

Peralatan
Vibrator

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

E.47

Sewa-hari

0.100
134,750.00
Jumlah Harga Peralatan
15% x D

Tenaga Kerja manual + Vibrator


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.500
75,900.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

B.16

C
1

Peralatan
Vibrator

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

E.47

Sewa-hari

1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal)

0.100
134,750.00
Jumlah Harga Peralatan
15% x D

AHSP.Pus Air.100

B.16a

Manual
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.250
75,900.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Peralatan

B.16b

15% x D

Menggunakan Pompa beton


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.200
75,900.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

A.3.3
B.17

C
1

Peralatan
Pompa dan conveyor beton

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

E.35

Sewa-hari

0.120
200,000.00
Jumlah Harga Peralatan
15% x D

Koefisien untuk analisa harga satuan pekerjaan pembesian beton


Pembesian 100 kg dengan besi polos atau ulir
No
1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang besi
Kepala tukang
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Harga Satuan
(Rp)
6

0.700
75,900.00
0.700
95,700.00
0.070
95,700.00
0.070
95,700.00
Jumlah Harga Tenaga Kerja

AHSP.Pus Air.101

1
2

Besi Beton (polos/ulir)


Kawat Ikat

Peralatan

M.55.d
M.60

kg
kg

105
6,833.33
1.5
1,931.60
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.18

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)

15% x D

Pembesian 100 kg jaring kawat (wire mesh)


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang besi
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.250
75,900.00
0.250
95,700.00
0.025
95,700.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2

Bahan
Wiremesh
Kawat Ikat

M.94.a
M.60

kg
kg

102
24,750.00
0.5
1,931.60
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F
B.19

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)

15% x D

Pembesian 100 kg kabel prestressed polos/strand


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang besi
Kepala Tukang besi
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.500
75,900.00
0.500
95,700.00
0.050
95,700.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3

Bahan
Kabel prestres
Besi beton
Kawat beton

M.59
M.55.d
M.60

kg
kg
kg

105
36,500.00
12.5
6,833.33
1
1,931.60
Jumlah Harga Bahan

C
1

Peralatan
Jack Tension/stressing

E.15

Sewa-hari

0.150

135,000.00

AHSP.Pus Air.102

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)

15% x D

B.20

Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikkan 100 kg tulangan set
vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan

B.20a

Manual (kenaikan 4m)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang besi
Mandor

L.01
L.02
L.04

OH
OH
OH

Bahan

Harga Satuan
(Rp)
6

0.300
75,900.00
0.100
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

B.20b

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

15% x D

Mekanis (penambahan jarak horizontal 10m s.d 25m)


No
1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang besi
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

Harga Satuan
(Rp)
6

0.200
75,900.00
0.040
95,700.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

B.20c

C
1

Peralatan
Crane*

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

E.07.a

Mekanis (setiap penambahan jarak horizontal 25m)

Sewa-hari

0.025
200,000.00
Jumlah Harga Peralatan
15% x D

AHSP.Pus Air.103

No
1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang besi
Mandor

Bahan

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

Harga Satuan
(Rp)
6

0.300
75,900.00
0.100
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

B.20d

C
1

Peralatan
Crane*

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

E.07.a

Sewa-hari

0.025
200,000.00
Jumlah Harga Peralatan
15% x D

Mekanis (kenaikan setiap 4m)


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang besi
Mandor

L.01
L.02
L.04

OH
OH
OH

Bahan

Harga Satuan
(Rp)
6

0.300
75,900.00
0.100
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

A.3.4
B.21

C
1

Peralatan
Lift*

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

E.23

Sewa-hari

0.025
340,000.00
Jumlah Harga Peralatan
15% x D

Koefisien untuk analisa harga satuan pekerjaan pembuatan/penyediaan bekisting beton


1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
No
1
A
1

Tenaga Kerja
Pekerja

Uraian

Kode

Satuan

Koefisien

L.01

OH

Harga Satuan
(Rp)
6

0.200

75,900.00

AHSP.Pus Air.104

2
3
4

Tukang kayu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

Peralatan

L.02
L.03
L.04

OH
OH
OH

0.600
95,700.00
0.060
95,700.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja

M.38.d
M.33.d
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.02
1,400,000.00
0.25
12,500.00
0.2
40,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0135 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0113 (Ka

7
B.22

1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.220
75,900.00
0.660
95,700.00
0.066
95,700.00
0.022
95,700.00
Jumlah Harga Tenaga Kerja

M.35.e
M.37.a
M.65.b
M.129

m3
m3
kg
L

0.04
1,500,000.00
0.02
1,400,000.00
0.4
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,028 (papan) dan 0,0135 (Kaso)

yang ke-3, koefisien menjadi 0,024 (papan) dan 0,0113 (Kaso

B.23

1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm (tan
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

AHSP.Pus Air.105

A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

Peralatan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.330
75,900.00
0.990
95,700.00
0.099
95,700.00
0.033
95,700.00
Jumlah Harga Tenaga Kerja

M.38.d
M.37.a
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.025
1,400,000.00
0.35
12,500.00
1.6
40,000.00
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0169 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0142 (Ka

B.24

1 m2 perancah bekisting kaso 5/7 cm tinggi 4 m*


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.600
95,700.00
0.060
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2

Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm

M.37.a
M.65.b

m3
kg

0.1
1,400,000.00
0.35
12,500.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: * Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, menjadi 0,0675 (Kaso) dan ke-3 menjadi 0,0567 (Kaso

Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, misal un
2m, maka digunakan koefisien 2/4 x 0,1 = 50% x 0,1 yaitu 0,05 m3 kayu kaso 5/7.

B.25

1 m2 perancah bekisting kayu dolken diameter 8 cm 10 cm tinggi 4 m *


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

AHSP.Pus
HargaAir.106
Satuan

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.330
75,900.00
0.660
95,700.00
0.066
95,700.00
0.033
95,700.00
Jumlah Harga Tenaga Kerja

Bahan

1
2

*Kayu dolken diameter 8 cm -10 cm,


panjang 4 m
Paku 5 cm dan 7 cm

M.31.b
M.65.b

btg
kg

6
5,000.00
0.35
12,500.00
Jumlah Harga Bahan

Peralatan

(Rp)
6

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: * Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, menjadi 4 batang (Kaso) dan ke-3 menjadi 3,4 batang

Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, misal un
2m, maka digunakan koefisien 2/4 x 0,1 = 50% x 0,1 yaitu 0,05 m3 kayu kaso 5/7.

B.26

1 m2 Bekisting balok beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.600
95,700.00
0.060
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
4
5

Bahan *
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

M.38.d
M.37.a
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.14
1,400,000.00
0.35
12,500.00
1.6
40,000.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0945 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0794 (Ka

B.27

1 m2 Perancah Bekisting balok dengan Kaso 5/7 tinggi 4 m

AHSP.Pus Air.107

No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.600
95,700.00
0.060
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

M.37.a
M.65.b

m3
kg

0.14
1,400,000.00
0.35
12,500.00
Jumlah Harga Bahan

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

B
1
2

Bahan
Kaso 5/7 cm
Paku 5 cm dan 7 cm

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: * Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, menjadi 0,0945 (Kaso) dan ke-3 menjadi 0,0794 (Kaso

Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, misal un
2m, maka digunakan koefisien 2/4 x 0,1 = 50% x 0,1 yaitu 0,05 m3 kayu kaso 5/7.

B.28

1 m2 Perancah Bekisting balok dengan Kayu dolken diameter 8 cm tinggi 4 m


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.330
75,900.00
0.660
95,700.00
0.066
95,700.00
0.033
95,700.00
Jumlah Harga Tenaga Kerja

Bahan
M.31.b
M.65.b

btg
kg

6
5,000.00
0.35
12,500.00
Jumlah Harga Bahan

*Kayu dolken diameter 8 cm -10 cm,


panjang 4 m
Paku 5 cm dan 7 cm

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: * Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, menjadi 4 batang (Kaso) dan ke-3 menjadi 3,4 batang

Untuk ketinggian lain dapat dihitung secara proporsional terhadap koefisien bahan kayu kaso 5/7, misal un
2m, maka digunakan koefisien 2/4 x 0,1 = 50% x 0,1 yaitu 0,05 m3 kayu kaso 5/7.

AHSP.Pus Air.108

B.29

1 m2 Bekisting kolom beton biasa dengan multiflex 12 mm atau 18 mm


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.600
95,700.00
0.060
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

M.38.d
M.37.a
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.14
1,400,000.00
0.25
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0945 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0794 (Ka

B.30

1 m2 Bekisting kolom beton biasa dengan papan ukuran 3/20 cm


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.330
75,900.00
0.660
95,700.00
0.066
95,700.00
0.033
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

M.35.e
M.37.a
M.65.b
M.129

m3
m3
kg
L

0.04
1,500,000.00
0.18
1,400,000.00
0.4
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,028 (papan) dan 0,122 (Kaso)

AHSP.Pus Air.109

yang ke-3, koefisien menjadi 0,024 (papan) dan 0,102 (Kaso

B.31

1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.250
75,900.00
0.500
95,700.00
0.050
95,700.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

M.38.d
M.37.a
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.14
1,400,000.00
0.25
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0945 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0794 (Ka

B.32

1 m2 Bekisting dinding beton biasa dengan papan ukuran 3/20 cm


No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
75,900.00
0.600
95,700.00
0.060
95,700.00
0.030
95,700.00
Jumlah Harga Tenaga Kerja

M.35.e
M.37.a
M.65.b
M.129

m3
m3
kg
L

0.04
1,500,000.00
0.18
1,400,000.00
0.4
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Jumlah Harga Peralatan


15% x D

AHSP.Pus Air.110

Harga Satuan Pekerjaan per - m2 (D+E)

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,028 (papan) dan 0,122 (Kaso)

yang ke-3, koefisien menjadi 0,024 (papan) dan 0,102 (Kaso

B.33

1 m2 Bekisting fondasi dan sloof beton biasa dengan multiflex 12 mm/18 mm


No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.250
75,900.00
0.500
95,700.00
0.050
95,700.00
0.025
95,700.00
Jumlah Harga Tenaga Kerja

M.38.d
M.37.a
M.65.b
M.129

lbr
m3
kg
L

0.35
222,000.00
0.14
1,400,000.00
0.25
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Multiflex 18 mm
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

Jumlah Harga Peralatan


15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,245 (Multiflex) dan 0,0945 (Kaso)

yang ke-3, koefisien menjadi 0,210 (Multiflex) dan 0,0794 (Ka

B.34

1 m2 Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.660
75,900.00
0.330
95,700.00
0.033
95,700.00
0.066
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Papan 3/20 cm kayu kelas II
Kaso 5/7 cm
Paku 5 cm dan 7 cm
Minyak bekisting

M.35.e
M.37.a
M.65.b
M.129

m3
m3
kg
L

0.04
1,500,000.00
0.18
1,400,000.00
0.4
12,500.00
0.2
40,000.00
Jumlah Harga Bahan

Peralatan

Jumlah Harga Peralatan

AHSP.Pus Air.111

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali, yang ke-2, koefisien menjadi 0,028 (papan) dan 0,122 (Kaso)

yang ke-3, koefisien menjadi 0,024 (papan) dan 0,102 (Kaso

B.35

Bongkar 1 m2 bekisting secara biasa


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.025
75,900.00
0.0025
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F
B.36

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

Bongkar 1 m2 bekisting secara hati-hati


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.060
75,900.00
0.006
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

Jumlah Harga Peralatan

A.3.5
B.37

15% x D

Koefisien untuk AHSP pelaksanaan curing


Menggenangi air 100 m 2 permukaan beton
No

Uraian

Kode

Satuan

Koefisien

1
A

Tenaga Kerja

Harga Satuan
(Rp)
6

AHSP.Pus Air.112

1
2

Pekerja
Mandor

L.01
L.04

OH
OH

0.800
75,900.00
0.040
95,700.00
Jumlah Harga Tenaga Kerja

B
1

Bahan
Air

M.02

m3

5.0
50.00
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F
B.38
B.38a

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

Menyirami air 100 m2 permukaan beton


Memasang 100 m2 terpal/karung goni
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

0.800
75,900.00
0.080
95,700.00
Jumlah Harga Tenaga Kerja

B
1

Bahan
Karung goni

M.123.b

m2

102
1,500.00
Jumlah Harga Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

Jumlah Harga Peralatan

B.38b

15% x D

Menyirami 100 m2 Karung Goni dengan air selama 4 hari


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

2.000
75,900.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

B
1

Bahan
Air

M.02

m3

20.0
50.00
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m2 (D+E)

15% x D

AHSP.Pus Air.113

A.3.6
B.39

Pembongkaran konstruksi beton dalam rangka renovasi


Bongkar 1 m3 beton secara konvensional
Uraian

Kode

Satuan

Koefisien

1
A
1
2

L.01
L.04

OH
OH

M.118

1.2
25,000.00
Jumlah Harga Bahan

E.30
E.12
E.29

bh
bh
bh

0.1
100,000.00
0.2
17,500.00
0.5
225,000.00
Jumlah Harga Peralatan

B.40

Harga Satuan
(Rp)

No

Tenaga Kerja
Pekerja
Mandor
Bahan
Cuka Bibit

C
1
2
3

Peralatan
Palu / Godam
Gergaji Besi
Pahat Beton (Baja keras)

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

2.650
75,900.00
0.265
95,700.00
Jumlah Harga Tenaga Kerja

15% x D

Bongkar 1 m3 beton dengan Jack Hammer


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Harga Satuan
(Rp)
6

0.600
75,900.00
0.060
95,700.00
Jumlah Harga Tenaga Kerja
Jumlah Harga Bahan

B.41

C
1
2
3
4

Peralatan
Jack Hammer
Palu / Godam
Gergaji Besi
Pahat Beton (Baja keras)

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m3 (D+E)

E.14
E.30
E.12
E.29

Sewa-hari
bh
bh
bh

0.16
135,000.00
0.05
100,000.00
0.1
17,500.00
0.2
225,000.00
Jumlah Harga Peralatan
15% x D

Pemasangan Water Stop


Memasang 1 m water stop PVC lebar 150 mm
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

AHSP.Pus
HargaAir.114
Satuan

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.060
75,900.00
0.030
95,700.00
0.003
95,700.00
0.006
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2

Bahan
Water Stop PVC lebar 150 mm
Kawat Beton

M.144.a
M.60

m
kg

1.05
75,000.00
0.01
1,931.60
Jumlah Harga Bahan

Peralatan

(Rp)
6

Jumlah Harga Peralatan


D
E
F
B.42

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m (D+E)

15% x D

Memasang 1 m water stop PVC lebar 200 mm


No

Uraian

1
A
1
2
3
4

2
Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor

B
1
2

Bahan
Water Stop PVC lebar 200 mm
Kawat Beton

Peralatan

Harga Satuan
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.070
75,900.00
0.035
95,700.00
0.0035
95,700.00
0.0070
95,700.00
Jumlah Harga Tenaga Kerja

M.144.b
M.60

m
kg

1.05
90,000.00
0.01
1,931.60
Jumlah Harga Bahan

Jumlah Harga Peralatan


D
E
F
B.43

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m (D+E)

15% x D

Memasang water stop 1 m PVC lebar 230 mm 320 mm


No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

L.01
L.02
L.03

OH
OH
OH

Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang

Harga Satuan
(Rp)
6

0.080
0.040
0.004

75,900.00
95,700.00
95,700.00

AHSP.Pus Air.115

Mandor

B
1
2

Bahan
Water Stop PVC lebar 230-320 mm
Kawat Beton

Peralatan

L.04

OH

0.008
95,700.00
Jumlah Harga Tenaga Kerja

M.144.c
M.60

m
kg

1.05
115,000.00
0.01
1,931.60
Jumlah Harga Bahan
Jumlah Harga Peralatan

D
E
F
B.44

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m (D+E)

15% x D

Pemasangan water stop 1m karet (rubber) lebar 150 mm 200 mm


Harga Satuan
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang batu/kayu/pipa
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.0700
75,900.00
0.0350
95,700.00
0.0035
95,700.00
0.0070
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2

Bahan
Rubber Water Stop lebar 150-200 mm
Kawat Beton

M.144.d
M.60

m
kg

1.05
125,000.00
0.02
1,931.60
Jumlah Harga Bahan

Peralatan

AHSP.Pus Air.116

Jumlah Harga Peralatan


D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m (D+E)

15% x D

AHSP.Pus Air.117

gan jarak < 5m, maka

harus ditambah perancahnya

Jumlah
(Rp)
7
100,188.00
21,054.00
2,105.40
12,632.40
135,979.80
429,780.00
124,200.00
148,000.00
10.75
701,990.75

837,970.55
125,695.58
963,666.13

Jumlah
(Rp)
7
125,235.00
26,317.50
2,631.75
15,790.50
169,974.75
429,780.00
124,200.00
148,000.00

AHSP.Pus Air.118

10.75
701,990.75

871,965.50
130,794.83
1,002,760.33

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,661.11
132,982.41
429,780.00
124,200.00
148,000.00
10.75
701,990.75
100,000.00
100,000.00
934,973.16
140,245.97
1,075,219.13

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50
170,022.60
480,240.00
118,285.71

AHSP.Pus Air.119

149,925.93
10.75
748,462.39

918,484.99
137,772.75
1,056,257.74

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
480,240.00
118,285.71
149,925.93
10.75
748,462.39
100,000.00
100,000.00
981,416.09
147,212.41
1,128,628.50

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50
170,022.60
520,260.00

AHSP.Pus Air.120

114,142.86
150,666.67
10.75
785,080.27

955,102.87
143,265.43
1,098,368.30

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
520,260.00
114,142.86
150,666.67
10.75
785,080.27
100,000.00
100,000.00
1,018,033.97
152,705.10
1,170,739.07

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50
170,022.60

AHSP.Pus Air.121

567,240.00
108,571.43
152,444.44
10.75
828,266.62

998,289.22
149,743.38
1,148,032.61

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,661.11
132,982.41
567,240.00
108,571.43
152,444.44
10.75
828,266.62
100,000.00
100,000.00
1,061,249.03
159,187.35
1,220,436.39

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50
170,022.60

AHSP.Pus Air.122

612,480.00
104,428.57
152,740.74
10.75
869,660.06

1,039,682.66
155,952.40
1,195,635.06

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,661.11
132,982.41
612,480.00
104,428.57
152,740.74
10.75
869,660.06
100,000.00
100,000.00
1,102,642.47
165,396.37
1,268,038.84

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50

AHSP.Pus Air.123

170,022.60
645,540.00
99,714.29
155,111.11
10.75
900,376.15

1,070,398.75
160,559.81
1,230,958.56

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
645,540.00
99,714.29
155,111.11
10.75
900,376.15
100,000.00
100,000.00
1,133,329.85
169,999.48
1,303,329.32

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60
15,790.50

AHSP.Pus Air.124

170,022.60
668,160.00
98,857.14
153,925.93
10.75
920,953.82

1,090,976.42
163,646.46
1,254,622.88

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
668,160.00
98,857.14
153,925.93
10.75
920,953.82
100,000.00
100,000.00
1,153,907.52
173,086.13
1,326,993.65

Jumlah
(Rp)
7
125,235.00
26,317.50
2,679.60

AHSP.Pus Air.125

15,790.50
170,022.60
706,440.00
97,714.29
152,000.00
10.75
956,165.04

1,126,187.64
168,928.15
1,295,115.78

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
706,440.00
97,714.29
152,000.00
10.75
956,165.04
100,000.00
100,000.00
1,189,118.74
178,367.81
1,367,486.55

Jumlah
(Rp)
7
125,235.00
26,317.50

AHSP.Pus Air.126

2,679.60
15,790.50
170,022.60
718,620.00
97,285.71
151,259.26
10.75
967,175.72

1,137,198.32
170,579.75
1,307,778.07

Jumlah
(Rp)
7
100,415.70
18,087.30
1,818.30
12,632.40
132,953.70
718,620.00
97,285.71
151,259.26
10.75
967,175.72
100,000.00
100,000.00
1,200,129.42
180,019.41
1,380,148.84

Jumlah
(Rp)
7
159,390.00

AHSP.Pus Air.127

33,495.00
3,349.50
20,097.00
216,331.50
763,860.00
95,714.29
149,037.04
10.75
1,008,622.07

1,224,953.57
183,743.04
1,408,696.61

Jumlah
(Rp)
7
127,512.00
22,968.00
2,296.80
16,077.60
168,854.40
763,860.00
95,714.29
149,037.04
10.75
1,008,622.07
100,000.00
100,000.00
1,277,476.47
191,621.47
1,469,097.94

Jumlah
(Rp)
7

AHSP.Pus Air.128

159,390.00
33,495.00
3,349.50
20,097.00
216,331.50
779,520.00
95,285.71
148,148.15
10.75
1,022,964.61

1,239,296.11
185,894.42
1,425,190.53

Jumlah
(Rp)
7
127,512.00
22,968.00
2,296.80
16,077.60
168,854.40
779,520.00
95,285.71
148,148.15
10.75
1,022,964.61
100,000.00
100,000.00
1,291,819.01
193,772.85
1,485,591.86

Jumlah
(Rp)
7

AHSP.Pus Air.129

75,900.00
23,925.00
2,392.50
9,570.00
111,787.50
892,500.00
892,500.00
24,000.00
24,000.00
1,028,287.50
154,243.13
1,182,530.63

pelaksanaan curing disesuaikan


urannya dilakukan pada proses
1,2 L/m. Berbagai jenis bahan

nsi);

Jumlah
(Rp)
7

48,000.00
48,000.00

48,000.00
7,200.00
55,200.00
penggunaannya

AHSP.Pus Air.130

mpuran beton dengan jarak > 5m

Jumlah
(Rp)
7
31,119.00
3,923.70
35,042.70

35,042.70
5,256.41
40,299.11

Jumlah
(Rp)
7
37,950.00
4,785.00
42,735.00

42,735.00
6,410.25
49,145.25

Jumlah
(Rp)
7
15,180.00
1,914.00

AHSP.Pus Air.131

17,094.00

24,000.00
24,000.00
41,094.00
6,164.10
47,258.10

Jumlah
(Rp)
7
18,975.00
2,392.50
21,367.50

13,475.00
13,475.00
34,842.50
5,226.38
40,068.88

Jumlah
(Rp)
7
37,950.00
4,785.00
42,735.00

13,475.00
13,475.00
56,210.00
8,431.50
64,641.50

AHSP.Pus Air.132

Jumlah
(Rp)
7
18,975.00
2,392.50
21,367.50

21,367.50
3,205.13
24,572.63

Jumlah
(Rp)
7
15,180.00
1,914.00
17,094.00

24,000.00
24,000.00
41,094.00
6,164.10
47,258.10

Jumlah
(Rp)
7
53,130.00
66,990.00
6,699.00
6,699.00
133,518.00

AHSP.Pus Air.133

717,500.00
2,897.40
720,397.40

853,915.40
128,087.31
982,002.71

Jumlah
(Rp)
7
18,975.00
23,925.00
2,392.50
2,392.50
47,685.00
2,524,500.00
965.80
2,525,465.80

2,573,150.80
385,972.62
2,959,123.42

Jumlah
(Rp)
7
37,950.00
47,850.00
4,785.00
4,785.00
95,370.00
3,832,500.00
85,416.67
1,931.60
3,919,848.27
20,250.00

AHSP.Pus Air.134

20,250.00
4,035,468.27
605,320.24
4,640,788.51

0 kg tulangan setiap kenaikan

Jumlah
(Rp)
7
22,770.00
9,570.00
2,871.00
35,211.00

35,211.00
5,281.65
40,492.65

Jumlah
(Rp)
7
15,180.00
3,828.00
1,914.00
20,922.00

5,000.00
5,000.00
25,922.00
3,888.30
29,810.30

AHSP.Pus Air.135

Jumlah
(Rp)
7
22,770.00
9,570.00
2,871.00
35,211.00

5,000.00
5,000.00
40,211.00
6,031.65
46,242.65

Jumlah
(Rp)
7
22,770.00
9,570.00
2,871.00
35,211.00

8,500.00
8,500.00
43,711.00
6,556.65
50,267.65

npa perancah)
Jumlah
(Rp)
7
15,180.00

AHSP.Pus Air.136

57,420.00
5,742.00
1,914.00
80,256.00
77,700.00
28,000.00
3,125.00
8,000.00
116,825.00

197,081.00
29,562.15
226,643.15

dan 0,0135 (Kaso)

flex) dan 0,0113 (Kaso)

Jumlah
(Rp)
7
16,698.00
63,162.00
6,316.20
2,105.40
88,281.60
60,000.00
28,000.00
5,000.00
8,000.00
101,000.00

189,281.60
28,392.24
217,673.84

n 0,0135 (Kaso)

an) dan 0,0113 (Kaso)

kaso 5/7 cm (tanpa perancah)


Jumlah
(Rp)
7

AHSP.Pus Air.137

25,047.00
94,743.00
9,474.30
3,158.10
132,422.40
77,700.00
35,000.00
4,375.00
64,000.00
181,075.00

313,497.40
47,024.61
360,522.01

dan 0,0169 (Kaso)

flex) dan 0,0142 (Kaso)

Jumlah
(Rp)
7
22,770.00
57,420.00
5,742.00
2,871.00
88,803.00
140,000.00
4,375.00
233,178.00

321,981.00
48,297.15
370,278.15

enjadi 0,0567 (Kaso)

yu kaso 5/7, misal untuk tinggi

Jumlah
(Rp)

Jumlah
(Rp)
7
25,047.00
63,162.00
6,316.20
3,158.10
97,683.30

30,000.00
4,375.00
34,375.00

132,058.30
19,808.75
151,867.05

menjadi 3,4 batang (Kaso)

yu kaso 5/7, misal untuk tinggi

Jumlah
(Rp)

dan 0,0945 (Kaso)

flex) dan 0,0794 (Kaso)

7
22,770.00
57,420.00
5,742.00
2,871.00
88,803.00
77,700.00
196,000.00
4,375.00
64,000.00
342,075.00

430,878.00
64,631.70
495,509.70

AHSP.Pus Air.138

AHSP.Pus Air.139

Jumlah
(Rp)
7
22,770.00
57,420.00
5,742.00
2,871.00
88,803.00
196,000.00
4,375.00
200,375.00

289,178.00
43,376.70
332,554.70

enjadi 0,0794 (Kaso)

yu kaso 5/7, misal untuk tinggi

Jumlah
(Rp)
7
25,047.00
63,162.00
6,316.20
3,158.10
97,683.30

30,000.00
4,375.00
34,375.00

132,058.30
19,808.75
151,867.05

menjadi 3,4 batang (Kaso)

yu kaso 5/7, misal untuk tinggi

AHSP.Pus Air.140

Jumlah
(Rp)
7
22,770.00
57,420.00
5,742.00
2,871.00
88,803.00
77,700.00
196,000.00
3,125.00
8,000.00
284,825.00

373,628.00
56,044.20
429,672.20

dan 0,0945 (Kaso)

flex) dan 0,0794 (Kaso)

n 0,122 (Kaso)

Jumlah
(Rp)
7
25,047.00
63,162.00
6,316.20
3,158.10
97,683.30
60,000.00
252,000.00
5,000.00
8,000.00
325,000.00

422,683.30
63,402.50
486,085.80

AHSP.Pus Air.141

an) dan 0,102 (Kaso)

Jumlah
(Rp)
7
18,975.00
47,850.00
4,785.00
2,392.50
74,002.50
77,700.00
196,000.00
3,125.00
8,000.00
284,825.00

358,827.50
53,824.13
412,651.63

dan 0,0945 (Kaso)

flex) dan 0,0794 (Kaso)

Jumlah
(Rp)
7
22,770.00
57,420.00
5,742.00
2,871.00
88,803.00
60,000.00
252,000.00
5,000.00
8,000.00
325,000.00

413,803.00
62,070.45

AHSP.Pus Air.142

475,873.45

n 0,122 (Kaso)

an) dan 0,102 (Kaso)

Jumlah
(Rp)
7
18,975.00
47,850.00
4,785.00
2,392.50
74,002.50
77,700.00
196,000.00
3,125.00
8,000.00
284,825.00

358,827.50
53,824.13
412,651.63

dan 0,0945 (Kaso)

flex) dan 0,0794 (Kaso)

Jumlah
(Rp)
7
50,094.00
31,581.00
3,158.10
6,316.20
91,149.30
60,000.00
252,000.00
5,000.00
8,000.00
325,000.00

AHSP.Pus Air.143

416,149.30
62,422.40
478,571.70

n 0,122 (Kaso)

an) dan 0,102 (Kaso)

Jumlah
(Rp)
7
1,897.50
239.25
2,136.75

2,136.75
320.51
2,457.26

Jumlah
(Rp)
7
4,554.00
574.20
5,128.20

5,128.20
769.23
5,897.43

Jumlah
(Rp)
7

AHSP.Pus Air.144

60,720.00
3,828.00
64,548.00
250.00
250.00

64,798.00
9,719.70
74,517.70

Jumlah
(Rp)
7
60,720.00
7,656.00
68,376.00
153,000.00
153,000.00

221,376.00
33,206.40
254,582.40

Jumlah
(Rp)
7
151,800.00
9,570.00
161,370.00
1,000.00
1,000.00

162,370.00
24,355.50
186,725.50

AHSP.Pus Air.145

Jumlah
(Rp)
7
201,135.00
25,360.50
226,495.50
30,000.00
30,000.00
10,000.00
3,500.00
112,500.00
126,000.00
382,495.50
57,374.33
439,869.83

Jumlah
(Rp)
7
45,540.00
5,742.00
51,282.00

21,600.00
5,000.00
1,750.00
45,000.00
73,350.00
124,632.00
18,694.80
143,326.80

Jumlah
(Rp)

Jumlah
(Rp)
7
4,554.00
2,871.00
287.10
574.20
8,286.30
78,750.00
19.32
78,769.32

87,055.62
13,058.34
100,113.96

Jumlah
(Rp)
7
5,313.00
3,349.50
334.95
669.90
9,667.35
94,500.00
19.32
94,519.32

104,186.67
15,628.00
119,814.67

Jumlah
(Rp)
7
6,072.00
3,828.00
382.80

AHSP.Pus Air.146

AHSP.Pus Air.147

765.60
11,048.40
120,750.00
19.32
120,769.32

131,817.72
19,772.66
151,590.37

Jumlah
(Rp)
7
5,313.00
3,349.50
334.95
669.90
9,667.35
131,250.00
38.63
131,288.63

AHSP.Pus Air.148

140,955.98
21,143.40
162,099.38

A.4

PEKERJAAN PEMANCANGAN
Berbagai jenis pekerjaan terkait dengan pemancangan dapat berupa tiang pancang untuk menahan gaya normal dan ada
pula yang berupa turap (sheet pile) untuk menahan gaya geser. Secara umum bahan yang digunakan berupa kayu, baja
dan beton; namun jika dilihat dari alat pemancangnya (pile driver) yaitu baik dengan tanpa mesin dan/atau juga mekanis.
Adapun alat pancang yang tanpa mesin menggunakan tripod + hammer, sedangkan peralatan mekanis umumnya berupa mesin tenaga diesel, uap dan juga kompresor udara.

A.4.1

AHSP pemancangan secara manual/tanpa mesin menggunakan Tripod dan Hammer

F.01

Tiang Pancang Kayu Gelondongan


Per-m' panjang tiang pancang kayu gelondongan diameter 15 - 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung
tiang pancang beban normal dan untuk maksimum 1,5 m jarak antar tiang dalam satu group tiang pancang
No

F.02

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Tiang Pancang kayu dia 15-20 cm

M.42.b

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang

E.45
E.01.b
E.02.c

Sewa-hari
Sewa-hari
bh

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.2496
75,900.00
0.0312
95,700.00
0.0250
95,700.00
Jumlah Harga Tenaga Kerja

18,944.64
2,985.84
2,388.67
24,319.15

1.05
42,000.00
Jumlah Harga Bahan

44,100.00
44,100.00

0.0312
450,000.00
0.0312
750,000.00
0.2500
25,000.00
Jumlah Harga Peralatan

14,040.00
23,400.00
6,250.00
43,690.00
112,109.15
16,816.37
128,925.52

15% x D

Tiang Pancang Baja Pipa atau Kotak


Per-m panjang tiang pancang baja pipa diameter 30 cm atau kotak ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
ton daya dukung tiang pancang beban normal dan untuk maksimum 1,5 m jarak antar tiang dalam satu group tiang pancang
Harga Satuan
(Rp)

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang tembok
Tukang las listrik
Mandor

L.01
L.02
L.02
L.04

OH
OH
OH
OH

0.1680
75,900.00
0.0210
95,700.00
0.0210
95,700.00
0.0168
95,700.00
Jumlah Harga Tenaga Kerja

12,751.20
2,009.70
2,009.70
1,607.76
18,378.36

B
1
2

Bahan
Tiang Pancang baja dia/kotak 30 cm
Kawat las listrik

M.92.a
M.62

m
kg

1.02
500,000.00
0.15
24,750.00
Jumlah Harga Bahan

510,000.00
3,712.50
513,712.50

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Las listrik diesel (termasuk solar)

E.45
E.01.b
E.22

Sewa-hari
Sewa-hari
Sewa-hari

0.0210
450,000.00
0.0210
750,000.00
0.0210
385,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

9,450.00
15,750.00
8,085.00
33,285.00
565,375.86
84,806.38
650,182.24

15% x D

F.03

Tiang Pancang Beton Bertulang (30 x 30 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tiang
pancang beban normal dan untuk maksimum 1,5 m jarak antar tiang dalam satu group tiang pancang
No

F.04

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Tiang Pancang beton tulang 30x30 cm

M.18.c

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang

E.45
E.01.b
E.02.a

Sewa-hari
Sewa-hari
bh

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.2500
75,900.00
0.0312
95,700.00
0.0250
95,700.00
Jumlah Harga Tenaga Kerja

18,975.00
2,985.84
2,392.50
24,353.34

1.03
315,000.00
Jumlah Harga Bahan

324,450.00
324,450.00

0.0312
450,000.00
0.0312
750,000.00
0.2500
200,000.00
Jumlah Harga Peralatan

14,040.00
23,400.00
50,000.00
87,440.00
436,243.34
65,436.50
501,679.84

15% x D

Tiang Pancang Beton Bertulang (40 x 40 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tiang
pancang beban normal dan untuk maksimum 1,5 m jarak antar tiang dalam satu group tiang pancang.
No

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Tiang Pancang beton tulang 40x40 cm

M.18.f

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang

E.45
E.01.b
E.02.a

Sewa-hari
Sewa-hari
bh

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.4208
75,900.00
0.0526
95,700.00
0.0421
95,700.00
Jumlah Harga Tenaga Kerja

31,938.72
5,033.82
4,028.97
41,001.51

1.03
240,000.00
Jumlah Harga Bahan

247,200.00
247,200.00

0.0526
450,000.00
0.0526
750,000.00
0.2500
200,000.00
Jumlah Harga Peralatan

23,670.00
39,450.00
50,000.00
113,120.00
401,321.51
60,198.23
461,519.74

15% x D

F.05

Turap Kayu Dolken


Per-m' panjang pemancangan 1 m lebar turap kayu dolken diameter 8-10 cm untuk sampai dengan per-satuan 1 ton daya
dukung per-tiang beban normal
No
1
A
1
2
3
B

F.06

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

M.31.a

E.45
E.01.b
E.02.c

Tenaga Kerja
Pekerja
Tukang tembok
Mandor
Bahan
1 Kayu dolken dia 10 cm

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.400
75,900.00
0.050
95,700.00
0.040
95,700.00
Jumlah Harga Tenaga Kerja

30,360.00
4,785.00
3,828.00
38,973.00

10.50
2,300.00
Jumlah Harga Bahan

24,150.00
24,150.00

Sewa-hari
Sewa-hari
bh

0.050
450,000.00
0.050
750,000.00
0.250
25,000.00
Jumlah Harga Peralatan

22,500.00
37,500.00
6,250.00
66,250.00
129,373.00
19,405.95
148,778.95

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung tiang pancang

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

15% x D

Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung pertiang beban normal
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor

L.01
L.02
L.02
L.04

OH
OH
OH
OH

B
1

Bahan
Turap baja profi larsen lebar 350 mm

M.93

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Las listrik diesel (termasuk solar)

E.45
E.01.b
E.22

Sewa-hari
Sewa-hari
Sewa-hari

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.1664
75,900.00
0.0208
95,700.00
0.0208
95,700.00
0.0166
95,700.00
Jumlah Harga Tenaga Kerja

12,629.76
1,990.56
1,990.56
1,588.62
18,199.50

1.05
140,000.00
Jumlah Harga Bahan

147,000.00
147,000.00

0.0208
450,000.00
0.0208
750,000.00
0.0208
385,000.00
Jumlah Harga Peralatan

9,360.00
15,600.00
8,008.00
32,968.00
198,167.50
29,725.13
227,892.63

15% x D

F.07

Turap beton Bertulang Precast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1
ton daya dukung tiang pancang beban normal
No

F.08

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Turap beton tulang pre-cast 30x12 cm

M.19.a

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton

E.45
E.01.b
E.02.b

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.1336
75,900.00
0.0167
95,700.00
0.0134
95,700.00
Jumlah Harga Tenaga Kerja

10,140.24
1,598.19
1,282.38
13,020.81

1.030
55,000.00
Jumlah Harga Bahan

56,650.00
56,650.00

Sewa-hari
Sewa-hari
bh

0.0167
450,000.00
0.0167
750,000.00
0.2500
100,000.00
Jumlah Harga Peralatan

7,515.00
12,525.00
25,000.00
45,040.00
114,710.81
17,206.62
131,917.43

15% x D

Turap Beton Bertulang Pre-cast (40 x 15 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-satuan 1
ton daya dukung tiang pancang beban normal
No

F.09

Uraian

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Turap beton tulang pre-cast 40x15 cm

M.19.d

C
1
2
3

Peralatan
Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton

E.45
E.01.b
E.02.b

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.200
75,900.00
0.025
95,700.00
0.020
95,700.00
Jumlah Harga Tenaga Kerja

15,180.00
2,392.50
1,914.00
19,486.50

1.030
210,000.00
Jumlah Harga Bahan

216,300.00
216,300.00

Sewa-hari
Sewa-hari
bh

0.025
450,000.00
0.025
750,000.00
0.25
100,000.00
Jumlah Harga Peralatan

11,250.00
18,750.00
25,000.00
55,000.00
290,786.50
43,617.98
334,404.48

15% x D

Turap
Bertulang
Pre-cast
(50beton
x 22 bertulang
cm)
Per-m' Beton
panjang
pemancangan
turap
pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-satuan 1
ton daya dukung tiang pancang beban normal
No

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

M.19.d

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang tembok
Mandor

B
1

Bahan
Turap beton tulang pre-cast 40x15 cm

Peralatan

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.3336
75,900.00
0.0417
95,700.00
0.0334
95,700.00
Jumlah Harga Tenaga Kerja

25,320.24
3,990.69
3,196.38
32,507.31

1.030
210,000.00
Jumlah Harga Bahan

216,300.00
216,300.00

1
2
3

Tripod tinggi 5 m
Hammer 1 - 2 ton (manual)
Alat penyambung turap beton

E.45
E.01.b
E.02.b

Sewa-hari
Sewa-hari
bh

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

0.0417
450,000.00
0.0417
750,000.00
0.2500
100,000.00
Jumlah Harga Peralatan
15% x D

18,765.00
31,275.00
25,000.00
75,040.00
323,847.31
48,577.10
372,424.41

A.4.2

AHSP Pemancangan Secara Mekanis


Ada beberapa jenis mesin pile driver yaitu berupa mesin tenaga diesel, uap dan juga kompresor udara.

F.10

Tiang Pancang Kayu Gelondongan


Per-m' panjang tiang pancang kayu gelondongan diameter 15 - 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung
tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
No

F.11

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator

B
1

Bahan
Tiang Pancang kayu dia 15-20 cm

M.42.b

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.c

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.0520
75,900.00
0.0104
95,700.00
0.0052
95,700.00
0.0104
75,900.00
0.0104
63,800.00
Jumlah Harga Tenaga Kerja

3,946.80
995.28
497.64
789.36
663.52
6,892.60

1.050
42,000.00
Jumlah Harga Bahan

44,100.00
44,100.00

Sewa-jam
Sewa-jam
bh

0.0728
455,000.00
0.0728
210,000.00
0.2500
25,000.00
Jumlah Harga Peralatan

33,124.00
15,288.00
6,250.00
54,662.00
105,654.60
15,848.19
121,502.79

15% x D

Tiang Pancang Baja Pipa atau Kotak


Per-m' panjang tiang pancang baja pipa diameter 30 cm atau kotak ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
Harga Satuan
(Rp)

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
5
6

Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor
Operator Crane
Pembantu operator

L.01
L.02
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH
OH

0.0345
75,900.00
0.0069
95,700.00
0.0069
95,700.00
0.0035
95,700.00
0.0069
75,900.00
0.0069
63,800.00
Jumlah Harga Tenaga Kerja

2,618.55
660.33
660.33
330.17
523.71
440.22
5,233.31

B
1
2

Bahan
Tiang Pancang baja dia 30 cm
Kawat las listrik

M.92.a
M.62

m
kg

1.010
500,000.00
0.150
24,750.00
Jumlah Harga Bahan

505,000.00
3,712.50
508,712.50

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Las listrik diesel (termasuk solar)

E.07.b
E.01.d
E.22

Sewa-jam
Sewa-jam
Sewa-jam

0.0483
455,000.00
0.0483
210,000.00
0.0483
55,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

21,976.50
10,143.00
2,656.50
34,776.00
548,721.81
82,308.27
631,030.08

15% x D

F.12

Tiang Pancang Beton Bertulang (30 x 30 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tiang
pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
No

F.13

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu operator

B
1

Bahan
Tiang Pancang beton tulang 30x30 cm

M.18.c

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.a

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.0520
75,900.00
0.0104
95,700.00
0.0052
95,700.00
0.0104
75,900.00
0.0104
63,800.00
Jumlah Harga Tenaga Kerja

3,946.80
995.28
497.64
789.36
663.52
6,892.60

1.030
315,000.00
Jumlah Harga Bahan

324,450.00
324,450.00

Sewa-jam
Sewa-jam
bh

0.0728
455,000.00
0.0728
210,000.00
0.250
200,000.00
Jumlah Harga Peralatan

33,124.00
15,288.00
50,000.00
98,412.00
429,754.60
64,463.19
494,217.79

15% x D

Tiang Pancang Beton Bertulang (40 x 40 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tiang
pancang beban normal dan untuk maksimum 1 m jarak antar tiang dalam satu group tiang pancang
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu operator

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

B
1

Bahan
Tiang Pancang beton tulang 40x40 cm

M.18.d

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.b

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.0945
75,900.00
0.0189
95,700.00
0.0095
95,700.00
0.0189
75,900.00
0.0189
63,800.00
Jumlah Harga Tenaga Kerja

7,172.55
1,808.73
909.15
1,434.51
1,205.82
12,530.76

1.030
550,000.00
Jumlah Harga Bahan

566,500.00
566,500.00

Sewa-jam
Sewa-jam
bh

0.1323
455,000.00
0.1323
210,000.00
0.2500
100,000.00
Jumlah Harga Peralatan

60,196.50
27,783.00
25,000.00
112,979.50
692,010.26
103,801.54
795,811.80

15% x D

F.14

Turap Kayu Dolken


Per-m' panjang pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung pertiang beban normal
No

F.15

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator

B
1

Bahan
Kayu dolken dia 8 - 10 cm

M.31.a

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.c

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.0835
75,900.00
0.0167
95,700.00
0.0084
95,700.00
0.0167
75,900.00
0.0167
63,800.00
Jumlah Harga Tenaga Kerja

6,337.65
1,598.19
803.88
1,267.53
1,065.46
11,072.71

1.050
2,300.00
Jumlah Harga Bahan

2,415.00
2,415.00

Sewa-jam
Sewa-jam
bh

0.1169
455,000.00
0.1169
210,000.00
0.2500
25,000.00
Jumlah Harga Peralatan

53,189.50
24,549.00
6,250.00
83,988.50
97,476.21
14,621.43
112,097.64

15% x D

Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung pertiang beban normal
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
5
6

Tenaga Kerja
Pekerja
Tukang
Tukang las listrik
Mandor
Operator Crane
Pembatu operator

L.01
L.02
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH
OH

B
1

Bahan
Turap baja profi larsen lebar 350 mm

M.93

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Las listrik diesel (termasuk solar)

E.07.b
E.01.d
E.22

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.0345
75,900.00
0.0069
95,700.00
0.0069
95,700.00
0.0034
95,700.00
0.0069
75,900.00
0.0069
63,800.00
Jumlah Harga Tenaga Kerja

2,618.55
660.33
660.33
325.38
523.71
440.22
5,228.52

1.050
140,000.00
Jumlah Harga Bahan

147,000.00
147,000.00

Sewa-jam
Sewa-jam
Sewa-jam

0.0483
455,000.00
0.0483
210,000.00
0.0483
55,000.00
Jumlah Harga Peralatan

21,976.50
10,143.00
2,656.50
34,776.00
187,004.52
28,050.68
215,055.20

15% x D

F.16

Turap Beton Bertulang Pre-cast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1
ton daya dukung tiang pancang beban normal

F.17

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembatu operator

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

B
1

Bahan
Turap beton tulang pre-cast 30x12 cm

M.19.c

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung turap

E.07.b
E.01.d
E.02.b

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

Jumlah
(Rp)
7

0.0280
75,900.00
0.0056
95,700.00
0.0028
95,700.00
0.0056
75,900.00
0.0056
63,800.00
Jumlah Harga Tenaga Kerja

2,125.20
535.92
267.96
425.04
357.28
3,711.40

1.030
125,000.00
Jumlah Harga Bahan

128,750.00
128,750.00

Sewa-jam
Sewa-jam
bh

0.0392
455,000.00
0.0392
210,000.00
0.250
100,000.00
Jumlah Harga Peralatan

17,836.00
8,232.00
25,000.00
51,068.00
183,529.40
27,529.41
211,058.81

15% x D

Turap Beton Bertulang Pre-cast (40 x 15 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal
daya dukung tiang pancang beban normal
No

F.18

Harga Satuan
(Rp)

15 cm untuk sampai dengan per-1 ton


Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04
L.05
L.06

OH
OH
OH
OH
OH

0.0415
75,900.00
0.0083
95,700.00
0.0042
95,700.00
0.0083
75,900.00
0.0083
63,800.00
Jumlah Harga Tenaga Kerja

3,149.85
794.31
401.94
629.97
529.54
5,505.61

1
A
1
2
3
4
5

Tenaga Kerja
Pekerja
Tukang
Mandor
Operator Crane
Pembantu Operator

B
1

Bahan
Turap beton tulang pre-cast 40x15 cm

M.19.d

m'

1.030
210,000.00
Jumlah Harga Bahan

216,300.00
216,300.00

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.b

Sewa-jam
Sewa-jam
bh

0.0581
455,000.00
0.0581
210,000.00
0.250
100,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - m' (D+E)

26,435.50
12,201.00
25,000.00
63,636.50
285,442.11
42,816.32
328,258.43

15% x D

Turap Beton Bertulang Pre-cast (50 x 22 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal
daya dukung tiang pancang beban normal
No
1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang
Mandor

Uraian

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

0.0700
0.0140
0.0070

15 cm untuk sampai dengan per-1 ton


Harga Satuan
(Rp)
6
75,900.00
95,700.00
95,700.00

Jumlah
(Rp)
7
5,313.00
1,339.80
669.90

4
5

Operator Crane
Pembantu Operator

L.05
L.06

OH
OH

B
1

0.0140
75,900.00
0.0140
63,800.00
Jumlah Harga Tenaga Kerja

1,062.60
893.20
9,278.50

Bahan
Turap beton tulang pre-cast 50x22 cm

M.19.e

1.050
385,000.00
Jumlah Harga Bahan

404,250.00
404,250.00

C
1
2
3

Peralatan
Crane 5-10 ton
Alat pancang + Hammer 2 ton
Alat penyambung tiang pancang

E.07.b
E.01.d
E.02.a

Sewa-jam
Sewa-jam
bh

0.098
455,000.00
0.098
210,000.00
0.250
200,000.00
Jumlah Harga Peralatan

44,590.00
20,580.00
50,000.00
115,170.00
528,698.50
79,304.78

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m' (D+E)

15% x D

608,003.28

AHSP.Pus Air.159

A.1

PEKERJAAN DEWATERING

D.01
D.01a

Kistdam pasir/tanah
1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ( sebesar karung beras 25 kg) uk. 43 x 65 cm
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

0.040
75,900.00
0.004
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3

Bahan
Karung plastik / bagor
Tali rapia / plastik
Sewa pasir *

M.123.a
M.141
M.14.a

bh
m
m3

1.000
2,500.00
2.000
2,500.00
0.120
100,000.00
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

D.01b

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
15% x D
Harga Satuan Pekerjaan per - buah (D+E)
* Koef. dihitung 50%, jika penggunaan kistdam selesai, pasir dimanfaatkan kembali, gunakan HS pasir 100

1 bh Kistdam pasir/tanah dibungkus karung plastik bagor atau terpal uk. 45 x 120 cm
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang jahit
Mandor

L.01
L.02
L.04

OH
OH
OH

0.100
75,900.00
0.025
95,700.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3

Bahan
Karung terpal
Tali/benang pengikat
Sewa pasir *

M.123.b
M.141
M.14.a

m2
m
m3

1.300
1,500.00
2.000
2,500.00
0.030
100,000.00
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

D.01c

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
15% x D
Harga Satuan Pekerjaan per - buah (D+E)
* Koef. dihitung 50%, jika penggunaan kistdam selesai, pasir dimanfaatkan kembali, gunakan HS pasir 100

1 bh geobag pasir/tanah uk. 145 x 240 cm


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang Jahit
Mandor

L.01
L.02
L.04

OH
OH
OH

0.600
75,900.00
0.100
95,700.00
0.060
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3

Bahan
Geotekstil
Tali/benag geotekstil (pengikat)
Sewa pasir *

M.122.a
M.122.d
M.14.a

m2
m'
m3

7.500
60,000.00
3.200
3,500.00
0.275
100,000.00
Jumlah Harga Bahan

C
1

Peralatan
Mesin jahit geotekstil

M.122.e Sewa-hari

D
E
F

D.02

AHSP.Pus
Air.160
Harga
Satuan
(Rp)

No

0.1
250,000.00
Jumlah Harga Peralatan

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
15% x D
Harga Satuan Pekerjaan per - buah (D+E)
* Koef. dihitung 50%, jika penggunaan kistdam selesai, pasir dimanfaatkan kembali, gunakan HS pasir 100

Kerangka kayu untuk 1 m3 kistdam pasir/tanah uk. 43 cm x 65 cm

Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau untuk 36 buah
setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan dalam pancangan kayu kaso s
1 m ke dalam tanah
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang kayu
Mandor

L.01
L.02
L.04

OH
OH
OH

0.050
75,900.00
0.100
95,700.00
0.005
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2

Bahan
Kayu kaso ukuran 5/7 kelas II *
Paku campuran 5 cm & 7 cm

M.37.b
M.65.b

m3
kg

0.0756 1,400,000.00
0.325
12,500.00
Jumlah Harga Bahan

Peralatan
Jumlah Harga Peralatan

D
E
F

D.03

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
15% x D
3
Harga Satuan Pekerjaan per - 1 m (D+E)
* Kayu kaso 8 batang, koefisien untuk pemakaian ke-1 (0,112), untuk ke-2 (0,0756) dan untuk ke-3 (0,0635

Kerangka baja profil L.50.50.5 atau L.60.60.6 atau besi profil berlubang untuk 1 m 3 kistdam pasir/tanah ukuran

AHSP.Pus Air.161

23 cm x 65 cm. Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau u
buah karung setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan dalam pancang
profil sedalam 1 m ke dalam tanah
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja
Tukang besi
Mandor

L.01
L.02
L.04

OH
OH
OH

0.050
0.100
0.005

B
1
2

Bahan
Baja profil L.50.50.5 *
Baut dia 12 mm panjang 5 cm

M.54.g
M.56.b

kg
bh

24.13
12,000.00
8
5,600.00
Jumlah Harga Bahan

Peralatan

75,900.00
95,700.00
95,700.00
m

Jumlah Harga Peralatan


D
E
F

D.04

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
15% x D
3
Harga Satuan Pekerjaan per - 1 m (D+E)
* 32m profil baja dapat digunkan berkali-kali, misal L.50.50.5; L.60.60.6 atau juga besi profil berlubang:
Untuk profil L.50.50.5 pada pemakaian ke-1 (60,32 kg), ke-2 (33,176 kg) dan ke-3(24,128 kg)
Untuk profil L.60.60.6 pada pemakaian ke-1 (86,72 kg), ke-2 (47,696 kg) dan ke-3(34,688 kg)

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 5 kW dengan suction head max. 3m dan
discharge head max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misalkan
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor

L.01
L.05
L.04

OH
OH
OH

B
1

Bahan
Solar

M.140b

ltr

42.400
10,800.00
Jumlah Harga Bahan

C
1

Peralatan
Pompa air diesel 5 KW

E.34.a

Sewa-hari

1.2
225,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 1 hari (D+E)

1.000
75,900.00
3.000
75,900.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

15% x D

AHSP.Pus Air.162

D.05

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 10 kW dengan suction head max. 3m da
discharge head max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misalkan
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:

D.06

No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3

Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor

L.01
L.05
L.04

OH
OH
OH

B
1
2

Bahan
Solar
Oli

M.140b
M.132a

ltr
ltr

72.600
10,800.00
0.300
30,250.00
Jumlah Harga Bahan

C
1

Peralatan
Pompa air diesel 10 KW

E.34.b

bh

1.2
442,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 1 hari (D+E)

1.000
75,900.00
3.000
75,900.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

15% x D

Pengoperasian per hari selama 24 jam 1 buah pompa air diesel daya 20 kW dengan suction head max. 3m da
discharge head max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (misalkan
buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

L.01
L.05
L.04

OH
OH
OH

1
A
1
2
3

2
Tenaga Kerja
Pekerja (memantau mengalirnya air)
Operator pompa
Mandor

B
1
2

Bahan
Solar
Oli

M.140b
M.132a

ltr
ltr

132.800
10,800.00
0.500
30,250.00
Jumlah Harga Bahan

C
1

Peralatan
Pompa air diesel 20 KW

E.34.c

bh

1.2
830,000.00
Jumlah Harga Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)
Harga Satuan Pekerjaan per - 1 hari (D+E)

1.000
75,900.00
4.000
75,900.00
0.100
95,700.00
Jumlah Harga Tenaga Kerja

15% x D

AHSP.Pus Air.163

uk. 43 x 65 cm
Jumlah
(Rp)
7
3,036.00
382.80
3,418.80
2,500.00
5,000.00
12,000.00
19,500.00

22,918.80
3,437.82
26,356.62
ali, gunakan HS pasir 100%

Jumlah
(Rp)
7
7,590.00
2,392.50
957.00
10,939.50
1,950.00
5,000.00
3,000.00
9,950.00

20,889.50
3,133.43
24,022.93
ali, gunakan HS pasir 100%

Jumlah
(Rp)

Jumlah
(Rp)
7
45,540.00
9,570.00
5,742.00
60,852.00
450,000.00
11,200.00
27,500.00
488,700.00

25,000.00
549,552.00
82,432.80
631,984.80
ali, gunakan HS pasir 100%

cm atau untuk 36 buah karung


m pancangan kayu kaso sedalam
Jumlah
(Rp)
7
3,795.00
9,570.00
478.50
13,843.50
105,840.00
4,062.50
109,902.50

123,746.00
18,561.90
142,307.90
6) dan untuk ke-3 (0,0635)

stdam pasir/tanah ukuran

AHSP.Pus Air.164

AHSP.Pus Air.165

x 30 cm x 50 cm atau untuk 36
dengan dalam pancangan baja
Jumlah
(Rp)
7
3,795.00
9,570.00
478.50
13,843.50
289,536.00
44,800.00
334,336.00

348,179.50
52,226.93
400,406.43
a besi profil berlubang:
-3(24,128 kg)
-3(34,688 kg)

uction head max. 3m dan


ead 10m)

mpa cadangan (misalkan untuk 4


Jumlah
(Rp)
7
75,900.00
227,700.00
9,570.00
313,170.00
457,920.00
457,920.00
270,000.00
270,000.00
1,041,090.00
156,163.50
1,197,253.50

AHSP.Pus Air.166

suction head max. 3m dan


ad 10m)

mpa cadangan (misalkan untuk 5


Jumlah
(Rp)
7
75,900.00
227,700.00
9,570.00
313,170.00
784,080.00
9,075.00
793,155.00
530,400.00
530,400.00
1,636,725.00
245,508.75
1,882,233.75

suction head max. 3m dan


ad 10m)

mpa cadangan (misalkan untuk 5


Jumlah
(Rp)
7
75,900.00
303,600.00
9,570.00
389,070.00
1,434,240.00
15,125.00
1,449,365.00
996,000.00
996,000.00
2,834,435.00
425,165.25
3,259,600.25

A.6

PEKERJAAN PINTU AIR


Biaya pemasangan (jika harga pintu air belum termasuk harga pemasangan)

H.01

Biaya Pemasangan Pintu Angkat


Contoh Pintu Angkat No.1; Lebar B = 200mm; H = 250mm; H1 = 500mm dan TR = 1050mm
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.620
75,900.00
0.310
95,700.00
0.031
95,700.00
0.062
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Besi Pengaku
Kawat Las Listrik
Campuran beton fc'= 19,3 Mpa (K-225)
Pas. Bata, mortar tipe N (1pc : 4 pp)

M.54.g
M.62
B.07a
P.02b

kg
kg
m3
m3

1.860
12,000.00
0.413
24,750.00
0.012
1,230,958.56
0.025
1,096,232.90
Jumlah Harga Bahan

C
1
2
3

Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel

M.69xx
E.45
E.22

bh
Sewa-hari
Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

1.000
0.093
450,000.00
0.093
385,000.00
Jumlah Harga Peralatan
15% x D

F Harga Satuan Pekerjaan per - bh (D+E)


**) Harga disesuaikan dengan jenis atau tipe pintu air

H.02

Biaya Pemasangan Pintu Sorong Kayu


Contoh Pintu Sorong Kayu dengan Roda Gigi (Stang Draat Ganda) No.1; Lebar B = 1500mm; H = 1500mm; H1 = 3
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

L.01
L.02
L.03
L.04

OH
OH
OH
OH

15.400
75,900.00
7.700
95,700.00
0.770
95,700.00
1.540
95,700.00
Jumlah Harga Tenaga Kerja

M.54.g
M.62
B.07a
P.02b

kg
kg
m3
m3

1.860
12,000.00
10.267
24,750.00
0.310
1,230,958.56
0.620
1,096,232.90
Jumlah Harga Bahan

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor

B
1
2
3
4

Bahan
Besi Pengaku
Kawat Las Listrik
Campuran beton fc'= 19,3 Mpa (K-225)
Pas. Bata, mortar tipe N (1pc : 4 pp)

C
1
2
3

Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

M.69xx
E.45
E.22

bh
Sewa-hari
Sewa-hari

1.000
2.310
450,000.00
2.310
385,000.00
Jumlah Harga Peralatan
15% x D

F Harga Satuan Pekerjaan per - bh (D+E)


**) Harga disesuaikan dengan jenis atau tipe pintu air

H.03

Biaya Pemasangan Pintu Sorong Baja dengan Roda Gigi


Contoh Pintu Sorong Baja dengan Roda Gigi (Stang Double) No.1; Lebar B = 500mm; H = 500mm; H1 = 1000mm
No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

1
A
1
2
3
4

Tenaga Kerja
Pekerja
Tukang las
Kepala tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

2.940
75,900.00
1.470
95,700.00
0.147
95,700.00
0.294
95,700.00
Jumlah Harga Tenaga Kerja

B
1
2
3
4

Bahan
Besi Pengaku
Kawat Las Listrik
Campuran beton fc'= 19,3 Mpa (K-225)
Pas. Bata, mortar tipe N (1pc : 4 pp)

M.54.g
M.62
B.07a
P.02b

kg
kg
m3
m3

8.820
12,000.00
1.960
24,750.00
0.088
1,230,958.56
0.176
1,096,232.90
Jumlah Harga Bahan

C
1
2
3

Peralatan
Pintu air **)
Tackle/Tripod tinggi 4-5m
Mesin las listrik 250A, diesel

M.69xx
E.45
E.22

bh
Sewa-hari
Sewa-hari

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

1.000
0.441
450,000.00
0.441
385,000.00
Jumlah Harga Peralatan
15% x D

**) Harga disesuaikan dengan jenis atau tipe pintu air

Jumlah
(Rp)
7
47,058.00
29,667.00
2,966.70
5,933.40
85,625.10
22,320.00
10,221.75
14,771.50
27,405.82
74,719.08
41,850.00
35,805.00
77,655.00
237,999.18
35,699.88
273,699.05

m; H = 1500mm; H1 = 3000mm dan TR = 3800mm


Jumlah
(Rp)
7
1,168,860.00
736,890.00
73,689.00
147,378.00
2,126,817.00
22,320.00
254,100.83
381,597.15
679,664.40
1,337,682.38

1,039,500.00
889,350.00
1,928,850.00
5,393,349.38
809,002.41
6,202,351.78

00mm; H1 = 1000mm dan TR = 1900mm


Jumlah
(Rp)
7
223,146.00
140,679.00
14,067.90
28,135.80
406,028.70
105,840.00
48,510.00
108,324.35
192,936.99
455,611.34
198,450.00
169,785.00
368,235.00
1,229,875.04
184,481.26
1,414,356.30

A.6

PEKERJAAN PINTU AIR


Biaya pemasangan (jika harga pintu air belum termasuk ha

A.6.1

Pintu Angkat

No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

H1

TR

(mm)

(mm)

(mm)

(mm)

250

200
250
300

300
300
400
500
600
300
350
400
300
400
500
600
400
500
600

300
300
300
350
350
350
400
400
400
400
500
500
500

500
600
600
800
1000
1200
600
700
800
600
800
1000
1200
800
1000
1200

1050
1150
1150
1350
1550
1750
1150
1250
1350
1150
1350
1550
1750
1350
1550
1750

Pekerja
(OH)
(a).
0.620
0.620
0.680
0.740
0.750
0.800
0.660
0.680
0.720
0.670
0.730
0.780
0.840
0.770
0.830
0.900

A.6.2

PINTU SORONG KAYU DENGAN RODA GIGI

A.6.2.a

Pintu Sorong Kayu dengan Roda Gigi (Stang Draat Ganda)

No.
1
2
3
4
5
6

A.6.2.b

H1

TR

(mm)

(mm)

(mm)

(mm)

1500
2000
2000
2000
2500
2500

1500
1000
1500
2000
2000
2500

3000
2000
3000
3800
4000
5000

3800
2800
3800
4600
4800
5800

Pekerja
(OH)
(a).
15.40
15.60
16.40
18.20
20.00
22.00

Pintu Sorong Kayu dengan Roda Gigi (Stang Draat Tunggal)

No.

A.6.3
A.6.3.a

H1

TR

(mm)

(mm)

(mm)

(mm)

Pekerja

1
2
3
4

600
800
900
1000

1000
1000
1000
1000

1800
1800
2000
2100

2600
2700
2800
2900

(OH)
(a).
7.00
7.60
8.20
9.00

1200

1500

3000

3800

12.60

PINTU SORONG BAJA DENGAN RODA GIGI


Pintu Sorong Baja dengan Roda (Stang Tunggal)

No.
1
2
3
4
5
6
A.6.3.b

H1

TR

(mm)

(mm)

(mm)

(mm)

1000
1000
1000
1000
1000
1000

800
900
1000
1200
1500
1000

1400
1400
1450
1900
1900
2000

Pekerja
(OH)
(a).
2.30
2.42
2.50
2.42
2.52
2.58

2200
2200
2250
2700
2700
2900

Pintu Sorong Baja dengan Roda (Stang Double)

No.

H1

TR

(mm)

(mm)

(mm)

(mm)

Pekerja

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

500
500
500
600
600
600
600
700
700
700
800
800
800
800
900
900
900
900
900
900
900
900

500
600
700
500
600
1000
800
600
700
800
600
700
800
1000
600
700
900
900
1000
600
700
800

1000
1000
1200
1000
1200
1800
1200
1200
1400
1400
1200
1200
1400
1800
1200
1200
1200
1400
2100
1200
1200
1300

1900
2100
2000
2100
2100
2600
2000
2000
2200
2200
2000
2000
2000
2700
2000
2000
2000
2200
2200
2000
2000
2100

(OH)
(a).
2.94
2.60
2.46
2.60
2.64
2.56
2.60
2.68
3.14
2.62
2.68
2.78
2.86
2.76
2.82
2.96
3.12
3.24
6.40
6.60
6.70
6.84

23

900

900

1400

2200

7.20

m termasuk harga pemasangan)

at Tunggal)

Tukang
(OH)
(b).
0.310
0.310
0.340
0.370
0.375
0.400
0.330
0.340
0.360
0.335
0.365
0.390
0.420
0.385
0.415
0.450

Tukang
(OH)
(b).
7.70
7.80
8.20
9.10
10.00
11.00

Kepala
Tukang
(OH)
(c).
0.0310
0.0310
0.0340
0.0370
0.0375
0.0400
0.0330
0.0340
0.0360
0.0335
0.0365
0.0390
0.0420
0.0385
0.0415
0.0450

Kepala
Tukang
(OH)
(c).
0.77
0.78
0.82
0.91
1.00
1.10

Mandor
(OH)
(d).
0.0620
0.0620
0.0680
0.0740
0.0750
0.0800
0.0660
0.0680
0.0720
0.0670
0.0730
0.0780
0.0840
0.0770
0.0830
0.0900

Mandor
(OH)
(d).
1.54
1.56
1.64
1.82
2.00
2.20

Besi
Pengaku

(kg)
(e).
1.860
1.860
2.040
2.220
2.250
2.400
1.980
2.040
2.160
2.010
2.190
2.340
2.520
2.310
2.490
2.700

Besi
Pengaku

(kg)
(e).
1.86
1.86
2.04
2.22
2.25
2.40

Kawat
Las
(kg)
(f).
0.413
0.413
0.453
0.493
0.500
0.533
0.440
0.453
0.480
0.447
0.487
0.520
0.560
0.513
0.553
0.600

Camp.
Tackle
Mesin
Pas. Bata
Beton
/Tripod
Las
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.012
0.025
0.093
0.093
0.012
0.025
0.093
0.093
0.014
0.027
0.102
0.102
0.015
0.030
0.111
0.111
0.015
0.030
0.113
0.113
0.016
0.032
0.120
0.120
0.013
0.026
0.099
0.099
0.014
0.027
0.102
0.102
0.014
0.029
0.108
0.108
0.013
0.027
0.101
0.101
0.015
0.029
0.110
0.110
0.016
0.031
0.117
0.117
0.017
0.034
0.126
0.126
0.015
0.031
0.116
0.116
0.017
0.033
0.125
0.125
0.018
0.036
0.135
0.135

Kawat
Las
(kg)
(f).
10.27
10.40
10.93
12.13
13.33
14.67

Camp.
Tackle
Mesin
Pas. Bata
Beton
/Tripod
Las
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.31
0.62
2.31
2.31
0.31
0.62
2.34
2.34
0.33
0.66
2.46
2.46
0.36
0.73
2.73
2.73
0.40
0.80
3.00
3.00
0.44
0.88
3.30
3.30

(OH)
(b).
3.50
3.80
4.10
4.50

Kepala
Tukang
(OH)
(c).
0.35
0.38
0.41
0.45

6.30

0.63

Tukang

Tukang
(OH)
(b).
1.15
1.21
1.25
1.21
1.26
1.29

Kepala
Tukang
(OH)
(c).
0.115
0.121
0.125
0.121
0.126
0.129

(OH)
(b).
1.47
1.30
1.23
1.30
1.32
1.28
1.30
1.34
1.57
1.31
1.34
1.39
1.43
1.38
1.41
1.48
1.56
1.62
3.20
3.30
3.35
3.42

Kepala
Tukang
(OH)
(c).
0.147
0.130
0.123
0.130
0.132
0.128
0.130
0.134
0.157
0.131
0.134
0.139
0.143
0.138
0.141
0.148
0.156
0.162
0.320
0.330
0.335
0.342

3.60

0.360

Tukang

(OH)
(d).
0.70
0.76
0.82
0.90

(kg)
(e).
21.00
22.80
24.60
27.00

Kawat
Las
(kg)
(f).
4.67
5.07
5.47
6.00

1.26

37.80

8.40

Mandor

Besi
Pengaku

Mandor

(OH)
(d).
0.230
0.242
0.250
0.242
0.252
0.258

Besi
Pengaku

(kg)
(e).
6.90
7.26
7.50
7.26
7.56
7.74

0.50

1.89

1.89

Camp.
Tackle
Mesin
Pas. Bata
Beton
/Tripod
Las
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.069
0.138
0.345
0.345
0.073
0.145
0.363
0.363
0.075
0.150
0.375
0.375
0.073
0.145
0.363
0.363
0.076
0.151
0.378
0.378
0.077
0.155
0.387
0.387

Camp.
Tackle
Mesin
Pas. Bata
Beton
/Tripod
Las
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.088
0.176
0.441
0.441
0.078
0.156
0.390
0.390
0.074
0.148
0.369
0.369
0.078
0.156
0.390
0.390
0.079
0.158
0.396
0.396
0.077
0.154
0.384
0.384
0.078
0.156
0.390
0.390
0.080
0.161
0.402
0.402
0.094
0.188
0.471
0.471
0.079
0.157
0.393
0.393
0.080
0.161
0.402
0.402
0.083
0.167
0.417
0.417
0.086
0.172
0.429
0.429
0.083
0.166
0.414
0.414
0.085
0.169
0.423
0.423
0.089
0.178
0.444
0.444
0.094
0.187
0.468
0.468
0.097
0.194
0.486
0.486
0.192
0.384
0.960
0.960
0.198
0.396
0.990
0.990
0.201
0.402
1.005
1.005
0.205
0.410
1.026
1.026

(OH)
(d).
0.294
0.260
0.246
0.260
0.264
0.256
0.260
0.268
0.314
0.262
0.268
0.278
0.286
0.276
0.282
0.296
0.312
0.324
0.640
0.660
0.670
0.684

(kg)
(e).
8.82
7.80
7.38
7.80
7.92
7.68
7.80
8.04
9.42
7.86
8.04
8.34
8.58
8.28
8.46
8.88
9.36
9.72
19.20
19.80
20.10
20.52

0.720

21.60

4.80

Besi
Pengaku

0.25

Kawat
Las
(kg)
(f).
1.53
1.61
1.67
1.61
1.68
1.72

Kawat
Las
(kg)
(f).
1.96
1.73
1.64
1.73
1.76
1.71
1.73
1.79
2.09
1.75
1.79
1.85
1.91
1.84
1.88
1.97
2.08
2.16
4.27
4.40
4.47
4.56

Mandor

Camp.
Tackle
Mesin
Pas. Bata
Beton
/Tripod
Las
(m3)
(m3)
Sewa-hari Sewa-hari
(g).
(h).
(i).
(j).
0.14
0.28
1.05
1.05
0.15
0.30
1.14
1.14
0.16
0.33
1.23
1.23
0.18
0.36
1.35
1.35

0.216

0.432

1.080

1.080

AHSP.Pus Air.185

AT

PEKERJAAN AIRTANAH
AT.01

ANALISIS BIAYA OPERASI ALAT BERAT PEMBUATAN SUMUR BOR AIRTANAH DALAM

1 m' Pengambilan dan Deskripsi Sampel Batuan (termasuk laporan)

ANALISIS PRODUKTIVITAS OPERASI ALAT BERAT PEMBUATAN SUMUR BOR AIRTANAH DALAM

(diambil dari AHSP Geoteknik)


No

Uraian

Kode

Satuan

Koefisien
5

Tenaga Kerja

Pekerja

L.01

OH

Mandor

L.04

OH

Akhli Madya Geologist (minimum)

L.08

OH

Harga Satuan
(Rp)

JENIS ALAT

Jumlah
(Rp)

No.
2.50

75,900.00

0.25

95,700.00

0.10

650,000.00

65,000.00

A.
1.

Bahan
Kawat Kasa sampel

paket

0.10

25,000.00

2,500.00

Kotak sampel

paket

0.20

250,000.00

50,000.00

Kantong Plastik (tebal)

paket

0.05

20,000.00

Peralatan

1,000.00

Jumlah Harga Bahan

53,500.00

Jumlah Harga Peralatan


E

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

15% x D

Merk / Tipe
Pw
Cp

HP
-

Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat

A
W
B

Tahun
Jam
Rp

B.

BIAYA PASTI PER JAM KERJA

49,826.25

Rp

1. Nilai Sisa Alat

=(i x
(1+i)
^A )/
( (1+i)
= ((BC)
^A1)
x D)/W

Faktor Angsuran Modal


3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal

Kode

Satuan

Koefisien

1
A

Tenaga
Kapasitas

5.
6.
7.

382,001.25

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Tone, Koken

Mud Pump

Truck Cargo

Pick up

Welding set

WATER
JETTING
Gardner
Denver

4.
5.

Double
stroke
120

Atlas Copco
350/Rotary
300

Mitsubishi
Colt Diesel
110
-

Izuzu /Toyota

24
-

Grunfos dan
Jhon Deer
42
-

10
1,500
150,000,000.00

10
1,500
225,000,000.00

5
2,000
175,000,000.00

5
2,000
100,000,000.00

5
1,500
140,000,000.00

10
1,500
160,000,000.00

10
1,500
220,000,000.00

64,575,000

15,000,000

22,500,000

17,500,000

10,000,000

14,000,000

16,000,000

22,000,000

100
-

Kubota
225Ah

PUMPING TEST
UNIT

10
1,500
645,750,000.00

130
-

RRC/

AIR
COMPRESSOR

120
-

=px
B/W

b. Asuransi, dll.

Pekerja

L.01

OH

Tukang Bor

L.02

OH

Mandor

L.04

OH

Bahan

0.3088

75,900.00

0.0772

95,700.00

0.0309

95,700.00

23,437.92

Suku bunga
0.16275
i = 10%

0.16275

0.16275

0.16275

0.26380

0.26380

0.26380

0.16275

Rp/jam

63,055.70

14,647.09

21,970.63

20,774.05

11,870.89

22,158.99

15,623.56

21,482.39

Rp/jam

861.00

200.00

300.00

175.00

100.00

186.67

213.33

293.33

Asuransi alat berat

Peralatan

Borehole dia 8 3/4"

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

2. Pelumas
0.5405

Rp/jam

63,916.70

14,847.09

22,270.63

20,949.05

11,970.89

22,345.66

15,836.89

21,775.73

Rp/jam

156,000.00

144,000.00

360,000.00

26,400.00

24,000.00

28,800.00

50,400.00

144,000.00

Koefisien biaya OP
12.00%

Rp/jam

97,500.00

90,000.00

225,000.00

8,250.00

7,500.00

18,000.00

31,500.00

90,000.00

2.50%

Rp/jam

6.
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar
= (12%-15%) x Pw x Ms

*)
m

G = (E + F)

827,253.19

= (2.5%-3%) x Pw x Mp

447,130.35

Jumlah Harga Peralatan

447,130.35

Biaya bengkel

= (6,25% - 8,75%)

26,906.25

6,250.00

9,375.00

5,833.33

6,666.67

9,166.67

6.25%

Rp/jam

53,812.50

12,500.00

18,750.00

2,187.50

1,250.00

11,666.67

13,333.33

18,333.33

12.50%

Rp/jam

10,842.86

10,842.86

10,842.86

10,842.86

10,842.86

10,842.86

10,842.86

10,842.86

Rp/jam

9,114.29

9,114.29

9,114.29

9,114.29

9,114.29

9,114.29

9,114.29

9,114.29

Rp/jam

354,175.89

272,707.14

633,082.14

57,888.39

53,332.14

84,257.14

121,857.14

281,457.14

Rp/jam

418,092.60

287,554.23

655,352.77

78,837.44

65,303.03

106,602.80

137,694.03

303,232.87

3. Perawatan dan

72,137.02

x
/
x
/

= (m orang/jam) x U1

5. Pembantu operator = (n orang/jam) x U2

480,913.44
15% x D

553,050.45

= (12,5%-17,5%)

perbaikan

1,093.75

625.00

*) Produktivitas alat sangat tergantung kepada: kondisi peralatan yang digunakan dan konsitensi tanah yang dibor

4. Operator
1m' Reaming dia. 8 3/4" - 12"
No

Uraian

Kode

Satuan

Koefisien

L.01

OH

Tenaga Kerja

Pekerja

Harga Satuan
(Rp)

Biaya Operasi (per Jam)

Jumlah
7

75,900.00

21,555.60

OH

0.071

95,700.00

6,794.70

1. Bahan Bakar Premium (non subsidi)

Mb

Liter

10,000.00

10,000.00

10,000.00

10,000.00

10,000.00

10,000.00

10,000.00

10,000.00

OH

0.029

95,700.00

2,737.02

2. Bahan Bakar Solar


3. Minyak Pelumas

Ms
Mp

Liter
Liter

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

10,000.00
30,000.00

Bahan

31,087.32

Jumlah Harga Bahan


Peralatan

Reaming dia 8 3/4" - 12"

0.5

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

Uraian

1
Tenaga Kerja

Pekerja

413,626.59
444,713.91

Satuan

Koefisien

L.01

OH

66,707.09

Tukang Bor

L.02

OH

Mandor

L.04

OH

Bahan

Harga Satuan
(Rp)

Reaming dia 8 3/4" - 14 3/4"

0.072

95,700.00

0.029

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

2,765.73

417,845.58
417,845.58
449,360.91

1
Tenaga Kerja

Pekerja

L.01

OH

Tukang Bor

L.02

OH

Mandor

L.04

OH

Koefisien

Harga Satuan
(Rp)

(Rp)

0.3240

75,900.00

0.0810

95,700.00

0.0327

95,700.00

7
24,591.60
3,129.39

Peralatan

Temporary Cassing (ID) 12"

0.5714

468,520.86

267,712.82

Jumlah Harga Peralatan


D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

267,712.82
303,185.51

15% x D

45,477.83
348,663.34

1m' Bongkar pasang Temporary Cassing (ID) 17"


No

Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

Tenaga Kerja

Pekerja

L.01

OH

0.3280

75,900.00

Tukang Bor

L.02

OH

0.0820

95,700.00

Mandor

L.04

OH

0.0328

95,700.00

24,895.20

Bahan

Peralatan

Temporary Cassing (ID) 17"

3,138.96

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

35,881.56

Jumlah Harga Bahan


m

0.5714

468,520.86

267,712.82

Jumlah Harga Peralatan


E

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

267,712.82
303,594.38

15% x D

45,539.16
349,133.54

1m' Pengadaan dan Pemasangan Cassing Pipa Black Steel 6"


No

Uraian

Kode

Satuan

Harga Satuan
Koefisien
(Rp)
5

Jumlah
(Rp)

Tenaga Kerja

Pekerja

L.01

OH

0.072

75,900.00

Tukang Bor

L.02

OH

0.018

95,700.00

Mandor

L.04

OH

0.007

95,700.00

Bahan

5,464.80

Pipa Black Steel 6"

Centralizer

679.47
7,866.87

M.104.i

1.050

88,300.00

92,715.00

Ls

0.100

100,000.00

10,000.00

E.09

0.125

Jumlah Harga Bahan


C

Peralatan

Drilling Rig + perlengkapan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

102,715.00

842,342.31

105,292.79

Jumlah Harga Peralatan

105,292.79
215,874.66

15% x D

32,381.20
248,255.86

1m' Pengadaan dan Pemasangan LC Screen 6"


No

Uraian

Kode

Satuan

Koefisien

L.01

OH

Tenaga Kerja

Pekerja

Harga Satuan
(Rp)

Jumlah
(Rp)

0.072

75,900.00

Tukang Bor

L.02

OH

0.018

95,700.00

Mandor

L.04

OH

0.007

95,700.00

5,464.80
1,722.60

Bahan

LC Screen 6"

Peralatan

Drilling Rig + perlengkapan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

M.108.b

1.050

1,500,000.00

Jumlah Harga Bahan

Overhead + Profit (Contoh 15%)


Harga Satuan Pekerjaan per - m1 (D+E)

E.09

0.125

1,575,000.00

842,342.31

1,582,866.87

15% x D

237,430.03
1,820,296.90

1m' Pengadaan dan Pemasangan Cassing Pipa Black Steel 8"


No

Uraian

Kode

Satuan

Koefisien

L.01

OH

Tenaga Kerja

Pekerja

Harga Satuan
(Rp)

Jumlah
(Rp)

0.080

75,900.00

Tukang Bor

L.02

OH

0.020

95,700.00

Mandor

L.04

OH

0.008

650,000.00

Bahan

Pipa Black Steel 8"

Centralizer

6,072.00

M.104.j

1.050

152,300.00

Ls

0.100

200,000.00

E.09

0.143

13,316.00
159,915.00
20,000.00

Jumlah Harga Bahan


C

Peralatan

Drilling Rig + perlengkapan

179,915.00

842,342.31

120,370.72

Jumlah Harga Peralatan


D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

4.000

1,914.00
5,330.00

Jumlah Harga Tenaga Kerja

120,370.72
313,601.72

15% x D

47,040.26
360,641.97

1m' Pengadaan dan Pemasangan LC Screen 8"


No

Uraian

Kode

Harga Satuan
(Rp)

Satuan

Koefisien

Tenaga Kerja

Pekerja

L.01

OH

0.080

75,900.00

Tukang Bor

L.02

OH

0.020

95,700.00

Mandor

L.04

OH

0.008

95,700.00

Jumlah
(Rp)

7
6,072.00

Bahan

LC Screen 8"

M.108.c

1.050

E.09

0.143

3,250,000.00

Jumlah Harga Bahan


C

Peralatan

Drilling Rig + perlengkapan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

4.000

1,914.00
784.74

Jumlah Harga Tenaga Kerja

8,770.74
3,412,500.00
3,412,500.00

842,342.31

120,370.72

Jumlah Harga Peralatan

AT.11

0.072

7,866.87
1,575,000.00

Jumlah Harga Peralatan


E
F

4.000

679.47

Jumlah Harga Tenaga Kerja

AT.10

1,722.60

Jumlah Harga Tenaga Kerja

AT.09

7,847.40

Jumlah Harga Tenaga Kerja

AT.08

4.0000

7,751.70
35,472.69

Bahan
Jumlah Harga Bahan

AT.07

6.

Jumlah

Jumlah Harga Tenaga Kerja


B

120,370.72
3,541,641.46

15% x D

531,246.22
4,072,887.67

1 m' Pengadaan dan Pemasangan Pipa Sounding PVC 1"


No

Uraian

Kode

Satuan

Koefisien

L.01

OH

Tenaga Kerja

Pekerja

Harga Satuan
(Rp)

Jumlah
(Rp)

*)
0.024

75,900.00

Tukang Bor

L.02

OH

0.006

95,700.00

Mandor

L.04

OH

0.002

95,700.00

1,821.60

Bahan *)

Pipa Sounding GIP 1" + Asesoris

Peralatan

Drilling Rig + perlengkapan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

M.107.b

1.250

220.11

E.09

0.040

2,615.91

19,455.00

24,318.75

Jumlah Harga Bahan

24,318.75

842,342.31

33,693.69

Jumlah Harga Peralatan


E

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m1 (D+E)

4.000

574.20

Jumlah Harga Tenaga Kerja


B

33,693.69
60,628.35

15% x D

9,094.25
69,722.61

*) biaya asesoris diperkirakan 25% dari biaya pipa

AT.12

1 m3 Pengadaan dan Pemasangan Gravel Pack


No

Uraian

Kode

Satuan

Koefisien

L.01

OH

Harga Satuan
(Rp)

Jumlah
(Rp)

Tenaga Kerja

Pekerja

1.040

75,900.00

Tukang Bor

L.02

OH

0.260

95,700.00

Mandor

L.04

OH

0.104

95,700.00

Bahan Gravel Pack

Koral

M.12

PC

M.15

Kg

325

E.09

m3

1.818

78,936.00
24,882.00

1.20

Peralatan

Drilling Rig + perlengkapan

200,000.00

240,000.00

1,740.00

842,342.31

Jumlah Harga Peralatan

AT.13

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

1.04

113,761.23

565,500.00

Jumlah Harga Bahan


C

4.000

9,943.23

Jumlah Harga Tenaga Kerja


m3

240,000.00
1,531,546.79
1,531,546.79
1,885,308.02

15% x D

282,796.20
2,168,104.22

1 Jam Pencucian Sumur *


No

Uraian

Kode

Harga Satuan
(Rp)

Jumlah

Satuan

Koefisien

Tenaga Kerja

Pekerja

L.01

OH

0.572

75,900.00

43,414.80

Tukang Bor

L.02

OH

0.143

95,700.00

13,685.10

Mandor

L.04

OH

0.057

95,700.00

(Rp)

7
4.000
0.572

5,464.47

Jumlah Harga Tenaga Kerja


B

62,564.37

Bahan
Jumlah Harga Bahan

Peralatan

Drilling Rig + perlengkapan

E.09

m3

1.000

774,480.63

774,480.63

Jumlah Harga Peralatan

774,480.63

15% x D

125,556.75

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

837,045.00

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

962,601.75

*) Pencucian sumur dapat dilakukan dengan metode Air Lifting, Air Jetting dan Blow up

AT.14

1 Jam Uji Pemompaan *


No

Uraian

Kode

Satuan

Tenaga Kerja

Pekerja

L.01

OH

Tukang Bor

L.02

OH

Mandor

L.04

OH

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

0.572

75,900.00

43,414.80

0.143

95,700.00

13,685.10

0.057

95,700.00

Bahan

Peralatan

Drilling Rig + perlengkapan

E.09

m3

1.000

246,114.87

246,114.87

Jumlah Harga Peralatan

246,114.87

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

308,679.24

Overhead + Profit (Contoh 15%)

0.572

62,564.37

Jumlah Harga Bahan

4.000

5,464.47

Jumlah Harga Tenaga Kerja


B

15% x D

46,301.89

Harga Satuan Pekerjaan per - m3 (D+E)

354,981.12

*) Uji pemompaan sumur dapat dilakukan dengan metode V-Notch atau Orifice

AT.15

1 lokasi Pasang dan bongkar Peralatan Uji


No

Uraian

Kode

Tenaga Kerja

Satuan
4

Harga Satuan
Koefisien
(Rp)
5

Jumlah
(Rp)

*)

Pekerja

L.01

OH

Tukang Bor

L.02

OH

Mandor

L.04

OH

8.00

75,900.00

1.00

95,700.00

0.80

95,700.00

607,200.00
95,700.00
76,560.00

Jumlah Harga Tenaga Kerja


B

76,560.00

Bahan

Resin

tube

250,000.00

500,000.00

Kabel isolasi, air accu, besi strip,


asetelin H2O dll.

Ls

550,000.00

550,000.00

Peralatan

Jumlah Harga Bahan

550,000.00

Jumlah Harga Peralatan


D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - lokasi (D+E)

626,560.00

15% x D

93,984.00
720,544.00

*) Dapat disesuikan dengan kebutuhan di lapangan

AT.16

Sampling 1 sampel Analisa Kualitas Air


No

Uraian

Tenaga Kerja

Teknisi sampling kualitas air

Bahan

1 bh Jerigen 1 L, 2 bh botol 250mL

Peralatan

Kode

Satuan

L.05

OH

LS

Koefisien

Harga Satuan
(Rp)

6
0.50

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)


Overhead + Profit (Contoh 15%)

(Rp)
7
37,950.00
37,950.00

35,000.00

35,000.00

Jumlah Harga Bahan

35,000.00

Jumlah Harga Peralatan


E

Jumlah

75,900.00

Jumlah Harga Tenaga Kerja


1

72,950.00

15% x D

Mud Pump
Air Compressor
30%
0%
287,554.23
655,352.77
287,554.23
655,352.77

Truck Cargo
10%
78,837.44
78,837.44

Produktivitas
(Q)
1.75 m/jam
1.75 m/jam

Koefisien Alat
(1/Q)
0.5714
0.5714

20%
65,303.03
65,303.03

Welding set
5%
106,602.80
106,602.80

Pumping Test
0%
137,694.03
137,694.03

Water Jetting
0%
303,232.87
303,232.87

*) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah, kapasitas ini untuk konsistensi
stiff (sedang), sedangkan untuk tanah lembek kapasitas dikali 2 - 3 dan untuk tanah keras
kapasitas dikali 30 - 50%

Pick up
0%
65,303.03
65,303.03

Welding set
50%
106,602.80
106,602.80

Pumping Test
0%
137,694.03
137,694.03

Water Jetting
0%
303,232.87
303,232.87

Welding set
100%
106,602.80
106,602.80

Pumping Test
0%
137,694.03
137,694.03

Water Jetting
100%
303,232.87
303,232.87

Welding set
5%
106,602.80
106,602.80

Pumping Test
0%
137,694.03
137,694.03

Water Jetting
0%
303,232.87
303,232.87

Welding set
5%
106,602.80
106,602.80

Pumping Test
100%
137,694.03
9,000.00
9,000.00
146,694.03

Water Jetting
0%
303,232.87
303,232.87

Koefisien Tenaga Kerja (OH)


(Pekerja)
(Tukang Bor)
(Mandor)
0.3265
0.0816
0.0327
0.3265
0.0816
0.0327

Truck Cargo
10%
78,837.44
78,837.44

Produktivitas
(Q)
8.00 m/jam
7.00 m/jam
25.00 m/jam
0.55 m3/jam

Koefisien Alat
(1/Q)
0.1250
0.1429
0.0400
1.8182

Pick up
10%
65,303.03
65,303.03

Koefisien Tenaga Kerja (OH)


(Pekerja)
(Tukang Bor)
(Mandor)
0.0714
0.0179
0.0071
0.0816
0.0204
0.0082
0.0229
0.0057
0.0023
1.0390
0.2598
0.1039

Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam

Produktivitas
(Q)
1.00 jam
1.00 jam
1.00 jam

Drilling Rig
20%
418,092.60
418,092.60
774,480.63
Koefisien Alat
(1/Q)
1.0000
1.0000
1.0000

Mud Pump
0%
287,554.23
287,554.23

Air Compressor
100%
655,352.77
12,500.00
12,500.00
667,852.77

Truck Cargo
10%
78,837.44
78,837.44

Pick up
15%
65,303.03
65,303.03

Koefisien Tenaga Kerja (OH)


(Pekerja)
(Tukang Bor)
(Mandor)
0.5714
0.1429
0.0571
0.5714
0.1429
0.0571
0.5714
0.1429
0.0571

Kode
M
S
K
S+K
M x (S+K)

Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam

Drilling Rig
20%
418,092.60
418,092.60
246,114.87

Mud Pump
0%
287,554.23
287,554.23

Air Compressor
0%
655,352.77
655,352.77

Truck Cargo
5%
78,837.44
78,837.44

67,404.14
516,765.05

Satuan

Development Methods

5.
Uji Pemompaan (Pumping Test)
No.
UraIan
1.
Prsentase pemanfaatan
2.
Biaya operasi Alat S = (G + P)
3.
Bahan pakai habis
- Battery, cable lamp, dll.
4.
Biaya operasi Alat+Material
5.
Biaya operasi total

31,515.33

827,253.19

15% x D

Kode

Koefisien Tenaga Kerja (OH)


(Pekerja)
(Tukang Bor)
(Mandor)
0.3089
0.0772
0.0309
0.2857
0.0714
0.0286
0.2886
0.0722
0.0289
0.3008
0.0752
0.0301

Pick up

4.0000

1m' Bongkar pasang Temporary Cassing (ID) 12"


Uraian

Drilling Rig
75%
418,092.60
10,000.00
6,500.00
3,500.00
428,092.60
468,520.86

Truck Cargo
15%
78,837.44
78,837.44

6,890.40

95,700.00

0.5051

Pemasangan Cassing dan


Screen Low Carbon
a. BS Casing or LC Screen 6"
b. BS Casing or LC Screen 8"
c. Pipa sounding PVC 1"
d. Gravel Pack

a. Air Lifting
b. Air Jetting
c. Blow Up

21,859.20

Jumlah Harga Peralatan

No

6.

Jumlah Harga Bahan


Peralatan

(non subsidi)

(Rp)

75,900.00

Jumlah Harga Tenaga Kerja

Temporary Cassing
Diameter
a. (ID) 17"
b. (ID) 12"

Jumlah

0.288

Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam

Koefisien Alat
(1/Q)
0.5405
0.5000
0.5051
0.5263

Mud Pump
Air Compressor
100%
0%
287,554.23
655,352.77
287,554.23
655,352.77

3.
Pemasangan Konstruksi Sumur (Pipa Black Steel dan Screen Low Carbon)
No.
UraIan
Kode
Satuan
Drilling Rig
Mud Pump
Air Compressor
1. Prsentase pemanfaatan
M
%
100%
0%
0%
2. Biaya operasi Alat S = (G + P)
S
Rp./jam
418,092.60
287,554.23
655,352.77
3. Bahan pakai habis
K
Rp./jam
12,500.00
- Wire RB & Ciron
Rp./jam
- Acetelyn & CO2
Rp./jam
12,500.00
4. Biaya operasi Alat+Material
S+K
Rp./jam
418,092.60
287,554.23
667,852.77
5. Biaya operasi total
M x (S+K) Rp/jam
842,342.31

6.
Kode

Bongkar pasang Temporary Cassing


UraIan
Kode
Prosentase pemanfaatan
M
Biaya operasi Alat S = (G + P)
S
Bahan pakai habis
K
- Wire RB & Ciron
- Acetelyn & CO2
Biaya operasi Alat+Material
S+K
Biaya operasi total
M x (S+K)

4.
Pencucian Sumur (Well Development)
No.
UraIan
Kode
1. Prsentase pemanfaatan
M
2. Biaya operasi Alat S = (G + P)
S
3. Bahan pakai habis
K
- Foam/Detergen
4. Biaya operasi Alat+Material
S+K
5. Biaya operasi total
M x (S+K)

413,626.59

511,421.00

Produktivitas *)
(Q)
1.85 m/jam
2.00 m/jam
1.98 m/jam
1.90 m/jam

Drilling Rig
100%
418,092.60
91,390.00
68,890.00
22,500.00
509,482.60
827,253.19

827,253.19

15% x D

1m' Reaming dia. 8 3/4" - 14 3/4"


No

AT.06

LAIN - LAIN

L.02
L.04

Jumlah Harga Peralatan

AT.05

BIAYA OPERASI ALAT / JAM = (G + P)

E.

Tukang Bor

Mandor

Jumlah Harga Tenaga Kerja

AT.04

D.

2
3

Satuan
%
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp./jam
Rp/jam

(Rp)

0.284

4.
5.

2,957.13
33,783.09

Jumlah Harga Bahan


C

Biaya Pasti per Jam

Pengeboran (Pilot hole dan


Reaming)
a. Borehole dia 8 3/4"
b. Reaming dia 8 3/4" - 12"
c. Reaming dia 8 3/4" - 14 3/4"
d. Reaming dia 8 3/4" - 17"

2.
No.
1.
2.
3.

p = 0.2%

Pengeboran (Pilot hole dan Reaming)


UraIan
Kode
Prsentase pemanfaatan
M
Biaya operasi Alat S = (G + P)
S
Bahan pakai habis
K
- Drilling Fluid/mud
- Bit
Biaya operasi Alat+Material
S+K
Biaya operasi total
M x (S+K)

7,388.04

Jumlah Harga Tenaga Kerja

AT.03

6.

Tenaga Kerja

1.
No.
1.
2.
3.

332,175.00

1m' Pengeboran dia. 8 3/4"


No

KETERANGAN

Perhitungan Biaya Operasi Peralatan

MESIN BOR
(Drilling Rig)

3.
4.

*) Jika tenaga kerja telah dihitung dalam kegiatan pengeboran, maka Harga Satuan (kolom 6) = 0

AT.02

SATUAN

URAIAN PERALATAN
Jenis Peralatan

2.

1
2

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

KODE

23,925.00
278,675.00

C
D

URAIAN ANALISA HARGA SATUAN

URAIAN

189,750.00

Jumlah Harga Tenaga Kerja


B

: Mesin Bor, Mud Pump, Air Compressor, Pumping Test unit, Water Jetting

SATUAN PEMBAYARAN : Rupiah/jam

*)

10,942.50

8.000
4

Pumping Test
Air Lift Methods:
a. Method "V" Notch
b. Method Orifice

Produktivitas
(Q)
1.00 jam
1.00 jam

Koefisien Alat
(1/Q)
1.0000
1.0000

Koefisien Tenaga Kerja (OH)


(Pekerja)
(Tukang Bor)
(Mandor)
0.5714
0.1429
0.0571
0.5714
0.1429
0.0571

Pick up
10%
65,303.03
65,303.03

AHSP.Pus Air.186

Harga Satuan Pekerjaan per - sampel (D+E)

Biaya Analisa Sampel Kualitas Air (air minum)

83,892.50
sampel

1,500,000.00

1,500,000.00

15% x G

225,000.00
1,808,892.50

AT.17

1 bh Patok Sumur
(diambil dari AHSP Pengukuran dan Pemetaan)
No

Uraian

Kode

Satuan

Tenaga Kerja

1.

Pekerja

L.01

OH

2.

Mandor

L.04

OH

Koefisien

Harga Satuan
(Rp)

Jumlah
(Rp)

6
1.00

75,900.00

0.10

95,700.00

7
75,900.00
9,570.00

Jumlah Harga Tenaga Kerja


B

Bahan

1.

Patok beton uk. 20cm x 20 cm

3.

Cat tembok

Peralatan

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - bh (D+E)

85,470.00

Ls

1.00

175,000.00

175,000.00

M.115.d

kg

0.50

25,200.00

12,600.00

Jumlah Harga Bahan

187,600.00

Jumlah Harga Peralatan

AT.18

273,070.00

15% x D

40,960.50
314,030.50

1 titik Electric Logging


(diambil dari AHSP Hidrologi)
No

Uraian

1
A

Kode
3

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

Tenaga Kerja

Pekerja

L.01

OH

1.00

75,900.00

75,900.00

Engineer (sipil/geologi)/akhli madya

L.08

OH

0.25

650,000.00

162,500.00

Jumlah Harga Tenaga Kerja


B

Bahan

Patok kayu kaso 5/7 - 1m'

Cat tembok

Peralatan

Geo listrik

238,400.00

Ls

6.00

30,000.00

M.115.d

kg

0.50

25,200.00

12,600.00

Jumlah Harga Bahan

192,600.00

M.121

Sewa-hari

0.333

2,500,000.00

Jumlah Harga Peralatan


D

Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)

Overhead + Profit (Contoh 15%)

Harga Satuan Pekerjaan per - titik (D+E)

180,000.00

832,500.00
832,500.00
1,263,500.00

15% x D

189,525.00
1,453,025.00

AHSP.Pus Air.187

A.8

PEKERJAAN LAIN-LAIN

LA.01

Pemagaran daerah kerja

LA.01a

1 m' pemagaran daerah kerja dengan seng gelombang BJLS-30, tinggi 1,8 m pakai rangka kayu atau baja
Rangka baja L.40.40.4
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
3

L.01
L.02
L.02
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang besi
Tukang tembok
Mandor

Harga Satuan
(Rp)

Jumlah
(Rp)

0.20
75,900.00
0.10
95,700.00
0.10
95,700.00
0.02
95,700.00
Jumlah Harga Tenaga Kerja

B
1

Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m

M.88.d

lbr

2
3
4

Baja L 40.40.4
Kawat seng 3mm
Pas. Batu uk. 20/50, t=40cm

M.54.g
M.63
P.01d

kg
kg
m3

Peralatan

D
E
F

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)
Harga Satuan Pekerjaan per - m 2 (D+E)

1.200

15,180.00
9,570.00
9,570.00
1,914.00
36,234.00

60,200.00

72,240.00
162,000.00
7,500.00
151,981.80 *
393,721.80

13.500
12,000.00
0.300
25,000.00
0.150
1,013,212.00
Jumlah Harga Bahan
Jumlah Harga Peralatan

LA.01b

429,955.80
64,493.37
494,449.17

15% x D

Rangka Kayu
No

Uraian

Kode

Satuan

Koefisien

1
A
1
2
3
3

L.01
L.02
L.02
L.04

OH
OH
OH
OH

Tenaga Kerja
Pekerja
Tukang kayu
Tukang tembok
Mandor

Harga Satuan
(Rp)

Jumlah
(Rp)

0.180
75,900.00
0.100
95,700.00
0.080
95,700.00
0.018
95,700.00
Jumlah Harga Tenaga Kerja

B
1

Bahan
Seng Gelombang BJLS-30 (t=0,05)
tinggi 1,8 m dan lebar 0,9m

M.88.d

lbr

1.200

Kaso 5/7 kayu kelas II


Paku seng
Paku 7 cm
Pas. Batu uk. 20/50, t=40cm

M.35.a
M.54.h
M.54.g
P.01d

m3
kg
kg
m3

0.035

3
4
5
C

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)

Harga Satuan Pekerjaan per - m 2 (D+E)

13,662.00
9,570.00
7,656.00
1,722.60
32,610.60

60,200.00
72,240.00

1,500,000.00
16,500.00
0.300
12,000.00
0.120
0.150
1,013,212.00
Jumlah Harga Bahan

52,500.00
4,950.00
1,440.00
151,981.80
283,111.80

Jumlah Harga Peralatan

LA.02

315,722.40
47,358.36

15% x D

363,080.76

Pembuatan direksi keet, los kerja dan gudang


1 m2 pembuatan direksi keet atap abses gelombang, dinding triplek, kaca nako.
No

Uraian

Kode

Satuan

Koefisien

1
A.
1
2
3
4

Tenaga Kerja
Pekerja
Tukang Tembok/batu
Kepala tukang batu
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

B.
1
2
3
5
6
7
8
9
10
11
12

Bahan
Kaso 5/7
Dinding triplek 4mm
Fondasi pas. Batu
Plafon asbes 3 mm (1x1 m)
Paku
Asbes gelombang
Paku asbes
Floor lantai (Beton lantai kerja)
Pintu double teakwood rangka kayu
Jendela kaca nako
Cat dinding/plafon

M.33.d
M.42.b
P.01d
M.66.c
M.110.a
M.54.f
B.01
M.40.a
M.115.d

m3
lbr
m3
lbr
kg
lbr
kg
m3
m2
daun
m2

Peralatan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan per - m2( D + E )

Harga Satuan
(Rp)

Jumlah
(Rp)

1.20
75,900.00
0.40
95,700.00
0.04
95,700.00
0.12
95,700.00
Jumlah Harga Tenaga Kerja

91,080.00
38,280.00
3,828.00
11,484.00
144,672.00

0.35
1.00
0.165
1.24
0.75
0.30
0.1
0.15
0.1
1.00
16.50

490,000.00 *
60,000.00
167,179.98
31,000.00
10,875.00
15,000.00
1,650.00
125,695.58 *

1,400,000.00
60,000.00
1,013,212.00
25,000.00
14,500.00
50,000.00
16,500.00
837,970.55
146,000.00
25,000.00
25,200.00
Jumlah Harga Bahan

14,600.00
25,000.00
415,800.00
1,356,800.56

Jumlah Harga Peralatan

LA.03

0
1,501,472.56
225,220.88
1,726,693.45

15% x D

Pembuatan papan nama pekerjaan


1 bh papan nama proyek
No

Uraian

Harga Satuan
(Rp)

Jumlah
(Rp)

Kode

Satuan

Koefisien

L.01
L.02
L.03
L.02
L.04

OH
OH
OH
OH
OH

1.00
75,900.00
1.00
95,700.00
0.10
95,700.00
1.50
95,700.00
0.1
95,700.00
Jumlah Harga Tenaga Kerja

75,900.00
95,700.00
9,570.00
143,550.00
9,570.00
258,390.00

M.38.d
M.33.a
M.65.b
M.115.b

Lbr
m3
kg
kg

1.00
222,000.00
0.077
4,158,000
1.25
12,500.00
2.50
37,450.00
Jumlah Harga Bahan

222,000.00
320,166.00
15,625.00
93,625.00
651,416.00

1
A.
1
2
3
4
5

2
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang kayu
Tukang Cat dan Tulis
Mandor

B.
1
2
3
4

Bahan
Multiplek tebal 18 mm
Kayu 8/12 kelas II
Paku campuran 5 cm dan 7cm
Cat kayu

Peralatan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Jumlah Harga Peralatan


909,806.00
136,470.90
1,046,276.90

15% x D

LA.04

Mobilisasi

LA.04a

Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
No

Uraian

Kode

Satuan

Koefisien

1
A.
1
2
3

Tenaga Kerja
Akhli alat berat (akhli madya)
Pelaksana kegiatan (pemberi tugas)
Staf (Kontraktor)

L.08
L.08
L.07

OH
OH
OH

B.

Bahan

Peralatan

Harga Satuan
(Rp)

Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
Jumlah
(Rp)

2
650,000.00
3
450,000.00
4
450,000.00
Jumlah Harga Tenaga Kerja

1,300,000.00
1,350,000.00
1,800,000.00
4,450,000.00

No

Uraian

Kode

Satuan

Koefisien

1
A.
1
2
3

Tenaga Kerja
Akhli alat berat (akhli madya)
Pelaksana kegiatan (pemberi tugas)
Staf (Kontraktor)

L.08
L.08
L.07

OH
OH
OH

B.

Bahan

Peralatan
Jumlah Harga Peralatan

4,450,000.00
667,500.00
5,117,500.00

15% x D

D
E
F

*) disesuaikan dengan waktu pencapaian ke lokasi pekerjaan yang mempertimbangkan kesulitan transportasi

LA.04b

No

Uraian

Kode

Satuan

Koefisien

1
A.

Tenaga Kerja

B.

Bahan

C
1

Peralatan
Sewa lahan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

15% x D

*) disesuaikan dengan waktu pencapaian ke lokasi pekerjaan yang mempertimbangkan kesulitan transportasi

Sewa Lahan
- Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha atau sesuai kebutuhan
- lama waktu penyewaan harus menghitung 1 bulan sebelum dan sesudah pelaksanaan pekerjaan
Harga Satuan
(Rp)

Sewa Lahan
- Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha atau sesuai kebutuhan
- lama waktu penyewaan harus menghitung 1 bulan sebelum dan sesudah pelaksanaan pekerjaan

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A.

Tenaga Kerja

B.

Bahan

C
1

Peralatan
Sewa lahan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Jumlah Harga Tenaga Kerja

LA.04c

ha-bulan

18

36,000,000.00
36,000,000.00
36,000,000.00
5,400,000.00
41,400,000.00

15% x D

Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.
Uraian

Kode

Satuan

Koefisien

1
A.

Harga Satuan
(Rp)
6

ha-bulan

Jumlah
(Rp)
7

Tenaga Kerja

2 - 10
Jumlah Harga Peralatan

15% x D

No

Uraian

Kode

Satuan

Koefisien

1
A.

Harga Satuan
(Rp)
6

Tenaga Kerja
Jumlah Harga Tenaga Kerja

B.
1
2

Bahan
Base Camp
Kantor

m2
m2

60
30

750,736.28
1,501,472.56

45,044,176.88
45,044,176.88

B.
1
2

Bahan
Base Camp
Kantor

m2
m2

50 - 300
10 - 60

3
4

Barak
Bengkel

m2
m2

30
20

1,501,472.56
1,501,472.56

45,044,176.88
30,029,451.25

3
4

Barak
Bengkel

m2
m2

10 - 60
20 - 100

Gudang, dan lain-lain

m2

40

1,501,472.56

60,058,902.50

Gudang, dan lain-lain

m2

20 - 100

Ruang Laboratorium (sesuai Gambar)

m2

20

1,501,472.56

30,029,451.25

Ruang Laboratorium (sesuai Gambar)

m2

10 - 50

set
set

1.00
1.00

..
..
Peralatan
Peralatan laboratorium
Perabotan & layanan

..
..

set
set

1.00
1.00

Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.

Jumlah Harga Tenaga Kerja

C
1
2

Jumlah
(Rp)

Jumlah Harga Bahan

2,000,000.00
Jumlah Harga Peralatan

No

Harga Satuan
(Rp)

Jumlah Harga Tenaga Kerja

Jumlah Harga Bahan


-

Jumlah Harga Bahan

Jumlah Harga Peralatan


Jumlah harga tenaga, bahan dan peralatan ( A + B + C )
Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Jumlah
(Rp)

1-5
1-5
1-5
Jumlah Harga Tenaga Kerja

Jumlah Harga Bahan

D
E
F

Harga Satuan
(Rp)

Jumlah Harga Bahan

255,250,335.63

40,000,000.00
12,500,000.00

40,000,000.00
12,500,000.00

Jumlah Harga Bahan


C
1
2

Peralatan
Peralatan laboratorium
Perabotan & layanan

Jumlah
(Rp)
7

AHSP.Pus Air.188

Jumlah Harga Peralatan


D
E
F
LA.04d

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

52,500,000.00

Jumlah Harga Peralatan

82,529,451.25
12,379,417.69
94,908,868.94

15% x D

D
E
F

Kebutuhan lain-lain
No
1
A.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

15% x D

Kebutuhan lain-lain
Uraian

Kode

Satuan

Koefisien

Harga Satuan
(Rp)
6

Jumlah
(Rp)

No

1
A.

Tenaga Kerja

Uraian

Kode

Satuan

Koefisien

Jumlah Harga Tenaga Kerja


B.
1
2
3
4
5

Bahan
Perkuatan jalan yang dilalui
Perkuatan jembatan yang dilalui
Biaya pengaturan lalu lintas
Biaya transportasi peralatan *
Peralatan K3 **

Peralatan

LS
LS
LS
LS
LS

25,000,000.00
42,000,000.00
6,750,000.00
125,000,000.00
12,500,000.00

25,000,000.00
42,000,000.00
6,750,000.00
125,000,000.00
12,500,000.00

Jumlah Harga Bahan

211,250,000.00

LA.05

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
15% x D
Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah, volume dan berat peralatan yang diangkut
** Disesuaikan dengan jumlah pekerja dan jenis pekerjaannya

B.
1
2
3
4
5

Bahan
Perkuatan jalan yang dilalui
Perkuatan jembatan yang dilalui
Biaya pengaturan lalu lintas
Biaya transportasi peralatan *
Peralatan K3 **

Peralatan

LS
LS
LS
LS
LS
Jumlah Harga Bahan

LA.05b

211,250,000.00
31,687,500.00
242,937,500.00

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
15% x D
Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah, volume dan berat peralatan yang diangkut
** Disesuaikan dengan jumlah pekerja dan jenis pekerjaannya

Foto dokumentasi
1 Set foto dokumentasi menggunakan Camera

Jika menggunakan Camera dengan isi film selulosa


No

Jika menggunakan Camera dengan isi film selulosa

Uraian

Kode

Satuan

Koefisien

1
A.
1

Tenaga Kerja
Tukang foto

B.
1
2
3
4

Bahan
Film Selulosa isi 36
Cuci film
Foto printing
Foto Album

C
1

Peralatan
Kamera SLR

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Harga Satuan
(Rp)
6

Jumlah
(Rp)

No

L.02

OH

2
95,700.00
Jumlah Harga Tenaga Kerja

191,400.00
191,400.00

M.119c
M.119b
M.119d
M.119a

roll
roll
lbr
bh

3
3
300
6

225,000.00
165,000.00
450,000.00
450,000.00

E.16

Sewa-hari

75,000.00
55,000.00
1,500.00
75,000.00
Jumlah Harga Bahan

1,290,000.00

2
750,000.00
Jumlah Harga Peralatan

1,500,000.00
1,500,000.00
2,981,400.00
298,140.00
3,279,540.00

15% x D

Kode

Satuan

Koefisien

Tenaga Kerja
Tukang foto

B.
1
2
3

Bahan
CD copy soft file foto image
Foto printing
Foto Album

C
1

Peralatan
Kamera SLR

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

L.02

M.117
M.119d
M.119a

E.16

OH

Harga Satuan
(Rp)
6

2
95,700.00
Jumlah Harga Tenaga Kerja

bh
lbr
bh

3
300
6

Sewa-hari

Kode

Satuan

Koefisien

L.02

OH

M.119c
M.119b
M.119d
M.119a

roll
roll
lbr
bh

Tenaga Kerja
Tukang foto

B.
1
2
3
4

Bahan
Film Selulosa isi 36
Cuci film
Foto printing
Foto Album

C
1

Peralatan
Kamera SLR

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Harga Satuan
(Rp)

Jumlah
(Rp)

2
Jumlah Harga Tenaga Kerja

1-3
1-3
100 - 350
3-9

E.16

Sewa-hari

2
Jumlah Harga Peralatan

15% x D

1 Set foto dokumentasi menggunakan Camera Digital tanpa Film


Menggunakan camera digital, untuk dokumentasinya dg CD dan album foto

Uraian

1
A.
1

Uraian

1
A.
1

Jumlah Harga Bahan

1 Set foto dokumentasi menggunakan Camera Digital tanpa Film


Menggunakan camera digital, untuk dokumentasinya dg CD dan album foto
No

Jumlah Harga Peralatan

Foto dokumentasi
1 Set foto dokumentasi menggunakan Camera

LA.05a

Jumlah
(Rp)

Jumlah Harga Tenaga Kerja

Jumlah Harga Peralatan


D
E
F

Harga Satuan
(Rp)

Tenaga Kerja

Jumlah
(Rp)

No

7
191,400.00
191,400.00

10,000.00
1,500.00
75,000.00
Jumlah Harga Bahan

30,000.00
450,000.00
450,000.00
930,000.00

2
250,000.00
Jumlah Harga Peralatan

500,000.00
500,000.00
1,621,400.00
243,210.00
1,864,610.00

15% x D

Harga Satuan
(Rp)

Jumlah
(Rp)

Uraian

Kode

Satuan

Koefisien

L.02

OH

2
Jumlah Harga Tenaga Kerja

M.117
M.119d
M.119a

bh
lbr
bh

1-3
120 - 360
LS
Jumlah Harga Bahan

1
A.
1

Tenaga Kerja
Tukang foto

B.
1
2
3

Bahan
CD copy soft file foto image
Foto printing
Foto Album

C
1

Peralatan
Kamera SLR

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

E.16

Sewa-hari

7
-

2
Jumlah Harga Peralatan

15% x D

LA.06

Test bahan dan pengujian mutu pekerjaan


(Diambil dari Pekerjaan Geoteknik, Beton dan Mortar Pasangan)

Test bahan dan pengujian mutu pekerjaan


(Diambil dari Pekerjaan Geoteknik, Beton dan Mortar Pasangan)

LA.07
1)

Penggambaran
Peta situasi atau peta steak out bangunan
Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1

Penggambaran
Peta situasi atau peta steak out bangunan
Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1

LA.07a

No

Uraian

Kode

Satuan

Koefisien

1
A.
1
2

Tenaga Kerja
Drafter CAD
Desain engineer

L.14
L.15

OH
OH

B.

Bahan

C
1
2

Peralatan
Sewa komputer
Sewa scanner ukuran A4

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Harga Satuan
(Rp)
6

1.00
95,700.00
0.5
680,000.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
95,700.00
340,000.00
435,700.00

LA.07b

sewa-bulan
sewa-bulan

0.04
1,000,000.00
0.025
250,000.00
Jumlah Harga Peralatan

Kode

Satuan

Koefisien

Tenaga Kerja
Drafter CAD
Desain engineer

0
0

OH
OH

1.00
0.5
Jumlah Harga Tenaga Kerja

B.

Bahan

C
1
2

Peralatan
Sewa komputer
Sewa scanner ukuran A4

0
0

sewa-bulan
sewa-bulan

0.04
0.025
Jumlah Harga Peralatan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi bentuk gambar ukuran A1
No

Uraian

Kode

Satuan

Koefisien

1
A.
1
2

Tenaga Kerja
Drafter
Desain engineer

B.
1
2
3

Bahan
Kertas HVS atau kalkir (A1)
Tinta Rapido
Pena Rapido

Peralatan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

L.14
L.15

M.125.b
M.143b
M.134

OH
OH

Harga Satuan
(Rp)
6

1.25
95,700.00
0.1
680,000.00
Jumlah Harga Tenaga Kerja

lbr
bh
bh

1.2
0.05
0.01

Jumlah
(Rp)

119,625.00
68,000.00
187,625.00
2,220.00
2,000.00
750.00
4,970.00

Jumlah Harga Peralatan

LA.07c

LA.08
LA.08a

Uraian

Kode

Satuan

Koefisien

1
A.
1

Tenaga Kerja
Operator printer

L.16

OH

0.08

77,000.00
Jumlah Harga Tenaga Kerja

6,160.00
6,160.00

B.
1
2

Bahan
Kertas HVS atau kalkir
Tinta printer/plotter

M.125.b
M.143a

m2
set

0.3
0.05

555.00
1,750.00
2,305.00

C
1
2

Peralatan
Sewa komputer
Sewa scanner ukuran A4

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

1,850.00
35,000.00
Jumlah Harga Bahan

0.001
1,000,000.00
0.01
250,000.00
Jumlah Harga Peralatan

1,000.00
2,500.00
3,500.00
11,965.00
1,794.75
13,759.75

15% x D

Copy atau penggandaan buku/kontrak/laporan


Fotocopy dan jilid

No

Uraian

2
Lain-lain
Fotocopy kertas A4
Menjilid
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah halaman
LA.08b

Sewa-bulan
Sewa-bulan

Kode

Satuan

Koefisien

5*

M.120.b
M.127.c

halaman
buah

Harga Satuan
(Rp)
6
250.00
13,500.00

200.00
1.00

15% x D

Jumlah
(Rp)
7
50,000.00
13,500.00
27,000.00
4,050.00
31,050.00

1 set As built drawing (reduce dan copy kalkir serta blue/black print)
Uraian

Kode

Satuan

Koefisien

1
A

5*

M.120.a

lembar

M.137.a

lembar

M.137.b
M.114.a
M.114.b
M.114.c
M.127.d
M.127.e
M.127.f

lembar
lembar
lembar
lembar
buah
buah
buah

copy kalkir reduce z2%

blue/black print Ac
blue/black print A2
blue/black print A3
Menjilid A1
Menjilid A2
Menjilid A3
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan per - set ( D + E )
* Jumlah exemplar/lembar disesuaikan dengan kebutuhan

Uraian

Kode

Satuan

Koefisien

0
0

OH
OH

0
0
0

lbr
bh
bh

1
A.
1
2

Tenaga Kerja
Drafter
Desain engineer

B.
1
2
3

Bahan
Kertas HVS atau kalkir (A1)
Tinta Rapido
Pena Rapido

Peralatan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Harga Satuan
(Rp)

Jumlah
(Rp)

1.25
0.1
Jumlah Harga Tenaga Kerja
1.2
0.05
0.01

Jumlah Harga Bahan

0
-

15% x D

No

Uraian

Kode

Satuan

Koefisien

1
A.
1

Tenaga Kerja
Operator printer

OH

B.
1
2

Bahan
Kertas HVS atau kalkir
Tinta printer/plotter

0
0

m2
set

C
1
2

Peralatan
Sewa komputer
Sewa scanner ukuran A4

0
0

Sewa-bulan
Sewa-bulan

D
E
F

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )

Harga Satuan
(Rp)

Jumlah
(Rp)

Jumlah Harga Tenaga Kerja

0.08

0.3
0.05

Jumlah Harga Bahan

0.001
0.01
Jumlah Harga Peralatan

15% x D

Copy atau penggandaan buku/kontrak/laporan


Fotocopy dan jilid

No

Uraian

2
Lain-lain
Fotocopy kertas A4
Menjilid
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan ( D + E )
* Disesuaikan dengan jumlah halaman

Kode

Satuan

Koefisien

5*

0
0

halaman
buah

Harga Satuan
(Rp)

Jumlah
(Rp)

7
-

200.00
1.00

15% x D

1 set As built drawing (reduce dan copy kalkir serta blue/black print)

No

Lain-lain
Copy kalkir Ac
copy kalkir reduce z1%

Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
Jumlah
(Rp)

No

M.139.a
M.139.b

Jumlah Harga Peralatan

Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1

15% x D

0
192,595.00
28,889.25
221,484.25

Harga Satuan
(Rp)

Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi bentuk gambar ukuran A1
No

1,850.00
40,000.00
75,000.00
Jumlah Harga Bahan

15% x D

Jumlah Harga Bahan


40,000.00
6,250.00
46,250.00
481,950.00
72,292.50
554,242.50

15% x D

Jumlah
(Rp)

Uraian

1
A.
1
2

Jumlah Harga Bahan


M.139.a
M.139.b

Harga Satuan
(Rp)

No

Harga Satuan
(Rp)

Jumlah
(Rp)

40

6,500.00

260,000.00

40

16,500.00

660,000.00

40
40
40
40
1
1
1

12,500.00
2,600.00
2,000.00
1,250.00
17,500.00
11,500.00
6,750.00

500,000.00
104,000.00
80,000.00
50,000.00
17,500.00
11,500.00
6,750.00
1,689,750.00
253,462.50
1,943,212.50

15% x D

Ac adalah ukuran kertas gambar seperti A0, A1, A2.................dst


m
Jumlah penggandaan
contoh m = 20 kali
n
Jumlah buku/jilid
contoh n = 10 buah atau jilid
o
Jumlah lembar
contoh
perobuku/jilid
= 150 halaman, bisa saja tiap buku berbeda jumlah halamannya

Harga Satuan
(Rp)

Jumlah
(Rp)

No

Uraian

Kode

Satuan

Koefisien

1
A

5*

lembar

40

lembar

40

0
0
0
0
0
0
0

lembar
lembar
lembar
lembar
buah
buah
buah

40
40
40
40
1
1
1

Lain-lain
Copy kalkir Ac
copy kalkir reduce z1%
copy kalkir reduce z2%

blue/black print Ac
blue/black print A2
blue/black print A3
Menjilid A1
Menjilid A2
Menjilid A3
A Jumlah
B Overhead & profit (Contoh 15%)
C Harga satuan pekerjaan per - set ( D + E )
* Jumlah exemplar/lembar disesuaikan dengan kebutuhan

15% x D

Ac adalah ukuran kertas gambar seperti A0, A1, A2.................dst


m
Jumlah penggandaan
contoh m = 20 kali
n
Jumlah buku/jilid
contoh n = 10 buah atau jilid
o
Jumlah lembar contoh
per buku/jilid
o = 150 halaman, bisa saja tiap buku berbeda jumlah halamannya

AHSP.Pus Air.189
z1
z2

LA.09
LA.09a

presentase reduksi ukuran


presentase reduksi ukuran

contoh z1= 50% dari A1 ke A2


contoh z2= 25% dari A2 ke A4

z1
z2

1 m2 Pengangkatan Gulma Terapung


Secara Manual

No

Uraian

Kode

Satuan

Koefisien

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

L.01
L.04

OH
OH

Bahan

Peralatan

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

0.030
75,900.00
0.003
95,700.00
Jumlah Harga Tenaga Kerja

2,277.00
287.10
2,564.10

Jumlah Harga Bahan

Jumlah Harga Peralatan

LA.09b

2,564.10
384.62

15% x D

2,948.72

Secara Mekanis

No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

0.0040
75,900.00
0.0004
95,700.00
Jumlah Harga Tenaga Kerja

E.39
E.44

LS
sewa-hari
bh

0.0001
5,000,000
0.0001
525,000.00
0.0001
3,250,000.00
Jumlah Harga Peralatan

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2
3

Peralatan
Mobilisasi peralatan
Speed boat, motor 10 HP
Trawl diameter lubang 5mm

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)

Harga Satuan Pekerjaan per - m2 (D+E)

Jumlah
(Rp)
7
303.60
38.28
341.88

Jumlah Harga Bahan

LA.10
LA.10a

500.00
52.50
325.00
877.50
1,219.38
182.91

15% x D

1,402.29

1 m3 Pengangkatan Gulma Padat, ketebalan 25cm


Secara Manual

No
1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

Peralatan

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

Harga Satuan
(Rp)
6

0.500
75,900.00
0.050
95,700.00
Jumlah Harga Tenaga Kerja

Jumlah
(Rp)
7
37,950.00
4,785.00
42,735.00

Jumlah Harga Bahan


Jumlah Harga Peralatan

LA.10b

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

15% x D

42,735.00
6,410.25
49,145.25

Secara Mekanis

No

Harga Satuan
(Rp)

Uraian

Kode

Satuan

Koefisien

L.01
L.04

OH
OH

0.100
75,900.00
0.010
95,700.00
Jumlah Harga Tenaga Kerja

E.11.a
E.37.a

LS
sewa-hari
sewa-hari

0.0001
15,000,000
0.0260
168,000.00
0.0260
107,142.86
Jumlah Harga Peralatan

1
A
1
2

Tenaga Kerja
Pekerja
Mandor

Bahan

C
1
2
3

Peralatan
Mobilisasi peralatan
Exavator
Ponton

D
E

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


Overhead & profit (Contoh 15%)

Harga Satuan Pekerjaan per - m3 (D+E)

Jumlah Harga Bahan

15% x D

Jumlah
(Rp)
7
7,590.00
957.00
8,547.00
1,500.00
4,368.00
2,785.71
8,653.71
17,200.71
2,580.11
19,780.82

presentase reduksi ukuran


presentase reduksi ukuran

contoh z1= 50% dari A1 ke A2


contoh z2= 25% dari A2 ke A4

AHSP.Pus Air.190

AHSP.Pus Air.191

AHSP.Pus Air.192

AHSP.Pus Air.193

AHSP.Pus Air.194

AHSP.Pus Air.195

AHSP.Pus Air.196

Pekerjaan Rawa
L.14

Pekerjaan Airtanah
L.15

Pekerjaan Air Baku


L.16

PP.01

Pengadaan dan pemasangan GIP dia. 100mm


No

Uraian

1
A
1
2
3

2
Tenaga Kerja
Pekerja
Tukang pipa
Mandor

B
1
2

Bahan
GIP dia. 4"
Asesories

Peralatan

Sewa Tripod/Tackel &


handle crane 2 T

Kode

Satuan

Koefisien

L.01
L.02
L.04

OH
OH
OH

M.106.h

Harga Satuan
(Rp)
6

0.4180
75,900.00
0.3470
95,700.00
0.0420
95,700.00
Jumlah Harga Tenaga Kerja
1.02

155,600.00

Jumlah Harga Bahan

E.45

Sewa-hari

D
E

0.0500
450,000.00
Jumlah Harga Peralatan
Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
Overhead + Profit (Contoh 15%)
15% x D

Harga Satuan Pekerjaan per - m' (D+E)

Jumlah
(Rp)
7
31,726.20
33,207.90
4,019.40
68,953.50
158,712.00
47,613.60
158,712.00

22,500.00
22,500.00
250,165.50
37,524.83
287,690.33

HSD.Pus Air.199

LAMPIRAN A.9
CONTOH DAFTAR HARGA SATUAN DASAR TENAGA KERJA,
BAHAN DAN ALAT, PROVINSI KALIMANTAN SELATAN 2014
No

Uraian

Harga
Satuan Dasar
( Rp. )
5

UPAH TENAGA KERJA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Pekerja
Tukang
Kepala Tukang
Mandor
Juru ukur, operator/mekanik alat berat
Pembantu Juru ukur & operator/mekanik alat berat
Akhli muda
Akhli madya
Akhli utama
Supir truck
Supir kendaraan < 2 ton (termasuk sedan)
Kenek
Penjaga malam/Satpam
Drafter CAD/manual
Desain Engineer
Operator komputer/printer/ploter

II

BAHAN / MATERIAL

KELOMPOK AIR, TANAH, BATU DAN SEMEN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Abu Batu
Air
Bahan Aditif (Caldbon, Strorox, dll)
Batu bata / merah bakar kelas I
Batu bata / merah bakar kelas II
Batu bata / merah bakar kw biasa
Batu bata / merah bakar pres
Batu bata / merah oven (Klingker)
Batu / batu kali/ batu belah
Batu brojol (Untuk bronjong)
Batu candi
Batu muka
Bentonit
Beton Ready Mixed K-175
Beton Ready Mixed K-200
Beton Ready Mixed K-225
Beton Ready Mixed K-250
Beton Ready Mixed K-275
Beton Ready Mixed K-300
Beton Ready Mixed K-325
Beton Ready Mixed K-350
Beton Ready Mixed K-375

75,900.00
95,700.00
95,700.00
95,700.00
75,900.00
63,800.00
450,000.00
650,000.00
1,000,000.00
95,700.00
70,000.00
63,800.00
57,200.00
95,700.00
680,000.00
77,000.00

150,000.00
50.00
40,000.00
1,000.00
800.00
700.00
1,000.00
17,000.00
231,000.00
198,000.00
140,000.00
100,000.00
8,500.00
875,000.00
938,000.00
958,000.00
970,500.00
978,000.00
1,015,000.00
1,029,000.00
1,052,500.00
1,076,000.00

Ket.
6

HSD.Pus Air.200
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

Beton Ready Mixed K-400


Beton Ready Mixed K-425
Beton Ready Mixed K-450
Beton Ready Mixed K-500
Buis Beton dia 30 cm tanpa tulang, pjg 0,5m
Buis Beton dia 40 cm tanpa tulang, pjg 0,5m
Buis Beton dia 50 cm tanpa tulang, pjg 0,5m
Buis Beton dia 60 cm tanpa tulang, pjg 0,5m
Buis Beton grevel dia 20 cm tanpa tulang, pjg 1 m
Buis Beton grevel dia 30 cm tanpa tulang, pjg 1 m
Buis Beton grevel dia 40 cm tanpa tulang, pjg 1 m
Kapur
Kerikil/Koral/Agregat Beton
Lempengan rumput
Pasir beton
Pasir pasang kali/gunung
Pasir teras
Pasir urug
Portland Cement (PC 50 kg / zak)
Sirtu
Tanah liat
Tanah urug di lokasi
Tanah urugan di Borrrow Area
Tiang pancang beton dia 20 cm
Tiang pancang beton dia 30 cm
Tiang Pancang beton tulang 30x30 cm
Tiang Pancang beton tulang 40x40 cm
Tiang pancang beton ukuran 30x30 cm
Tiang pancang beton ukuran 40x40 cm
Turap beton pre-cast ukuran 30x12 cm
Turap beton pre-cast ukuran 40x20 cm
Turap beton tulang pre-cast 30x12 cm
Turap beton tulang pre-cast 40x15 cm
Turap beton tulang pre-cast 50x22 cm

KELOMPOK KAYU

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Bambu dia 2", pjg 6m


Bambu dia 3 - 4", pjg 6-8m
Dolken kayu galam dia 10 cm, pjg 3m
Dolken kayu galam dia 8 cm, pjg 3m
Dolken kayu klas III 5 7 cm, pjg 3m
Dolken kayu klas III 7 10 cm, pjg 3m
Ijuk tebal 5 cm
Kayu balok klas 2 (Kamper Banjar)
Kayu balok klas 2 (Kamper Medan/Borneo Super)
Kayu balok klas 2 (Kamper Samarinda)
Kayu balok klas 3 (Albasia)
Kayu gelondongan diameter 20cm
Kayu papan bekisting kelas 3
Kayu papan klas 2 (Kamper Banjar)
Kayu papan klas 2 (Kamper Medan/Borneo Super)
Kayu papan klas 2 (Kamper Samarinda)

1,085,500.00
1,098,200.00
1,148,200.00
1,200,000.00
41,250.00
65,450.00
96,800.00
115,500.00
20,000.00
40,000.00
60,000.00
30,000.00
200,000.00
2,000.00
200,000.00
200,000.00
270,000.00
200,000.00
87,000.00
200,000.00
90,000.00
45,000.00
25,000.00
50,000.00
110,000.00
315,000.00
550,000.00
135,000.00
240,000.00
55,000.00
120,000.00
125,000.00
210,000.00
385,000.00

13,900.00
16,200.00
6,900.00
5,000.00
18,000.00
24,000.00
10,000.00
4,158,000.00
4,158,000.00
4,158,000.00
1,400,000.00
350,000.00
1,500,000.00
4,158,000.00
4,158,000.00
4,158,000.00

HSD.Pus Air.201
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Kayu papan klas 3 (Albasia)


Kayu untuk cerucuk dia 2", pjg 2,5 m
Kayu untuk cerucuk dia 3", pjg 2,5 m
Kayu untuk cerucuk dia 4", pjg 2,5 m
Kayu untuk cerucuk dia 6", pjg 2,5 m
Kayu usuk/kaso klas 2 (Kamper Medan/B. Super)
Kayu usuk/kaso klas 3 (Albasia)
Multiplek tebal 0,6 cm
Multiplek tebal 0,9 cm
Multiplek tebal 1,2 cm
Multiplek tebal 1,8 cm
Seseg Bambu
Teakwood 3mm 120 x 240
Teakwood 3mm uk. Pintu
Teakwood 4mm 120 x 240
Teakwood 4mm uk. Pintu
Tiang Pancang kayu dia 8-10 cm
Tiang Pancang kayu dia 20 cm
Triflex t=3mm
Triflex t=4mm
Tusuk bambu

KELOMPOK LOGAM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Baja Pelat tebal 2 mm


Baja Pelat tebal 3 mm
Baja Pelat tebal 5 mm
Baja Pelat tebal 6 mm
Baja Pelat tebal 8 mm
Baja Pelat setrip
Baja Profil IWF Ex. Jepang
Baja Profil IWF Ex. DN SII
Baja Profil CNP
Baja Profil DN SII
Baja Profil Ex. Luar Negeri
Baja Profil INP
Baja Profil siku
Baja Profil UNP
Baja Tulangan U 32 Ulir
Baja Tulangan U 39 Ulir
Baja Tulangan U 42 Ulir
Baja Tulangan U 24 (besi beton biasa) Polos
Baja Tulangan U 32 Polos
Baut dia 10 mm panjang 5 cm
Baut dia 10 mm panjang 10 cm
Baut dia 12 mm panjang 5 cm
Baut dia 12 mm panjang 10 cm
Baut dia 12 mm panjang 20 cm
Dynabolt/raamset dia 8 mm panjang 4-5 cm
Kabel baja/sling
Kabel prestress
Kawat beton / Bendrat
Kawat bronjong dia 2 - 4 mm
Kawat las listrik
Kawat seng 3mm
Paku biasa 1 cm - 3 cm

1,500,000.00
25,000.00
55,000.00
85,000.00
155,000.00
5,870,000.00
1,400,000.00
80,000.00
128,000.00
172,000.00
222,000.00
25,000.00
146,000.00
103,000.00
146,000.00
103,000.00
12,000.00
42,000.00
56,000.00
60,000.00
1,000.00

157,000.00
235,500.00
392,500.00
475,000.00
628,000.00
12,000.00
15,000.00
14,000.00
16,500.00
12,000.00
17,500.00
16,500.00
12,000.00
16,500.00
11,000.00
13,000.00
16,000.00
6,833.33
10,000.00
2,200.00
3,200.00
5,600.00
8,600.00
10,500.00
5,000.00
30,000.00
36,500.00
1,931.60
19,350.00
24,750.00
25,000.00
23,100.00

HSD.Pus Air.202
33
34
35
36
37
38
39
40
41

42

43

44

45

46

47

48

49

50

51

52

Paku biasa 4 cm - 7 cm
Paku seng gelombang
Pintu Angkat Type I.B = 0,30 m
Pintu Angkat Type I.B = 0,40 m
Pintu Angkat Type I.B = 0,50 m
Pintu Angkat Type II.B = 0,30 m
Pintu Angkat Type II.B = 0,40 m
Pintu Angkat Type II.B = 0,50 m
Pintu Sorong Baja (satu draad) stang
b = 0,30 , h = 0,30
b = 0,30 , h = 0,50
b = 0,30 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,40 , h = 0,30
b = 0,40 , h = 0,50
b = 0,40 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,50 , h = 0,30
B = 0,50, h = 0,50
b = 0,50 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,60 , h = 0,30
b = 0,60 , h = 0,50
b = 0,60 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 0,70 , h = 0,30
b = 0,70 , h = 0,50
b = 0,70 , h =1,00
Pintu Sorong Baja (satu draad) stang
b = 0,80, h = 0,30
b = 0,80, h = 0,50
b = 0,80, h =1,00
Pintu Sorong Baja (satu draad) stang
b = 0,90 , h = 0,30
b = 0,90 , h = 0,50
b = 0,90, h = 1,00
Pintu Sorong Baja (satu draad) stang
b =1,00 , h = 0,30
b =1,00 , h = 0,50
b =1,00 , h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 1,50, h = 0,30
b = 1,50, h = 0,50
b = 1,50, h = 1,00
Pintu Sorong Baja (satu draad) stang
b = 2.00 h = 0.30
b = 2.00 h = 0.50
b = 2,00, h = 1,00
Pintu Sorong Baja (dua draad) stang
b = 1,20, h = 1,00
b = 1,20, h = 1,50
b = 1,20, h = 2.00
Pintu Sorong Baja (dua draad) stang
b = 1,30, h = 1,00
b = 1,30, h = 1,50

12,500.00
14,500.00
1,500,000.00
1,800,000.00
2,700,000.00
2,100,000.00
2,700,000.00
3,300,000.00
7,300,000.00
8,200,000.00
10,400,000.00
7,700,000.00
8,600,000.00
11,000,000.00
8,200,000.00
9,100,000.00
11,700,000.00
8,450,000.00
9,550,000.00
12,300,000.00
8,850,000.00
10,100,000.00
12,900,000.00
9,300,000.00
10,500,000.00
13,500,000.00
9,700,000.00
11,000,000.00
14,150,000.00
10,350,000.00
11,600,000.00
14,800,000.00
12,150,000.00
13,800,000.00
17,950,000.00
14,200,000.00
16,150,000.00
20,950,000.00
72,500,000.00
77,100,000.00
81,100,000.00
74,600,000.00
78,450,000.00

HSD.Pus Air.203
b = 1,30, h = 2,00
53 Pintu Sorong Baja (dua draad) stang
b = 1,40, h = 1,00
b = 1,40, h = 1,50
b = 1,40, h = 2,00
54 Pintu Sorong Baja (dua draad) stang
b = 1,50, h = 1,00
b = 1,50, h = 1,50
b = 1,50, h = 2,00
55 Pintu Sorong Baja (dua draad) stang
b = 1,60, h = 1,00
b = 1,60, h = 1,50
b = 1,60, h = 2,00
56 Pintu Sorong Baja (dua draad) stang
b = 1,70, h = 1,00
b = 1,70, h = 1,50
b = 1,70, h = 2,00
57 Pintu Sorong Baja (dua draad) stang
b = 1,80, h = 1,00
b = 1,80, h = 1,50
b = 1,80, h = 2,00
58 Pintu Sorong Baja (dua draad) stang
b = 1,90, h = 1,00
b = 1,90, h = 1,50
b = 1,90, h = 2,00
59 Pintu Sorong Baja (dua draad) stang
b = 2,00, h = 1,00
b = 2,00, h = 1,50
b = 2,00, h = 2,00
60 Seng gelombang uk. 0,9 x 1,8, t=0,02
61 Seng gelombang uk. 0,9 x 1,8, t=0,025
62 Seng gelombang uk. 0,9 x 1,8, t=0,03
63 Seng gelombang uk. 0,9 x 1,8, t=0,05
64 Seng pelat BJLS-30 lebar 0,6 m'
65 Seng pelat BJLS-30 lebar 0,9 m'
66 Seng pelat lebar 0,9 m' t=0,02
67 Seng pelat lebar 0,9 m' t=0,025
68 Seng pelat lebar 0,9 m' t=0,03
69 Seng pelat lebar 0,9 m' t=0,04
70 Seng pelat lebar 0,9 m' t=0,05
71 Stang besi polos diameter 12 mm
72 Stang besi ulir diameter 16 mm
73 Stang besi ulir diameter 16 mm + gear
74 Stang besi ulir diameter 20 mm
75 Stang ulir diameter 20 mm + gear
76 Tiang Pancang Baja dia 30 cm
77 Tiang Pancang baja kotak 30 x 30 cm
78 Turap baja profi larsen lebar 350 mm
83 Wiremesh untuk pelat lantai beton
84 Wiremesh utk bronjong dia 6 mm (buatan pabrik)
85 Wiremesh utk bronjong dia 8 mm (buatan pabrik)
86 Wiremesh utk bronjong dia 10 mm (buatan pabrik)
D

KELOMPOK PIPA

Pipa Black Steel dia 1/2"

83,200,000.00
75,800,000.00
82,150,000.00
90,050,000.00
77,050,000.00
83,650,000.00
94,050,000.00
78,250,000.00
85,150,000.00
95,900,000.00
79,450,000.00
83,950,000.00
89,650,000.00
80,650,000.00
85,400,000.00
91,250,000.00
81,850,000.00
86,750,000.00
92,900,000.00
83,100,000.00
105,250,000.00
112,850,000.00
36,000.00
50,000.00
50,000.00
60,200.00
30,000.00
45,000.00
22,000.00
26,250.00
29,000.00
29,000.00
35,000.00
55,000.00
125,000.00
175,000.00
250,000.00
300,000.00
500,000.00
575,000.00
140,000.00
24,750.00
26,350.00
26,350.00
26,350.00

1,600.00

HSD.Pus Air.204
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Pipa Black Steel dia 3/4"


Pipa Black Steel dia 1"
Pipa Black Steel dia 1,5"
Pipa Black Steel dia 2,5"
Pipa Black Steel dia 2"
Pipa Black Steel dia 3"
Pipa Black Steel dia 4"
Pipa Black Steel dia 6"
Pipa Black Steel dia 8"
Pipa DCI dia 4"
Pipa DCI dia 6"
Pipa DCI dia 8"
Pipa DCI dia 10"
Pipa DCI dia 12"
Pipa DCI dia 14"
Pipa DCI dia 400mm
Pipa DCI dia 600mm
Pipa DCI dia 800mm
Pipa DCI dia 1000mm
Pipa DCI dia 1200mm
Pipa GI tebal Class dia 1/2"
Pipa GI Medium Class dia 1/2"
Pipa GI Medium Class dia 3/4"
Pipa GI Medium Class dia 1 1/2"
Pipa GI Medium Class dia 2"
Pipa GI Medium Class dia 2 1/2"
Pipa GI Medium Class dia 3"
Pipa GI Medium Class dia 4"
Pipa PVC dia. 20 mm S.10
Pipa PVC dia. 25 mm S.10
Pipa PVC dia. 32 mm S.10
Pipa PVC dia. 40 mm S.10
Pipa PVC dia. 50 mm S.10
Pipa PVC dia. 63 mm S.12.5
Pipa PVC dia. 75 mm S.12.5
Pipa PVC dia. 90 mm S.12.5
Pipa PVC dia. 110 mm S.12,5
Pipa PVC dia. 140 mm S.12,5
Pipa PVC dia. 160 mm S.12,5
Pipa PVC dia. 200 mm S.12,5
Pipa PVC dia. 225 mm S.12,5
Pipa PVC dia. 250 mm S.12,5
Pipa PVC dia. 315 mm S.12,5
Pipa PVC dia. 355 mm S.12,5
Pipa PVC dia. 400 mm S.12,5
Pipa PVC dia. 500 mm S.12,5
Pipa PVC dia. 630 mm S.12,5
Screen 4'' low carbon
Screen 6'' low carbon
Screen 8'' low carbon

III

KELOMPOK PERALATAN

1
2
3

Alat Hammer 0,5 - 1 ton


Alat Hammer 1 - 2 ton
Alat pancang + Hammer 1 ton

2,900.00
4,400.00
8,400.00
12,400.00
17,000.00
27,600.00
46,500.00
88,300.00
152,300.00
97,600.00
219,500.00
390,600.00
550,000.00
732,000.00
940,000.00
1,730,000.00
2,585,000.00
3,460,000.00
4,320,000.00
5,190,000.00
18,700.00
18,133.33
25,600.00
52,283.33
64,016.67
81,800.00
106,700.00
155,600.00
14,150.00
19,455.00
26,630.00
39,990.00
45,925.00
58,610.00
85,705.00
115,580.00
75,000.00
115,000.00
125,000.00
231,000.00
290,500.00
335,500.00
522,000.00
787,500.00
960,000.00
1,635,000.00
2,602,000.00
750,000.00
1,500,000.00
3,250,000.00

450,000.00
750,000.00
110,000.00

HSD.Pus Air.205
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Alat pancang + Hammer 2 ton


Alat penyambung tiang pancang beton
Alat penyambung turap beton
Alat penyambung tiang pancang dolken
Bodem
Bor listrik
Bulldozer 100-120 HP
Chainsaw
Crane 2.5 ton
Crane 5-10 ton
Crane > 10 ton
Dump truck 3,5 ton
Dump truck 5 ton
Drilling Rig
Ember
Excavator (standar)/Backhoe
Excavator (long arm)
Gergaji besi (mata gergaji)
Gunting pemotong baja
Jack hammer
Jack Stressing
Kamera SLR
Kayu Kasut
Kayu pemikul + tampar
Kereta dorong
Kotak adukan (dolak kayu)
Kuas
Kunci pembengkok tulangan (baja keras)
Las listrik 250 A diesel
Lift sampai dengan tinggi maksimum 12m
Linggis
Wheel Loader
Track Loader
Mesin Jahit Geotekstil
Mesin pancang kompresor udara 8 ton
Mesin pancang tenaga diesel 8 ton
Mesin pancang tenaga uap 8 ton
Molen (Concrete Mixer 0.125 m3)
Molen (Concrete Mixer 0.35 m3)
Pahat Beton (baja keras)
Palu/godam pemecah batu
Pemadat timbunan (vibro roller kecil/stamper)
Peneumatic Roller
Pick up (Mobil)
Pompa air diesel 5 KW; 3"
Pompa air diesel 10 KW
Pompa air diesel 20 KW
Pompa dan Conveyor Beton
Perahu
Ponton kecil
Ponton sedang
Ponton besar
Roller, Steel wheel
Roller, Tandem
Speedboat, Motor 10 HP

180,000.00
200,000.00
100,000.00
25,000.00
52,250.00
20,000.00
190,000.00
160,000.00
200,000.00
270,000.00
375,000.00
470,800.00
539,000.00
120,000.00
5,000.00
168,000.00
275,000.00
17,500.00
2,500,000.00
135,000.00
135,000.00
250,000.00
5,000.00
12,000.00
8,000.00
25,000.00
1,500.00
5,000.00
385,000.00
340,000.00
51,150.00
168,000.00
225,000.00
100,000.00
750,000.00
850,000.00
735,000.00
134,750.00
400,000.00
225,000.00
100,000.00
150,000.00
382,800.00
136,500.00
225,000.00
442,000.00
830,000.00
200,000.00
250,000.00
750,000.00
750,000.00
750,000.00
400,000.00
700,000.00
1,200,000.00

HSD.Pus Air.206
59
60
61
62
63
64
65
66
67
68
69
70
71
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Tang / alat pemotong kawat


Theodolit
Timbris
Tongkang 500 ton
Tongkang 1000 ton
Tongkang 2000 ton
Trawl diameter lubang 5mm
Tripod tinggi 5 m
Tusuk bambu
Vibrator beton (portable)
Vibro Roller
Water Tank
Waterpass

12,000.00
150,000.00
15,000.00
850,000.00
1,550,000.00
2,750,000.00
785,000.00
450,000.00
10,000.00
134,750.00
350,000.00
203,500.00
100,000.00

LAIN-LAIN
Ajir acuan tanaman
Asbes gelombang besar uk. 105 x 180, 5mm
Asbes gelombang kecil uk. 80 x 180, 4mm
Asbes uk 1 x 1 m2
Aspal Panas
Bensin/Premiun/BBM bersubsidi
Bensin/Premiun/BBM non subsidi
Bibit Mangrove
Blue/black print uk A1
Blue/black print uk A2
Blue/black print uk A3
Cat besi
Cat kayu
Cat meni
Cat tembok
Cetakan armor
Copy CD (soft file)
Cuka Bibit
Foto Album
Foto cuci film Selulosa Kimia
Foto Film Selulosa Kimia
Foto printing
Foto copy kalkir A1 ke kalkir
Foto copy kertas Letter, Legal, A4
Geo Listrik
Geotekstil A
Geotekstil B (Polyfelt, dll.)
Geotekstil C
Geotekstil tali
Geotekstil mesin jahit
Karung plastik / bagor
Karung goni/terpal
Kertas HVS 80 gr ukuran A0
Kertas HVS 80 gr ukuran A1
Kertas HVS 80 gr ukuran A2
Kertas HVS 80 gr ukuran A3
Kertas HVS 70 gr ukuran A4/legal/letter/B5
Kertas HVS 80 gr ukuran A4/legal/letter/B5
Kertas Kalkir 80 gr ukuran A0 (lebar 90 cm)
Kertas Kalkir 80 gr ukuran A1 (lebar 60 cm)

2,000.00
50,000.00
40,000.00
7,500.00
9,130.00
6,500.00
10,000.00
3,500.00
2,600.00
2,000.00
1,250.00
45,500.00
37,450.00
22,500.00
25,200.00
250,000.00
10,000.00
25,000.00
75,000.00
55,000.00
75,000.00
1,500.00
6,500.00
250.00
2,500,000.00
60,000.00
120,500.00
225,000.00
3,500.00
250,000.00
2,500.00
1,500.00
3,500.00
1,850.00
1,000.00
500.00
250.00
200.00
120,000.00
75,000.00

HSD.Pus Air.207
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Laburan meni / ter / solinem


Menjilid pakai kertas di lakban A4
Menjilid pakai kertas langsung A4
Menjilid pakai kertas langsung A4 + laminasi
Menjilid uk A1
Menjilid uk A2
Menjilid uk A3
Mimic panel untuk 6 channel pintu air
Minyak bekisting
Minyak tanah
Motor 2 KW 1350 rpm + pengkabelan
Motor 5 KW 1350 rpm + pengkabelan
Motor 10 KW 1350 rpm + pengkabelan
Olie mesin (Mesran 40 SAE)
Oli hidraulic
Oli transmisi
Pemotong Rumput
Pena Rapido
Perlengkapan ruang jaga meja kursi
Rakit
Reduksi kalkir A2 ke kertas A4
Reduksi kalkir dari A1 ke A2
Roda Dorong
Sewa Komputer utk drafting CAD
Sewa Scaner A4
Sewa Plotter uk. A1
Solar bersubsidi
Solar non subsidi
Tali pengikat/Tambang Nylon
Tinta Printer
Tinta Rapido (Hitam)
Waterstop PVC.150
Waterstop PVC.200
Waterstop PVC.270
Waterstop Rubber lebar 150mm - 200mm

7,500.00
7,500.00
10,000.00
13,500.00
17,500.00
11,500.00
6,750.00
120,000,000.00
40,000.00
7,150.00
10,000,000.00
40,000,000.00
100,000,000.00
30,250.00
37,500.00
38,500.00
1,000,000.00
75,000.00
1,000,000.00
300,000.00
16,500.00
12,500.00
75,000.00
1,000,000.00
250,000.00
5,000,000.00
5,500.00
10,800.00
2,500.00
35,000.00
40,000.00
75,000.00
90,000.00
115,000.00
125,000.00

ANALISA BIAYA SEWA ALAT


TIPE ALAT
HYDRAULIC EXCAVATOR
NO.

URAIAN ANALIS
ZX 60

1
2
3
4
5
6
7
a.
b.
c.
8
a.
b.
c.
9
a.

Power/ Tenaga
Umur Ekonomis
Jam Kerja per Tahun
Harga Pokok Alat
Harga Sisa
Harga Penyusutan
Lain-lain
Bunga Modal
Asuransi
Faktor Kerja Alat
Biaya Kepemilikan
Penyusutan
Bunga Modal
Asuransi
Biaya Operasional
Biaya BBM
Solar
Biaya Solar :
Oli Mesin

Biaya Oli Mesin :


Oli Transmisi

Biaya Oli Trasnmisi :


Oli Hidraulik

Biaya Oli Hidraulik :


Gemuk
Filter
b. Operator
c. Pembantu Operator
10
Biaya Pemeliharaan
Koefisien
11

Biaya Sewa / jam

12

Total Biaya/ Jam

(N)
(UE)
(h)
(HP)
(Hs)

60
5
2,000
600,600,000
60,060,000
540,540,000

PHONTOON
DUDUKAN
EXCAVATOR

PC100

HP
Thn.
Jam
Rp.
Rp.
Rp.

110
5
2000
850,000,000
85,000,000
765,000,000

HP
Thn
Jam
Rp.
Rp.
Rp.

(i)
(p)
(Etot)

10%
2%
0.6587

10%
2%
0.6587

(D)
(Bm)
(Ba)

54,054 Rp.
18,018 Rp.
3,604 Rp.

76,500 Rp.
25,500 Rp.
5,100 Rp.

S
C
S
T
C
S
T
C
S
T
S

(f)

(Rp.)

0.125
136,637
0.1300
0.0005
250
1,919
0.2230
0.0003
1,000
1,018
2.87500
0.00064
2,000
3,614
0.0006
1,366
35,884
10,843
9,114

Rp.

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

0.125
250,501
0.1300
0.0005
250
3,518
0.2230
0.0003
1,000
1,866
2.87500
0.00064
2,000
6,625
0.0006
2,505
131,574
10,843
9,114

4
2000
75,000,000
7,500,000
67,500,000

HP
Thn
Jam
Rp.
Rp.
Rp.

10%
2%
0.9000
8,438 Rp.
2,344 Rp.
469 Rp.

BULLDOZER

80
5
2000
330,000,000
33,000,000
297,000,000

HP
Thn
Jam
Rp.
Rp.
Rp.

10%
2%
0.6587

20
3
2000
50,000,000
5,000,000
45,000,000
10%
2%
0.6587

29,700 Rp.
9,900 Rp.
1,980 Rp.

7,500
1,667
333

Rp.
Rp.
Rp.
Rp.

0.125
45,546
0.1300
0.0005
250
640
0.2230
0.0003
1,000
339
2.87500
0.00064
2,000
1,205
0.0006
455
11,961
10,843
27,343

90%
8,438 Rp.

90%
29,700 Rp.

90%
7,500

49,000 Rp.

332,000 Rp.

115,000

Rp.

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

10,843 Rp.
18,229 Rp.

90%
54,054 Rp.

90%
76,500 Rp.

330,000 Rp.

600,000 Rp.

0.125
182,183
0.1300
0.0005
250
2,558
0.2230
0.0003
1,000
1,357
2.87500
0.00064
2,000
4,818
0.0006
1,822
47,845
10,843
9,114

Pickup

Rp.

Rp.

Rp.

Rp.

TIPE ALAT
HYDRAULIC EXCAVATOR
Pickup

Gerobak + motor

HP
Thn
Jam
Rp.
Rp.
Rp.

5
3
2000
20,000,000
2,000,000
18,000,000

HP
Thn
Jam
Rp.
Rp.
Rp.

10%
2%
0.6587
Rp.
Rp.
Rp.

Rp.

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

15
3
2000
150,000,000
15,000,000
135,000,000

HP
Thn
Jam
Rp.
Rp.
Rp.

10%
2%
0.6587

3,000 Rp.
667 Rp.
133 Rp.

0.125
11,386
0.1300
0.0005
250
160
0.2230
0.0003
1,000
85
2.87500
0.00064
2,000
301
0.0006
114
2,990
10,843
18,229

Klotok

Rp.

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

22,500 Rp.
5,000 Rp.
1,000 Rp.

0.125
34,159
0.1300
0.0005
250
480
0.2230
0.0003
1,000
254
2.87500
0.00064
2,000
903
0.0006
342
8,971
10,843
18,229

Rp.

Rp.

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

90%
3,000 Rp.

90%
22,500 Rp.

Rp.

51,000 Rp.

125,000 Rp.

Klotok
Jarak angkut
Kapasitas bak
Kecepatan angkut
Kecepatan kosong
Cycle time
- waktu angkut (isi)
- waktu kembali (kosong)
- Memuat
- Lain-lain
Kapasitas produksi

L
V
v1
v2

km
m3
km/jam
km/jam

15.000
5.00
20.00
30.00

16.000
5.00
###
###

17.000
5.00
20.00
30.00

T1
T2
T3
T4
Ts2
Q2

menit
menit
menit
menit
menit
jam/m3

45.00
30.00
231.00
1.00
307.00
1.02

48.00
32.00
231.00
###
312.00
1.04

51.00
34.00
231.00
1.00
317.00
1.06

You might also like